Loading...
HomeMy WebLinkAboutSW3231103_Stormwater Report_20240315 STORMWATER REPORT Prepared For: JCH OP, LLC HERITAGE AT MARVIN SINGLE FAMILY SUBDIVISION MARVIN, NORTH CAROLINA Prepared By: CIVIL & ENVIRONMENTAL CONSULTANTS, INC. CHARLOTTE, NORTH CAROLINA CEC Project 326-256 MARCH 2024 cAR NORTH CAROLINA •��///Y, SEAL - BOARD OF EXAMINERS = 043168 FOR ENGINEERS AND ' i %9d�0'FHGINEER*..c• :\ SURVEYORS ....... �G LICENSE NO.C-3035 ////II/I�."''G``\`�‘‘ 03/15/24 "rjrwr Civil & Environmental Consultants, Inc. Charlotte 3701 Arco Corporate Drive,Suite 400 I Charlotte, NC 28273 I p:980-237-0373 f:980-237-0372 I www.cecinc.com TABLE OF CONTENTS Page 1.0 CONSTRUCTION NARRATIVE 1 1.1 PROJECT DESCRIPTION 1 1.2 SITE DESCRIPTION 1 1.3 ADJACENT PROPERTIES 1 I A SOILS 2 2.0 STORMWATER CONSTRUCTION SEQUENCE 3 3.0 PERMANENT STORMWATER MEASURES 4 .1 PROPOSED STORMWATER SYSTEM 4 3.2 STORMWATER CALCULATIONS 5 TABLES Table 1 —Soil Properties Table 2—Summary of Pre/Post Peak Discharges & Max Elevations APPENDICES Appendix A—Stormwater Calculations Supplemental Documents Appendix B—Permanent Stormwater Calculations Appendix C—Preliminary Jurisdictional Determination -i- Heritage at Marvin Civil & Environmental Consultants, Inc. Stormwater Report 1.0 CONSTRUCTION NARRATIVE 1.1 PROJECT DESCRIPTION This project consists of the construction of a single-family residential development along with associated roadways, driveways, sidewalks, stormwater management facility, and other associated features on a 46-acre site. 1.2 SITE DESCRIPTION The existing site is located on New Town Road in Union County,North Carolina. The site is densely wooded in its current condition. A jurisdictional wetland is located within the property boundary south of the project site. Slopes range from 0-8% on majority of the site. Steep slopes up to 40% are found on small portions of the site. The proposed site will have 2 main entrances at latitude N034°59'45.78" longitude W080°49'26.43" and latitude N034°59'41.10" longitude W080°49'38.86" along New Town Road. The site will be graded to construct single family house pads, paved driveways, erosion control measures, and stormwater collection pipes. A topographic map (Figure 1) in the appendix shows the general area of the project site and surrounding features. 1.3 ADJACENT PROPERTIES The project site is bounded on the east,west and south by residential areas,and the New Town Road corridor to the north. Civil & Environmental Consultants. Inc. -1- Heritage at Marvin Stormwater Report I SOILS The soils located within the disturbed limit are described in the table below: TABLE 1 - SOIL PROPERTIES Hydrologic Map Unit Symbol Map Unit Name Soil Group Rating ApB Appling Sandy Loam, 2 to 8 percent slopes B CoA Colfax sandy loam, 0 to 3 percent slopes C/D HeB Helena fine sandy loam, 2 to 8 percent slopes D Civil & Environmental Consultants,Inc. -2- Heritage at Marvin Stormwater Report 2.0 STORMWATER CONSTRUCTION SEQUENCE 1. Once grading is complete and the entire site has been stabilized for the Development the Erosion Control Sediment Basin#1 & Sediment Basin#2 may be converted to SCM Wetpond #1 & Wetpond#2. 2. Proposed Wetpond #1 & Wetpond#2 will treat the storm drainage from all impervious areas on the site including roof drainage and asphalt/concrete pavement, and off-site areas flowing on to site. 3. Proposed Wetpond #1 & Wetpond #2 have been sized to receive storm drainage from the proposed roof drainage,roadways, driveways, sidewalks, and off-site areas. Wetpond#1 has a proposed drainage area of 18.15 acres and an impervious area of 6.77 acres (37% of area). Wetpond#2 has a proposed drainage area of 21.72 acres and an impervious area of 9.93 acres (46% of area). See Post-Development Drainage Map (C508) in Appendix B and Heritage at Marvin Land Development plan set. Civil & Environmental Consultants,Inc. -3- Heritage at Marvin Stormwater Report 3.0 PERMANENT STORMWATER MEASURES 3.1 PROPOSED STORMWATER SYSTEM The stormwater runoff for the project primarily originates from roadways of the development driveways, building roofs, sidewalks, and on-site grassed areas. This project has an impervious area, including off-site, totaling 16.70 acres for both wetponds. All off-site area draining on to site is considered to be impervious for pond design. See Post-Development Drainage Map (C508) in Appendix B for the drainage areas into the proposed stormwater management facilities. Stormwater on the site is directed to grate inlets and curb inlets throughout the site. Once the stormwater has entered the drainage system through the structures, it is directed by gravity flow through the stormwater drainage system to Proposed Wetpond #1 & Wetpond#2. The site also falls within the Goose Creek regulations per Union County Requirements. Those requirements are to detain the difference in hydraulic runoff volume of the 1 year- 24 hour storm event between the Pre-Developed and Post-Developed conditions. For the Proposed Wetpond#1, Hydrology analysis using TR-55 Tables provided a curve number of 62.0 for pre-developed area, and a curve number of 74.3 for post-developed area. For the Proposed Wetpond#2, Hydrology analysis using TR-55 Tables provided a curve number of 61.1 for pre-developed area, and a curve number of 76.8 for post-developed area. Rainfall depth data from NOAA Atlas 14, Volume 2, Version 3 The site outfalls to an existing low area on site where a jurisdictional wetland is located, see Appendix C for the USACE Jurisdictional Determination for the site. Riprap dissipaters in conjunction with matting and riprap-lined channels are used to reduce flow velocities. Furthermore, after the stormwater runoff has exited the riprap dissipaters, it will flow through undisturbed existing vegetated areas,further decreasing the velocity before entering surface waters adjacent to the site. Civil & Environmental Consultants. Inc. -4- Heritage at Marvin Stormwater Report 3.2 STORMWATER CALCULATIONS Stormwater calculations were performed using the rational method to determine the peak flow through any one drainage structure. These flows were added together, proceeding downstream in the system to ensure that each subsequent pipe was capable of handling the peak flows. The 10- year 24-hour storm event was used with a 5-minute time-of-concentration to yield an intensity (i) value for the storm drainage piping system. Wetpond calculations were performed using Hydraflow Hydrographs program. The wetponds where designed to treat the difference in volume between the pre-developed and post-developed 1-Year 24-hour storm events with the outlet structure controlling the 10-year 24-hour storm events. This resulting in the combined flows from post-development being less than the pre-development flows up to the NCDEQ (North Carolina Department of Environmental Quality)required 10-year 24-hour storm. TABLE 2-SUMMARY OF PRE/POST PEAK DISCHARGES&MAX ELEVATIONS ANALYSIS POINT-SITE OUTFALL Pre-Development Pre-Development Total Post- Max Max Total Pre-Development Wetpond Wetpond Elevation Elevation Storm Event Dranage Area#1 Dranage Area#2 Development (cfs) SCM#1(cfs) SCM#2(cfs) Wetpond Wetpond (cfs) (cfs) (° ) SCM#1(ft) SCM#2(ft) 1-YEAR 2.37 2.41 4.77 0.55 0.49 1.04 646.55 646.54 2-YEAR 4.89 5.10 9.98 2.01 1.75 3.76 646.69 646.67 10-YEAR 14.72 15.97 30.64 13.67 11.97 25.64 647.61 647.40 25-YEAR 21.94 24.07 45.93 29.48 18.77 48.25 648.30 648.08 50-YEAR I 28.17 31.13 59.14 51.43 43.35 94.78 648.70 648.51 100-YEAR 34.94 38.82 73.51 60.35 54.85 115.20 649.18 648.96 *A11 results taken from Hydraflow Hydrograph Calculations Proposed Wetpond#1 has been sized to be capable of handling the required 10-year storm event with a max elevation of 647.61 with a peak flow of 13.67 cfs. The emergency overflow weir (at 649.00) is not activated until the 100-year storm event, with a max elevation of 649.18, which is 0.82 feet from the top of berm with a peak flow of 60.35 cfs. Proposed Wetpond #2 has been sized to be capable of handling the required 10-year storm event with a max elevation of 647.40 with a peak flow of 11.97 cfs. The emergency overflow weir (at 649.00) is never activated, with 100-year storm event max elevation of 648.96,which is 1.04 feet from the top of berm with a peak flow of 54.85 cfs. Civil & Environmental Consultants. Inc. -5- Heritage at Marvin Stormwater Report Goose Creek 1-year 24 hour storm event Volume Control for each pond will be detained for the difference in hydrologic volume between the Pre-Developed and Post-Developed condition. Proposed Wetpond#1 Pre-Developed Drainage Area 1 Year 24 Hour Volume: 24,485 cuft Post-Developed Drainage Area 1 Year 24 Hour Volume: 54,703 cuft Difference Between Pre-Developed and Post-Developed Volume: 54,703 - 24,485 = 30,218 cuft Required Treatment Volume Stage Elevation: 646.23 Elevation(ft) Acc Vol.(cf) 645 0 Permanent Pool 645.5 11,567 646 24,075 nt 646.5 36" x 6" Orifice Invert - Provided Treatment 647 51,139 647.5 65,483 648 80,379 Top of Riser 648.5 95,833 649 111,853 Spillway 649.5 128,445 650 145,616 Top of Dam Proposed Wetpond#2 Pre-Developed Drainage Area 1 Year 24 Hour Volume: 27,263 cuft Post-Developed Drainage Area 1 Year 24 Hour Volume: 75,288 cuft Difference Between Pre-Developed and Post-Developed Volume: 75,288 —27,263 =48,025 cuft Required Treatment Volume Stage Elevation: 646.23 Civil & Environmental Consultants,Inc. -6- Heritage at Marvin Stormwater Report Elevation(ft) Acc Vol.(cf) 645 0 Permanent Pool 645.5 18,587 646 38,342 646.5 59,026 36" x 6" Orifice Invert - Provided Treatment 647 80,340 647.5 102,291 648 124,887 Top of Riser 648.5 148,134 649 172,040 Spillway 649.5 196,611 650 221,856 Top of Dam With this project being High Density as proposed, to meet the requirements of Water Quality and Peak Control parameters, Wetpond SCM's were the preferred method of treatment. Due to the poor soil conditions and retention of as much existing vegetation and natural area as possible, the promotion of infiltration was not able to be obtained with our approach to meeting the Goose Creek Watershed rules. See geotechnical report by Summit Engineering for details. However,we are able to provide more volume control with the use of Wetpond style SCM's. Civil & Environmental Consultants,Inc. -7- Heritage at Marvin Stormwater Report APPENDIX A STORMWATER CALCULATIONS SUPPLEMENTAL DOCUMENTS ' �O�, , rt/EtiF /_ �) .� , \O �6so es) .....t. X U�/ V a/CyT Z \ yZ 1� DD \�'� '9`Y,4y�N � �-y�'�'Q (3, O� P�J n��y. o Ol\,f F Banks Presbyterian by ��//// f y �-� IVhNRD p F 2 l 4. y4,0 o /i> / C/? , �o �nO by0 (..,__) ~ 1 o \ � 11 i o ‘C STOUSAo RD oAlrSR /c \ . v 60 Co v , <----ri. 4°- 4 \ c" EG\y //v RAVENW000 DR y \�G� G h0 �� y � x \ vo ( o ihis4O� \•d n. STRIKE 31 0........\ N (( b00 O \ Z FUNNY CIDE D,. Z ��\ NER50N LN g'o _ o \ 'rFo /600� \ �J 0 71 N /r\u/ \ F<O I \ ‘2,7 rf,?. , 13 a I 0',' °RrOR4e by '? \ cN N 0�` N LVD 0 - o b 1111' \ 0ct Q G ui LN 4 - Y/ o7 \ • \ w y c \ u. J •, yy0 2 o �� \ \ a I J b00 Z 60D v �� 600 ,s ..,.,2. o CEDAR LN AQ \\ -\\521 00 6Do L 't`/ ilir ��O\J� coY b 2 ` y/y PP o 1 21 S\EGPooO o 1 550 71- O lik _,_ •••• ,t, ‘ ‘H ii v�'er H6gND CREEK C1 p��� i o I O t;; t 737 � i \I D 550 p \600 51 REFERENCE SCALE IN FEET 1. U.S.G.S. 7.5' TOPOGRAPHIC MAP, CATWABA, SC I I a QUADRANGLE, DATED: 2020. 0 2000 4000 3 o ,-,=,-rE M HERITAGE AT MARVIN SINGLE-FAMILY SUBDIVISION N Civil & Environmental Consultants, Inc. JONES HOMES USA 43 3701 Arco Corporate Drive-Suite 400-Charlotte, NC 28273 MARVIN, NORTH CAROLINA tn Ph:980.237.0373-Fax:980.237.0372 0 TOPOGRAPHIC MAP o www.cecinc.com R, DRAWN BY: ERR CHECKED BY: ATB APPROVED BY: MLG FIGURE NO.: DATE: JULY 2023 DWG SCALE: 1"=2000' PROJECT NO: 326-256 1 SOIL DATA 3 Soil Map—Union County,North Carolina 3 (property boundry) ol 515560 515650 515740 515830 515920 516010 516100 516190 516280 516370 516460 34°59'48"N - , - 34°59'48"N • 401111 „„sp 7.-- - --. 4 ... - oz.' _Az_ ,,7, .1,- a. y00 it oIli ho ApB ,, ,vim ` 4.!4 t y4k CoA • R. v A a A i.Air. 8 S Oool i adap MEW'GOVI b,N ea[164 DI aGhoo. ogmho 34°59'28"N -- 34°59'28"N 515560 515650 515740 515830 515920 516010 516100 516190 516280 516370 516460 3 3 TA Map Scale:1:4,200 if printed on A landscape(11"x 8.5")sheet. a v Meters v m N 0 50 100 200 X0 $ Feet A 0 200 400 m 800 1200 Map projection:Web Mercabar Coer coordinates:WC584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 2/7/2023 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Union County,North Carolina (property boundry) MAP LEGEND MAP INFORMATION Area of Interest(AOI) Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soils Very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet Spot Enlargement of maps beyond the scale of mapping can cause .�� Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other line placement.The maps do not show the small areas of p Soil Map Unit Points contrasting soils that could have been shown at a more detailed Special Line Features Special Point Features scale. (o, Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map cs Borrow Pit measurements. Transportation I Clay Spot Rails Source of Map: Natural Resources Conservation Service 0 Closed Depression Web Soil Survey URL: ti Interstate Highways Coordinate System: Web Mercator(EPSG:3857) X Gravel Pit US Routes 04,00 Maps from the Web Soil Survey are based on the Web Mercator ,. Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 0 Landfill Local Roads Albers equal-area conic projection,should be used if more Lava Flow accurate calculations of distance or area are required. Background 46 Marsh or swamp Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. iRk Mine or Quarry Soil Survey Area: Union County, North Carolina O Miscellaneous Water Survey Area Data: Version 23,Sep 12,2022 Q Perennial Water Soil map units are labeled(as space allows)for map scales v Rock Outcrop 1:50,000 or larger. ▪ Saline Spot Date(s)aerial images were photographed: Mar 13,2022—May 9,2022 Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor • Sinkhole shifting of map unit boundaries may be evident. 3) Slide or Slip oa Sodic Spot i\ Natural Resources Web Soil Survey 2/7/2023 001. Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Union County, North Carolina property boundry Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI ApB Appling sandy loam,2 to 8 28.1 61.4% percent slopes CoA Colfax sandy loam,0 to 3 12.5 27.3% percent slopes HeB Helena fine sandy loam,2 to 8 5.1 11.3% percent slopes Totals for Area of Interest 45.7 100.0% USDA Natural Resources Web Soil Survey 2/7/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 a Hydrologic Soil Group—Union County,North Carolina (property boundry) in 515560 515650 515740 515830 515920 516010 516100 516190 516280 516370 516460 34°59'48"N ' I 34°59'48"N _ I •e -.) .i y • 21 I a ° , — , Nrill"1111• — . . '0 i V O v 3s ao Ito%\. 1 41/4 a r a :50O o0 Gasp 'v Tura epUo 1 RItM¶M,5.,7-,aOQo 34°59'28"N .... ` 34°59'28"N 515560 515650 515740 515830 515920 516010 516100 516193 516280 516370 516460 3 3 Map Scale:1:4,200 if printed on A landscape(11"x 8.5")sheet. a v Meters v a N 0 50 100 ao 300 $ Feet A 0 200 400 m 800 1200 Map projection:Web Mercator Coer coordinates:WC584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 2/7/2023 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Union County,North Carolina (property boundry) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 C/D Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Union County, North Carolina Survey Area Data: Version 23,Sep 12,2022 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Mar 13,2022—May Soil Rating Points 9,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 2/7/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Union County, North Carolina property boundry Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ApB Appling sandy loam,2 to B 28.1 61.4% 8 percent slopes CoA Colfax sandy loam,0 to C/D 12.5 27.3% 3 percent slopes HeB Helena fine sandy loam, D 5.1 11.3% 2 to 8 percent slopes Totals for Area of Interest 45.