HomeMy WebLinkAboutNCC232316_NOT Closeout Documents_20240328 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Catawba Project: E Maiden Rd&Hwy 150 Gravity River basin: Catawba
Person financially responsible:Catawba County-Mick Berry,County Manager Project#: CATAW-2022-008
Address: 100 A South West Boulevard,Post Office Box 389,Newton,NC 28658
1. Project Location: Highway 150,Maiden
Pictures: No
2. Weather and soil conditions: Sunny Workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Nathalia Queen Title: Project manager
Inspection report: Gave Report Date given/sent: March 25,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
All projects that have been approved prior to April 01,2019,under the old permit system,are
not required to take any additional actions.The stormwater permit is terminated at the same
time as the termination of this erosion control permit.
Reported by: Ian Callaway Others present:
Date of inspection: March 21,2024 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM
cc: