HomeMy WebLinkAboutNCC221909_MODIFICATION Supporting Documents_20240322 ROY COOPER s
Grn>enror
ELIZABETH S.BISER
Secretary { _
BRIAN WRENN
Director NORTH CAROLINA
Environmental Quality
August 19, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
DR Horton, Inc.
Attention: Jonathan Cook, Land Acq.
4150 Mendenhall Oaks Pkwy
High Point,NC 27265
RE: Project Name: Collybrooke Farm—Phase 1
Project ID: ROCKI-2022-011
Acres Approved: 53.4
County: Rockingham
City: New Bethel
Address: NC Hwy 65
River Basin: Roanoke
Stream Classification: C
Submitted By: Hugh Creed Associates, Inc. P.A.
Date Received by LQS: August 5, 2022
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed atdeq.nc.gov/NCGOI. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 3001 Winston-Salem,North Carolina 27105
336-776-9800
OEM
Letter of Approval with Modifications
D.R. Horton, Inc.
August 19, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Collybrooke Farm—Phase 1
Project ID: ROCKI-2022-011
County: Rockingham
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. This review was for the additional 3 acres added to the plan. All prior comments apply.
2. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
Rr p I p
�
v
0 p u b 0 aA
r A *OEM
♦'
4.5
CJ
W .� . z
p 4-0
•�
y o
Fact Sheet on the New NCG01 Permit RE�Q;
April 2019 „�„
The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below. Most notably,there is a new
process in which construction sites will obtain official coverage under an NCG01 permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions,
contact Annette Lucas at Annette.lucas@ncdenr.gov or(919) 707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit
• Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; a-NOI: Notice of Intent, application farm for the NCG01 permit
• Is clearly organized by topic; and a-NOT: Notice of Termination, form for closing out the NCG01 permit
• Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01
Technical Updates
The new permit:
• Requires that the E&SC Plan meet
SWPPP requirements (p. 2);
• Provides a list of items that must be
included in the SWPPP, such as the
construction sequence, plans,
calculations, etc. (p. 2-4);1
• Has updated language on bypasses and
upsets that is tailored to construction
activities (p. 10);
• Puts all timeframes for inspections,
record-keeping and reporting in The NCG01 Process
"calendar days" for clarity and The new NCG01 applies to permits approved on or after April 1, 2019.
consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCG01 permit in the mail
• Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the
(during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each
once per 7 calendar days and after construction project and issue each construction project its own COC.
every storm > 1.0 inch (previously 0.5
inch);'and Under the new NCG01 process, construction sites will continue to
• Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated
holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCG01 by
place (p. 23). completing an e-NOI (available at deq.nc.gov/NCG01). The e-NOI will
only take about 20 minutes to fill out and submit on-line.
1 This list is based on website guidance
by the DEMLR Sediment Program. Initially, there will be no charge associated with applying for an NCG01
The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100
selected to be as equivalent as annual general permit fee as required per§143-215.3D,
possible with the previous permit. DEMLR is working on creating a single application form that will allow an
J The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01
to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at
DEMLR.
�;ne.SSA7�cr
V NWml
ROY COOPER r�$'
Governor + '
ELIZABETH S.BISER
Secretary . * n»
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
January S, 2022
LETTER OF APPROVAL
DR Horton, Inc.
ATTN: Jessica Meyer, NPDES Technical Compliance Administrator
2000 Aerial Center Parkway, Suite 110A
Morrisville, NC 27560
RE: Project Name: Collybrooke Farm - Phase 1
Acres Approved: SOA
Project ID: ROCKI-2022-011
County: Rockingham
City: New Bethel
Address: NC HWY 6S
River Basin: Roanoke
Stream Classification: C
Submitted By: Hugh Creed Associates, Inc. P.A.
Date Received by LQS: December 13, 2021
Plan Type: New
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval. This plan approval
shall expire three (3)years following the date of approval, if no land-disturbing activity has been
undertaken, as is required by Title 1SA NCAC 4B .0129.
As of April 1, 2019,all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete,you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at de�.nc.gov�NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future,the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
D_E Winston-Salem Regional Office 1 450 Hanes Mill Road,Suite 3001 Winston-Salem,North Carolina 27103
336.776.9800
Letter of Approval
DR Horton, Inc.
January 5, 2022
Page 2 of 2
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land-disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Digitally signed by Zachary Lentz
Zachary Lentz Date:2022.01.05 16:26:16-05'00'
Zachary Lentz, PE
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
cc: Dalton Ward of Hugh Creed Associates, Inc. P.A. (via e-mail)
WSRO file