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 2/7/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Union County, North Carolina property boundry Rating Options Aggregation Method: Dominant Condition Aggregation is the process by which a set of component attribute values is reduced to a single value that represents the map unit as a whole. A map unit is typically composed of one or more "components". A component is either some type of soil or some nonsoil entity, e.g., rock outcrop. For the attribute being aggregated, the first step of the aggregation process is to derive one attribute value for each of a map unit's components. From this set of component attributes, the next step of the aggregation process derives a single value that represents the map unit as a whole. Once a single value for each map unit is derived, a thematic map for soil map units can be rendered. Aggregation must be done because, on any soil map, map units are delineated but components are not. For each of a map unit's components, a corresponding percent composition is recorded. A percent composition of 60 indicates that the corresponding component typically makes up approximately 60% of the map unit. Percent composition is a critical factor in some, but not all, aggregation methods. The aggregation method "Dominant Condition"first groups like attribute values for the components in a map unit. For each group, percent composition is set to the sum of the percent composition of all components participating in that group. These groups now represent"conditions" rather than components. The attribute value associated with the group with the highest cumulative percent composition is returned. If more than one group shares the highest cumulative percent composition, the corresponding "tie-break" rule determines which value should be returned. The "tie-break" rule indicates whether the lower or higher group value should be returned in the case of a percent composition tie. The result returned by this aggregation method represents the dominant condition throughout the map unit only when no tie has occurred. Component Percent Cutoff.None Specified Components whose percent composition is below the cutoff value will not be considered. If no cutoff value is specified, all components in the database will be considered. The data for some contrasting soils of minor extent may not be in the database, and therefore are not considered. Tie-break Rule: Higher The tie-break rule indicates which value should be selected from a set of multiple candidate values, or which value should be selected in the event of a percent composition tie. USDA Natural Resources Web Soil Survey 2/7/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 RAINFALL DATA 1/16/23, 12:37 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 Su:a Location name: Marvin, North Carolina,USA* ifs.' ''N Latitude: 34.995°, Longitude: -80.824° norm Elevation:671.72 ft** ��+` *source:ESRI Maps . 100 �`$`� **source:USGS �,"""`� POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 _ 10 25 50 100 - 200 500 1000 5-min 0.416 0.491 0.570 0.628 0.695 0.740 0.783 0.821 0.864 0.894 (0.384-0.452) (0.452-0.534) (0.524-0.620) (0.576-0.681) (0.634-0.752) (0.673-0.802) (0.708-0.847) (0.738-0.889) (0.770-0.938) (0.791-0.973) 10-min 0.665 0.785 0.913 1.00 1.11 1.18 1.24 1.30 1.37 1.41 (0.613-0.721) (0.722-0.855) (0.838-0.993) (0.921-1.09) (1.01-1.20) (1.07-1.28) (1.12-1.35) (1.17-1.41) (1.22-1.48) (1.25-1.53) 15-min 0.831 0.987 1.16 1.27 1.40 1.49 1.57 1.64 1.72 1.77 (0.766-0.901) (0.908-1.07)_ (1.06-1.26) (1.16-1.38) (1.28-1.52) (1.36-1.62) (1.42-1.70) (1.48-1.78) (1.53-1.87) (1.56-1.92) 30-min 1.14 1.36 1.64 1.84 2.08 2.25 2.41 2.56 2.74 2.86 (1.05-1.24) (1.25-1.48) (1.51-1.79) (1.69-2.00) (1.90-2.25) (2.04-2.44) (2.18-2.61) (2.30-2.77) 1 (2.44-2.97) (2.53-3.11) 60-min 1.42 1.71 2.10 2.40 2.77 3.05 3.32 3.58 3.93 4.18 (1.31-1.54) (1.57-1.86) (1.93-2.29) (2.20-2.60)J (2.53-3.00) I (2.77-3.30) (3.00-3.59) (3.22-3.88) (3.50-4.26) (3.70-4.55) 2-hr 1.64 1.99 2.46 2.82 3.30 3.66 4.02 4.38 4.86 5.23 (1.51-1.80) (1.82-2.18) (2.25-2.70) (2.57-3.09) (2.99-3.60) (3.30-3.99) (3.61-4.38) (3.91-4.78) (4.29-5.30) (4.58-5.71) 3-hr 1.75 2.11 2.62 3.03 3.58 4.01 4.45 4.91 5.54 6.04 (1.60-1.92) (1.93-2.32) (2.40-2.88) (2.76-3.32) i (3.24-3.92) (3.61-4.38) (3.98-4.86) (4.36-5.36) (4.85-6.05) (5.23-6.60) 6-hr 2.10 2.53 3.16 3.65 4.33 1 4.87 5.43 6.00 6.81 7.45 (1.93-2.31) (2.32-2.78) (2.89-3.46) (3.33-4.00) , (3.92-4.72) I (4.39-5.30) (4.85-5.91) (5.32-6.53) (5.95-7.40) I (6.44-8.10) 12-hr 2.48 3.00 3.76 4.37 5.21 5.90 6.62 7.38 8.45 9.32 (2.28-2.72) (2.75-3.30) (3.44-4.12) (3.98-4.78) (4.72-5.69) (5.31-6.43) (5.90-7.20) (6.50-8.02) (7.33-9.18) (7.98-10.1) 24-hr 2.94 3.54 4.45 5.17 6.15 6.94 1 7.76 8.61 9.78 10.7 (2.72-3.17) (3.29-3.84)_ (4.12-4.81) (4.78-5.59) (5.67-6.65) (6.38-7.50) (7.11-8.38) (7.85-9.31) (8.87-10.6) (9.68-11.6) 2-day 3.46 4.17 5.20 6.01 7.13 8.03 8.94 9.89 11.2 12.3 (3.21-3.75) (3.87-4.52) I (4.82-5.63) (5.56-6.51) L(6.57-7.71) (7.37-8.68) (8.18-9.69) I (9.02-10.7) (10.2-12.2) (11.1-13.3) 3-day 3.67 4.41 5.47 6.31 7.47 8.40 9.35 10.3 11.7 12.8 (3.41-3.97) (4.10-4.77) (5.08-5.92) (5.84-6.82) (6.89-8.07) (7.72-9.07) (8.57-10.1) (9.44-11.2) (10.6-12.7) (11.6-13.9) 4-day 3.88 4.66 5.75 6.62 7.81 8.77 9.75 10.8 12.2 13.3 (3.61-4.19) (4.33-5.02) (5.34-6.20) (6.12-7.13) (7.21-8.43) (8.07-9.47) (8.95-10.5) (9.85-11.6) (11.1-13.2) (12.1-14.4) 7-day 4.50 5.37 6.54 7.48 8.77 9.80 10.9 12.0 13.5 14.7 (4.21-4.82) (5.02-5.75) (6.11-7.01) (6.98-8.01) (8.15-9.40) (9.09-10.5) (10.0-11.6) (11.0-12.8) (12.4-14.5) (13.4-15.8) 10-day 5.14 6.12 7.36 8.34 9.66 10.7 11.8 12.8 14.3 I 15.5 (4.83-5.50) (5.73-6.54) (6.89-7.87) (7.79-8.91) (9.00-10.3) (9.95-11.4) (10.9-12.6) (11.9-13.8) (13.2-15.4) (14.2-16.6) 20-day 6.86 8.10 9.57 10.7 12.3 13.5 14.8 16.0 17.7 19.1 (6.46-7.31) (7.62-8.64) (8.99-10.2) (10.1-11.4) (11.5-13.1) (12.6-14.4) (13.7-15.7) (14.9-17.1) (16.4-19.0) (17.6-20.4) 30-day 8.42 9.90 11.5 12.8 14.4 15.7 17.0 18.2 19.9 21.2 (7.94-8.95) (9.34-10.5) (10.9-12.3) (12.0-13.6) (13.6-15.4) (14.7-16.7)_ (15.9-18.1) (17.0-19.4) (18.5-21.3) (19.6-22.7) 45-day 10.6 12.4 14.2 15.6 17.3 18.7 20.0 21.3 23.0 24.3 (10.1-11.2) (11.8-13.1) (13.5-14.9) (14.7-16.4) (16.4-18.2) (17.7-19.7) (18.9-21.1) (20.0-22.5) (21.6-24.3) (22.7-25.7) 60-day 12.6 14.7 16.6 18.1 20.0 21.5 22.8 24.2 26.0 27.3 (12.0-13.2) (14.0-15.4) (15.8-17.4) (17.2-19.0) (19.0-21.0) (20.4-22.6) (21.6-24.0) (22.9-25.5) (24.5-27.4) 1 (25.7-28.8) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_pri ntpage.html?lat=34.9950&Ion=-80.8240&data=depth&units=english&series=pds 1/4 1/16/23, 12:39 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 u .Location name: Marvin, North Carolina,USA* .' '�'' XaA Latitude: 34.995°, Longitude: -80.824° norm Elevation:671.72 ft** ��+` *source:ESRI Maps 'y �`$`� **source:USGS �,"""`� POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.99 5.89 6.84 7.54 8.34 8.88 9.40 9.85 10.4 10.7 (4.61-5.42) (5.42-6.41) (6.29-7.44) (6.91-8.17) (7.61-9.02) (8.08-9.62) (8.50-10.2) (8.86-10.7) (9.24-11.3) (9.49-11.7) 10-min 3.99 4.71 5.48 6.02 6.64 7.07 7.46 7.81 8.20 8.45 (3.68-4.33) (4.33-5.13) (5.03-5.96) (5.53-6.54) i (6.06-7.19) (6.43-7.66) (6.74-8.08) (7.02-8.46) (7.31-8.90) (7.48-9.19) 6 15-min 3.32 3.95 4.62 5.08 5.61 5.97 6.29 6.56 6.88 I 7.07 (3.06-3.60) (3.63-4.30) (4.24-5.03) (4.66-5.52) (5.12-6.08) (5.43-6.47) (5.68-6.81) (5.90-7.12) (6.13-7.47) ( .26-7.69) 30-min 2.28 2.73 3.28 3.68 4.16 4.50 4.82 5.11 5.47 5.73 (2.10-2.47) (2.51-2.97) (3.01-3.57) (3.37-4.00) `(3.79-4.50) (4.09-4.87) (4.35-5.21) (4.59-5.54) (4.88-5.94) (5.06-6.23) 60-min 1.42 1.71 2.10 2.40 2.77 3.05 3.32 3.58 3.93 4.18 (1.31-1.54) (1.57-1.86) (1.93-2.29) (2.20-2.60) (2.53-3.00) (2.77-3.30) (3.00-3.59) (3.22-3.88) (3.50-4.26) I (3.70-4.55) 2-hr 0.822 0.994 1.23 1.41 1.65 1.83 2.01 2.19 2.43 2.61 (0.752-0.900) (0.909-1.09) (1.12-1.35) (1.29-1.54) (1.50-1.80) (1.65-1.99) (1.81-2.19) (1.96-2.39) (2.15-2.65) (2.29-2.86) 3-hr 0.582 0.701 0.874 1.01 1.19 1.34 1.48 1.64 1.85 2.01 (0.532-0.640) (0.642-0.772) (0.798-0.960) (0.918-1.11) (1.08-1.30) (1.20-1.46) (1.33-1.62) (1.45-1.79)_ (1.62-2.02) (1.74-2.20) 6-hr 0.351 0.423 0.527 0.610 0.722 1 0.813 0.906 1.00 1.14 1.24 (0.321-0.385) (0.387-0.464) (0.482-0.578) (0.556-0.667) (0.655-0.788) (0.733-0.885) (0.811-0.986) (0.889-1.09) (0.994-1.24) (1.08-1.35) 12-hr 0.206 0.249 0.312 0.362 0.433 0.490 0.550 0.613 0.701 0.774 (0.189-0.226) (0.229-0.274) (0.286-0.342) (0.331-0.397) (0.392-0.472) (0.441-0.534) (0.490-0.598) (0.540-0.666) (0.608-0.762)I(0.662-0.841) 24-hr 0.122 0.148 0.185 0.215 0.256 0.289 0.323 0.359 0.407 0.446 (0.113-0.132) (0.137-0.160) (0.172-0.201) (0.199-0.233) (0.236-0.277) (0.266-0.312) (0.296-0.349) (0.327-0.388) (0.370-0.441) (0.403-0.484) 2-day 0.072 0.087 0.108 0.125 0.149 0.167 0.186 ' 0.206 0.234 0.255 (0.067-0.078) (0.081-0.094) (0.100-0.117) (0.116-0.136) (0.137-0.161) (0.153-0.181) (0.170-0.202)1(0.188-0.224) (0.212-0.254) (0.230-0.278) 3-day 0.051 0.061 0.076 0.088 0.104 0.117 0.130 0.143 0.162 0.178 (0.047-0.055) (0.057-0.066) (0.070-0.082) (0.081-0.095) (0.096-0.112) (0.107-0.126) (0.119-0.140) (0.131-0.155) (0.148-0.176) (0.161-0.193) 4-day 0.040 0.049 0.060 0.069 0.081 0.091 0.102 0.112 0.127 0.139 (0.038-0.044) (0.045-0.052) (0.056-0.065) (0.064-0.074) (0.075-0.088) (0.084-0.099) (0.093-0.110) (0.103-0.121) (0.116-0.138) (0.126-0.150) 7-day 0.027 0.032 0.039 0.045 0.052 0.058 0.065 0.071 0.080 0.088 (0.025-0.029) (0.030-0.034) (0.036-0.042) (0.042-0.048) (0.049-0.056) (0.054-0.063) (0.060-0.069) (0.066-0.076) (0.074-0.086) (0.080-0.094) 10-day 0.021 0.025 0.031 0.035 0.040 0.045 0.049 0.053 0.060 0.064 (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.032-0.037) (0.038-0.043) (0.041-0.048) (0.045-0.052) (0.049-0.057) (0.055-0.064) (0.059-0.069) 20-day 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.033 0.037 0.040 (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.030) (0.029-0.033) (0.031-0.036) (0.034-0.040) (0.037-0.043) 30-day 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.029 (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.027-0.032) 45-day 0.010 0.011 0.013 0.014 0.016 0.017 0.019 0.020 0.021 0.022 (0.009-0.010) (0.011-0.012) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 60-day 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_pri ntpage.html?lat=34.9950&Ion=-80.8240&data=intensity&units=english&series=pds 1/4 APPENDIX B PERMANENT STORMWATER CALCULATIONS WETPOND CALCULATIONS 8 I 7 I 6 I 5 I 4 H H i I • cc PID#0624000\ PID#06225003E \ `` \ 0 W o PID#06240002C \\ JERRY A PRESSLEY&WIFE, \ VASS KRISTEN CROWS o JERRY A PRESSLEY&WIFE, DB D157 PG 1087cc E ROBBIE C PRESSLEY ROBBIE C PRESSLEY \ PC L FILE 536 DB 3633 PG 864 \ DB 4514 PG 425 LOT 3 I Z LAND USE RESIDENTIAL \ LAND USE: RESIDENTIAL PID#06225003 I O \ LAND USE: RESIDENTIAL VASS KRISTEN CROWS o \ ZONING: RESIDENTIAL ZONING: RESIDENTIAL ZONING: RESIDENTIAL to o i DB 157 PG,087 PID#06240002B \ _, -- \ PC L FILE 536 CARL S NICHOLS&WIFE, \ LOT, c ='o " ho \ IRIS W NICHOLS � � j \ LAND USE: RESIDENTIAL I w \ DB 691 PG 53 Kitt --- _;�. --�-- b / --e\ ZONING: RESIDENTIAL B Q N PC C FILE 877 _- —��_ L !_ \\ / \ \ g o `3 G LOT 2A 1/ I m N LAND USE: RESIDENTIAL y� / \\ w \ \ ZONING: RESIDENTIA • /^v a I � \ \CV C �a �\ I B \ 1 \ \\ \\ NBEIV �\ a i 3 \ ^v�v - vA ,A. ���-,-IIIT-- - �v,v v se- ess�� - ' SWAY � I/� v ° -_ o a d S.\ PID#06240002A rg°11 _= \ s- ..\\ \`- -\_�\ -�- , ��� \i'- ''\ `�� !\� \,- r m e CARL S NICHOLS&WIFE, - , \\_�� �\ ��\\\ ' •'tia _ `\ I \ \ z IRIS W NICHOLS 218 v A V- v V -Av vA __ '----------Z----:---a _ A� V A DB 564 PG 218 /J t -�\ \\ -/- �\-\--- --� ----__ 69 \ PID#06225003D \ \ \ PC C FILE 877 / '/ ~ \\ �� -\ - \� -\ S�< --- mac \\ \ MARK&LISA WINDLE I�. / _\ - ;TOTAL Tc - 59.5 MIN.;-\•\ - \ -- \ LOT 2B F �\.a i / /// �\ _`� \-� \, \�_ --_ _�, \ '\ PID#06225003C DB 7289 PG 702 sNN LAND USE RESIDENTIAL / F//////j /- - �� �\\ cs \ -\ _—--� \\1\ -_ IGOR&VALENTINA PC L FILE 536 EN AL ZONING: RESIDENTIAL (/// / / j - -�- ������- --�== --�=�`�\ \\�\� _ PRIYMAK \ \ LAND USE RESIDENTIAL 1 1 U n / III I I r ( /----- �.�\\ ��6jO�\\ _\\\ -\49p\ -��� \\ DB 8217 PG 563 ••, �+'' ZONING: RESIDENTIAL I1 I \ I 1 1 N v \ A _ Pc F FILE 481 j m \ I h I I I I I 1 j\� - \� \� —�\��--- --=__ \ \6�__ LOT zs-c \ II w F I 1 e I I ) / -- \\- \ -\_ \---- \\��- PROPERTY CLASS: \ - \ > I) I 4- --— \ I / / / ,----- -� -�- � --- RESIDENTIAL ' PID#06225003B - 1111 I I V F N / 1 1 PRE-DEVELOPMENT -s=`1 .- --- ---.....-..„--....-,-„......„----....,_---_-=--- _ 'I N I I 1 q - 1 \ A \ )/ / / /� \- \\ -�\ ZONING: VILLAGE OF DAVID&KASEY COATES I NIIIII / / 1) I I l Ill / l/ /%/ / \ \=\\ - -\\\ \ \�\\\`_- \ l� -/ / I PI 06225007A o co DRAINAGE AREA 2 -� 6a:,, MARVIN DB 8528FFILE PG 864 # N \\ PC F 481 / JOE M ARDREY Pam. N. \ PID#06240031 \ F / /// / TOTAL DA: 24.08 AC zz- - \ - " -\ \ LOT 25-B �- / DB 1561 PG 564 Q \ WILLIAM K DOBBRATZ&WIFE, /._/// l/l I/ /// ' / / lam\ \-\\ -�� �\ - �\ - z� --� \ PROPERTY CLASS: N,„ __.,2 / LAND USE RESIDENTIAL pj t r \ JENNY C DOBBRATZ / �/_// / // / // ' ' \�\` Q10 = 19.34 CFS ��\-^�\ �\ \ -� \� \ �\ \\ \ RESIDENTIAL _ � / j ZONING: RESIDENTIAL \v - ZONING: VILLAGE OF MARVIN� \\ DB 3037 PG 607 /// / i/i/0//�%l//// / / /%�\ \ \ -Jl1l%1`\\\� �- -������ �\\ � - / ` O O � PC D FILE 543 4, �/ / %61% / / / / / 7/' _\ ,eD/\ \ _----` - -/q)\� _ ���\\�\ \\ \ \ ,\� \ -..,.,,,./..1 �� 1 LOT,C y` .� /�'�' / / / / / / / - -- \6 \\ \ \�\ �665_� /%L Nl�\-\ �\\�\ \\ \ -�6ea��\\�\\\� \ \ �A\I III 1 I 1 o co E C 4, �//6' / ./ / / / / / \ - -iL I \ ��\��� C \\ \\\\ \ \ PID 06225003A I ,' / \ a tPi LAND USE: RESIDENTIAL ', 6 / / /6g / / / I \ \�--�--- - - \\ - \ \ \�\\ # \ ``11 11 X ZONING: RESIDENTIAL / � �/� %// / /ib/ / / / I 1 I -____-----,,,:'-------IN,\ \\� �`-=-- _\--�� /�\\\\`� \ \ 's --�\\\ \\\\ \ n TERRENCE PHILBRICK JR&JILL-/ \' �i l I I (� ..d.. 10 [� _ + I oll\ \\\\�� \ �\\ \ PHILBRICK _/ 11 +a 9 a _ / / / I \ -\�./-_--- - fj/\ < - \,:, \ \\ DB 4375 PG 325 / U) /- // / / / / / Z I I1 / - -�� - ter\\\\�'-- \� \ \ \\\\ \\\\ PCF FILE 481 ".' GI\ I I..-1 I /// - _ ---�J \\�2, \ \\ LOT 25-A/ III/- I // / C.,,,„„ \ / / / / \ - \\--- - \ \ A \\\ \\\ PZONING VILLLAGE OFSIMARVIN Q �: �nll - - / I v 7� v \ V �( / / / ( \ � �w 1II� VAA \ ��A\ i dry ,-a f 1 v vAA vA v A: A V I / l , l I A - v --_e55_� \,,,,,,�- - I I \ 1 A\A A V \\I I v -- A 'A� t F % o • 40 4,// vvA vv - / VAI I / / I V 1 - - - vv vvA. I I I \ VA A A V v•v A - I ..� PID#06240030 \ \ _ \ \\\--� . 2. \\ , I - I I \ J \ �\\--- _-------\ \\\\\\ %\ 1 I I I / III \ \ \\\\� --- -� \��\ /i - - - \ �I o r E PAROROSS LLC A v- -�wvv v��_ _ V A I l I - I l / / v v v v 1 1 I I / / I V A A V A V I �� - A V a DPC6D56ILEG5439 \\/--- \=`�\ '\\ m' I / / //%// /-,.