Loading...
HomeMy WebLinkAboutNCG030552 DMR SWSemi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qua ity G neral Permit No. NCG030000 _ Date submitted CERTIFICATE OF COVERAGE NO. NCG03 U S S _Z FACILITY NAME S C.N P �F_l D 0�- ZL_Q 2-1 - COUNTY PDQ /}A�) PERSON COLLECTING SAMPLES LABORATORY _9toF_ R, D6E ZM 5 Lab Cert. # EP—L--go-15 —6763 Comments on sample collection or analysis:, - - L,4g y►�PLE _ b 4 I D—'2v1S-03098 Part A: Stormwater Benchmarks and Monitoring Results ' SAMPLE COLLECTION YEAR- -SAMPLE PERIOD ❑ Jan -June ® July -Dec or- []Monthly'- ~ - (month) DISCHARGING TO CLASS ❑ORW , ❑HQW OTrout ❑PNA _ ❑Zero -flow _. _❑Water.Supply ❑SA . ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 - -. ❑'No discharge this period?' Outfall.No.y Date Sample p Collected (mo/dd/yr) 24-hour rainfall amount, - Inches %' - Total Suspended solids, >; H p "' Staridard;units- Copper Lead , Zinc Non -Polar o&G /` Total�Petroleum . - � Hydrocafiioris r; Total-Tox"ic - s . 'Organics,_ , Benchmarks 100 mg/Lor 50 mg/L_°; 6.0.- 9.0 °:, 0.007 mg/L '0.033 mg/L,0.067 mg/L- 15.mg%L 5 Co. - 3 . S < . oo7 rr /t v 067 J S. qO A_ �- 1 Monthly sampling (instead of semi-annual) must begin with -the second consecutive benchmark exceedance for the -same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12;,for-;electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Da' /1/2012-10/31/2017. SWU-245, last -revised "15/2012 Page 1 of 3 " Facilities t incorporate a solvent management plan into the Stormwater Pi on Prevention Plan may so certify, and the requirement for TTO itoring may be waled. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff: has -occurred since:filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan.included in the Stormwater Pollution Prevention Plan." f Name (Print name)' " Title' Print itle) = - (Signat (Date) - - - Note: Results must be reported:in•numerical format. -Do not report Below Detection Limit, BDL, <PQL, Non -detect, -ND, or other similar non -numerical format. When results -are below the applicable.limits, they must be reported in the format, "<XX me/L" where XX -is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in. excess of the benchmark, you -must implement Tier 1, Tier 2,, or Tier 3 responses. See General Permit text. _ Part B: Vehicle Maintenance Area Monitoring Results: only for facilities'averaging > 55 gal offinew oil "per mont - , ' - ' - • - - - ischarge this period ?2 - ._ - . - . Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications'where the -more protective benchmark applies. Permit Date: 11/1/2012-10/31'/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 ' ;Date Sample= 24-hour rain fall= - Outfall;No. - ' = Collected���,� =amount, Nori=polar O H by Inches 3 EPA (SGT -HEM) Total Suspended Solids • pH, :Benchmarks'===>� •- _ _ , • - .,� 15 mg/L 100 mg/GDr 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications'where the -more protective benchmark applies. Permit Date: 11/1/2012-10/31'/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 ' Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results !or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thatftere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Z* I 1 12V1.5 (Date) Permit Dat /1/2012-10/31/2017 SWU-245, last revised 'S/2012 Page 3 of 3 _