Loading...
HomeMy WebLinkAboutNCC232798_NOT Closeout Documents_20240401 Sedimentation/Construction Storm\\ater Inspection Report North Carolina Department of Environmental Quality Land Resources:450 W.Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336)776-9800 County: Davidson Project: Cypress Grove River basin: Yadkin-PeeDee Person financially responsible:PoP Homes-GSO LLC-Daniel Everhart.Market Project#: DAVID-2024-010 Manager Address: 464 Rickard Drive,Winston-Salem,NC 27101 1. Project Location: Jubilee Road,Linwood Pictures: No 2. Weather and soil conditions: Sunny,workable soil conditions Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No if Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Daniel Everhart Title: Inspection report: Sent Report Date given/sent: March 22,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGO 1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Please reply within 30 days if you decide to make this project active again. Reported by: Jalen Hairston Others present: Date of inspection: March 20,2024 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM cc: ROY COOPER Governor North Carolina Elizabeth Biser Environmental Quality Secretary WILLIAM E.TOBY VINSON,JR. Interim Director SEDIMENTATION INSPECTION REPORT Dear Sir or Madam: Enclosed is a copy of the inspection report, which was prepared following an onsite inspection of the referenced project. This report is intended to provide you with information concerning the status of the project as it relates to compliance with the North Carolina Sedimentation Pollution Act of 1973. Please review this report carefully, as it may contain corrective actions needed or comments, which will assist you in meeting the required standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact Jalen Hairston, 336-776-9656 or jalen.hairston@deq.nc.gov, if you have any questions. Enclosure: Sedimentation Inspection Report Cie North Carolina Department of Environmental Quality I Division of Energy.Minerals&Land Resources Winston-Salem Regional Office r 450 West Hanes Mill Road.Suite 300/Winston-Salem,North Carolina 27105 (336)776.9800