`,/"-- � - \ \ \ 1 \\1 \ l \ I / / / I 1 l \ \\ \ \ \ \ t,n` 'P W O LOT 1B // / -_- - —7\ ,, a, %I,/ /� // �// 850.i/ ��--sso \\ \ \ I I I / I ' \ \\ 1 / I I I I I ' I 1 ' 1 \ I - ` 1 / - \ �` ° ° o LAND USE RESIDENTIAL 'a / / ��"—�� _ p VA/ ( \ / / / -v- III ,,- , \-, I \ I / / I I I I I I l \ y o �� ; %�-/ --‘-`'\ V, A \ ��\I\,A\VAVA A\�\1 \I \V / �7 // �/ , \\ \V 11 11 ; \ '\\ \\ V I IV 1 \ 1�; I 1 A �� 1 ' /' A\vv ��� I M \ o� .v `\v VV AI 1 I II 1 11 lV '/ - --- A \ A 1 A AVI 1 \ V A\\\\\1\ I V 11 11 a\ \\ 1 IV o \ A \V '1 'n \ U 66 V A ,AI IA V 1 / / A A A V \ l V \ A \ \ / ��—� I I I I \ 1 1 I \ \ v \ \A \ \ A .85--�� ---- I I \ AVV\1�1 V I\ \ \\\V\\ \I 1 I I I . A \ V A V \\\A\\\�AV AV A V\ w A V A A \ V A 1 \ 1 \\.'). % / ) j / / \ : / / 1 \ \ ,1 \\\A V V\ - \V A\ \ V A\ v A A VAA \ V A \$;A v A A \\\ A V / / / / / V —= 1 I I �\ V V A \ V A A\\\\\\—\\\\\ V \V\ A \ V V A A A 1 (TOTAL Tc = 92.6 MIN. / / * /� -- - A ( \AII1I A1111VIiA11 AVA VAIIII 1 V A \ \\ \ v V v�` VAv AV A A'\ \ VA \ /' /i� / - V A A \ \VA A I I v v A A V A� \ V A I \ \ - / /// I 1 IIII IIII \ \ I S � \ \\ \\ \II \ f ' ! �/� - -- V I 1 1 1 V A A\ VA 1 - A A A v v v v IIII V A V AVA V A 1 1 1 V A \ / / / v \v I \ 1 \ 1\11 A v vl`l I v vv vv vv vv v-v�Vv v y\v \v y v vy v I 1 I I v % ��^ z a \ q al al `I 1 O m l V oll I I A I / // Z D V PID#06240006A I I I.I V A \a a Z a I o I I A L^11 A \$ I It" A \ �y�'� \A I III A l l 1 o a I I I v A �'' / A A \VI v v v v / 2 (n \ GERALD L EARNHEART& \ I \ \ I to 1 \ \ I I \ \ I \ I \ \ \ 1 ) \ I / I/ / \\\ \\ \ \ \ \ \ \ \ - J WIFE,DEBRA P EARNHEART ---- I\ I \ \ \ \ \ \ \1 I I\ \I V \ I I I/ / / /I I 1 III - \ S / I I / // // / > \ \\ \ \ \ \ \l I I I I \\ \\\\ \ \ --/ // > > DB 425 PG 79z 1 I 1 III I Il I I I //) I I - / v / I I / / // v 1 \ \ \ I ;III v v v PRE-DEVELOPMENT O I \ I / I l l l / I I I / v' /%� �/ �' / i I Vv ��/i! DRAINAGE AREA 3 Q U Q Pc FILE 1as - • / I I III III l l l l 1 1 I 1 A / >A�, / / / 4 1 1 1 1 1 v A \ // 0 CC LAND ZONING)ND USE: RESIDENTIAL RESIDENTIAL -- --i ) III 1 I l/11 1 :I I) I l / l /// I 1 i% i/ice/ %� 6 - / / / I 1 I I lAvvvv • A \v /ij m / , , I l/li1t.ICI ) ),,), l/////// / I _ v \ v ///;///)* -_� -- , Il1I 1 vvvv v / TOTAL DA: 9.78 AC -I C.) N �/ / lily / I / �l//lll/ //// // v i)%%///i'S ;//!/ %--- / %/ / / / cf v I 1 v v- // Q10 = 5.61 CFS H 2 TOTAL Tc = 55.0 MIN. -- --� '//� / �'/ //// //// // ry A / i //�/ 660 % %% / // / 1 v `�V-- / Q -1 O CC V-- /, d I�1I//ll// j// /,// l �_/> /)// /// z/i'' //i4--/- - _ _'ice/ i /-- v/ ti W / •�i/- �./ j �, �llll lll lid 1�1 //j'/�'� /j/ � VA1A \ 1 �/ j- /"-���-\ / '6ja y ?� �o � QVZ h Illll .."� 1 - , / l \ \`\\ o \ \ oe Z/ , /„ `>/7/7//i / /// J//'� T }—.� / 1Vi\/ ' lAVAVA / ti'z _ ' / / oc� e / vv _/�///i� l l/lI l l 4,h ,/ /�//i 1 11 1l IIII A A/� v VAA\���. I / /// �\ / �� --_I A s2 \ 2 � W N. cX 0 / /��� ��i i%� � /!/�_ kVAVAA\Av 11 /^ I /�'7 ' - I/ r 4- �Q�QOO Z CC a V�� — / - vv� . . / PRE-DEVELOPMENT 6 /// �i// �Av l�l i �//�1 !I _ 2 DRAINAGE AREA 1 = �//�// �� -� TOTAL DA: 4.4 AC - / / // // I 1 l Ji i —�// / \ ? / I// % //////II IIIie, / / 11(l IIII IIII IIII_- / je�lll! l/ 1 Q10 = 3.86 CFS _J 1 /// III / 1 I I V / - I 1 1 I I J�i -/i�ii/ Il V / /1 I IIII 11 II 11 1V v---/ / /0%/ 1 1 \ - i1/I I///'�i/ii / 1 1 1 V 1 IIII v v / _ PID o6z40005A l lob/1/l?i// /l( \ \\ l \y\\� / / (' / A ?t a N , ROGER#ADAIR WILLIAMS _ --_,./ / /// // /// / \1 \ \ \ \ j // . U U to \ DB 5082 PG 683 / ///// ////'•` , \ \ \ \ \ -� / J / PID#06225021 N / //- \\ \ \ \ - / / / a n LAND USE: RESIDENTIAL - i// /// / \ \ / SCOTT E LETT&WIFE, �- ZONING: RESIDENTIAL F //r /////%j- \t\ \ \ \ / / BEVERLY B LETT Q H \ II ( (`'l/// /// \ \ \ \\ \\22-J / I / '� DB 258 PG 626 4 \ I I ‘ \\\\(l/l i l \ PID#06225055 \\ V \_________/ / / / DB 265 PG 852 W / I \\\\`t 1 \ CHRISTOPHER SLOTTEN& \ \\ / / / / LAND USE RESIDENTIAL Q Z \ / I \\\\ WIFE,JENNIFER SLOTTEN \\ \ / ( / Z B I / \ PID#06225054 DB 6201 PG 810 \ . B PC B FILE 8-B \\ // Q ~ m o \ I / RAYMOND B XIQUES& \ LOT 21 \ ITS. L / z w / WIFE,CAROL A XIQUES LAND USE: RESIDENTIAL \ �l \ DB 3054 PG 108 \ \ // �� Z 3 / PCB FILE 8 B ZONING: RESIDENTIAL /� // \ LOT 20 E j ~ v U / LAND USE: RESIDENTIAL \ / Z V a \ ZONING: RESIDENTIAL /� / (./ ui PID#06225053 i BEFORE YOU MI 2LijZ N — \ JEFFREY M SAUSER&WIFE, \ \ /' // /' CALL 1-800-832-4949 a \ PATRICIA A SAUSER DB 462 PG 500 \ - WS THE LAM _1 U) ¢ N.C.ONE-CALL CEN7ER / PCB FILE 8-B / LOT 19 J //� NORTH W X Q LAND USE RESIDENTIAL \ j7 Me / iiii srvcirveeasµoo suaoas�icErxse NO caaas W W / ZONING: RESIDENTIAL \ o \ /J w 8 l.V ,i NORTH Essl•N9<� "; a w o o a h A - SEAL _ DRAWING NO.: a ¢ A 043168 ■w_ SCALE IN FEET 3ryo fycINEEP..yO=. ■ _505 0 100 200 "„,t;,,,GR v 03/15/24 a 8 7 6 I5 4 I 3 I 2 I 1 8 7 6 5 4 3 2 1 H H I 2 \\ \ PID 06240002C PID#06240004 PID#06225003E Ill 2 # VASS KRISTEN CROWE W O \ JERRY A PRESSLEY&WIFE, JERRY A PRESSLEY&WIFE, \ cc E - J ROBBIE C PRESSLEY ROBBIE C PRESSLEY \ DB D157 PG 1087 \ DB 4514 PG 425 PC L FILE 536 DB 3633 PG 864 LOT 3 \ PID#06225003 I Z O G LAND USE: RESIDENTIAL LAND USE: RESIDENTIAL VASS KRISTEN CROWS O 11 G LAND USE: RESIDENTIAL ZONING: RESIDENTIAL ZONING: RESIDENTIAL DB 157 PG 1087 'm �` ZONING: RESIDENTIAL \ PC L FILE 536 W = PID#06240002B \ \ LOT 1 f CARL S NICHOLS&WIFE, \ b -._ :7,, --� ---&-„„ LAND USE RESIDENTIAL \ IRIS W NICHOLS - CC 1 \ DB 891 PG 53 �a _ -� � �� ZONING: RESIDENTIAL a g ` ., G \ PC C FILE 877 __ / \ Pig'� G LOT 2A 11l -_-„� - �\ I °a \ \ LAND USE RESIDENTIAL WS—nn/a �� _ � I N \ ZONING: RESIDENTIAL fir, �= _ � B c \ �� r . �T *AY__---2,-„.\ /i11 A of µ. o \ PID#osz4000zA \ �ii 1 \ - \ _ A s \ CARL S NICHOLS&WIFE,IRI / //(�,1�`'�'�' G • •-"� \`.V,�S • _``� - I I \ P W NICHOLS CSC FILE 877 �'� -\�� 1 L�! 4 ,,_ - �C©�\�I� MARK D#&BLISA DWINDLE I I I 73 11r� III IUMi���i _ \ LOT 2B `4 / �\� I�J I�II�r G_►��` PID#06225003C o DB 72 9 PG 70 LAND USE RESIDENTIAL / y/ / it �I1/ I!��s #1 IGOR&VALENTINA \\ PC L FILE 536 :O o \ _ LAND USE: RESIDENTIAL �. 0 I. ZONING. RESIDENTIAL Atioligiv---i---71 DB 8217 MPG 563 \�`'F_' LOT 2 V M \\ \� / li PC F FILE 481 l B .� ZONING: RESIDENTIAL it\I� \ I0 ~ N�" / Y�� \ \\ \ / �/ I�Om�O - PROPERTLASS -. I - -- W\ �yp� -` ����, = II p���,11 -. - RESIDENTIAL PID#06225003E �_ � ail I ZF I //' '\ / � �� ��� - I� �11 ZONING: VILLAGE OF DAVID&KASEY COATES I Y N��- 111 ®�l �i ARVIN DB 8528 PG 864 \---- 1 I PID#06225007A y� n \ ♦ _ _ —_ //�,� \ PLOT F2 E BS1 / / I I JOE M ARDREY 4 p o \ PID#06240031 \\ f �/ � ► -��_-` �1,1 - / / DB 1561 PG 564/ I / �_� #� \-M PROPERTYSCLASS: WE \ / LAND USE: RESIDENTIAL ` n\\WIWAM K DOBBRATZ&WIFE, '% / , �� _ /_/ �� -_��� Q� RESIDENTIAL \ ! ,y M JENNY C DOBBRATZ .4111; , , �\ � ZONING: VILLAGE OF MAR VIN, j '� ZONING: RESIDENTIAL i.lU NOB 3037 PG 607 / /j / ®� �����`I�� , \ N 1 OOOs1ELAND USE: RESIDENTIAL �•a /� _• � ♦ Il # / i "'_� \ I111 ZONING: RESIDENTIAL / • / � �� �/ Z'' N l� ( l��•x®' � \n TERRENCE PHIILBRCKO JR&JILL ,\ ` 7 / I 1 •'-' LL c �. �.� \ I I I //� TI ��� 11� PHILBRICK �� I 11 i> > - \ �/y / / ' �'.�/ ��. ��`,� -'l �I P�/� '� � \. DB 4375 PG 325 �/ I \ V. M //�i :1,..\\.,_"-,r,,,>,%.10.--\%\\,,\v,:v,\N:e'',4',,i),° // y PCF FILE 481 ( �. I 1 I. \ - / �.��/ ` =� i I �`` \O / \ \ \\ LOT 25-A \ \ / 1 S L 1 Lyn(( �� �` -L "`\��48\ � � \ PROPERTY CLASS: RESIDENTIAL 1 \\� kjc) 1 l F"► \ ✓., - 1__ ,.0. � � -�+ \ ZONING:VILLAGE OF MARVIN 1 1! 0 ._ M1( a ye � � POTOTA�DRAINAGETARE�R.NS815AC 1, iff �� ,% N. 1\ � � �� - I '�.: '�'� , a 03PID#06240030 / �� IMPERVIOUS AREA:8.77AC / /l ( a ' ii , �1 �y O LPARCROSS LLC O TOTAL Tc-5 MIN. \ ( I �� UdE DB 6156 PG fi39 1`1 / IV/ \ / k WPc DOFiEBs43 / �. ; 7‘� ' 7 � _��.�_• i„ s► ��� —,� v , 2J ` J — 1,,(// LAND USE: RESIDENTIAL / �� {,. �..r / 1S � /,.' * `\ I �I\ AP NN.s;‘,4‘ , ' , s ,,,111 . . / \ /\ ( �/�, Q ZONING: RESIDENTIAL ��_iii���" I� �� ^ 1 I ♦ L 1 '^Ii," •N.n*‘\44y, ,,,\,,,,1,, ,,,,,r • - ,,,./1,\ ,Tr ,, \ �-a / ��'v` �\ 1`II\ II I��� 0,\\4fr,7 ' y� POST DEVELOPMENTDRAINAGEAREA 2 ���I� \ \ \ II�"I \ \ TOTALDRAINAGEAREA:21.72AC �' \ ` /.\ , ♦ • S �, IMPERVIOUS AREA:9.93 AC � ���' / /i \ ¢' ♦N1 \l\\ 1 �� ��`� TOTAL Tc 5 MIN. \�`� �� / A / / ( r� � / Vv ✓ ,1��i E ��.�� �,111 ��� ��� �i� gnu, ��� /�/i ii v PID#os24000sAZ el A., WETPOND #1 Nk ��� 1 Zfn J„ \ , / , \ CC WlERADEBRAEPREARNHE&T -. \\�: ���* .o , //II/ , ` � a ,. I I.,I //. /�De 4zsPG 7sz , I 1 v ,� / ����' ����iii — /� ,>y > 0 PC I FILE 146 I ��y,� �A / I I _ � -��V -/ / �� LL /LAND USE. RESIDENTIAL _ 11 ,' ����\ �`, I �„ / �� ;� �� ��� /��// Q m U Q ZONING. RESIDENTIAL ` 1 1 I II / l �1� ♦ - if, //ii , , ! c) Ill- III / .. / ;1�, �.-� .. .- i o oc ,N-/:,�� I % r�_�,,�� iI/ _/,/:1// . �� �0\, WETP0ND #2 >� �� � - `/ / eC'3 20 /^ �\ \ Ijl: I��II 4. �� �II ' ( �i�l :2 ' \.).N;,'��IS®p /I� _ L/ �` yam;��` LaL ci Zcc di z w G / - may\\ a /` t r_�i� �'� le/ i , - 4,/ Z CC Q,inw._ _......-, \ -.411 vp, )(le* i': /; %�1 r/ / it, / \---\4 111L1':, pilsr N-. 2; / 1; 1.1 "tiO0 \ \ , / I I / ii I111 /�C /i JI IAPID#oszaaoosA _ %�ljl/l•��/�i/��(� i IIIAI � / ? a a N g— RROGER A062 005 AMS _ Y/ ////// // / / \ \ V VDB 5082 PG 883 / // // // /�+ \ \\ I \ IJ lPID#06225021a NM LAND USE: RESIDENTIAL - il/111 l/ ///� - \\ \ v/ �j SCOTT E LETT&WIFE, a ZONING: RESIDENTIAL f / ////// /_ \ BEVERLY B LETT2 \ I I �)/// / / A \ DB258Pc626`(C //// // f / DB 260 PG 605lJJ\ I I \\\\\l1/% PID#06225055 r DB 265 PG 852 \\\\`` CHRISTOPHERLOTTEN & \ LAND USE: RESIDENTIAL a \ I ; `\\\\ WIFE,JENNIFESLOTTEN \ _ _ \ % / ZONING: RESIDENTIAL Z 1 DB 6201 PG 810 /! BI I / PID#06225054 e`er\` / /�.S Y RAYMOND B XIQUES& PC B FILE 8-8 .\ \. p7- • m p B 3 \ / WIFE,CAROL A XIQUES LOT 21 `\ �. ` V $/�' 0 2,',-, ( LAND USE: RESIDENTIAL I 3 w\ DB 3054 PG 708 / PCB FILE 8-B ZONING: RESIDENTIAL c Z o L LOT 20 ,\ eLAND USE: RESIDENTIAL �a�/ lJJ a \ ZONING: RESIDENTIAL - /_ • N / JEFFREY DM SAUSERS3&WIFE, / ��// i� BEFORE YOU DICI d \ 0 PATRICIA A SAUSER / / CALL 1-B00-832-4949 \ DB 462 PG 500 �\ �^ '-�< / N.C.ONETMCELLCEENTER -I 2 / PC B FILE 8-B I1I'SS e / LOT 19 „� /� u+oiuvnanuo suavoRa ucu+aeuo- W LAND USE RESIDENTIAL \ j� e / 0 Ci \ / ZONING: RESIDENTIAL _ \ c.wouN. o \ \ \� ` jr \,4 NORTH eN@'s R.<i p 2 . h A E SEAL .. _ DRAWING NO.: O a A 043168 SCALE IN FEET 9so fN cIniEEP.�SO,; C508 NLI . ,,. ti 0 100 200 `"03/15/24 A 8 7 4 3 2 I1 BMP WETPOND #1 SUMMARY CHART PEAK CONTROL POST- POST STORM EVENTS DEVELOPMENT DEVELOPMENT ELEVATION *values taken from RUNOFF OUTFLOW hydrographs Top of Berm 650.00 ummor 1YR-24HR 27.19 CFS 0.55 CFS 646.55 2YR-24HR 39.73 CFS 2.01 CFS 646.69 10YR-24HR 77.29 CFS 13.67 CFS 647.61 25YR-24HR 101.88 CFS 29.48 CFS I 648.30 50YR-24HR 122.11 CFS 51.43 CFS I 648.70 100YR-24HR 143.34 CFS 60.35 CFS I 649.18 --M M J Page 1 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND #1 COMPOSITE CURVE NUMBERS (CN) Project Area Soil Types= See attached Soils Report Input Calculated Pre-Construction Conditions: Pre-Drainage Area-Entire Site Cover Type/Condition Soil Classification CN Area Area (SF) (AC) Woods-Good Condition B 55 493,428 11.33 Woods-Good Condition C 70 148,539 3.41 Woods-Good Condition D 77 148,539 3.41 B _ 0 _ 0 _ 0.00 B Nom= 0 0 0.00 TOTAL: 62.0 790,506 18.15 *NCDEQ Table 4:HSGs for NC Soil Types-Urban Areas Runoff Curve Numbers for SCS Method NCDEQ Stormwater Design Manual Revised 3-15-2017 Post-Construction Conditions: Post-Drainage Area#1 Cover Type/Condition Soil Classification CN Area Area (SF) (AC) Impervious B 98 294,901 6.77 Grass-Good Condition B 61 424,274 9.74 Woods-Good Condition B 55 71,438 1.64 B 0 0 0.00 D 0 0 0.00 TOTAL: 74.3 790,613 18.15 /I EL7 Page 2 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND #1 Water Treatment Calculations Input Calculated I Drainage Area 18.15 ac SA/DA Ratio Impervious Area 6.77 ac %Impervious Permanent Pool Average Depth(ft) Impervious% 37% Cover 3.50 4.00 4.50 30%_ 1.06 0.94 0.89 _ Estimated Avg.Depth 4.00 ft 37%_ 1.14 1.02 0.96 SA/DA Ratio 1.02 % lio 40% 1.38 1.24 1.17 SA Required 0.19 ac *C-3 Table 1 (Piedmont and Mountain Region) SA Required 8,072 sf (NCDEQ BMP Design Manual revised 11-23-2020) Main Pool Calculations *Average Depth calculations are based on Equation 2 of Wet Pond MDC 2 of the NCDEQ Storm water Design Manual Main Pool Provided Depth 4.00 ft DMAx 0.50 ft Calc Avg.Depth 3.35 ft I Perimeter" 553.00 ft SA Provided 18,137 ft WidthsUBMERG 3.00 ft SA Provided 0.42 ac VsHEEF 414.75 cf Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal 0.00 641.00 13,059 0 0 Top of Sediment Removal 0.50 641.50 13,560 6,655 6,655 1.00 642.00 14,069 6,907 13,562 1.50 642.50 14,585 7,164 20,726 2.00 643.00 15,109 7,424 28,149 2.50 643.50 15,641 7,688 35,837 3.00 644.00 16,180 7,955 43,792 3.50 644.50 16,723 8,226 52,018 Bottom of Shelf 4.00 645.00 18,137 8,715 60,733 Permanent Pool //"Pi 7 Page 3 of 6 Civil&Environmental Consultants,Inc. Treatement Volume Orifice Size Calculation Treatment Vol _ 37,338 CF 37,338 Draw Down Time 2 DAYS 5 (NCDEQ required time frame) Draw Down Time 172,800 sec 432,000 Flow(Q) 0.216 CFS 0.086 Cd 0.6 0.6 H/3 0.411 ft 0.411 Area of orifice 0.070 sf 0.028 Max orifice diameter 3.58 in 2.27 Min orifice diameter Orifice Size Used(Dia.) 2.75 in Draw Down Time 3 DAYS Forebay Volume Calculation Forbay Provided Depth 4.00 ft Forebay 1-Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal 0.00 641.00 1,032 0 0 Top of Sediment Removal 0.50 641.50 1,167 550 550 1.00 642.00 1,310 619 1,169 1.50 642.50 1,459 692 1,861 2.00 643.00 1,617 769 2,630 2.50 643.50 1,781 850 3,480 3.00 644.00 1,953 934 4,413 3.50 644.50 2,132 1,021 5,435 4.00 645.00 2,318 1,113 6,547 Permanent Pool Forebay 2-Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal _ 0.00 641.00 656 0 0 Top of Sediment Removal 0.50 641.50 771 357 357 1.00 642.00 892 416 773 1.50 642.50 1,021 478 1,251 2.00 643.00 1,157 545 1,795 2.50 643.50 1,301 615 2,410 3.00 644.00 1,451 688 3,098 3.50 644.50 1,609 765 3,863 4.00 645.00 1,774 846 4,709 Permanent Pool //7:// Page 4 of 6 Civil&Environmental Consultants,Inc. Total Forebay Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal _ 0.00 641.00 1,688 0 0 Top of Sediment Removal 0.50 641.50 1,938 907 907 1.00 642.00 2,202 1,035 1,942 1.50 642.50 2,480 1,171 3,112 2.00 643.00 2,774 1,314 4,426 2.50 643.50 3,082 1,464 5,890 3.00 644.00 3,404 1,622 7,511 3.50 644.50 3,741 1,786 9,297 4.00 645.00 4,092 1,958 11,256 Permanent Pool 15%Permanent Pool Volume 9,110 20%Permanent Pool Volume 12,147 Forebay Volume Provided 11,256 18.5% Temporary Pool Calculations(Goose Creek Rules-Required Treatement Volume) Temp.Pool Provided Depth 5.00 ft Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 0.00 645.00 22,229 0 0 Permanent Pool 0.50 645.50 24,039 11,567 11,567 Top of Shelf 1.00 646.00 25,993 12,508 24,075 1.50 646.50 27,060 13,263 37,338 36"x 6"Orifice 2.00 647.00 28,141 13,800 51,139 2.50 647.50 29,237 14,345 65,483 3.00 648.00 30,347 14,896 80,379 Top of Riser 3.50 648.50 31,470 15,454 95,833 4.00 649.00 32,608 16,020 111,853 Spillway 4.50 649.50 33,760 16,592 128,445 5.00 650.00 34,926 17,172 145,616 Top of Dam(allow 1 ft FB) Pre-Developed Drainage Area-1 Year,24 Hour Volume 24,485 cf Post-Developed Drainage Area-1 Year,24 Hour Volume 54,703 cf Required Treatment Volume(Volume Difference) 30,218 cf Required Treatment Volume-Stage Elevation 646.23 Provided Treatment Volume 37,338 cf Provided Treatment Volume-Stage Elevation 646.50 //7:// Page 5 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND#1 ANTI-FLOTATION ANCHOR update area calculations for rectangular or circular riser Riser Inside Dimensions(ft)-square conc structure only 5.00 structures Riser Inside Area(sf) 25.00 Density of concrete(Ibs/cf) 150.00 Riser Outside Dimensions(ft)-square conc structure only 6.00 Riser Outside Area(sf) 36.00 Density of water(lbs/cf) 62.40 Riser Structure Height(ft) _ 4.00 WEIGHT DISPLACE BY RISER(Ibs) 6,240.00 Area of concrete(sf)-assume 6"wall thickness 11.00 Anchor Dimension(n x n)(ft) 7.00 Riser Structure Height(ft) 4.00 Anchor Thickness(ft) 1.50 Volume of Riser concrete(cf) 44.00 Anchor Area(sf) 49.00 Net Displaced by the Riser(lbs/cf) 87.60 Anchor Volume(cf) 96.00 WEIGHT OF THE CONCRETE RISER(Ibs) 3,854.40 WEIGHT OF ANCHOR(Ibs) 14,400.00 WEIGHT OF RISER&ANCHOR vs WEIGHT DISPLACED BY RISER ANTI-SEEP COLLAR Barell Size(in) 30 Anti-Seep Collar Size(ft x ft) 6.5 Provide min.two(2)6.5'x 6.5'anti-seep collars assume 6"thickness on pipe barrel and min.1.5 feet • Protection against piping-Install at least one watertight anti-seep collar projection around barrel(thickness may vary depending with a minimum projection of 1.5 feet around the barrel of principal on barrel type) spillway conduits,8 inches or larger in diameter. Locate the anti-seep collar slightly downstream from the dam center line. A properly designed drainage diaphragm installed around the barrel may be used instead of an anti-seep collar when it is appropriate. 