Loading...
HomeMy WebLinkAboutNCC240572_ESC Approval Submitted_20240228 __-Ftac STATE;'^"\ ROY COOPER a Governor V O` ELIZABETH S.BISER ` ,, ,z.,6 Secretary �`Q ND"'_ WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality February 26,2024 LETTER OF APPROVAL Express Option Piedmont Natural Gas Attn: Kevin Thomas,Project Manager,Natural Gas Business Unit 4720 Piedmont Row Drive Charlotte,NC 28210 RE: Project Name: Cumberland County Industrial Park Regulator Station 2 Replacement Project Acres Approved: 1.35 Project ID: CUMBE-2024-772 County: Cumberland, City: Hope Mills, Address: Production Drive River Basin: Cape Fear Stream Classification: Other Submitted By: HDR Engineering,Inc. Date Received by LQS: February 26, 2024 Plan Type: Express Dear Mr. Thomas: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required(G.S. 113A-54.1)(b). "This project meets the NCGO1 exemption as defined in the Clean Water Act (CWA) section 402(1)(2) for<transmission facilities,drill pads,processing facilities,access roads, etc.>." Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. DE North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources --;) Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301 NORTH CAROLINA Department of Environmental seam /`� 910.433.3300 Letter of Approval Piedmont Natural Gas February 26,2024 Page 2 of 2 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition,it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerel , 611-4; to►.CL Jodi Pace,EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: Brooke Ahrens,HDR Engineering, Inc. (electronic copy) David Reeves,Chief Building Inspector(electronic copy) DEMLR-Fayetteville Regional Office