HomeMy WebLinkAboutNCC240444_NOI Application_20240216 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 2/15/2024 9:32:13 AM (NCG01 NOI Submission)
Approve by Brooklyn.Broussard 2/15/2024 9:43:01 AM (Review-NOI 182882 Drake Estates Phase 1A-Lots 1-22,
74-84,94)
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: February 20,2024 5:00
PM 2/15/2024 9:32:24 AM
• The task was assigned to Brooklyn.Broussard by round robin distribution 2/15/2024 9:32:24 AM
Submit by Tev.Holloman 2/16/2024 11:00:58 AM (Payment Verification for NCC240444)
•Agnieszka Nau
• The task was assigned to DEMLR NCG01 Payment Team.The due date is: March 28,2024 5:00 PM
2/15/2024 9:43:20 AM
• Tev.Holloman assigned the task to Tev.Holloman 2/16/2024 11:00:25 AM
applicationConstruction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
Previous Rejected NOI No.
182876
Prior Reviewer Name
Brooklyn Broussard
1a. Project Name*
Drake Estates Phase 1A-Lots 1-22,74-84,94
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
1-22,74-84,94
1c. Parcel ID Number(s)(PIN)
List all PINs associated with this project.
2577928917
2577927907
2577926918
2577925929
2577934030
2577933040
2577932051
2577931062
2577930020
2577920960
2577921801
2577921742
2577921682
2577922523
2577922461
2577920374
2577920425
2577829584
2577829654
2577829713
2577828872
2577828932
2577939403
2577939397
2577938202
2577936210
2577935204
2577934216
2577933228
2577932229
2577931219
2577930231
2577839137
2577837068
2.County*
Wayne
3. Highway or Street Address*
HWY 13&Providence Church Rd
Street name only is acceptable if no address number assigned yet
4.City or Township*
Goldsboro
5.State* NC
6.Zip Code* 27530
7. Latitude* Enter the latitude in decimal degrees
35.3195
B. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-78.0629
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 02/19/2024
Estimated Construction Project Start Date
10. Date to End* 02/18/2025
Estimated Construction Project End Date
11.SIC(Primary)*
Residential,Single Family Houses(SFE)(1521)
Standard Industrial Classification for Development
12.Acres to be 15.98
disturbed* (including off-site borrow and waste areas)
13.Total site area 75.23
(acres)*
14. Post-construction 3.20
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-WAYNE-2024-Drake Estates Phase 1A-Lots 1-22,74-84,94
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Edwards Branch
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.*
27-54-5-4
NC Waterbody Index Number
Stormwater discharges will flow to additional waters
No
Yes
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
SDH Raleigh, LLC
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Mike
If Corporation,enter Registered Agent First Name
3. Last Name* Kahm
If Corporation,enter Registered Agent Last Name
3b.Title Vice president
4. Permitee E-mail Address*
mkahm@smithdouglas.com
5. Permittee Telephone No.*
919-948-8390
6. Permittee Mailing Address*
Street Address
2520 Reliance Ave
Address Line 2
City State/Province/Region
Apex INC
Postal/Zip Code Country
27539 United States
Check box if the street address the same as mailing address
Yes
7. Permittee Street Address*
Street Address
2520 Reliance Ave
Address Line 2
City State/Province/Region
Apex NC
Postal/Zip Code Country
27539 United States
B.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Non-Government
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Ashley
2. Primary Site Contact-Last Name*
Turner
3.Title
4.Site Contact E-mail Address*
aturner@smithdouglas.com
5.Site Contact Telephone No.*
919-917-3742
6.Organization Name
Smith Douglas
7.Site Contact Mailing Address*
Street Address
2520 Reliance Ave
Address Line 2
City State/Province/Region
Apex NC
Postal/Zip Code Country
27539 United States
8.Consultant Name
(Optional)
First and Last name
9.Consultant E-mail
anau@thenauco.com
This person will be copied on all correspondence.
10.Consultant Telephone No.
19196244875
11.Billing E-mail
(For Annual Fee correspondence)
mkahm@smithdouglas.com
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
919-948-8390
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 02/13/2024
Approved*
2. E&SC Plan Project WAYNE-2024-0106
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4.State DEQ Office* Washington(WaRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan approval Ietter.pdf 294.15KB
Approval letter or Must be PDF format
Grading Permit
6.Signed FRO Financial Responsibility/Ownership Form
2023-12-21 Signed FRO.pdf 96.28KB
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
CO-COVER CO-COVER SHEET.pdf 678.43KB
Please do not upload entire set of E&SC plans.
8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
9. NOI Certification 2024-02-14_NCG01-eNO1-Certification-Form-
Form 317.37KB
Signed.pdf
Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person'(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
Type Name* G. Michael Kahm
Title Vice President
Organization Legally Responsible Entity
SDH Raleigh, LLC
Date* 02/15/2024
F. Tracking and COC Info
NOI Tracking No. 182882
NC Reference No. NCG01-2024-0444
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SIP(passed
from workflow if eNOI approved)
Certificate of NCC240444
Coverage(COC) No.* Uses NOI number until approved,then uses NUMBER incremented by SIP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC240444-2024
Invoice Due Date 3/16/2024
Initial Fee $ 120.00
Fee increased to$120,effective October 3,2023
Invoice Status OPEN