1'FREEBOARD EMBANKMENT HEAD ABOVE OUTLET END OF BARREL EMERGENCY SPILLWAY HEAD ABOVE- PRINCIPAL RISER CREST SPILL WAY BARREL DIA r, M Page 6 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND #2 SUMMARY CHART PEAK CONTROL POST- POST STORM EVENTS DEVELOPMENT DEVELOPMENT ELEVATION *values taken from RUNOFF OUTFLOW hydrographs Top of Berm 650.00 1YR-24HR 37.63 CFS 0.49 CFS 646.54 2YR-24HR 53.40 CFS 1.75 CFS 646.67 10YR-24HR 100.37 CFS 11.97 CFS 647.40 25YR-24HR 130.36 CFS 18.77 CFS 648.08 50YR-24HR 154.87 CFS 43.35 CFS 648.51 100YR-2411R 180.48 CFS 54.85 CFS 648.96 --M M J Page 1 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND #2 COMPOSITE CURVE NUMBERS (CN) Project Area Soil Types= See attached Soils Report Input Calculated Pre-Construction Conditions: Pre-Drainage Area-Entire Site Cover Type/Condition Soil Classification CN Area Area (SF) (AC) Woods-Good Condition B 55 657,342 15.09 Woods-Good Condition C 70 80,561 1.85 Woods-Good Condition D 77 208,217 4.78 B 0 0 0.00 B 0 0 0.00 TOTAL: 61.1 946,120 21.72 *NCDEQ Table 4:HSGs for NC Soil Types-Urban Areas Runoff Curve Numbers for SCS Method NCDEQ Stormwater Design Manual Revised 3-15-2017 Post-Construction Conditions: Post-Drainage Area#1 Cover Type/Condition Soil Classification CN Area Area (SF) (AC) Impervious B 98 432,551 9.93 Grass-Good Condition B 61 345,431 7.93 Woods-Good Condition B 55 168,229 3.86 B 0 0 0.00 D 0 0 0.00 TOTAL: 76.8 946,211 21.72 /I EL7 Page 2 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND #2 Water Treatment Calculations Input Calculated Drainage Area 21.72 ac SA/DA Ratio Impervious Area 9.93 ac %I ,• v i 1' Permanent Pool Average Depth(ft) Impervious% 46% Cove 3.50 4.00 4.50 40% 1.38 1.24 1.17 _ Estimated Avg.Depth 4.00 ft 46% 1.49 1.36 1.27 _ SA/DA Ratio 1.36 % 50% 1.65 1.51 1.41 SA Required 0.29 ac *C-3 Table 1 (Piedmont and Mountain Region) SA Required 12,828 sf (NCDEQ BMP Design Manual revised 11-23-2020) Main Pool Calculations *Average Depth calculations are based on Equation 2 of Wet Pond MDC 2 of the NCDEQ Storm water Design Manual Main Pool Provided Depth 4.00 ft DMAX 0.50 ft Calc Avg.Depth 3.51 ft I Perimeter" 655.00 ft SA Provided 29,626 ft WidthsUBMERG 3.00 ft SA Provided 0.68 ac VsHEEF cf Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal 0.00 641.00 23,308 0 0 Top of Sediment Removal 0.50 641.50 23,939 11,812 11,812 1.00 642.00 24,579 12,130 23,941 1.50 642.50 25,227 12,452 36,393 2.00 643.00 25,883 12,778 49,170 2.50 643.50 26,548 13,108 62,278 3.00 644.00 27,222 13,443 75,721 3.50 644.50 27,905 13,782 89,502 Bottom of Shelf 4.00 645.00 29,626 14,383 103,885 Permanent Pool //"Pi 7 Page 3 of 6 Civil&Environmental Consultants,Inc. Treatement Volume Orifice Size Calculation Treatment Vol 59,026 CF 59,026 Draw Down Time 2 DAYS 5 (NCDEQ required time frame) Draw Down Time 172,800 sec 432,000 Flow(Q) 0.342 CFS 0.137 Cd 0.6 0.6 H/3 0.411 ft 0.411 Area of orifice 0.111 sf 0.044 Max orifice diameter 4.50 in 2.85 Min orifice diameter Orifice Size Used(Dia.) 3.50 in Draw Down Time 3 DAYS Forebay Volume Calculation Forbay Provided Depth 4.00 ft Forebay 1-Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal 0.00 641.00 1,821 0 0 Top of Sediment Removal 0.50 641.50 1,988 952 952 1.00 642.00 2,162 1,038 1,990 1.50 642.50 2,343 1,126 3,116 2.00 643.00 2,531 1,219 4,335 2.50 643.50 2,726 1,314 5,649 3.00 644.00 2,927 1,413 7,062 3.50 644.50 3,135 1,516 8,578 4.00 645.00 3,350 1,621 10,199 Permanent Pool Forebay 2-Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal _ 0.00 641.00 1,564 0 0 Top of Sediment Removal 0.50 641.50 1,729 823 823 1.00 642.00 1,902 908 1,731 1.50 642.50 2,082 996 2,727 2.00 643.00 2,270 1,088 3,815 2.50 643.50 2,465 1,184 4,999 3.00 644.00 2,666 1,283 6,282 3.50 644.50 2,875 1,385 7,667 4.00 645.00 3,091 1,492 9,158 Permanent Pool /,i i i/ Page 4 of 6 Civil&Environmental Consultants,Inc. Total Forebay Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 640.50 Bottom of Sediment Removal _ 0.00 641.00 3,385 0 0 Top of Sediment Removal 0.50 641.50 3,717 1,776 1,776 1.00 642.00 4,064 1,945 3,721 1.50 642.50 4,425 2,122 5,843 2.00 643.00 4,801 2,307 8,150 2.50 643.50 5,191 2,498 10,648 3.00 644.00 5,593 2,696 13,344 3.50 644.50 6,010 2,901 16,244 4.00 645.00 6,441 3,113 19,357 Permanent Pool 15%Permanent Pool Volume 15,583 20%Permanent Pool Volume 20,777 Forebay Volume Provided 19,357 18.6% Temporary Pool Calculations(Goose Creek Rules-Required Treatement Volume) Temp.Pool Provided Depth 5.00 ft Volume Calculation(Average End Method) Stage Elevation Area Inc.Vol. Acc Vol. (ft) (ft) (sf) (cf) (cf) 0.00 645.00 36,067 0 0 Permanent Pool 0.50 645.50 38,281 18,587 18,587 Top of Shelf 1.00 646.00 40,740 19,755 38,342 1.50 646.50 41,994 20,684 59,026 36"x 6"Orifice 2.00 647.00 43,262 21,314 80,340 2.50 647.50 44,543 21,951 102,291 3.00 648.00 45,839 22,596 124,887 Top of Riser 3.50 648.50 47,150 23,247 148,134 4.00 649.00 48,474 23,906 172,040 Spillway 4.50 649.50 49,812 24,572 196,611 5.00 650.00 51,165 25,244 221,856 Top of Dam(allow 1 ft FB) Pre-Developed Drainage Area-1 Year,24 Hour Volume 27,263 cf Post-Developed Drainage Area-1 Year,24 Hour Volume 75,288 cf Required Treatment Volume(Volume Difference) 48,025 cf Required Treatment Volume-Stage Elevation 646.23 Provided Treatment Volume 59,026 cf Provided Treatment Volume-Stage Elevation 646.50 //7:// Page 5 of 6 Civil&Environmental Consultants,Inc. BMP WETPOND#2 ANTI-FLOTATION ANCHOR update area calculations for rectangular or circular riser Riser Inside Dimensions(ft)-square conc structure only 5.00 structures Riser Inside Area(sf) 25.00 Density of concrete(Ibs/cf) 150.00 Riser Outside Dimensions(ft)-square conc structure only 6.00 Riser Outside Area(sf) 36.00 Density of water(Ibs/cf) 62.40 Riser Structure Height(ft) _ 4.00 WEIGHT DISPLACE BY RISER(Ibs) 6,240.00 Area of concrete(sf)-assume 6"wall thickness 11.00 Anchor Dimension(n x n)(ft) 7.00 Riser Structure Height(ft) 4.00 Anchor Thickness(ft) 1.50 Volume of Riser concrete(cf) 44.00 Anchor Area(sf) 49.00 Net Displaced by the Riser(Ibs/cf) 87.60 Anchor Volume(cf) 96.00 WEIGHT OF THE CONCRETE RISER(Ibs) 3,854.40 WEIGHT OF ANCHOR(Ibs) 14,400.00 WEIGHT OF RISER&ANCHOR vs WEIGHT DISPLACED BY RISER ANTI-SEEP COLLAR Barell Size(in) 30 Anti-Seep Collar Size(ft x ft) 6.5 Provide min.two(2)6.5'x 6.5'anti-seep collars assume 6"thickness on pipe barrel and min.1.5 feet • Protection against piping-Install at least one watertight anti-seep collar projection around barrel(thickness may vary depending with a minimum projection of 1.5 feet around the barrel of principal on barrel type) spillway conduits,8 inches or larger in diameter. Locate the anti-seep collar slightly downstream from the dam center line. A properly designed drainage diaphragm installed around the barrel may be used instead of an anti-seep collar when it is appropriate. 1 FREEBOARD - EMBANKMENT _=I HEAD ABOVE OUTLET END OF BARREL EMERGENCY SPILLWAY HEAD ABOVE` PRINCIPAL RISER CREST SPILLWAY WIWire T •may BARREL DIA /I/_/_/ Page 6 of 6 Civil&Environmental Consultants,Inc. Hydraflow Table of Contents 326256-Heritage at Marvin-Wetponds Hydrogprah.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pre-Dev. Drainage Area #1 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, Pre-Dev. Drainage Area #2 6 TR-55 Tc Worksheet 7 Hydrograph No. 3, Combine, Pre-Dev. Discharge Rate 8 Hydrograph No. 4, SCS Runoff, Post-Dev. Drainage Area #1 9 Hydrograph No. 5, Reservoir, Wetpond #1 10 Pond Report -Wet Pond #1 11 Hydrograph No. 6, SCS Runoff, Post-Dev. Drainage Area #2 12 Hydrograph No. 7, Reservoir, Wet Pond #2 13 Pond Report -Wet Pond #2 14 2 - Year Summary Report 15 Hydrograph Reports 16 Hydrograph No. 1, SCS Runoff, Pre-Dev. Drainage Area #1 16 Hydrograph No. 2, SCS Runoff, Pre-Dev. Drainage Area #2 17 Hydrograph No. 3, Combine, Pre-Dev. Discharge Rate 18 Hydrograph No. 4, SCS Runoff, Post-Dev. Drainage Area #1 19 Hydrograph No. 5, Reservoir, Wetpond #1 20 Hydrograph No. 6, SCS Runoff, Post-Dev. Drainage Area #2 21 Hydrograph No. 7, Reservoir, Wet Pond #2 22 10 - Year Summary Report 23 Hydrograph Reports 24 Hydrograph No. 1, SCS Runoff, Pre-Dev. Drainage Area #1 24 Hydrograph No. 2, SCS Runoff, Pre-Dev. Drainage Area #2 25 Hydrograph No. 3, Combine, Pre-Dev. Discharge Rate 26 Hydrograph No. 4, SCS Runoff, Post-Dev. Drainage Area #1 27 Hydrograph No. 5, Reservoir, Wetpond #1 28 Hydrograph No. 6, SCS Runoff, Post-Dev. Drainage Area #2 29 Hydrograph No. 7, Reservoir, Wet Pond #2 30 25 - Year Summary Report 31 Hydrograph Reports 32 Hydrograph No. 1, SCS Runoff, Pre-Dev. Drainage Area #1 32 Hydrograph No. 2, SCS Runoff, Pre-Dev. Drainage Area #2 33 Hydrograph No. 3, Combine, Pre-Dev. Discharge Rate 34 Hydrograph No. 4, SCS Runoff, Post-Dev. Drainage Area #1 35 Contents continued... 326256-Heritage at Marvin-Wetponds Hydrogprah.gpw Hydrograph No. 5, Reservoir, Wetpond #1 36 Hydrograph No. 6, SCS Runoff, Post-Dev. Drainage Area #2 37 Hydrograph No. 7, Reservoir, Wet Pond #2 38 50 - Year Summary Report 39 Hydrograph Reports 40 Hydrograph No. 1, SCS Runoff, Pre-Dev. Drainage Area #1 40 Hydrograph No. 2, SCS Runoff, Pre-Dev. Drainage Area #2 41 Hydrograph No. 3, Combine, Pre-Dev. Discharge Rate 42 Hydrograph No. 4, SCS Runoff, Post-Dev. Drainage Area #1 43 Hydrograph No. 5, Reservoir, Wetpond #1 44 Hydrograph No. 6, SCS Runoff, Post-Dev. Drainage Area #2 45 Hydrograph No. 7, Reservoir, Wet Pond #2 46 100 - Year Summary Report 47 Hydrograph Reports 48 Hydrograph No. 1, SCS Runoff, Pre-Dev. Drainage Area #1 48 Hydrograph No. 2, SCS Runoff, Pre-Dev. Drainage Area #2 49 Hydrograph No. 3, Combine, Pre-Dev. Discharge Rate 50 Hydrograph No. 4, SCS Runoff, Post-Dev. Drainage Area #1 51 Hydrograph No. 5, Reservoir, Wetpond #1 52 Hydrograph No. 6, SCS Runoff, Post-Dev. Drainage Area #2 53 Hydrograph No. 7, Reservoir, Wet Pond #2 54 IDF Report 55 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 1 2 3 6 Legend Hyd. Origin Description 1 SCS Runoff Pre-Dev. Drainage Area#1 2 SCS Runoff Pre-Dev. Drainage Area#2 3 Combine Pre-Dev.Discharge Rate 4 SCS Runoff Post-Dev. Drainage Area#1 5 Reservoir Wetpond#1 6 SCS Runoff Post-Dev. Drainage Area#2 7 Reservoir Wet Pond#2 Project: 326256-Heritage at Marvin-Wetponds Hydrogprah.gpw Friday, 03/ 15/2024 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 2.371 4.890 9.964 14.72 21.94 28.17 34.94 Pre-Dev. Drainage Area#1 2 SCS Runoff 2.407 5.103 10.66 15.97 24.07 31.13 38.82 Pre-Dev. Drainage Area#2 3 Combine 1,2 4.769 9.977 20.56 30.67 45.93 59.14 73.51 Pre-Dev. Discharge Rate 4 SCS Runoff 27.19 39.73 60.17 77.29 101.88 122.11 1143.34 Post-Dev.Drainage Area#1 5 Reservoir 4 0.553 2.006 8.526 13.67 29.48 51.43 60.35 Wetpond#1 6 SCS Runoff 37.63 53.40 78.86 100.37 130.36 154.87 180.48 Post-Dev.Drainage Area#2 7 Reservoir 6 0.490 1.752 7.212 11.97 18.77 43.35 54.85 Wet Pond#2 Proj. file: 326256-Heritage at Marvin-Wetponds Hydrogprah.gpw Friday, 03/ 15/2024 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 2.371 2 756 24,485 Pre-Dev. Drainage Area#1 2 SCS Runoff 2.407 2 760 27,263 Pre-Dev. Drainage Area#2 3 Combine 4.769 2 758 51,747 1,2 Pre-Dev. Discharge Rate 4 SCS Runoff 27.19 2 718 54,703 Post-Dev.Drainage Area#1 5 Reservoir 0.553 2 1078 51,433 4 646.55 38,934 Wetpond#1 6 SCS Runoff 37.63 2 718 75,288 Post-Dev.Drainage Area#2 7 Reservoir 0.490 2 1318 59,646 6 646.54 61,016 Wet Pond#2 326256-Heritage at Marvin-Wetponds HydrogpRaltugpReriod: 1 Year Friday, 03/ 15/2024 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 2.371 cfs Storm frequency = 1 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 24,485 cuft Drainage area = 18.150 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 55.30 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.400 0.011 Flow length (ft) = 300.0 285.0 0.0 Two-year 24-hr precip. (in) = 3.54 3.54 0.00 Land slope (%) = 8.00 8.00 0.00 Travel Time (min) = 28.24 + 27.10 + 0.00 = 55.34 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.040 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 55.30 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 2.407 cfs Storm frequency = 1 yrs Time to peak = 760 min Time interval = 2 min Hyd. volume = 27,263 cuft Drainage area = 21.720 ac Curve number = 61.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 59.80 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #2 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 1 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.400 0.011 Flow length (ft) = 300.0 300.0 0.0 Two-year 24-hr precip. (in) = 3.54 3.54 0.00 Land slope (%) = 7.00 7.00 0.00 Travel Time (min) = 29.79 + 29.79 + 0.00 = 59.58 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 12.00 0.00 0.00 Wetted perimeter(ft) = 6.00 0.00 0.00 Channel slope (%) = 3.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =27.37 0.00 0.00 Flow length (ft) ({0})370.0 0.0 0.0 Travel Time (min) = 0.23 + 0.00 + 0.00 = 0.23 Total Travel Time, Tc 59.80 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 3 Pre-Dev. Discharge Rate Hydrograph type = Combine Peak discharge = 4.769 cfs Storm frequency = 1 yrs Time to peak = 758 min Time interval = 2 min Hyd. volume = 51,747 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 39.870 ac Pre-Dev. Discharge Rate Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 5.00 5.00 I 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 411'414.44.'''Ll1111.11111\ 0.00 � • ^ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 4 Post-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 27.19 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 54,703 cuft Drainage area = 18.150 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #1 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 -}—\4.--------- - 0.00 - - A — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 5 Wetpond#1 Hydrograph type = Reservoir Peak discharge = 0.553 cfs Storm frequency = 1 yrs Time to peak = 1078 min Time interval = 2 min Hyd. volume = 51,433 cuft Inflow hyd. No. = 4 - Post-Dev. Drainage Area #'Max. Elevation = 646.55 ft Reservoir name = Wet Pond #1 Max. Storage = 38,934 cuft Storage Indication method used. Wetpond #1 Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 - — 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 5 Hyd No. 4 111111111 Total storage used = 38,934 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Pond No. 1 - Wet Pond #1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=645.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 645.00 22,229 0 0 1.00 646.00 25,993 24,084 24,084 2.00 647.00 28,141 27,057 51,141 3.00 648.00 30,347 29,234 80,375 4.00 649.00 32,608 31,468 111,843 5.00 650.00 34,926 33,757 145,600 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 30.00 2.75 6.00 0.00 Crest Len(ft) = 20.00 15.00 0.00 0.00 Span(in) = 30.00 2.75 36.00 0.00 Crest El.(ft) = 648.00 649.00 0.00 0.00 No.Barrels = 1 1 2 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 642.00 645.00 646.50 0.00 Weir Type = 1 Ciplti --- --- Length(ft) = 55.50 0.50 0.50 0.00 Multi-Stage = Yes No No No Slope(%) = 1.80 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 650.00 I 4.00 649.00 3.00 648.00 2.00 647.00 1.00 646.00 0.00 I 645.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 Total Q Discharge(cfs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 6 Post-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 37.63 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 75,288 cuft Drainage area = 21.720 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #2 Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - e - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 0.490 cfs Storm frequency = 1 yrs Time to peak = 1318 min Time interval = 2 min Hyd. volume = 59,646 cuft Inflow hyd. No. = 6 - Post-Dev. Drainage Area #2/lax. Elevation = 646.54 ft Reservoir name = Wet Pond #2 Max. Storage = 61,016 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 L0.00 _ 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 61,016 cuft Pond Report 14 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Pond No. 2 - Wet Pond #2 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=645.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 645.00 36,067 0 0 1.00 646.00 40,740 38,376 38,376 2.00 647.00 43,262 41,990 80,366 3.00 648.00 45,839 44,540 124,906 4.00 649.00 48,474 47,146 172,052 5.00 650.00 51,165 49,809 221,860 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 30.00 3.50 6.00 0.00 Crest Len(ft) = 20.00 15.00 0.00 0.00 Span(in) = 30.00 3.50 36.00 0.00 Crest El.(ft) = 648.00 649.00 0.00 0.00 No.Barrels = 1 1 2 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 642.00 645.00 646.50 0.00 Weir Type = 1 Ciplti --- --- Length(ft) = 55.50 0.50 0.50 0.00 Multi-Stage = Yes No No No Slope(%) = 1.80 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 650.00 I 4.00 649.00 3.00 648.00 2.00 647.00 1.00 646.00 0.00 I 645.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 Total Q Discharge(cfs) 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.890 2 752 41,474 Pre-Dev. Drainage Area#1 2 SCS Runoff 5.103 2 754 46,917 Pre-Dev. Drainage Area#2 3 Combine 9.977 2 752 88,391 1,2 Pre-Dev. Discharge Rate 4 SCS Runoff 39.73 2 718 79,445 I Post-Dev.Drainage Area#1 5 Reservoir 2.006 2 798 76,136 4 646.69 42,867 Wetpond#1 6 SCS Runoff 53.40 2 718 106,954 Post-Dev. Drainage Area#2 7 Reservoir 1.752 2 858 91,096 6 646.67 66,627 Wet Pond#2 326256-Heritage at Marvin-Wetponds HydrogpRaltugpReriod: 2 Year Friday, 03/ 15/2024 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 4.890 cfs Storm frequency = 2 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 41,474 cuft Drainage area = 18.150 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 55.30 min Total precip. = 3.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #1 Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 5.103 cfs Storm frequency = 2 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 46,917 cuft Drainage area = 21.720 ac Curve number = 61.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 59.80 min Total precip. = 3.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #2 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 3 Pre-Dev. Discharge Rate Hydrograph type = Combine Peak discharge = 9.977 cfs Storm frequency = 2 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 88,391 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 39.870 ac Pre-Dev. Discharge Rate Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 - 6.00 4.00 - 4.00 2.00 \ - 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 4 Post-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 39.73 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 79,445 cuft Drainage area = 18.150 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #1 Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 40.00 40.00 30.00 1 30.00 20.00 20.00 10.00 10.00 J 0.00 - s - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 5 Wetpond #1 Hydrograph type = Reservoir Peak discharge = 2.006 cfs Storm frequency = 2 yrs Time to peak = 798 min Time interval = 2 min Hyd. volume = 76,136 cuft Inflow hyd. No. = 4 - Post-Dev. Drainage Area #'Max. Elevation = 646.69 ft Reservoir name = Wet Pond #1 Max. Storage = 42,867 cuft Storage Indication method used. Wetpond #1 Q (cfs) Hyd. No. 5-- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 tilill..."' 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 5 Hyd No. 4 111111111 Total storage used = 42,867 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 6 Post-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 53.40 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 106,954 cuft Drainage area = 21.720 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.54 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #2 Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 60.00 60.00 T 50.00 50.00 40.00 40.00 1 30.00 30.00 20.00 20.00 10.00 10.00 JV 0.00 ' 1 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 1.752 cfs Storm frequency = 2 yrs Time to peak = 858 min Time interval = 2 min Hyd. volume = 91,096 cuft Inflow hyd. No. = 6 - Post-Dev. Drainage Area #2/lax. Elevation = 646.67 ft Reservoir name = Wet Pond #2 Max. Storage = 66,627 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 66,627 cuft 23 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 14.72 2 748 101,001 Pre-Dev. Drainage Area#1 2 SCS Runoff 15.97 2 752 116,645 Pre-Dev. Drainage Area#2 3 Combine 30.67 2 750 217,646 1,2 Pre-Dev. Discharge Rate 4 SCS Runoff 77.29 2 716 156,062 Post-Dev.Drainage Area#1 5 Reservoir 13.67 2 726 152,680 4 647.61 68,839 Wetpond#1 6 SCS Runoff 100.37 2 716 203,108 Post-Dev.Drainage Area#2 7 Reservoir 11.97 2 736 186,974 6 647.40 98,331 Wet Pond#2 326256-Heritage at Marvin-Wetponds HydrogpRaltugpReriod: 10 Year Friday, 03/ 15/2024 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 14.72 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 101,001 cuft Drainage area = 18.150 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 55.30 min Total precip. = 5.17 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 15.00 15.00 12.00 — 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 15.97 cfs Storm frequency = 10 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 116,645 cuft Drainage area = 21.720 ac Curve number = 61.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 59.80 min Total precip. = 5.17 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #2 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 L\ 6.00 3.00 3.00 0.00 - J _ �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 3 Pre-Dev. Discharge Rate Hydrograph type = Combine Peak discharge = 30.67 cfs Storm frequency = 10 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 217,646 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 39.870 ac Pre-Dev. Discharge Rate Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 35.00 35.00 30.00 _ t 30.00 25.00 25.00 20.00 20.00 15.00 I 15.00 II 10.00 10.00 I � 5.00 5.00 0.00 ^ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 4 Post-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 77.29 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 156,062 cuft Drainage area = 18.150 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.17 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #1 Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 80.00 i 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 I * — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 5 Wetpond #1 Hydrograph type = Reservoir Peak discharge = 13.67 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 152,680 cuft Inflow hyd. No. = 4 - Post-Dev. Drainage Area #'Max. Elevation = 647.61 ft Reservoir name = Wet Pond #1 Max. Storage = 68,839 cuft Storage Indication method used. Wetpond #1 Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 80.00 I 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 5 Hyd No. 4 111111111 Total storage used = 68,839 cuft 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 6 Post-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 100.37 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 203,108 cuft Drainage area = 21.720 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.17 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #2 Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 I 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 6 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 11.97 cfs Storm frequency = 10 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 186,974 cuft Inflow hyd. No. = 6 - Post-Dev. Drainage Area #2/lax. Elevation = 647.40 ft Reservoir name = Wet Pond #2 Max. Storage = 98,331 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — — 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 98,331 cuft 31 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 21.94 2 748 143,469 Pre-Dev. Drainage Area#1 2 SCS Runoff 24.07 2 750 166,771 Pre-Dev. Drainage Area#2 3 Combine 45.93 2 750 310,240 1,2 Pre-Dev. Discharge Rate 4 SCS Runoff 101.88 2 716 206,361 Post-Dev.Drainage Area#1 5 Reservoir 29.48 2 724 202,958 4 648.30 89,913 Wetpond#1 6 SCS Runoff 130.36 2 716 265,375 Post-Dev.Drainage Area#2 7 Reservoir 18.77 2 728 249,158 6 648.08 128,829 Wet Pond#2 326256-Heritage at Marvin-Wetponds HydrogpRaltugpReriod: 25 Year Friday, 03/ 15/2024 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 21.94 cfs Storm frequency = 25 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 143,469 cuft Drainage area = 18.150 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 55.30 min Total precip. = 6.15 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #1 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 24.00 24.00 S 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 24.07 cfs Storm frequency = 25 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 166,771 cuft Drainage area = 21.720 ac Curve number = 61.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 59.80 min Total precip. = 6.15 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #2 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 J — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 3 Pre-Dev. Discharge Rate Hydrograph type = Combine Peak discharge = 45.93 cfs Storm frequency = 25 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 310,240 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 39.870 ac Pre-Dev. Discharge Rate Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 1 20.00 I 20.00 1 i 10.00 I 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 4 Post-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 101.88 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 206,361 cuft Drainage area = 18.150 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.15 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #1 Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 4 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 5 Wetpond #1 Hydrograph type = Reservoir Peak discharge = 29.48 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 202,958 cuft Inflow hyd. No. = 4 - Post-Dev. Drainage Area #'Max. Elevation = 648.30 ft Reservoir name = Wet Pond #1 Max. Storage = 89,913 cuft Storage Indication method used. Wetpond #1 Q (cfs) Hyd. No. 5-- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 Jir — — — 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 4 111111111 Total storage used = 89,913 cuft 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 6 Post-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 130.36 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 265,375 cuft Drainage area = 21.720 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.15 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #2 Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 140.00 I 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 6 Time (min) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 18.77 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 249,158 cuft Inflow hyd. No. = 6 - Post-Dev. Drainage Area #2/lax. Elevation = 648.08 ft Reservoir name = Wet Pond #2 Max. Storage = 128,829 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 . 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 128,829 cuft 39 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 28.17 2 748 180,309 Pre-Dev. Drainage Area#1 2 SCS Runoff 31.13 2 750 210,397 Pre-Dev. Drainage Area#2 3 Combine 59.14 2 750 390,706 1,2 Pre-Dev. Discharge Rate 4 SCS Runoff 122.11 2 716 248,413 Post-Dev.Drainage Area#1 5 Reservoir 51.43 2 722 244,998 4 648.70 102,448 Wetpond#1 6 SCS Runoff 154.87 2 716 317,120 Post-Dev.Drainage Area#2 7 Reservoir 43.35 2 724 300,848 6 648.51 148,912 Wet Pond#2 326256-Heritage at Marvin-Wetponds HydrogpRaltugpReriod: 50 Year Friday, 03/ 15/2024 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 28.17 cfs Storm frequency = 50 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 180,309 cuft Drainage area = 18.150 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 55.30 min Total precip. = 6.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #1 Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 30.00 30.00 II 25.00 25.00 20.00 I 20.00 15.00 15.00 I 10.00 10.00 5.00 5.00 , L 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 31.13 cfs Storm frequency = 50 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 210,397 cuft Drainage area = 21.720 ac Curve number = 61.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 59.80 min Total precip. = 6.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #2 Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 35.00 35.00 30.00 30.00 _i_ 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 J 44.-------------- 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 3 Pre-Dev. Discharge Rate Hydrograph type = Combine Peak discharge = 59.14 cfs Storm frequency = 50 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 390,706 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 39.870 ac Pre-Dev. Discharge Rate Q (cfs) Hyd. No. 3 -- 50 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 / - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 4 Post-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 122.11 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 248,413 cuft Drainage area = 18.150 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #1 Q (cfs) Hyd. No. 4 -- 50 Year Q (cfs) 140.00 I I 140.00 120.00 120.00 100.00 100.00 80.00 1 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 4 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 5 Wetpond #1 Hydrograph type = Reservoir Peak discharge = 51.43 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 244,998 cuft Inflow hyd. No. = 4 - Post-Dev. Drainage Area #'Max. Elevation = 648.70 ft Reservoir name = Wet Pond #1 Max. Storage = 102,448 cuft Storage Indication method used. Wetpond #1 Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 4 111111111 Total storage used = 102,448 cuft 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 6 Post-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 154.87 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 317,120 cuft Drainage area = 21.720 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #2 Q (cfs) Hyd. No. 6 -- 50 Year Q (cfs) 160.00 I 160.00 140.00 140.00 120.00 I 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — ----- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 43.35 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 300,848 cuft Inflow hyd. No. = 6 - Post-Dev. Drainage Area #2/lax. Elevation = 648.51 ft Reservoir name = Wet Pond #2 Max. Storage = 148,912 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 7 -- 50 Year Q (cfs) 160.00 1 _ 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 �� uNE .- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 148,912 cuft 47 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 34.94 2 748 220,505 Pre-Dev. Drainage Area#1 2 SCS Runoff 38.82 2 750 258,105 Pre-Dev. Drainage Area#2 3 Combine 73.51 2 750 478,610 1,2 Pre-Dev. Discharge Rate 4 SCS Runoff 143.34 2 716 293,131 Post-Dev.Drainage Area#1 5 Reservoir 60.35 2 722 289,705 4 649.18 117,847 Wetpond#1 6 SCS Runoff 180.48 2 716 371,922 Post-Dev.Drainage Area#2 7 Reservoir 54.85 2 724 355,600 6 648.96 170,294 Wet Pond#2 326256-Heritage at Marvin-Wetponds HydrogpRaltugpReriod: 100 Year Friday, 03/ 15/2024 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 1 Pre-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 34.94 cfs Storm frequency = 100 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 220,505 cuft Drainage area = 18.150 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 55.30 min Total precip. = 7.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 .1\ 25.00 4 25.00 20.00 20.00 I 15.00 15.00 10.00 10.00 iL 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 2 Pre-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 38.82 cfs Storm frequency = 100 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 258,105 cuft Drainage area = 21.720 ac Curve number = 61.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 59.80 min Total precip. = 7.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev. Drainage Area #2 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 • 20.00 I 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 3 Pre-Dev. Discharge Rate Hydrograph type = Combine Peak discharge = 73.51 cfs Storm frequency = 100 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 478,610 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 39.870 ac Pre-Dev. Discharge Rate Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 80.00 80.00 L 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 4 Post-Dev. Drainage Area #1 Hydrograph type = SCS Runoff Peak discharge = 143.34 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 293,131 cuft Drainage area = 18.150 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #1 Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 I 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 :::° 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 4 Time (min) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 5 Wetpond #1 Hydrograph type = Reservoir Peak discharge = 60.35 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 289,705 cuft Inflow hyd. No. = 4 - Post-Dev. Drainage Area #'Max. Elevation = 649.18 ft Reservoir name = Wet Pond #1 Max. Storage = 117,847 cuft Storage Indication method used. Wetpond #1 Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 4 111111111 Total storage used = 117,847 cuft 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 6 Post-Dev. Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 180.48 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 371,922 cuft Drainage area = 21.720 ac Curve number = 76.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev. Drainage Area #2 Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 210.00 210.00 180.00 ' 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 54.85 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 355,600 cuft Inflow hyd. No. = 6 - Post-Dev. Drainage Area #2/lax. Elevation = 648.96 ft Reservoir name = Wet Pond #2 Max. Storage = 170,294 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 210.00 210.00 180.00 - - 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 170,294 cuft 55 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/15/2024 Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.98 4.00 3.35 2.89 2.55 2.28 2.07 1.89 1.74 1.62 1.51 1.42 2 5.89 4.74 3.99 3.45 3.04 2.73 2.48 2.27 2.10 1.95 1.82 1.71 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.83 5.56 4.71 4.10 3.64 3.28 2.99 2.75 2.55 2.38 2.23 2.10 10 7.54 6.15 5.22 4.57 4.07 3.68 3.37 3.11 2.89 2.70 2.54 2.40 25 8.34 6.82 5.83 5.12 4.58 4.16 3.82 3.54 3.30 3.10 2.92 2.77 50 8.87 7.27 6.23 5.49 4.94 4.50 4.15 3.85 3.61 3.40 3.21 3.05 100 9.40 7.70 6.62 5.85 5.27 4.82 4.45 4.15 3.90 3.68 3.49 3.32 Tc=time in minutes.Values may exceed 60. STORM PIPING SYSTEM CALCULATIONS 8 7 6 5 4 H H 1 1 PID#0624000\ PID#06225003E cc `` \ 0 W o PID#06240002C \\ JERRY A PRESSLEY&WIFE, \ VASS KRISTEN CROWS o JERRY A PRESSLEY&WIFE, DB D157 PG 1087cc E ROBBIE C PRESSLEY ROBBIE C PRESSLEY \ PC L FILE 536 DB 3633 PG 864 \ DB 4514 PG 425 LOT 3 I Z LAND USE: RESIDENTIAL \ LAND USE: RESIDENTIAL 1 PID#06225003 I O \ LAND USE: RESIDENTIAL VASS KRISTEN CROWS o ZONING: RESIDENTIAL ZONING: RESIDENTIAL ZONING: RESIDENTIAL to o DB 157 PG 1087 PID#06240002B `\ -= \ PC L FILE 536 CARL S NICHOLS&WIFE, LOT 1 \ 5 o 2 i t' gg N IRIS W NICHOLS -•' LAND USE: RESIDENTIAL 3 0 w \ _ - ZONING: RESIDENTIAL B i w \ DB 691 PG 53 Ma G N PC C FILE 877 ���`��_ _�,� !� \ \ \ o i G \ LAND USE: RESIDENTIAL \\\l ��:���� =/�\ \,....„....... I s LOT 2A �- \ \ \ ZONING: RESIDENTIAL � / �1 0 ��,� ��. \ _—_ _ � , �/i �� ware z Z 0 = o a PID#06240002A — '� ■ / • ` -��. 1 CARL IRISNW NICHOLS DB WIFE, \lAb�V ®�Q®--1� —\® �c:Id# • -�\ =\ �11 I I \ �� �_ —` •.11.141 \' PID#06225003D \ \ PC C FILE 877 II I = 1■,`0, 0 \ MARK& SP WIN2LE A`, \ DB 564 PG 218 �� _ 1� �� 1� �, �- DB 7289 PG 702 \ LOT 2B F I!■�/ ^� PID$06225003C a PC L FILE 536 LAND USE RESIDENTIAL / ® �� ` �, I7 Xrine I ` ,I/��IIIIIII�'■,��l =�� _ IGOR&VALENTINA \�` LOT 536 C� M ZONING: RESIDENTIAL !I I/ll K■G i,! PRIYMAK �:' p�L(p E `� DB 8217 PG 563 \ LAND USE: RESIDENTIAL I I f� \\ y1 elI JIY OIM illy ■\�1 \ -_ PC F FILE 481 �, Nam\ �w ZONING: RESIDENTIAL j1\111111 ) I 0 HI ,�` 41k v1Y II ■- LOT 25 C \ \. \ N, /� '�` !■\�G! PROPERTYCLAS �� <.> V - - ___\ / ® �� �'� � 411.11118®' , I' 1'1o1■ 4 �\ \ RESIDENTIAL S PID#06225003B i ZF �`r fir, i��� U�ra a i�i�� A\ - , _ � Ii1 '� 1,.5„'. a� ! / ZONING: VILLAGE OF�' DAVID&KASEY COATES I driA&\ — /� MARVIN DB 8528 PG 864 N \ \� / —�' a yri j ��_ \ PC F FILE 481 \ �\ / PID#06225007A y� _ n \ PID#06240031 \ F '� .�1`� �� —'_ ��`�/ �'•� /�j � \\ LOT 25-B '--� / / I I DB 1561 APG R564 EY ~ \ # �,. I'- ''%� =7r�:� ` legit/® \ PROPERTY CLASS: \ JC / th WILLIAM K DOBBRATZ&WIFE, ! A -g ' �� LAND USE: RESIDENTIAL 4 t r ®% $ ��-� � �� � RESIDENTIAL \ / I �, th \ JENNY C DOBBRATZ . � ®�Ii,�' \` �� yy 7 � _/ ' / ZONING: RESIDENTIAL �j U N DB 3037 PG 607 /�, �' ♦►'�/ �� �j, 't .®/ \�\.ZONING VILLAGE OF MARVIN� / ie- PC D FILE 543 , , LOT 1C •?i Vl� 4 i /i �� \ ♦ �` gyp[ e di \ �VIi I I 1 o rn E LAND USEC DOB RATZ L / `0����� -III e WI /, ariell"Nw �� 1. � e �® �\\\ 06225003A \ �/ , y� I \ ^IaLL4„,,,,,,,\ ZONING RESIDENTIAL l �� PP 'rII � / n TERRENCE PHILBRICK JR&JILL � \' 1 I I (� ..d..II /[ ,v I` ,�\ b/ ,/ ,4 ,��/ I,• \` \„,„____..,,,,, l ® 4� ��\ DB 4375 PGK325 / - I % ,y N >_ __ / Pc F FILE aa1 ! I y n \ ® �����`�` �` T� ��'�� � \\ LOT 25 A ` \— 1l ®4�, �I sy �� ��/` � PzoNINc vi-ncE oFSldnRviN�� �V o Js %12:51:1) EMI/ iti, 4,‘ PID#06240030 / .,, a� /�%� " \ �' f- �� �,.� \� _--� \ \� _ \ 'PI °• r PARCROSS LLC \ - / ♦ • , . \ �I .// o a E DB 6156 PG 639 / ` =� �. �l ,� likv `��•.r �5. \ \ \ I ‘� I /�- I / \ t� W U PC D FILE 543 / / ,e� / � 'r`�40 1 � �1 1:111):1, ,y♦�� VI \ I / % � �TJ v LOT 1B 1,®�, O ,/ �s \® !/ fi„ ♦ _ / I I'PLANDUBERESIDENTIAL �a '',� ..4,4r -`"/i--.� /, _ `'� I \ \ I //L / I t ,• I Q ZONING: RESIDENTIAL �� � / 'I \' ` �� (tom ®i 1 !� \ ♦ \ \ yt \ .pr`ra \ / ‘'`;'' .i. •''' \ .4gPA , y-------- --:----.--- -----.„,-,----..-_-- \ :;/"` i ;,,..'. "As141:10ED z/4,0 es ,\ 4, /1 (-,---,-,- ,--,- ,y •Np. NI, A N / I i��\oit, %.. \�\ rs., ,A \ ,' , ,t� `I IIIIII- � ° .;�'w ' _':.7414 / lks Nr," ��` ,11�_ �\IV1'I 1 -f/' Z ,,, . / ,,, D V PI 06240006A ,�®"eaffini'149 '''' -", ' ss'�y'0i ,I I I I � € ���I / Z (O\ GERALD L EARNHEART& A 1 p� � I I I I I I /ii ®t,� �'°+� { /�� 1'(� /� �i/� 5 5 J WIFE,DEBRA P EARNHEART % I / / I I �I I ' / III 1 O �s DB 425 PG 792 L cc a cc Pc FILE 14s — I I Al 1 / /I �v �" Q Q LAND USE. RESIDENTIAL - AI ® / �%� ���///�� Com / ,t; ZONING RESIDENTIAL �� i\\1��-717: ������A�)c %/� � � i // Z��� ;(,i J \ ® III / / / ilt Ak III �� e_4111p 1100 � / 2 m d U 1 y 1 / , �• f m WJOO a, �// II' III �� I�III \ o �i � �� .IIr�� � G ° I- u_ ( i I I i I 1111' /� � f�f �oP°°� Z 477:I.iitt \ 7lEzna o W J CC G / ® �� �1 ®...eongifell4,1p,weqt o Z Q / 'J !1 — /(----- ----- '''':-'------- -----4--"%-----'":-.----' - \ i tip \ / / /ci— io I c GI—ios :k •�II / '/ % Cilti ,— a a n 0 N PID#06240005A / /' // �- ® �� U U ROGER ADAIR WILLI A M S --1,,, // \ DB 5082 PG 683 /'///// / // \ / PID#06225021 a N LAND USE: RESIDENTIAL - i/l l l / / \\� ,, SCOTT E LETT&WEE, a M n /// \.\ / BEVERLY B LETT ZONING: RESIDENTIAL F // / \ ('� \\\� \ PID#06225055 N DB 265 PG 852 (5 \ / I ,\\\\ WIFE,JENNIFER SLOTTEN GI-4\ // LAND USE RESIDENTIAL Z Q \\ \` \ CHRISTOPHER SLOTTEN& ZONING: RESIDENTIAL Q B I / PID#06225054 ' B I DB 6201 PG 810 / W \ I I RAYMOND B XIOUES& � PC BOTL2 8-B \1 �` �)// / / �'� E 4 m w WEE,CAROL A XIOUES Q \ I / DB 3054 PG 108 \ LAND USE: RESIDENTIAL / �� 0 W 3 w � � \ PC B FILE 8EN ZONING: RESIDENTIAL \ F �, LOT 20 \ ) Z Q \ LAND USE: RESIDENTIAL / / W Z N ZONING. RESIDENTIAL A/ QEFCgE YOU OIGI a Q o PID#06225053 // /_ JEFFREY M SAUSER&WIFE, \ CALL 1-800-832-47.. \ PATRICIA A SAUSER \ / N.C.ONE-CALL CEN 0 0 i_ DB 462 PG 500 J / PCB FILE 8-B �$7lIE ' W cc / LOT 19 �� 0 ervcirveeasµeo suaoas ucervs ~ \ / LAND ZONINGE.R RESIDENTIAL L \ 0 J �, \� \ NORTH , NE� R.,„ L~i�z 8 ..4- '<'•• -s 0 � w 'o O. as h q - SEAL _ DRAWING NO.: a ¢ A 043168 4 SCALE IN FEET -9so fNGINEEP..,P, C509 100 200 "�,�;,,,GR� 03/15/24 a 8 7 6 5 3 2 1 Storm Sewer Tabulation 10-YEAR STORM Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 72.075 0.24 4.19 0.75 0.18 3.14 5.0 8.4 6.4 20.05 47.13 5.99 36 0.50 645.00 645.36 646.44 646.80 648.83 663.18 CI-101 to EW-100 2 1 83.034 0.01 0.65 0.75 0.01 0.49 5.0 6.8 6.7 3.31 7.36 5.13 15 1.30 654.01 655.09 654.60 655.82 663.18 666.38 CI-102 to CI-101 3 2 55.012 0.05 0.64 0.75 0.04 0.48 5.0 6.5 6.8 3.28 6.46 4.85 15 1.00 655.29 655.84 655.92 656.56 666.38 666.66 CI-103 to CI-102 4 3 51.613 0.06 0.59 0.75 0.05 0.44 5.0 6.2 6.9 3.06 9.16 5.51 15 2.01 656.42 657.46 656.92 658.16 666.66 668.30 CI-105 to CI-103 5 4 99.098 0.08 0.42 0.75 0.06 0.32 5.0 5.3 7.2 2.26 8.17 4.78 15 1.60 663.31 664.90 663.76 665.50 668.30 670.27 CI-106 to CI-105 6 5 24.860 0.34 0.34 0.75 0.26 0.26 5.0 5.0 7.2 1.86 8.97 4.57 15 1.93 665.10 665.58 665.50 666.12 670.27 670.41 CI-107 to CI-106 7 4 24.000 0.11 0.11 0.75 0.08 0.08 5.0 5.0 7.2 0.59 7.00 3.04 15 1.00 663.47 663.71 663.71 664.00 668.30 668.30 CI-104 to CI-105 8 1 74.663 0.36 3.29 0.75 0.27 2.47 5.0 8.1 6.4 15.92 19.59 6.77 24 0.75 652.14 652.70 653.51 654.14 663.18 664.13 CI-108 to CI-101 9 8 153.408 0.30 2.94 0.75 0.22 2.20 5.0 7.5 6.6 14.47 19.59 6.57 24 0.75 652.90 654.05 654.18 655.42 664.13 661.40 GI-109 to CI-108 10 9 88.420 0.15 2.64 0.75 0.11 1.98 5.0 7.2 6.7 13.17 19.59 6.38 24 0.75 654.25 654.91 655.45 656.21 661.40 661.00 GI-110 to GI-109 11 10 85.186 0.46 2.49 0.75 0.34 1.86 5.0 6.8 6.7 12.58 19.59 6.29 24 0.75 655.11 655.75 656.28 657.02 661.00 661.00 GI-111 to GI-110 12 11 121.139 0.57 2.03 0.75 0.43 1.52 5.0 6.5 6.8 10.40 15.47 8.02 18 2.17 656.29 658.92 657.19 660.16 661.00 663.75 GI-112 to GI-111 13 12 143.277 0.79 1.46 0.75 0.59 1.09 5.0 6.1 6.9 7.59 10.51 6.97 15 2.26 659.17 662.40 660.16 663.49 663.75 667.04 GI-113 to GI-112 14 13 190.270 0.67 0.67 0.75 0.50 0.50 5.0 5.0 7.2 3.64 11.18 4.23 15 2.55 662.60 667.46 663.49 668.23 667.04 671.90 GI-114 to GI-113 Project File: BMP-100.stm Number of lines: 14 Run Date: 3/14/2024 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2024.00 Storm Sewer Tabulation 10-YEAR STORM Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 82.990 0.24 12.45 0.75 0.18 8.60 5.0 8.5 6.4 54.66 77.07 8.11 42 0.50 645.00 645.42 647.31 647.73 649.38 663.05 CI-201 to EW-200 2 1 24.022 0.45 11.83 0.75 0.34 8.14 5.0 8.4 6.4 51.84 107.3 11.91 36 2.59 650.85 651.47 652.32 653.81 663.05 663.05 CI-204 to CI-201 3 2 173.367 0.93 11.38 0.75 0.70 7.80 5.0 8.0 6.5 50.44 63.13 8.99 36 0.90 651.67 653.22 653.81 655.53 663.05 660.14 CI-205 to CI-204 4 3 163.763 0.54 9.09 0.75 0.41 6.09 5.0 7.5 6.6 40.07 74.62 7.65 36 1.25 653.42 655.47 655.53 657.53 660.14 667.49 DCI-209 to CI-205 5 4 24.011 0.60 7.95 0.75 0.45 5.22 5.0 7.4 6.6 34.51 57.74 7.39 36 0.75 655.67 655.85 657.53 657.76 667.49 667.48 DCI-212 to DCI-2 6 5 152.998 0.52 7.35 0.60 0.31 4.77 5.0 7.0 6.7 32.01 41.94 8.65 30 1.05 656.35 657.95 657.99 659.88 667.48 666.40 GI-213 to DCI-212 7 6 105.950 1.77 4.21 0.60 1.06 2.90 5.0 6.7 6.8 19.62 20.73 7.31 24 0.84 658.28 659.17 659.88 660.76 666.40 666.40 GI-216 to GI-213 8 7 98.779 0.55 2.45 0.75 0.41 1.84 5.0 6.3 6.9 12.63 15.93 5.56 24 0.50 659.37 659.86 660.76 661.19 666.40 665.77 GI-217 to GI-216 9 8 98.779 0.24 1.90 0.75 0.18 1.43 5.0 6.0 7.0 9.93 10.62 6.65 18 1.02 660.36 661.37 661.51 662.58 665.77 667.75 GI-218 to GI-217 10 9 98.779 0.74 1.66 0.75 0.55 1.25 5.0 5.6 7.1 8.80 9.39 5.90 18 0.80 661.37 662.16 662.58 663.31 667.75 667.15 GI-219 to GI-218 11 10 159.399 0.93 0.93 0.75 0.70 0.70 5.0 5.0 7.2 5.03 5.39 4.11 15 0.59 662.16 663.11 663.59 664.34 667.15 667.54 GI-220 to GI-219 12 6 95.485 1.25 2.61 0.60 0.75 1.57 5.0 5.5 7.1 11.10 12.02 7.33 18 1.31 658.95 660.20 660.09 661.47 666.40 664.91 GI-214 to GI-213 13 12 150.000 1.36 1.36 0.60 0.82 0.82 5.0 5.0 7.2 5.91 9.89 5.65 15 2.00 660.47 663.47 661.47 664.45 664.91 667.91 GI-215 to GI-214 14 4 154.623 0.25 0.61 0.75 0.18 0.46 5.0 5.3 7.2 3.27 6.46 4.84 15 1.00 658.26 659.81 658.89 660.54 667.49 669.05 CI-210 to DCI-209 15 14 24.000 0.36 0.36 0.75 0.27 0.27 5.0 5.0 7.2 1.96 4.57 3.40 15 0.50 659.91 660.03 660.54 660.60 669.05 669.05 DCI-211 to CI-210 16 3 120.843 0.22 1.36 0.75 0.17 1.02 5.0 5.6 7.1 7.18 8.57 7.12 15 1.50 655.50 657.31 656.37 658.38 660.14 662.57 GI-206 to CI-205 17 16 81.502 0.38 1.13 0.75 0.28 0.85 5.0 5.4 7.1 6.06 6.46 5.88 15 1.00 657.52 658.33 658.48 659.32 662.57 662.97 GI-207 to GI-206 18 17 71.991 0.75 0.75 0.75 0.56 0.56 5.0 5.0 7.2 4.08 9.20 4.88 15 2.03 658.53 659.99 659.32 660.81 662.97 664.43 GI-208 to GI-207 19 1 47.896 0.09 0.38 0.75 0.07 0.29 5.0 5.3 7.2 2.04 9.14 4.88 15 2.00 652.23 653.19 652.63 653.76 663.05 662.66 DCI-202 to CI-201 20 19 23.389 0.29 0.29 0.75 0.22 0.22 5.0 5.0 7.2 1.57 5.51 3.61 15 0.73 