Loading...
HomeMy WebLinkAboutSW6230705_Supplement-EZ Form_20240304 SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1ROJECT INFORMATION 1 Project Name Serenity Subdivision Ph.3-5 ._. . ... ._ _... 2 I Project Area(ac) 163.07 -- ____3_1Coastal Wetland Area lac) _ 0 4 IStirface Water Area(ac) 1.26 5 Is this project High or Low Density? Both High and Low Density 6 I Does this project use an off-site SCM? No ;OMPUANCE WITH 02H.1003(4) 1 19...41[SteMfat Width of vegetated setbacks provided(feet) 100&200 8 IWill the vegetated setback remain vegetated? . Yes i 9 !If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? ' N/A 1 10 ,I Is streambank stabilization proposed on this project? No a ,. .. LUMBER AND TYPE OF SCMs: -1 11 !Infiltration System -i 1 12 i Bioretention Cell 13 Wet Pond ,, 5 I 14 iStormwater Wetland , . I , i 15Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) I 18 'Green Roof ,: I 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 ;Treatment Swale ! 1 22 ; Pond ,Dry ! t 23 .StormFilter 1 24 ;Silva Cell 25 4-. 1 Bayfilter i 26 I Filterra FORMS LOADED 3ES1GNER CERTIFICATION 27 )Name and Title: C. Scott BrownPE 28 lOrganization: 4D Site, Solutions Inc. .-I! 29 I Street address: 409 Chicago Dr. Ste. 112 1 4 1 30 City State,Zip: Fayetteville, NC 28306 1 i 31 i Phone number(s): 910-426-6777 32 !Ema sbrown©4dsitesolutions.com . Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 11,,, ‘‘' , 0 ,\-5, CA P a /,, 1 „ „q%.• 0. j 14 '11)'/. .4.1',A,... EAL •. : Signature of Designer 027452 . • - --_ •. : , . . , , , •. GIN .- •• -A- '' --,, ,s, ••......• 0 .,.. ',‘ COTT eRs ox 0 .2-11)^2.V Seal Date DRAINAGE AREAS 1 ___-Is this a high density_project? Yes 2 If so mg number of draa a areas/SCMs 5 3 E Does this project have low density areas? Yes 5 4 ; If so number of low densely draina�eareas 1 !Is all/part of this project subject to previous rule _ (versions? 5 55 IFORMS LOADEDI j RAINAGE AREA INFORMATION 1 Entire Site 1 2 3 q 4 ;Type of SCM t Wet Pond _Wet Pond 12 Wet Pond 13 Wet Pond 14 Wet Pond 15____ 5 Total drainage area(sq ft) 7103334 450039 978807 658114 703037 _ .__6 1_Onsite drainage area(sq ft) 15 7047417 427950 950020 653073 703037 7 __Offsitedrainage area(sq_ft) 55917 22089 28787 5041 0 8Total BUA in project jsq„ftj 1669425 sf 214713 sf 483779 sf 317703 sf 321768 sf,_ {New BUA on subdivided lots(subject to f _..9_._.'Permittmn.(sq ft.)_.__.. _951012 sf + 120792 sf 264900sf 186180 sf w 202900 sf..__ New BUA not on subdivided lots(subject to 10 rpermtttm (sf) 1 662496 sf i 71832 sf 190092 sf 51 126482 sf 118868 sf 11 ._I Offsite BUA(sg ft)_ _771. 55917 sf _� 22089 sf 28787 sf 5041 sf 12 I Breakdown of new BUA not on subdivided lots f Parking{sq ft) __ I Sidewalkisq-ftj 129319 sf 13086 sf 35254 sf 26443 sf _ 23771 sf Roof(salt)._ _ 9, Roadway jsq ft). . -,.. 417613 sf 46238 sf - 117534 sf 81843sf _75097 sf _,. Future.(sq ftj , A,__-,_20000 sf h I 20000 sf E__ -Other, please specify in the comment box 31 below fsq5ft)_ f 90581 sf 12508 sf 17304 sf 18196 sf 20000 sf New infiltrating permeable pavement on ...