Loading...
HomeMy WebLinkAboutSW5231101_Stormwater Narrative_20240229 E. Jewett Ave Subdivision — Phase 1 Stormwater Narrative The proposed development site is located approximately 600 LF East of the intersection of NC Hwy 39 (Main Street) and E. Jewett Ave in Bunn, NC (PIN#2820-25-5666). The development is in the Tar-Pam river basin. The total development will create 15 townhomes and 55 Single Family Residential Lots located on a 25.36 Acre parcel which is currently undeveloped. Phase 1 of this development will include 15 townhomes on 2.64 Ac. of the site. The proposed E. Jewett Ave Subdivision's - Phase 1 development will consist of the construction of 15 townhomes totaling 22,096 SF of impervious area, 1,604 SF of sidewalk, 9,933 SF of streets, and the associated infrastructure the site requires. Currently, there is no impervious area on the site. Total proposed impervious area for Phase 1 of E. Jewett Ave Subdivision is 0.77 Acres. This is 29% of the Phase 1 area. One stormwater wetland will be installed for Phase 1 to capture and treat stormwater runoff. SCM #1 will be between lot 15 and the E. Jewett Ave right-of-way. Calculations have been performed to ensure that our site meets the stormwater MDC for the stormwater wetland. Outflow from the wetland will be dissipated and then flow into the NCDOT right-of-way. All required calculations and reports have been included. The remaining runoff that does not flow to the SCM will travel toward the buffered stream along the East side of the site. Since the remaining area will be below 24% built upon area and will meet low density runoff requirements no SCM is provided for these areas.