653.29 653.46 653.76 653.96 662.66 662.68 DCI-203 to DCI-2 Project File: BMP-200.stm Number of lines:20 Run Date: 3/14/2024 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2024.00 Storm Sewer Tabulation 10-YEAR STORM Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 76.482 0.23 14.27 0.75 0.17 9.71 5.0 9.9 6.1 58.88 70.92 8.26 42 0.50 645.00 645.38 647.40 647.84 649.38 661.35 DCI-301 to EW-30 2 1 186.969 0.01 10.68 0.75 0.01 7.02 0.0 9.3 6.2 43.30 59.65 8.61 36 0.80 647.80 649.30 649.70 651.44 661.35 663.40 CI-307 to DCI-301 3 2 49.070 0.12 10.67 0.75 0.09 7.01 5.0 9.2 6.2 43.45 59.65 8.50 36 0.80 649.50 649.89 651.44 652.04 663.40 663.50 CI-308 to CI-307 4 3 143.602 0.13 10.55 0.75 0.10 6.91 5.0 8.8 6.3 43.46 59.65 8.50 36 0.80 650.09 651.24 652.04 653.39 663.50 664.85 CI-309 to CI-308 5 4 133.027 0.02 8.92 0.75 0.01 5.69 5.0 8.4 6.4 36.32 66.70 7.46 36 1.00 651.44 652.77 653.39 654.73 664.85 666.90 CI-313 to CI-309 6 5 85.264 0.19 0.35 0.75 0.14 0.26 5.0 5.6 7.1 1.85 12.12 5.39 15 3.00 661.01 663.57 661.34 664.11 666.90 672.25 CI-315 to CI-313 7 6 24.429 0.16 0.16 0.75 0.12 0.12 5.0 5.0 7.2 0.86 4.95 2.97 15 0.50 665.87 665.99 666.22 666.35 672.25 672.25 CI-316 to CI-315 8 5 51.915 0.07 8.05 0.75 0.05 5.04 5.0 8.2 6.4 32.36 63.46 7.31 36 0.91 652.97 653.44 654.73 655.28 666.90 667.37 CI-318 to CI-313 9 8 188.387 0.48 7.98 0.75 0.36 4.99 5.0 7.5 6.6 32.81 47.36 7.18 36 0.50 654.18 655.13 656.02 656.99 667.37 663.26 DCI-319 to CI-318 10 9 215.627 0.21 0.40 0.75 0.16 0.30 5.0 5.5 7.1 2.14 7.84 4.63 15 1.48 658.39 661.57 658.84 662.16 663.26 666.82 CI-321 to DCI-319 11 10 23.998 0.19 0.19 0.75 0.14 0.14 5.0 5.0 7.2 1.03 4.57 3.00 15 0.50 662.10 662.22 662.51 662.63 666.82 666.82 CI-322 to CI-321 12 5 23.871 0.51 0.51 0.75 0.38 0.38 5.0 5.0 7.2 2.74 4.57 3.89 15 0.50 661.01 661.13 661.71 661.83 666.90 666.94 CI-314 to CI-313 13 9 153.182 3.54 6.65 0.60 2.13 3.99 5.0 6.3 6.9 27.44 47.16 6.52 36 0.50 655.23 655.99 656.99 657.68 663.26 662.20 GI-323 to DCI-319 14 13 147.500 1.16 2.00 0.60 0.69 1.20 5.0 5.8 7.0 8.43 10.59 6.29 18 1.02 657.49 658.99 658.50 660.12 662.20 663.70 GI-325 to GI-323 15 14 140.000 0.84 0.84 0.60 0.51 0.51 5.0 5.0 7.2 3.67 9.13 4.36 15 2.00 659.26 662.06 660.12 662.84 663.70 666.50 GI-326 to GI-325 16 9 23.829 0.45 0.45 0.75 0.34 0.34 5.0 5.0 7.2 2.44 4.96 4.00 15 0.50 658.84 658.96 659.46 659.59 663.26 663.31 DCI-320 to DCI-3 17 13 147.500 1.10 1.10 0.60 0.66 0.66 5.0 5.0 7.2 4.79 8.78 6.23 15 1.57 657.74 660.06 658.40 660.95 662.20 664.50 GI-324 to GI-323 18 1 24.000 0.43 3.36 0.75 0.32 2.52 5.0 7.9 6.5 16.35 21.66 7.12 24 0.92 650.35 650.57 651.65 652.03 661.35 661.35 DCI-302 to DCI-3 19 18 153.000 1.24 2.93 0.75 0.93 2.20 5.0 7.4 6.6 14.53 31.99 8.13 24 2.00 651.75 654.81 652.70 656.18 661.35 660.13 GI-303 to DCI-302 20 19 130.984 0.78 1.11 0.75 0.58 0.83 5.0 6.9 6.7 5.58 7.12 5.98 15 1.04 655.56 656.92 656.40 657.88 660.13 661.70 GI-304 to GI-303 21 20 164.468 0.33 0.33 0.75 10.25 0.25 5.0 5.0 7.2 1.78 4.50 2.95 15 0.49 657.12 657.92 657.88 658.45 661.70 661.36 GI-305 to GI-304 22 4 23.764 0.11 1.50 0.75 0.08 1.12 5.0 5.6 7.1 7.93 9.89 7.92 15 2.00 653.33 653.81 654.18 654.92 664.85 664.94 CI-310 to CI-309 Project File: BMP-300.stm Number of lines:25 Run Date: 3/14/2024 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2024.00 Storm Sewer Tabulation 10-YEAR STORM Paget Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 54.544 0.38 1.38 0.75 0.28 1.04 5.0 5.4 7.1 7.38 9.89 7.69 15 2.00 654.49 655.58 655.29 656.66 664.94 661.12 GI-311 to CI-310 24 23 116.983 1.01 1.01 0.75 0.75 0.75 5.0 5.0 7.2 5.46 6.07 5.54 15 0.75 655.78 656.66 656.71 657.61 661.12 661.10 GI-312 to GI-311 25 19 99.016 0.59 0.59 0.75 0.44 0.44 5.0 5.0 7.2 3.19 6.41 4.79 15 0.98 655.69 656.67 656.32 657.39 660.13 661.11 GI-306 to GI-303 Project File: BMP-300.stm Number of lines:25 Run Date: 3/14/2024 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2024.00 Storm Sewer Tabulation 10-YEAR STORM Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 78.698 0.06 5.39 0.75 0.05 3.73 5.0 10.0 6.0 22.51 47.16 6.24 36 0.50 645.00 645.39 646.53 646.92 648.83 663.28 CI-401 to EW-400 2 1 81.817 0.05 5.33 0.75 0.04 3.69 5.0 9.7 6.1 22.46 41.01 7.63 30 1.00 650.61 651.43 651.93 653.04 663.28 662.59 CI-402 to CI-401 3 2 34.366 0.04 4.42 0.75 0.03 3.00 5.0 9.6 6.1 18.38 29.00 6.24 30 0.50 651.63 651.80 653.07 653.25 662.59 662.14 CI-406 to CI-402 4 3 59.011 0.05 4.38 0.75 0.04 2.97 5.0 9.3 6.2 18.37 29.00 6.24 30 0.50 652.00 652.30 653.45 653.75 662.14 661.39 CI-407 to CI-406 5 4 113.315 0.40 4.20 0.75 0.30 2.84 5.0 8.8 6.3 17.85 29.00 6.18 30 0.50 652.50 653.07 653.92 654.50 661.39 660.53 DCI-409 to CI-407 6 5 207.380 0.30 3.79 0.75 0.22 2.53 5.0 7.7 6.5 16.54 29.16 6.06 30 0.51 653.17 654.22 654.52 655.59 660.53 660.00 GI-410 to DCI-409 7 6 145.787 0.93 3.50 0.75 0.70 2.31 5.0 7.2 6.7 15.37 17.05 6.15 24 0.57 654.22 655.05 655.71 656.53 660.00 660.40 GI-411 to GI-410 8 7 246.134 0.48 2.56 0.75 0.36 1.61 5.0 6.0 7.0 11.19 27.92 4.84 24 1.52 655.15 658.90 656.83 660.10 660.40 664.70 GI-412 to GI-411 9 8 176.368 0.33 2.08 0.60 0.20 1.25 5.0 5.4 7.1 8.89 11.27 6.58 18 1.15 659.10 661.13 660.10 662.28 664.70 667.40 GI-413 to GI-412 10 9 109.688 1.75 1.75 0.60 1.05 1.05 5.0 5.0 7.2 7.61 8.16 5.25 18 0.60 661.33 661.99 662.48 663.14 667.40 666.70 GI-414 to GI-413 11 4 23.247 0.13 0.13 0.75 0.10 0.10 5.0 5.0 7.2 0.72 4.72 2.77 15 0.53 656.79 656.91 657.12 657.25 661.39 661.40 CI-408 to CI-407 12 2 24.000 0.23 0.86 0.75 0.17 0.65 5.0 5.4 7.1 4.62 10.21 6.59 15 2.50 655.23 655.83 655.82 656.70 662.59 662.59 CI-403 to CI-402 13 12 25.765 0.25 0.63 0.75 0.19 0.48 5.0 5.2 7.2 3.41 10.21 4.38 15 2.50 655.93 656.57 656.70 657.32 662.59 663.04 CI-404 to CI-403 14 13 23.756 0.39 0.39 0.75 0.29 0.29 5.0 5.0 7.2 2.10 10.21 3.93 15 2.50 656.77 657.36 657.32 657.94 663.04 663.11 CI-405 to CI-404 Project File: BMP-400.stm Number of lines: 14 Run Date: 3/14/2024 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2024.00 INLET CAPACITY CHART DATE: 10/10/2023 HERITAGE AT MARVIN DRAWN BY: CPF PROJECT: 326-256 CHECKED BY: CAP Maximum Allowable Spread:7.5 Ft Inlet Drainage Runoff Surface Q(cfs) B p ass Type No. Area(ac) C Sub. Total Slope(%) K Spread Intercept Q To Inlet# CI 0.24 0.72 LP 1 LP 1 4.98 1 0.72 0.00 ! F y ! CI 0.01 0.03 2.00 27.0 1.58 0.03 0.00 ✓ r r CI 0.05 0.15 1.00 21.5 3.29 E., 0.15 0.00 ✓ r 1 r CI 0.11 0.33 2.00 27.0 F 4.79 j 0.54 0.04 CI 0.06 0.18 2.00 27.0 4.47 0.48 0.00 L L J L CI 0.08 0.24 2.00 1 27.00 1 3.45 1 0.24 1 0.00 i J i CI 0.34 1.02 2.00 1' 27.00 5.93 0.77 1 0.25 CI 0.36 1.08 2.00 I 27.00 1 6.13 0.82 0.30 ✓ r i r CI 0.24 0.72 1.00 21.50 ; 5.92 0.61 0.11 ✓ r 1 r DCI 0.09 0.27 LP LP 2.54 0.38 0.00 I r r DCI 0.29 0.87 LP I LP L 6.46 j 1.52 I 0.00 CI 0.45 1.35 1.00 I 21.50 I 7.50 I 0.91 1 0.44 ✓ L J L DCI 0.54 1.62 LP I LP F 1 6.74 J 1 1.62 1 0.00 • DCI 0.25 0.75 1.55 1 24.0 5.54 0.75 0.00 ✓ r i r DCI 0.36 1.08 1.55 24.0 6.35 1.00 0.08 ✓ r 1 r DCI 0.60 1.80 LP LP 7.44 0 1.88 0.00 r r 1 r DCI 0.23 0.69 LP LP F 3.81 i 0.69 � 0.00 DCI 0.43 1.29 LP 1 LP L 5.79 ,j 1.29 0.00 CI 0.01 0.03 1.00 i 1 21.5 1 L 1.80 J 1 0.03 1 0.00 i CI 0.12 0.36 1.00 21.5 4.57 di 0.36 0.00 Inlet Drainage Runoff Surface Q cfs B p ass Tpe No. Area(ac) C Sub. Total Slope(%) K Spread Intercept Q To Inlet# CI 0.13 0.39 1.00 21.5 4.71 0.39 0.00 CI 0.11 0.33 1.00 j 21.5 F 6.53 � 0.72 j 0.21 CI 0.02 0.06 2.00 I 27.0 L 2.05 J 0.06 I 0.00 L L J L CI 0.51 1.53 3.00 1 30.0 1 6.51 1 1.00 1 0.60 • L CI 0.19 0.57 10.00 1 37.5 1 3.52 0.45 1 0.12 • F y • CI 0.16 0.48 10.00 ; 37.5 3.30 0.40 0.08 ✓ r r CI 0.01 0.03 2.00 27.0 1.58 E., 0.03 0.00 ✓ r -1 r CI 0.07 0.21 2.00 1 27.0 3.88 0.33 0.00 DCI 0.48 1.44 LP LP r 6.40 1 1.50 j 0.00 L L J L DCI 0.45 1.35 LP 1 LP L L 6.07 1 1.38 1 0.00 L CI 0.21 0.63 2.00 1 27.0 1 4.95 4J 0.57 1 0.06 • F . CI 0.19 0.57 2.00 1 27.0 4.77 0.54 0.03 ✓ r r CI 0.06 0.18 2.00 27.0 3.09 ti 0.18 0.00 ✓ r -1 r CI 0.05 0.15 2.00 27.0 3.69 0.29 0.00 I r r CI 0.23 0.69 2.00 i 27.0 L 5.42 j 0.66 I 0.14 CI 0.25 0.75 2.00 I 27.0 5.28 0.64 1 0.11 L L j L CI 0.39 1.17 2.00 1 27.0 1 6.24 1 0.84 1 0.33 • L -. 4 CI 0.04 0.12 2.50 1 27.0 2.55 1 0.12 0.00 ✓ r ti r CI 0.05 0.15 2.50 27.0 2.77 0.15 0.00 ✓ r r CI 0.13 0.39 1.00 21.5 5.92 1 0.61 0.11 r r r DCI 0.40 1.20 LP i LP IL 5.84 j 1.31 1 0.00 RIPRAP APRON CALCULATIONS PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 Do La=APRON LENGTH,(FEET) D=OUTLET PIPE DIAMETER,(INCHES) 0 d=MEDIAN STONE SIZE,(FEET) RI 50 W = Do + La _ N OUTLET 2 MIN 90 • �p, Z PIPE 1 /j"� DIAMETER,D V E 0 0 80 /co �jl Z La t<<G�'� �` Aii, 5 0 _ .TAILWATER < 0.5 Do V?; 70, a0 .� II' C C •'= "'==`=•1=° PERMANENT GEOTEXTILE FABRIC �0� E r D = 2 TIMES THE D50 0' pg 60 - a°Ar : // -1 _1 STONE DIAMETER BUT NOT LESS '(� � m •//4- THAN 6-INCHES V��G _ /� /Aunw �jC A . 171 `��� 50 - '.so �i■o !,, a��=; 0 40 - a—i//// a' II II m 0 O __ '1 All111111111=1 4 M W 30 -d%iiin C 1�y Z ei-_,»/ /11111MI z xi a-�ii i r- i MIi 0_ Xi n .////fie' I I I I tIW-111 0 La=20' ���A cb 3 W - -... d' ii�� ���r. //co • 0 3 - 10 - ;ram ' ''�o- N Z a O / _ ca // I, .-. - _ —�— /i MIS. l _ rx /' . f a Z ',-a'' . c3 Oc a� f2 in rmi I. r ����� //� ,N5�. _��A_G� V 1 m 91 RECOMMENDED MIN a/ " — —1 r �p �,�7 -D50=0.6' m 0 d50=6-IN 1 d / / �jMlllllll 0 z Q=20.05 cfs 0 3 5 10 20 50 100 200 500 1000 C r r DISCHARGE, FT3/SEC PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 Da L =APRON LENGTH,(FEET) D=OUTLET PIPE DIAMETER,(INCHES) 0 d=MEDIAN STONE SIZE,(FEET) RI 50 W = Do + La N OUTLET 2 MIN 90 Z PIPE rj.il, DIAMETER,D o ;TA ! 0 i��I ii La ���� 80 ��°r� �jIlj�Il o �,II,I�II C _ .TAILWATER < 0.5 Do Na.' 70�, 111 a� p I C _1 Fe.,-„,:.,:„:-.„..,„,,,,,,„:„, PERMANENT GEOTEXTILE FABRIC PQ�ON ' III ��. . / III II 3 r '/ //.%' s II m D = 2 TIMES THE D50 OF 60 a/�/ //.�a// I'll STONE DIAMETER BUT NOT LESS �(� - - ¢ IIII■1 THAN 6—INCHES �G - m ��" 50 - :�,II.iuIII��w a//,_IIIIIuii IC 0 ' `�v , `� i'i■o■o� , // un1n1 N ��� ■■E - I :���G I' II m o 40 MOH ., - a 13 7Aw �a/ II Al�Illlli 4 m n o IIII■■■■■■■■■■ - - M - 1 IIIIIIIII•••••IIIII 1 �'�/ 11 ,III1I1ci 0 0 N 30 nnnuunnun■■■■■■■■■■ _d%iii i unnnnuunuun■■■■■■■■■■ - iIi!iiH La=22' i��I�IIIIIIIIIIIIIIIIIIII��l��IIIII�I ,\ o_ 5.1-n 0 20 mmnnmmMnnnnununnl■■■■■ 1 IL.iii _ �,1111>III 3 IA111111111111111111111111111111111111■■■■■ \ -,.'///7�_ I I I I I I 1 III I I Ems _ *-- 1111111111111111111111111 IIII■■IPC■.ai/_G%'//—_ �cb Ell � , 11111111111111111111 II!GMPIiIP�IIEG/--_ —,� /// CAll 0 a ■mnmmunn a' .iimu.■■■■n.�■■ i—�� ' I- 10 11111111111111111!::iilIII!!!liillll■��■■■■■■■ = k\, a/. l w Z O IIIIIIIII!!;iilllll!!iiiiiiiiIIIIIIId■■■■■■■■■ _ • II N !eiiiiiiiUllll1111111111IIiiiIIIII■■■■■■■■■■ _ —co // , ( ^ Xi iiuiiiiiiiuiiiiiiiuiiiiiiiiiiiuiiuii■■■■■■■■■■ — uunlunuuuuu■uunuin11■■■■■■■■■■ - —A— r/� Cl- *� 0 m 0 uunluuuuuuu■uunu1u11■■■■■■■■■■ _ ,o :�/� �. I� n uuulunuuuuu■uuuu11111■■■■■■■■■■ , �4 r� i 2 a C a ■1111111111111111111111111111111111■■■■■■■■■■ - cL1 -a:— • II II d Z XI iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii■■■■■■■■■■ _ r / / • � �/ O ■numm�llnnnn■1luumn■■■■■■■■■■ a' A co OV/7- // C7 N p 111111111111111111111111111111111111■■■■■■■■■■ A, "- '/ ■nunmmunnnnuunnuu■■■■■■■■■■ N V.mi ar' a.' o C ■nmmminimmi unmu■■■■■■■■■■ A/ _ ■nmmnunmmuuumm�■■■■■■■■■■ a'- p / La ■ inimnunmmmnmmilim■■■■■■■■ i munuuuuuuu■uunniu11■■■■■■■■■■ A* / i A m mununn nummimmum ■■■■■ r 1 immimmiimmimminim■■■■ ��'�5--/=---t 11111■1 m 11 RECOMMENDED MIN LIII D50=0.7' r dm=6-IN 1 -ate m 0 _______. � 73 - Z Q=54.66 cfs 0 3 5 10 20 50 100 200 500 1000 C r r DISCHARGE, FT3/SEC PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 Da L =APRON LENGTH,(FEET) D=OUTLET PIPE DIAMETER,(INCHES) 0 d=MEDIAN STONE SIZE,(FEET) RI 50 W = Do + La _ N OUTLET 2 MIN 90 Z PIPE /"� DIAMETER,Do /II 0 80 L° �TAILWATER < 0.5 Do tea' 70 C'= PERMANENT GEOTEXTILE FABRIC Q�O ' III E r D = 2 TIMES THE D50 OF 60 a� /i -1 _1 / ///'�a STONE DIAMETER BUT NOT LESS '(� � . pp- THAN 6-INCHES J��.�'4 50 �� /D`. A101 Ir/jC`-'/ r xi m e , Ncb- �/ I * O 40 -• -13 //' /a/ 4 30 LI — I� N d� I 0 U � , a% � I Z �+ Xi �,�Ii�lll ,1 � / // I o �l7La-22' ...... I ' . -%///- . . . . . . . . . . . / I H /r20 a,1 / / / 13w,�II/ ✓ —I 0 I i ' /go, u_ 0 - 10 /\ a �o- N Z a O �\ =a p0pL. rx a Z / � / 145 il,-.1,:// 7,/,/ // i 0 TI c1%\n '/. y"' 7 1 RECOMMENDED MIN LIII"12 D50=0.7' r d50=6-IN 1 -6y m 00 _ Z Q=58.88 cfs 0 3 5 10 20 50 100 200 500 1000 -n C r r DISCHARGE, FT3/SEC PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 Do La=APRON LENGTH,(FEET) D=OUTLET PIPE DIAMETER,(INCHES) 0 d=MEDIAN STONE SIZE,(FEET) rn 50 W = Do + La _ N OUTLET 2 MIN 90 &A)`" Z PIPE 1 // � DIAMETER,D0 a V E 0 80 /0 .jl Z _ .TAILWATER < 0.5 Do VD,' 70, a0 .� II' C C •'= "'=`=`=•l=° PERMANENT GEOTEXTILE FABRIC �0� r D = 2 TIMES THE D50 0' PQ 60 - a°Ar : // -I STONE DIAMETER BUT NOT LESS '(� � m •//4'_a Jo THAN 6-INCHES \,'‘40 _ i� �a /7' A . r XI 1 IC 171 40 - a-)//// a/ II II m O __ y 4 ,� W 30 i _^ . .n C 1�y Z ei-,,»/ �MI z xi 6-�ii i� r— i 11 I— 0_ Pti ���.�, I I I I SIIIIIM-1! 0 La=20' • ���� cb 3 W - -... 10 - ;ram ANIAMMIIIIiiiiraa�o- N Z a O _ -co // // .-. - _—�— //i MIS. `l _ / . 0- Z 's-a'' . co Oc a' fa�� CT N v N�a''" ' a'' a"r�►im Arm o v_ r ����� ��� m \3 -71 ��G�� 1 m •r1 dREC OMNENDEDMI; —~2✓N - — -D50=0.6' r�11 0 Z Q=22.51 cfs 0 3 5 10 20 50 100 200 500 1000 TI r r DISCHARGE, FT3/SEC PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 D° L =APRON LENGTH,(FEET) D=OUTLET PIPE DIAMETER,(INCHES) 0 d=MEDIAN STONE SIZE,(FEET) RI 50 W = D° + L° _ N OUTLET 2 MIN 90 Z PIPE 1 ;11,,,i1jDIAMETER,D 113O � I1 •L° �� $o �1°�� j�jl O ,il,i�11 c _ .TAILWATER < 0.5 D° tea.' 70, a/i gip' C m iat "!=-`=`=•0=° = PERMANENT GEOTEXTILE FABRIC PQ�0� III II r D = 2 TIMES THE D50 OF 60 - a'i MIEN , // II O STONE DIAMETER BUT NOT LESS '(� _ ��/�'`' . �_ Z THAN 6—INCHES ��G - /M�� C-' r D tv ��V 50 = °iacomar,��a�! * O *k 0`�\� = I I C ill A/ '' m 40 - a'� —i a/ ��� I ' 4 C 30 — _ *-- — i�II,1� '�;J// A/IIIIIIII 0 F a-�ii ii= /1�II,;IIm o 1 20 a-�5 %//J�" / IIIP�I,Ill! 3 W o w La=16' 1 '�/ _ —,,_,/A�.111 � O E 111111111111111111111111111 /// ---1• a�Uli i 10 IIIIIIIIIIIIIIIIIIIIIIIIIIP! _ \/ a'.0 W 11111111111111111_IIIIIIIIII _ o I. N Z 11111111!!liiilllllllllllll —ca // // I ^ 111111111111111111111111111 _ —��— /1-a 1 I 111111111111111111111111111 —�— //� /i it I d * 0 11 111111111111111111111111111 - O b /�/ 1 IA ..i 0 IIIIIIIIIIIIIIIIIIIIIIIIIII • ..- �:a o��,;°� ' .ai a�"" 2 < o Z 111111111111111111111111111 I IIU ,� ,, , IIII'II 111111111111111111111111111 I - D -a' I co o` " / / , i N v O 111111111111111111111111111 A, "� i , 111111111111111111111111111 N. a'.—/ a0 a—A.r�ilr—/t-111111111 o C nuui minim ini ,`L ----ur 111111111 111111111111111111111111111 a' mum! `� — m IIIIIIIIIIIIIIIIIIIIIIIIIII -,Nc6 JS/�t//� 111111111:5 a � > iiiii —/—/---iimmu mi d 11111111 1 R1 niii iii 5r rd RECOMMENDED IIIIIIIIiiiiii 11IIII1 12 / ' m /� , , , , D50=0.5' RI I � If 5 l Z Q=13.67cfs 0 3 5 10 20 50 100 200 500 1000 C r r DISCHARGE, FT3/SEC PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 D° L =APRON LENGTH,(FEET) D=OUTLET PIPE DIAMETER,(INCHES) 0 ds=MEDIAN STONE SIZE,(FEET) M W = D° + La _0 OUTLET 2 MIN 90 c Z PIPE /j.il, DIAMETER,D )111 3 O i'I1 - -n L° �� 80 ��°�APO O �,il,i�ll c _ .TAILWATER < 0.5 D° �,a.' 70 �O Ifll' C m •'= "'=`=`=•.