Loading...
HomeMy WebLinkAboutNCC211716_NOT Closeout Documents_20240402 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Catawba Project: Bethany Church Road Landfill Cap River basin: Catawba Person financially responsible:Catawba County-Mick Berry,County Manager Project#: CATAW-2021-010 Address: 100 A South West Boulevard,Post Office Box 389,Newton,NC 28658 1. Project Location: Bethany Church Road,Newton Pictures: No 2. Weather and soil conditions: Sunny,Workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Nathalie Queen Title: County Representative Inspection report: Sent Report Date given/sent: March 25,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01,2019,under the old permit system,are not required to take any additional actions.The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Ian Callaway Others present: Date of inspection: March 21,2024 Time arriving on site: 10:00 AM Time leaving site: 11:00 AM cc: