Loading...
HomeMy WebLinkAboutNCC240453_Site Plan or Location Map_20240307 R ♦ _ \ \ \ ' - 7vm - ��" CONSTRUCTION SCHEDULE I \ \ v �� _� \� �/ I.ohtam all necessary Permit.and plan approvals.Erosion and sedimem connoltEffisc>Permit and a Certificate or co.aSge \ \ IFI S/y (Imam all neessary pdmtts adpe any landdirovals. rosioleadSeM occur.A eopyo[rol E&SCpermitt and a Candcae of Covugepy•LE 1I \ \ `� P _ , zimmein A ��,, ®� r•+ plan must be kept on site,preferably in a permits box,and accessible during inspection. . \\ 1 I I I k \ , , \ \ \ _ �\ �j / / 10 2_ S/y • 2 Install gavel construction entrances first,then all fences,rcinlbrced silt fence \ 1 ��/�///���/�//� / ,.--I. 9 40• _ ' outlets and wattles. ..N.\ I I I \ 1 \ \\ \� /// / /_ ( 7 / /// ��- ' oodYi 3.Finish clearing and gobbing any necessary areas on the lots ae they are started. \ \ -- \"/�/\// / - o 4.Begin lot grading end excavation activities I\ 3 // SSrrE --all /. nagrassng,mucnganstazngootnmostcasestswnvovetenstalation of sod on Wlot.The silt lane 11 " 1 / �� /rem n il the lot is soddedisisnabi deshold ///• • IO.Thec'ntn our shall conduct self-inspections of the erosion and sedimrnmtion control measures and complete the following 1 �/ / ,'' �/ �, comb'rred self-inspectlon forth found on tM1e DEMLRwebeite _\ _ \\\�\\�\\ \ t:t0F*441 \ II I - �/ / / _ �a/� '"E'''www.deg.nc bs'r-v bcimEt vis iris/energy-minerel-snd-land iresources/stammer ormwarer-progrmn n'nE -con9rvctitlErogam. \ ` l 1 \_ I / / / �-_ twelve months ofcomplme inspection fomushall be kept on am and available for inspection&ell times.I[is recommrndede ''] \\YIIII ` / / /copy bekept inapemrits box.ReEG.5.113A-54.ItMough G.S.113A-3J Sations l3A NCAC 04A.0101 through lSA -��-_-_-_-_-_ \1 / ____ ^:` may NCAC 04E.0304 GmemlPermir NCG 010000 NPDES far Comwcdon Activities. \�_t� \ 1 1 \ II I �^ \ / / /®**St `` 11.Self-impectiotls forero andsMi gei rt'control meeawea are w mmM atleaaiones evm si:a: cR:tihr days ana \\ I rj I I'I �� I I I / /40 wimm z4 Horns oevery meant r �anlmch.Anr naaed Tau be mace immediamgmmammm measures as -\designed.All ESC meazures shell be maintainedas specifiedin the wnswcnondetails on thisplea Amingauge shell be inse project site for monitoring. 12.1. .1 dfinalaooepranceleaere WM1eniheprojeU is oomplAe:NiE01 mideea"anbuontaot DEMLRm closeout chrged"T9, ltt� Plan Afla DBMLR informs the permitkeof Neprojwt closeout via inspection report iM1e permiaa shall visit 1 ,u.P ZG° "d YnagovMCA01"Wsobmiten GwnonicNoticeo[termination(eNmT}AYIOOannosl&shoal permitfeewill be charged \\\\� t ��I II 1 I , / � \ / / / / / ////lp until the a-NOT has ban pled out ` / ' / 401 �.1. IIIII I I �, ' IGROUND STABILIZATION \ _ LVICINITY MAP1 SITE AREA STABILIZATIONEXCEPTIONS \ ' �, \ I� AIU1-. NO po , , N.T.S. DESCRIPTION TIME FRAME O / PERIMETER DIKES, 7 DAYS NONE 1 \ SWALES, DITCHES \ ` \ / •, HIGH SLOPES QUALTY 7 DAYS NONE �'\\�\�� \ �� \ Aleil,1 \ \ n •id:- R-ad 1 / , WATER ZONES \ �-: �-�\\ \ .. lid Help \ ��� / // (HOW) F / SLOPES STEEPER 7 DAYS IF SLOPES ARE \ r., \\ �I ' ../ / � Me A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN STEEPER 10 OR LESS IN �_'��_�' \\ \\ (�'j^ "�/NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE .\. \--\ \ \ 1 1qe� / �N Alkiihis COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER \..1 / AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 i � EROSION AND DAYS ARE ' \ / < SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED \ g / ''NCAC 046.0131 STATES T1AT•...DOCUMENTATION SHALL BE ACCOMPLISHED BY - Cv �• , ,• \ NDS� LINITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR / M ' \ / • ••.. ..p ^`APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER ' / ` G'vt __ _ __DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50.IN I rp/ _PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH - \ \ ` ' \ \ / TCONTROL PLAN." I „i.e . , / \ 1 ALL OTHER AREAS 14 DAYS NONE(EXCEPT / ,�OL -_ ,, tCNNN2 \ \ -- WITH SLOPES FOR PERIMETERS /_/ N \ uP r [P /) / •T plE7LAMgs . FLATTER THAN 4:1 AND HOW ZONES) I i fai, ,LI 1�. I' R1�1t� ILJ// f • 1 1 1 3� �4 1 / �, I /�/ III l / / ka LMII'TIO -ER2Typ EI�CE/ � \.361 I `-- - \ I ILL / ' .L / / / ( I 3 / r Fa - \ / N DATE: P LOW a,�I s t. n oaten r In..alert lam m PAGE: l / I j// I I , 4 REIN ORCED a ATT E i,I � imij I \ I 5 'ILITV FASEME Al - I I I I � / FUTURE/ S 5 /W Silt s k/Wattle \ �� FLo _ - - tati I SIL ENCE - 4 \ S\ III °a B• 65f n;� Mtearpr / //I 4 mu ET • �g <: tor ay 1 J �/DEV LOPMtNT Mnj - , Mis000gs peat I I I ;ti -L _ I \J. M w war 7 A p stakes �I Stakes 11' I l l I l l I \ 5"�ITILFjY '.EMENT -EINFOR.EO I I I I \ � / / SECTION SECTION I s"eluwa0el�locelea eelowou I I/' I I I 4 tor T FENCE Pat areas T.ends of Pe siltLEI \tJ l` _ e S - I 1/` \ \ II / < land disturbance.sockrtable1 o sage ormn rj 3s_I --MET �t CONSTRUC sN r I I'"f� - / Y I4 A • ",° ^""" <° eM`" I 4. lea%aOng nnatnaweatmald be turned slightly upslope to 1 11� ���� • ,"*4 E �� `I 2�0� -Ir '\ moo. \ ila \ ( ti • FIc - � t . rq IMI • � elck. , / /I_ I � a L of 8 feet if the Ate: 1� � / \ 1 / / o maximum interval RR Mersa «Corn a 9 na a M n aowrvnMe places n a 4 Inch Ypg W LE �k'" SILT •+/ l/I .J.. Wood haunt Of log t t maximum interval re� `' m rl at'n:- L.. .. -') // Y urvTRENCHEO INSTALLATION 1 NSU• . / ''� / �• S yI ...Hob.mew, a:Mrni"e.w.m...�.r.eo..on,wre,.,...,..is setewettie to hew it in place dudes omrcevema. \ \ �M` � - LIMIT / -L •A U 51-474 f f ��0�' y� \ \1B4`-used behind the sill //// ���/� EM �/ '�°/ / / MAINTENANCE: SOCK x nAL Slaw RATES ,. accumulated i'rice sate ediment ma ens debris as ttie at least weekly awl aver ON LIMITS \ -1 W.TT ... 178 rPo I \ ` P D/� I� 18m 18� //� S S E// // / / hluIch or cc nil. a jg iw sou a emu a L4F0 .•';; q" iye \ 1 �� MAIN AN E �- MAROFENANCr In umrencneas peagn wm�retnier m)nCOMPOST s(wo.am)(�.so.m)(ace.m) m") 2 m see or SILTFENCES�e - SZfi� ... ...)O �4 IE5B£NA CSFJI--T� �_ SAC M�Fy'r �- -Si-ACCESS-EA 1 �� ....7-: / - .. a / / / / / / -tea a �- 11TLET \ • \ //^� .. \CAT �\ �� ��/ / I/// shsetP wwy f w t�soeh/Mk"sr","'IaRi i°aaPmi i�isrmi (°.°.tcm1 (3'ex ( o _ _� \ '\` / /\ - \ �� J i �- ��� 0-. / H�pac n� rry 'Lougee � .��\-�/� � -- � \ �- i / �W 6 .>j' ash ao sT%n s r%n s'm%a / %n maaanre na. a Miaaa. \ \ WETLANDS ` �► I. -- -.N / °ca+ o„ �tae czar can manna-apmSill socks/wales shell. areaanaaaaaa .. .'-' 4_._. _ \' I ENSPA � �� _ - �/, I �I / , / per...testament. ....\.. \ .� i � f / SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION \ '' �� r /^ �\�. ._�. _ - .. i.:_�_-� NBA / I/ DATE: PAGE: / (...- -- \ \ 1:0 .... 20'SEWER EASE ' t--i� / /� \ �� I/ / s23 ( � � \\� _ _ - / � �� � � � �' � � /7 �\ � l IIIII I N ..A.. ..8. ..C.. .D.. ..E.. ..F. .G.� H. \� \ J / / \ // / \ \ III / I 3 ' 'I I- G I % % , I e e " dz I \ ` I/ if 4 ll nou 11 .HOua I �� ri inous \ \ �� \ \� / N ))))1: - --- �_ 1 1 III I I IIIII���/ ____ �.� �,� �. '�� � , �, _ _ 1 1 I Ili II J / R� - 1caPrr' .:A _Ro,. •Av�tFs oAnwAv 1.L;P�Rs,. G, \ \\\ -- 11I ul i LDReINE °EnFLDRB Notes \ II IIIII / 1.If needed Tree Protection fencing should bero installed along the buffer zone,etwetlandre ` c bountlary antllor arountl protecletl trees,previtlin9 a retlius of at least 1.25 feet for each I I I I I I I I Ic LEGEND inch of trunk diameter. );, ,./) 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on \ / ' DIRECTIONFLOW - - schematic/diagram s and have and fee adjusted.ow k necessary,for placement at low points.If lots are 1 / \ //J IIIII IIIII I I / '' contiguous and have tlMerent land owners or builders,each lot should have individual SittSILT FENCE / / \ SILT FENCE OUTLET ® 3.Install Fences. Silt Fence within lO feet of property line to ensure there is no Conflict with \ ENTRANCECONSTRUCTION septic system.It is the responsibility of the builder to ensure the installation M sediment ks,\.,„_.eu6e INLET controlm