HomeMy WebLinkAboutSW5231101_Supplement-EZ Form_20240229 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name E.Jewett Avenue Subdivison
2 Project Area(ac) 2.64(Phase 1 Only)
3 Coastal Wetland Area(ac) _ 0
4 Surface Water Area(ac) 0.01
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
!COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 50
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond
14 Stormwater Wetland 1
15 Permeable Pavement _
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof _
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: J.Michael Stocks,PE
28 Organization: Stocks Engineering
29 Street address: 801 E Washington St.
30 City,State,Zip: Nashville,NC 27856
31 Phone number(s): 252-459-8196 _
32 Email: mstocks@stocksengineering.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that
the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer ,•i�11ltl9ttf/g,t
%'4% CVI CARp''i.
: •
ssic'•ti
•
bk."' .9
S.
- •
SEAL,•
• 7t4IaJSk
ature of Designer
y9t ;3 g
AAe .A `460
1111
,e'd �1Et 1o•`
0/Z6/ 3
Seal Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 1
3 Does this project have low density areas? Yes
4 If so,number of low density drainage areas 1
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1 LD 1
4 Type of SCM Wetland None
5 Total drainage area(sq ft) 114796 sf 50088 sf 64708 sf
6 Onsite drainage area(sq ft) 114796 sf 50088 sf 64708 sf
7 Offsite drainage area(sq ft) 0 0 0
8 Total BUA in project(sq ft) 33633 sf 28357 sf 5276 sf
New BUA on subdivided lots(subject to
9 permitting)(sq ft) 22096 sf 16863 sf 5233 sf
New BUA not on subdivided lots(subject to
10 permitting)(sf) 11537 sf 11494 sf 43 sf
11 Offsite BUA(sq ft) sf sf sf
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft) sf sf sf
-Sidewalk(sq ft) 1604 sf 1561 sf 43 sf
-Roof(sq ft) sf sf sf
-Roadway(sq ft) 9933 sf 9933 sf sf
-Future(sq ft) sf sf sf
-Other,please specify in the comment box
below(sq ft) sf sf sf
New infiltrating permeable pavement on
13 subdivided lots(sq ft) sf sf sf
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) sf sf sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) sf sf sf
16 Existing BUA that is already permitted(sq ft) sf sf sf
17 Existing BUA that will be removed(sq ft) sf sf sf
18 Percent BUA 34% 57% 8%
19 Design storm(inches) 1.0 in
20 Design volume of SCM(cu ft) 2724 cf
21 Calculation method for design volume Simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
1 Drainage area number 1
2 Minimum required treatment volume(cu In 2724 cf
IERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes _
4 Is the SCM located away from contaminated soils? Yes
5 What are the side slopes of the SCM(H:V)? 3:1
6 Does the SCM have retaining walls,gabion walls or other No
engineered side slopes?
Are the inlets,outlets,and receiving stream protected from erosion
7(10-year storm)? Yes
8 Is there an overflow or bypass for inflow volume In excess of the Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes
11 Does the maintenance access comply with General MDC(8)? Yes _
12 Does the drainage easement comply with General MDC(9)? Yes
13 If the SCM is on a single family lot,does(will?)the plat comply with N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17 Was the SCM designed by an NC licensed professional? Yes
RMWATER WETLAND MDC FROM 02H.1054
18 Design volume of SCM(cu ft) 2724 cf
19 Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
20 Are berms or baffles provided to improve the flow path? No
21 Does the orifice drawdown from below the top surface of the Yes
permanent pool?
Does the wetland minimize impacts to the receiving channel from the
22 Yes
1-yr,24-hr storm?
23 Is a trash rack or other device provided to protect the outlet system? Yes
'atlons
24 Elevation,peak attenuation above temporary pool(if applicable) 254.29
(fmsl)
25 Elevation,temporary pool(top of the temporary inundation zone) 253.25
(fmsl)
26 Elevation,permanent pool(top of the shallow water zone)(fmsl) 252.00
27 Elevation,bottom of shallow water zone(fmsl) 251.25
28 Elevation,bottom of forebay deep pool at deepest point(at forebay 249.00
entrance)(fmsl)
Elevation,bottom of forebay deep pool at shallowest point(at
29 forebay exit)(fmsl) 250.00
30 Elevation,bottom of non-forebay deep pool at deepest point(fmsl) 250.00
tang Zones
31 Area,total surface area of the SW wetland at temporary pool elev. 3,450.00
(sq ft)
32 Area,temporary inundation zone at temporary pool elev.(sq ft) 1,569.00
33 Area,shallow water zone at temporary pool eiev.(sq R) 1,277.00
34 Area,forebay at temporary pool elev.(sq ft) 348.00
35 Area,non-forebay deep pool at temporary pool elev.(sq ft) 255.00
36 Percent area provided,temporary inundation zone(should be 30- 45%
45%)
37 Percent area provided,shallow water zone(should be 35-45%) 37%
38 Percent area provided,deep pool(forebay)(should be 10-15%) 10%
39 Percent area provided,deep pool(non-forebay)(should be 5-15%) 7%
the and Outlet
40 Peak attenuation depth above temporary inundation zone(inches) 12.49 in
41 Temporary inundation zone depth(temporary pool to permanent 15.00 in
pool)(inches)
42 Shallow water zone depth(permanent pool to bottom of wetland) 9 in
(inches)
43 Depth,forebay at entrance(permanent pool to bottom of forebay 36 in
entrance)(inches)
44 Depth,forebay at exit(permanent pool to bottom of forebay exit) 24 in
(Inches)
45 Depth,non-forebay deep pools(permanent pool to deep pool 24 In
bottom)(inches)
46 If there is an orifice,diameter(inches) 1 in
47 If there is a weir,weir height(inches) NA
48 If there is a weir,weir length(inches) NA
49 Drawdown time for the temporary pool(days) 2
and Pants_ -_- —
50 Soil amendment depth(Inches) 12 in
51 Has a soil amendment specification been provided? Yes
52 Has a landscaping plan that meets SW Wetland MDC(12)been Yes
provided?
53 Number of plants per 200 square feet(#)in the shallow water zone: 50
54 Does the temporary inundation zone planting comply with SW Yes
Wetland MDC(14)?
55 Are the dam structure and temporary fill slopes planted In non- Yes
clumping turfgrass?
56 Will cattails be planted in the wetland? No
DITIONAL INFORMATION
5?Please use this space to provide any additional information about
the stormwater welland(s):