__..__.._.. _._ _ ._. 51 13 ysubdivided:19 s(K.11 ti New infiltrating permeable pavement not on 14 jsubdivided lots(sg_ft) i i Existing BUA that will remain(not subject to A 15 permitting)fsq ft) 1 1-id BUA that is alreadypermitted_ ft — 17-4Existmg BUA that will be removed fsq ft) 18 Percent BUA 23% 48% 49% 48% ___ _46%______ 19 i Design storm(inches) loin 1.0 in 1 A in ...___. 1 0 in 20 ?Des n volume of SCM(cuftj 19036 cf 46650 cf 28499 cf 28341 cf 21 iCalcu i nlation method for del volume Sim le Sim le _4 - Sim le Sim le ADDITIONAL INFORMATION Please u use this to provide any additional information about the w 22 e Other impervious listed is for the surface water of the pond. 50 3 DRAINAGE AREAS 1 GIs this a high densti project? Yes 2 I If so, number of drainage areas/SCMs 5 3 [Does thisproject have low density areas? Yes 4_._. If so,number of low density drainage areas 1 I Is all/part of this project subject to previous rule i I_ 5...Lversions? _._. _.._ _.. No FORMS LOADED DRAINAGE AREA INFORMATION Entire i 1• 5 i LD 1 4 i Type of SCM Wet Pond 4 Wet Pond 16 - i' 5 Total drainage area(sq ft) 7103334 g 548797 3764540 t 6 Onsite drainage area(sq ft) 7047417 I 548797 3764540 7 Offsite drainage area(sq ft) 55917 0 8 tTotal BUA m ro ect ft i 1669425 sf 285107 sf 46355 sf 9 New BUA on subdivided lots(subject to „9_.1P g91ittmg)_(sq ft.) .. _ 951012 sf 163840 sf ._ 12400 sf • !New BUA not on subdivided lots(subject to 10 s ermittm sf t 662496 sf t 121267 sf it 33955 sf 11 ,Offsite BUAjsq ftf _ 55917 sf I_ __ g 12 Breakdown of new BUA not on subdivided lots _ Parking(Nit", 4983 sf ii i it Sidewalk(sq ft) 129319 sf.._, 24372 6393 sf E_ . Roof(Sgftl d ..._.. . .._.. Roaway(sq ft) 417613 sf 74322 sfsf 22579 sf r be-lo Other, please specify in the comment box 90581 sf 22573 sf Futures ft_ 20000 sf t 554 ) _.._. .... ........ ...._ 1 i New infiltrating permeable pavement on 13 subdividedlots.(sq ft) _.. .-. __... .__ New infiltrating permeable pavement not on 1 14 `subdivided lots(sq ft). . .._.. t ! 'Existing BUA that will remain(not subject to i, 15 permitting)(sgft) 16 Existing BUA that is already_permitted(so ft)_ 17 Existin BUA that will be removed ft) 18 a Percent BUA 23%_ 19__tDestgn storm finches) 1.0 in 20 dDesian volume of SCM(cu ft) -. i i nvolu 21 'Calculation method for des me Sim le 1 ADDITIONAL INFORMATION 'Please use this space to provide any additional information about thel 22drainae area(s). ti Other impervious listed is for the surface water of the pond. 1 1 g i WET POND i Drainagp area number -;- 12 13 14 15 16, . , . ....... ............ ., 2i Minimum required treatmenlyolur211SWL _ : 17979 cf 40362 cf 26570 cf 27062 cf 23670 cf 5ENERAL DC ROM 02H.1050 ,11.60tntstter.M.119 14514..11.9....1100094.1.0.4 31Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes Yes Yes es ______ ....... _____ 4;Is the SCM located away from contaminated soils? Yes Yes Ye sT" Yes sf ..„ 5rWhat are the side slopes of the SCM(H:V)? 3:1 3:1 t 3:1 3.1 3:1 .. . __ . 