Loading...
HomeMy WebLinkAboutNCC240471_ESC Approval Submitted_20240220 2/16/24, 12:13 PM Ricci Builders Mail-Review Completed-Lot 113A Lissara-SFD Construction mailJosh Ricci <josh@riccibuilders.com> Review Completed - Lot 113A Lissara - SFD Construction 1 message City of Winston-Salem<noreply@geocivix.com> Fri, Feb 16, 2024 at 11:50 AM Reply-To: kentw@cityofws.org To:josh@riccibuilders.com City of (di WINSTON-SALEM NOR11-1 CAROLNA Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02)Grading&Erosion Control Project: Lot 113A Lissara-SFD Construction A/P#: EN2400029 Acreage to be Disturbed: 0.50 https://wi nston-salem.geocivix.com/secure/project/?projectid=1230192 Hello Joshua Ricci, Thank you for submitting your project to City of Winston-Salem. Review of the Erosion Control Plan for this project has been completed.The design is adequate to meet the ordinance standards and the plan has been approved. Be aware that this plan shall expire three(3)years following the date of approval,if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Also, acceptance and approval of this plan is conditioned upon compliance with Federal and State water quality laws, regulations, and rules. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership(FRO) form as applicable.This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided,then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document. If this project will disturb more than 1 acre or is part of a larger common plan of development,the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater Permit(NPDES)has been obtained. Please obtain coverage under the permit at the following website (https://edocs.deq.nc.gov/Forms/NCG01-NOI). Once coverage is obtained, please upload a copy of the Certificate of Coverage(COC)to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided. Please direct questions about the eNOl form to NCDEQ- DEMLR Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, u iron!COC. ***This approval email serves as the"Approval Letter"that must be uploaded when filing the a-NOl application to obtain :ire NCGO1 Cagy lificate of Coverage.*** As outlined in the Unified Development Ordinances (UDO)of Winston-Salem/Forsyth County,Village of Clemmons,Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance. Should you have any questions as you move forward please contact Kent Wall at 336-462-7481 or kentw@cityofws.org. Winston-Salem North Carolina and Forsyth County City Link 311 311 or(336)727-8000 citylink@cityofws.org https://mail.google.com/mail/u/0/?ik=70d6976bd9&view=pt&search=all&permthid=thread-f:1791075027988742715&simpl=msg-f:17910750279887427... 1/2