- PERMANENT GEOTEXTILE FABRIC PQ LO III ��. I�I II 3 r ii /71/ • II m D = 2 TIMES THE D50 OF 60 = a/�// . // III O STONE DIAMETER BUT NOT LESS '(� mstrim •//4'_a THAN 6-INCHES G - �� 11111111 Z II ///111•111111111 ������ _ ��� 4iii= 1- =Ilnl� > N 40 ., - a'�//// a/ II 11111 4 m O C 30 - - %;ilia All11111111=1111111111 1 n 0 TI O a=-�;J// �/IIIIIIII zZr a-�ii� /1�11,11111i o AA La=20' 20 - -a,15 •- - -- /�IIIP 111 3 W -I 0 7/3'/'/L� W Ell iii�= a� ° 1-1- O a' �i r�� /w w 10 - %�� a0) 1 N Z a pj —co // // q XI 0 rMIIIIPl•— •IOW a 1 ' �- /� �c I Q O 0 '‘')C' — /�ro` MAW, 2 AC /\ a — pp_/ijiT .wi/ �11ce 'cL E IIIIII0- Z ` a. J co ' i�Aw �— I CT N G 0 0 " \ —/�terAr 1111m Na :� OaAmmoorions —/t-1111m '(A r/ . IIIIIIa �� %�% in a D —...... — 11111 1 E m m �\5—ice/=f--t 1111111 R1 11 a'—�I=���—� 11111ll RECOMMENDED oC 6-INENDED MIN r //— ./- T� - m 0 'l / D50=0.6' z Q=11.97 cfs O 3 5 10 20 50 100 200 500 1000 TI r r DISCHARGE, FT3/SEC APPENDIX C PRELIMINARY JURISDICTIONAL DETERMINATION (---- orf....ST:,o.4c.d- �1 1/ r�� DEPARTMENT OF THE ARMY W \\ � �xi U.S.ARMY CORPS OF ENGINEERS,WILMINGTON DISTRICT fir = m ��y���i� �� CHARLOTTE FIELD OFFICE a - ° 8430 UNIVERSITY EXECUTIVE PARK DRIVE SUITE 615 ,,�0." ` CHARLOTTE NORTH CAROLINA 28262 �ATES OF February 13, 2024 Regulatory Program/Division SAW-2023-02303 Marvin Village PJD Jones Homes USA c/o Scott Stearns 9717 Eagle Creek Center Boulevard Suite 200 Orlando, Florida 32832 Via Email: sstearns@joneshomesusa.com Dear Mr./Ms. Stearns: This letter is in response to your request to the Wilmington District, Charlotte Field Office for a preliminary jurisdictional determination (PJD). The project/review area is located south of New Town Road in Marvin, Union County, North Carolina. This project has been assigned the file number SAW-2023-02303 (Marvin Village SD). This file number should be referenced in all correspondence concerning this project. Based on our review of the information you furnished and other information available to our office, we have preliminarily determined the project area may contain waters of the United States under the U.S. Army Corps of Engineers (Corps) regulatory jurisdiction. These waters are identified in the enclosed site maps, Delineation Map dated October 15, 2023. This determination was made in accordance with the Corps regulatory authority pursuant to Section 404 of the Clean Water Act and based upon criteria contained in the 1987 Corps of Engineers Wetland Delineation Manual and the Eastern Mountains and Piedmont regional supplement. Section 404 of the Clean Water Act requires a Department of the Army (DA) permit be obtained prior to the discharge of dredged or fill material into waters of the United States, including wetlands. Section 10 of the Rivers and Harbors Act of 1899 requires a DA permit be obtained for any work in, on, over or under navigable waters of the United States. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made based on a preliminary jurisdictional determination will treat all waters including wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved jurisdictional determination, which is an appealable action, by contacting the Corps district for further instructions. Please sign and return the attached PJD form within 30 days of receipt. If a signed PJD form is not received within 30 days of the date of this letter, the Corps will presume concurrence. This determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the review area identified in this request. The determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. You are cautioned that work performed in areas which may be waters of the United States, as indicated in the preliminary JD, without a Department of the Army permit could subject you to enforcement action. If you have any questions concerning this correspondence, please contact Emily Greer, Regulatory Project Manager of the Charlotte Field Office by mail at the above address, or by email at emily.c.greer@usace.army.mil. Sincerely, Digitally signed by Emily Emily Greer Greer Date:2024.02.13 18:12:46 -05'00' Emily Greer Regulatory Project Manager Enclosures cc: Daniel Kuefler, WEPG (via daniel.kuefler@wetlands-epg.com) John Pribas, Owner (via gpribas@yahoo.com) U.S. Army Corps of Engineers (USACE) Form Approved- PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) OMB No.0710-0024 For use of this form,see Sec 404 CWA,Sec 10 RHA,Sec 103 MPRSA;the proponent agency is CECW-COR. Expires 2024-04-30 DATA REQUIRED BY THE PRIVACY ACT OF 1974 Authority Rivers and Harbors Act,Section 10,33 USC 403;Clean Water Act,Section 404,33 USC 1344; Marine Protection, Research,and Sanctuaries Act,Section 103,33 USC 1413; Regulatory Program of the U.S.Army Corps of Engineers; Final Rule for 33 CFR Parts 320-332. Principal Purpose The information that you provide will be used in evaluating your request to determine whether there are any aquatic resources within the review area that may be subject to federal jurisdiction under the regulatory authorities referenced above. Routine Uses This information may be shared with the Department of Justice and other federal,state,and local government agencies,and the public,and may be made available as part of a public notice or FOIA request as required by federal law.Your name and property location where federal jurisdiction is to be determined will be included in any resulting jurisdictional determination(JD),which may be made available to the public on the District's website and/or on the Headquarters USACE website. Disclosure Submission of requested information is voluntary;however,if information is not provided,the request for a JD cannot be evaluated nor can a PJD be issued. The Agency Disclosure Notice(ADN) The public reporting burden for this collection of information,0710-0024, is estimated to average 25 minutes per response,including the time for reviewing instructions,searching existing data sources,gathering and maintaining the data needed,and completing and reviewing the collection of information.Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense,Washington Headquarters Services,at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil.Respondents should be aware that notwithstanding any other provision of law,no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. SECTION I-BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD:2/13/2024 B. NAME AND ADDRESS OF PERSON REQUESTING PJD:Scott Stearns 9717 Eagle Creek Center Boulevard Suite 200, Orlando, Florida 32832 C.DISTRICT OFFICE, FILE NAME,AND NUMBER: Wilmington, Marvin Village SD, SAW-2023-02303 D.PROJECT LOCATION AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: North Carolina County/Parish/Borough: Union City: Marvin Center coordinates of site(lat/long in degree decimal format): Latitude: 34.994767° Longitude:-80.825165° Universal Transverse Mercator: Name of nearest waterbody: COW Branch E.REVIEW PERFORMED FOR SITE EVALUATION(CHECK ALL THAT APPLY): ❑X Office(Desk)Determination. Date: 2/13/2024 ❑ Field Determination Date(s): Inspection Date TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH"MAY BE"SUBJECT TO REGULATORY JURISDICTION. Site Number Latitude(decimal Longitude Estimated amount of Type of aquatic resources Geographic authority to which degrees) (decimal aquatic resources in (i.e.,wetland vs.non- the aquatic resource"may be" degrees) review area(acreage wetland waters) subject(i.e.,Section 404 or and linear feet,if Section 10/404) applicable _ WA 34.993206 -80.824915 0.05 ac Wetland 404 ENG FORM 6249, NOV 2023 Page 1 of 3 11) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area,and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD(AJD)for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit,or a Nationwide General Permit(NWP)or other general permit verification requiring"preconstruction notification"(PCN),or requests verification for a non-reporting NWP or other general permit,and the permit applicant has not requested an AJD for the activity,the permit applicant is hereby made aware that:(1)the permit applicant has selected to seek a permit authorization based on a PJD or no JD whatsoever,which do not make an official determination of jurisdictional aquatic resources;(2)the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization,and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions;(3)the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization;(4)the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit,including whatever mitigation requirements the USACE has determined to be necessary;(5)undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD or reliance on no JD whatsoever;(6)accepting a permit authorization(e.g.,signing a proffered individual permit)or undertaking any activity in reliance on any form of USAGE permit authorization based on a PJD or no JD whatsoever constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional,and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action,or in any administrative appeal or in any Federal court;and(7)whether the applicant elects to use either an AJD or a PJD,the JD will be processed as soon as practicable. Further,an AJD,a proffered individual permit(and all terms and conditions contained therein),or individual permit denial can be administratively appealed pursuant to 33 C.F.R.Part 331. If,during an administrative appeal,it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area,or to provide an official delineation of jurisdictional aquatic resources in the review area,the USAGE will provide an AJD to accomplish that result,as soon as is practicable.This PJD finds that there 'may be"waters of the U.S.and/or that there "may be"navigable waters of the U.S.on the subject review area,and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: F.SUPPORTING DATA.Data reviewed for PJD(check all that apply) Checked items should be included in subject file.Appropriately reference sources below where indicated for all checked items: O Maps,plans,plots or plat submitted by or on behalf of the PJD requestor: Map: Delineation Map dated 10/15/2023 ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the USACE: ❑ Corps navigable waters'study: CORPS STUDY LABEL_dated CORPS STUDY DATE ® U.S.Geological Survey Hydrologic Atlas: Z USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ❑ U.S.Geological Survey map(s).Cite scale&quad name: USGS TOPO LABEL dated_USGS TOPO DATE © USDA Natural Resources Conservation Service Soil Survey. Citation: NRCS Web Soil Survey ❑ National Wetlands Inventory map(s). Cite Name: USFWS NWI LABEL dated USFWS NWI DATE ❑ State/Local Wetland Inventory map(s): LOCAL NWI LABEL dated LOCAL NWI DATE ❑ FEMA/FIRM maps: FEMA NFHL LABEL dated FEMA NFHL DATE ENG FORM 6249,NOV 2023 Page 2 of 3 100-year Floodplain Elevation is: ELEVATION.(National Geodectic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial(Name&Date): or ❑ Other(Name&Date): ❑ Previous determination(s). File no.and date of response letter: PREVIOUS DETERMINATION LABEL dated PREVIOUS DETERMINATION DATE ❑ Other information(please specify): OTHER INFORMATION LABEL dated OTHER INFORMATION DATE IMPORTANT NOTE:The information recorded on this form has not necessarily been verified by the USACE and should not be relied upon for later jurisdictional determinations. Name of Regulatory Staff Member Completing PJD Date Signature of Regulatory Staff Member Completing PJD Emily Greer 2/13/2024 Digitally signed by Emily Greer Emily Greer Date e: 024.02.13 18:13:23 Name of Person Requesting PJD Date Signature of Person Requesting PJD(REQUIRED,unless obtaining the Signature is Impracticable 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame,the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. ENG FORM 6249, NOV 2023 Page 3 of 3 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Scott Stearns, Jones Homes USA File Number: SAW-2023-02303 Date: 2/13/2024 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B h C❑ PERMIT DENIAL WITHOUT PREJUDICE ❑ PERMIT DENIAL WITH PREJUDICE D ❑ APPROVED JURISDICTIONAL DETERMINATION E ❑x PRELIMINARY JURISDICTIONAL DETERMINATION F SECTION I The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at https://www.usace.army.mil/Missions/Civil-Works/Regulatory- Program-and-Permits/appeals/ or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. -1- C. PERMIT DENIAL WITHOUT PREJUDICE: Not appealable You received a permit denial without prejudice because a required Federal, state, and/or local authorization and/or certification has been denied for activities which also require a Department of the Army permit before final action has been taken on the Army permit application. The permit denial without prejudice is not appealable. There is no prejudice to the right of the applicant to reinstate processing of the Army permit application if subsequent approval is received from the appropriate Federal, state, and/or local agency on a previously denied authorization and/or certification. D: PERMIT DENIAL WITH PREJUDICE: You may appeal the permit denial You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information for reconsideration • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. • RECONSIDERATION: You may request that the district engineer reconsider the approved JD by submitting new information or data to the district engineer within 60 days of the date of this notice. The district will determine whether the information submitted qualifies as new information or data that justifies reconsideration of the approved JD. A reconsideration request does not initiate the appeal process. You may submit a request for appeal to the division engineer to preserve your appeal rights while the district is determining whether the submitted information qualifies for a reconsideration. F: PRELIMINARY JURISDICTIONAL DETERMINATION: Not appealable You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: -2- If you have questions regarding this decision you If you have questions regarding the appeal process, or may contact: to submit your request for appeal, you may contact: District Engineer, Wilmington Regulatory Division Krista Sabin Attn: Emily Greer Regulatory Administrative Appeal Review Officer U.S. Army Corps of Engineers U.S. Army Corps of Engineers Wilmington District South Atlantic Division 8430 University Executive Park Drive Suite 615 60 Forsyth Street, Room 10M15 Charlotte, North Carolina 28262 Atlanta, Georgia 30303-8801 Phone: 904.314.9631 Email: krista.d.sabin@usace.army.mil SECTION II — REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. Use additional pages as necessary. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. -3- RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation and will have the opportunity to participate in all site investigations. Date: Signature of appellant or agent. Email address of appellant and/or agent: Telephone number: -4- j " /\ N -- USACE UPLAND FORM DP2 I a a Nsy T n Ra u— \0 � Itli Ap iiii • . ,4 \``t. ,g,.i. , .( i 0 ,.' :.......: USACE UPLAND 01 FORM DP1 - v tom.-- 4* 141. r -\ /� P , � 0 3 p USACE WETLAND \ ♦ / / 'r. FORMA /� yr' .� o• C ,, PROPERTY BOUNDARY 1 v STUDY LIMITS ► WETLAND A iv 46.53+/-AC 0.05 AC LEGEND ,i . ❑ Project boundary study limits 0 150 300 600 "V Stream 0 Wetland I I Feet _ _ I O Landscape photoldirection TA .. ,,„» dill/iiI. _ilkif A _. • Prepared for: MARVIN VILLAGE Drawn By: Reviewed By: FIGURE 6 Wetlands and Environmental Planning Group Union Co.,NC Leonard S.Rindner,PLLC. JONES HOMES USA KKS DCK len.rindner@wetlands-epg.com DELINEATION MAP 10/15/23 (704)904-2277 For study purposes only-Subject to USACE/NCDEQ Verification www.wetlands-epg.com