4 Does the SCM have retaining walls,gabion walls or other engineered 6 No il No Yes No 1 Yes!side slopes? 5--- Are the inlets,outlets,and receiving stream protected from erosion --- 7(107year storm Yes i Yes Yes Yes Yes )? ! Is there an overflow or bypass for inflow volume in excess of the I 1 8, . Yes , Yes I Yes Yes Yes idesign volume? : t 1 91_ hat is the method for dewatering the SCM for maintenance? i Pump(preferred) Purrp(preferredyt Pump(preferred) Pump(preferred) PurnpApreferred)I 10'If applicable,will the SCM be cleaned out after construction? Yes Yes Yes Yes Yes - 11 Does the maintenance access comply with General MDC(8)? . Yes Yes Yes Yes Yes - 12 Does the drainage easement comp!),with General MDC(9)? Yes Yes Yes Yes, Yes 131'lf the SCM is on a single family lot,does(will?)the plat comply with N/A N/A N/A N/A N/A __LGeneral MDC,(10)? i 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes Yes Yes 151Is there an O&M Plan that complies with General MDC(12)? Yes Yes Yes Yes Yes , 16 Does the SCM follow the device specific MDC? Yes Yes Yes . Yes Yes 17rVVas the SCM desi ned„ImarafIC licensedzof_essional? _ ,,,,, ,. , Yes I Yes Yes Yes ;: ..„ i F H SOPMANOWL.A.M.1(111 18!Sizing method used i SA/DA A SA/DA SA/DA SNDA SA/DA 19 i Has a stage/storage table been provided in the calculations? ; Yes i Yes 5- Yes Yes / Yes is ; 1 20i Elevation of the excavated main pool depth(bottom of sediment ' I f 306.50 3 301.50 % 297.50 i 290.50 273.50 ;removal)(frnsll , -/---- 1 -1 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) ! 307.00 1 302.00 298.00 [ 291.00 274.00 22Elevation of the bottom of the vegetated shelf(fmsl)_ 312.00 i 307.00 302.50 295.00 279.00 i . 23:1Elevation of the permanent pool(fmsly 312.50 1,, 307.50 " 303.00 ' 295.50 279.50 24 i Elevation of the top of the vegetated shelf(fms1) 1 313.00 308.00 303.50 296.00 280.00 i 254Elevation of the temporarypool(fmsl) f 313.86 309.42 304.82 296.79 281.02 1 26,1Surface area of the main permanent pool(square feet) 9633 16644 10658 16831 . 12144 ,i 27Volume of the mainpermanent pool(cubic feet) 34387 cf j, 68687 cf 41003 cf 61958 cf ' 51599 cf 28 lAverag_e depth of the main pool(feet) 4. 3.60 ft 4.10 ft 3.90 ft 3.50 ft 4.20 ft *Average depth equation used , Equation 2 1 Equation 2 I Equation 2 Equation 2 ; Equation 2 If using equation 3,main pool perimeter(feet) 1 --i 31 If using equation 3,width of submerged veg.shelf(feet) ;-1 2 32 Volume of the forebay(cubic feet) 5917 cf i 12614 cf t 7358 cf ; 9950 cf 6 9538 cf !: 33,Is this 15-20%of the volume in the main pool? Yes 1 Yes t Yes J., Yes f Yes w: 34Clean-out depth for forebay(inches) 66 in Z 66 in t t 50 in t 54 in 66 in a I 35 Design volume of SCM(cu ft) : 19036 cf 46650 cf 8 t_ 28551 cf - 2 341 cf I 25863 cf 1 1 36 Is the outlet an orifice or a weir? Orifice ,.,; Orifice Orifice Orifice i Orifice 37 If orifice,orifice diameter(inches) 2 in .