Loading...
HomeMy WebLinkAboutNCC232080_MODIFICATION Supporting Documents_20240318 o` SUTE W. t .*Fe, ROY COOPER Governor V ELIZABETH S.BISER I=n* Secretary ,4'Q M vmt"* WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality March 7,2024 LETTER OF APPROVAL Duke Energy Progress, LLC ATTN: Nuwan Wijesuriya 410 South Wilmington Street Raleigh,NC 27601 RE: Project Name: Cape Fear-West End 230kV Line-Rebuild Line Acres Approved: 95.3 Project ID: LEE-2023-037 County: Lee City: West End to Moncure Address: NC-211 River Basin: Cape Fear Stream Classification: Other Submitted By: Dewberry; ATTN: Zachary Eulo, PE, CFM Date Received by LQS: February 21, 2024 Plan Type: Revised/Utility Dear Mr. Wijesuriya: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. QJ-A North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources D E Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh.North Carolina 27609 ^,,,,, , 919.791.4200 Letter of Approval Duke Energy Progress, LLC March 7, 2024 Page 2 of 2 Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules.In addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Pi Mail dt- Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Regional Office file Dewberry; ATTN: Zachary Eulo, PE, CFM L�!—D_E NorthRaleigh CarolinaRegional D Ofepartmentfice o11628fMail EnvironmentalServiceCenter Quali138ty 00 I Division Barrett ofDrive EnergyI ,Mineral Raleigh andNorth LandCarolina Resources , 27609 NORTH OAAOUNA Oe�°nin1 a mental OuNI 919.791.4200