Loading...
HomeMy WebLinkAboutNCC240825_NOI Application_20240322 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 3/21/2024 9:07:33 AM (NCG01 NOI Submission) Approve by Nicole Chiles 3/21/2024 10:51:41 AM (Review-NOI 188299 Ashton Park) • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: March 26,2024 5:00 PM 3/21/2024 9:07:40 AM • The task was assigned to Nicole Chiles by round robin distribution 3/21/2024 9:07:40 AM Submit by Tev.Holloman 3/22/2024 11:05:37 AM (Payment Verification for NCC240825) •Eastwood Homes • The task was assigned to DEMLR NCG01 Payment Team.The due date is: May 2,2024 5:00 PM 3/21/2024 10:51:58 AM • Tev.Holloman assigned the task to Tev.Holloman 3/22/2024 11:05:13 AM Construction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System(NPDES) Yrapplication General Permit 1 1 1 1 1 •' associated NORTH CAROUNA Environmental Quality A. Project Information Part A. Project Location and Waterbody Information ................................................................................................................................................................................................................................................................................................................................................................................................... Are you submitting an NOI that was rejected before? No Yes 1a. Project Name* Ashton Park 1b.Specific Lot Numbers This field may be used to list specifc lot numbers. 1-72 1c.Parcel ID Number(s)(PIN) List all PINS associated with this project. 09-143-014,09-143-015 2.County* Union 3.Highway or Street Address* 2602 Olive Branch Rd Street name only is acceptable if no address number assigned yet 4.City or Township* Monroe 5.State* NC 6.Zip Code* 28110 7. Latitude* Enter the latitude in decimal degrees 35.0070 8. Longitude* Enter the longitude in decimal degrees(MUST be negative) -80.5090 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 04/05/2024 Estimated Construction Project Start Date 10. Date to End* 04/03/2026 Estimated Construction Project End Date 11.SIC(Primary)* Residential,Single Family Houses(SFE)(1521) Standard Industrial Classification for Development 12.Acres to be 11.23 disturbed* (including off-site borrow and waste areas) 13.Total site area 39.02 (acres)* 14. Post-construction 8.30 impervious area (Estimated) (acres)* Project Tracking ID NCC-UNION-2024-Ashton Park Assigned automatically(not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a.Receiving Waterbody* Richardson Creek Name of waterbody into which stormwater runoff will discharge 15b.Waterbody Index No.* 13-17-36-(5) NC Waterbody Index Number Stormwater discharges will flow to additional waters* No Yes 16a.Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date. B. Permittee Information Part B. Permittee Information-Legally Responsible Entity and Individual ...................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1. Permittee* Legally Responsible Entity Eastwood Construction Partners, LLC If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name. Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership(FRO)Form. 2. First Name* Marc If Corporation,enter Registered Agent First Name 3. Last Name* Battiste If Corporation,enter Registered Agent Last Name 3b.Title VP of Construction 4. Permitee E-mail Address* mbattiste@eastwoodhomes.com 5. Permittee Telephone No.* 704-507-7033 6. Permittee Mailing Address* Street Address 2857 Westport rd Address Line 2 City State/Province/Region Charlotte INC Postal/Zip Code Country 28208 us Check box if the street address the same as mailing address Yes 7. Permittee Street Address* Street Address 2857 Westport rd Address Line 2 City State/Province/Region Charlotte NC Postal/Zip Code Country 28208 us B.Type of Ownership* Ownership is only individual if an individual is named in B.1.above. Non-Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................ 1. Primary Site Contact-First Name* James 2. Primary Site Contact-Last Name* Losee 3.Title Homebuilding Manager 4.Site Contact E-mail Address* jlosee@eastwoodhomes.com 5.Site Contact Telephone No.* 704-201-4394 6.Organization Name Eastwood Construction Partners, LLC 7.Site Contact Mailing Address* Street Address 2857 Westport Rd Address Line 2 City State/Province/Region Charlotte NC Postal/Zip Code Country 28208 United States 8.Consultant Name (Optional) First and Last name 9.Consultant E-mail This person will be copied on all correspondence. 10.Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) mbattiste@eastwoodhomes.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 704-507-7033 Default is legally responsible person telephone D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Plan Approval Information ...................................................................................................................................................................... 1. Date E&SC Plan 03/19/2024 Approved* 2. E&SC Plan Project PREN202401881 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. Local Program* City of Monroe Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can include the beginning point and end point coordinates in the"Notes"box below). 5. E&SC Plan monroe approval.pdf 553.37KB Approval letter or Must be PDF format Grading Permit 6.Signed FRO Financial Responsibility/Ownership Form Ashton Notarized FRO(1).pdf 524.62KB Must be PDF format 7.Site Location Map Must be PDF format(limit 20 MB) Site Plan area drawing.pdf 840.13KB Please do not upload entire set of E&SC plans. B. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application.Include additional waterbodies if necessary. 9. NOI Certification ashton enoi.pdf 358.81 KB Form Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is,to the best of my knowledge and belief,true, accurate,and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II(Stormwater Pollution Prevention Plan)of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person"(signing on behalf of Legally Responsible Person named in Part B) Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. 'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature yy 06-111W-1- Type Name* Marc Battiste Title Vp of Construction Organization Legally Responsible Entity Eastwood Construction Partners, LLC Date* 03/21/2024 F. Tracking and COC Info NOI Tracking No. 188299 NC Reference No. NCG01-2024-0825 Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SIP(passed from workflow if eNOI approved) Certificate of NCC240825 Coverage(COC) No.* Uses NOI number until approved,then uses NUMBER incremented by SIP(formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC240825-2024 Invoice Due Date 4/20/2024 Initial Fee $ 120.00 Fee increased to$120,effective October 3,2023 Invoice Status OPEN