- 3 in ,,,' 3 in 1 3 in 3 in I g i t 38 If weir,weir height(inches) ,; 1 1 1 I t- f39I weir,weir length(pches) , 1 _.' i 40prawdown time for the temporarypool(days), 2 2.8 I 2 2.1 2.2 41 ircuiti Are the inlet(s)and outlet located in a manner that avoids short- , Yes Yes Yes Yes Yes 42 the /kre berms or baffles provided to improve flow path? ; No No No No No I 43'i Depth of forebay at entrancelinches) 89 in 86 in 73 in 78 in 87 in 1.--- I 444Depth of forebay at exit(inches) , 73 in 74 in 67 in 61 in 73 in 451Does water flow out of the forebay in a non-erosive manner? I Yes Yes Yes Yes Yes 11 46Width of the vegetated shelf(feet) 6 ft 1 6 ft 6 ft 6 ft 6 ft I 471Slope of vegetated shelf(H:V) , 6:1 0 6:1 6:1 6:1 6:1 48i Does the orifice drawdown from below the top surface of the i 1 1 Yes Yes Yes Yes Yes permanent pool? . • Does the pond minimize impacts to the receiving channel from the 1- , I I Yes Yes Yes Yes Yes 49 vr,24-hr storm? - - Are fountains proposed?(If Y,please provide documentation that , 50! No i No No No No ,MDC(9)is met.) I 1 - - 1 I 51;Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes Yes i I i 1 Yes Z--, , 1 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 1 Yes Yes Yes 53 Species of turf that will be used on the dam and embankment , centipede [ centipede 1, centipede centipede centipede 541Has a lantin lan beeurovided for th„,e_yagetated,shelf? ,_ : Yes Yes _1 Yes Yes Yes ADDITIONAL INFORMATION the APeN...e.SwtatciaHfl.a.I.t.z..se.R.Wtirt..td.a.k.i.a.N.I. I Please use this space to provide any additional information about the 55 wet pond(s): i R i t i 'A SCM 1204& Wet Pond 2 10:21 AM 2/8/2024 LOW DENSITY NAfaAB.OAI.N.o.tiVXRW.ZHKOAF.H.ei.V.P.XtraN........dig.S...tkMf.Y.51.,.....MWV.,t9.rl..fitIVg..U.RIYPV....e.EQCVMAZ.AVA.P.8.e....I.....i.R..V.r.tli.Vdirt.V0PJ..at•.X...t...V.V.t.te..•Efthl*il.V1Ye...VIVSVNW . ..1.....d.rgraLIMAtaii.....0.. 1 1 Is project below density thresholds set forth in the applicable stormwater rule? 1 Yes 2 'Does pruject maximize dispersed flow and minimize channelization of flow? , Yes 3 ;Has the use of piping been minimized per.1003(2)(c)? Yes 4 ;Side slopes of the vegetated conveyances(H:V) 3 sf 5 ;Maximum velocity in the vegetated conveyances during the 10-year storm? 2.2 6 Are curb outlet swales proposed? 7 , Maximum longitudinal slope of curb outlet swale(s)(%) 1% 8 Bottom width of curb outlet swale(s)(feet) i Yes i i 2 ft 9 Maximum side slope of curb outlet swale(s)(H:V) ; 3:1 10 Minimum length of curb outlet swale(s)(feet)11 Are treatment swales used instead of curb outlet swales? !,Is stormwater released at the edge of the setback as dispersed flow? 145 ft No ; Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 1.-- 14 I Are variations to rule.1003 proposed? , No V ADDITIONAL INFORMATION 15 ,Please use this space to provide any additional information about this low density project: t k i ,,,......w. 1 .1110# ...2.4.....45NIR Drainage ii BUA Pervious ; Swale Q Slope ; Va.. 1 V.aa, ;Flow depth Area ! area ; C ; # htcl 1 (ac) tact (cis) (k) I (fps) ; (fps) ; (ft) ' 1 1.90 , 0.79 1.11 0.57 8.11 1.00 ! 4.50 2.20 0.82 , i... ft , 2 ' 3 ; . 4 , it h 5 . t , i 6 . ; t 7 : 8 9 10 11 12 1 , 16 , 17 ; 18 ; .!. ; , +21 23 ; r ; 25 ' 27 , 28 ' 29 . 30 , _ _ _