ores does not impact the septic system and repair area(sI. / / \ -` \ /- ��//l/IIIII II I I ��d.Al least onesConsimction Entrance/Exit is b be installetl per lot / \ \ /5.Waste bins and other areas dedicated for managing building material waste shall be at \ / I/ least 50 feet away from storm drain inlets or drainage dkches unless It can be shown that \� \ \ / \ 4 no other alternative exists.If this separation cannot be achieved,these areas must be / / / \ \ /�\ ..... /� �� �� �- /� jili 1111 \\ \\\\ ntained behind Sik Fence. _./ \ \6.Inlets downstream of disturbances should be protected streets shoultl be swept when �/ the F rice Outletis present / -�..\NC-Environmenlal.jpeq T.DetailSfor Gilt Fence,Silt Fence Outlets,Construction Entrances antl other measures era �_ _� j \ 7 : Iprovided on adtlitionel sheets.Erosion end sediment control details ere not drawn to scale. / -_ - -TYPICAL LOT LAYOUT WITH CURB AND GUTTER / / _ - - / /\ - / . \\\/\/�-\ \\ A DATE: PAGE: ■ / 'GC 1 of 2 / TOTAL DISTURBED ACREAGE: 1.71 ACRES •A� LOT EROSION CONTROL PLAN MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOTS 1, 2, 8 & 9 / 0 0 3 General-All measures will be inspected and corrections made after runoff producingrainfalls,or at least once perweek minimum.The builder will insure that the construction activities on anyparticular lot do not adverselyaffect anyof the installed erosion control measures.If lot construction dictates,measures will be p APPLETON SOUTH .,9 / �'° relocated on the lot to insure that the potential tel sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. :• S 'f�„n„� FOR * ^.•�^�'STD.�, "'a Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the constmction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all /,�� • S --±±,� objectionable materials spilled,washed,or tracked onto public roadways. F U R R CONSTRUCTION A N D f�'�gyi!LA6 < '� y� KK.Sn�-.�. Silt Fence-Sed ment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure or..-kr51. that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanoat operations. DEVELOPMENT INC. �I e Mn - , ;tip:,•'] �'!� • SoddingThe sod should be properly maintained to insure that thegrass take holds in the areas beingsecured.The sod should be watered as necessaryto maintain adequate moisture in the mot zone and prevent dormancyof the sod.The sod should not be mowed to close,since this could inhibit adequate growth / ` 4,.. /H - P P Y q -st -j�l S p�,t.*`O d stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. CARVERS CREEK TOWNSHIP CUMBERLAND COUNTY Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating propedy.Any bare areas should be SCALE: 1"=100' JANUARY 2024 Construction: Maintenance: repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 inspect at least once a week and after each 1 inch or GRAPHIC SCALE material and propedy grede k. greater rainfall;make any required repairs immediately. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a cendition to prevent mud or sediment o 0 smooth k. from leaving the construction site.This may require periodic sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. II 3.Provide drainage to early water toe sediment trap or other suitable outlet. topdressing with 2 inch stone. 4.Use geotextile fabrics in order to improve stability of the foundation in locators 3.Immediately remove all objectionable materials spilled washed or Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleenout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all subject to seepage or high water table, tracked onto pub,roadways. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) 1 inch = 100 ft. CONSTRUCTION ENTRANCE/EXIT MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE 8F-0106 LAST SAVED 1/3/2024 2:05 PM LAST PLOTTED:1/3/2024 4:35 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\FURR CONSTRUCTION\26-2651-01 APPLETON SOUTH-EC\PLANS\APPLETON SOUTH EC-LOTS 1.2.8&9.DWG