Loading...
HomeMy WebLinkAboutNCC240444_NOI Application_20240216 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 2/15/2024 9:32:13 AM (NCG01 NOI Submission) Approve by Brooklyn.Broussard 2/15/2024 9:43:01 AM (Review-NOI 182882 Drake Estates Phase 1A-Lots 1-22, 74-84,94) • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: February 20,2024 5:00 PM 2/15/2024 9:32:24 AM • The task was assigned to Brooklyn.Broussard by round robin distribution 2/15/2024 9:32:24 AM Submit by Tev.Holloman 2/16/2024 11:00:58 AM (Payment Verification for NCC240444) •Agnieszka Nau • The task was assigned to DEMLR NCG01 Payment Team.The due date is: March 28,2024 5:00 PM 2/15/2024 9:43:20 AM • Tev.Holloman assigned the task to Tev.Holloman 2/16/2024 11:00:25 AM applicationConstruction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System(NPDES) General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities NORTH CAROUNA Environmental Quality A. Project Information Part A. Project Location and Waterbody Information ................................................................................................................................................................................................................................................................................................................................................................................................... Are you submitting an NOI that was rejected before? No Yes Previous Rejected NOI No. 182876 Prior Reviewer Name Brooklyn Broussard 1a. Project Name* Drake Estates Phase 1A-Lots 1-22,74-84,94 1b.Specific Lot Numbers This field may be used to list specifc lot numbers. 1-22,74-84,94 1c. Parcel ID Number(s)(PIN) List all PINs associated with this project. 2577928917 2577927907 2577926918 2577925929 2577934030 2577933040 2577932051 2577931062 2577930020 2577920960 2577921801 2577921742 2577921682 2577922523 2577922461 2577920374 2577920425 2577829584 2577829654 2577829713 2577828872 2577828932 2577939403 2577939397 2577938202 2577936210 2577935204 2577934216 2577933228 2577932229 2577931219 2577930231 2577839137 2577837068 2.County* Wayne 3. Highway or Street Address* HWY 13&Providence Church Rd Street name only is acceptable if no address number assigned yet 4.City or Township* Goldsboro 5.State* NC 6.Zip Code* 27530 7. Latitude* Enter the latitude in decimal degrees 35.3195 B. Longitude* Enter the longitude in decimal degrees(MUST be negative) -78.0629 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/19/2024 Estimated Construction Project Start Date 10. Date to End* 02/18/2025 Estimated Construction Project End Date 11.SIC(Primary)* Residential,Single Family Houses(SFE)(1521) Standard Industrial Classification for Development 12.Acres to be 15.98 disturbed* (including off-site borrow and waste areas) 13.Total site area 75.23 (acres)* 14. Post-construction 3.20 impervious area (Estimated) (acres)* Project Tracking ID NCC-WAYNE-2024-Drake Estates Phase 1A-Lots 1-22,74-84,94 Assigned automatically(not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a.Receiving Waterbody* Edwards Branch Name of waterbody into which stormwater runoff will discharge 15b.Waterbody Index No.* 27-54-5-4 NC Waterbody Index Number Stormwater discharges will flow to additional waters No Yes 16a.Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date. B. Permittee Information Part B. Permittee Information-Legally Responsible Entity and Individual ...................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1. Permittee* Legally Responsible Entity SDH Raleigh, LLC If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name. Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership(FRO)Form. 2. First Name* Mike If Corporation,enter Registered Agent First Name 3. Last Name* Kahm If Corporation,enter Registered Agent Last Name 3b.Title Vice president 4. Permitee E-mail Address* mkahm@smithdouglas.com 5. Permittee Telephone No.* 919-948-8390 6. Permittee Mailing Address* Street Address 2520 Reliance Ave Address Line 2 City State/Province/Region Apex INC Postal/Zip Code Country 27539 United States Check box if the street address the same as mailing address Yes 7. Permittee Street Address* Street Address 2520 Reliance Ave Address Line 2 City State/Province/Region Apex NC Postal/Zip Code Country 27539 United States B.Type of Ownership* Ownership is only individual if an individual is named in B.1.above. Non-Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................ 1. Primary Site Contact-First Name* Ashley 2. Primary Site Contact-Last Name* Turner 3.Title 4.Site Contact E-mail Address* aturner@smithdouglas.com 5.Site Contact Telephone No.* 919-917-3742 6.Organization Name Smith Douglas 7.Site Contact Mailing Address* Street Address 2520 Reliance Ave Address Line 2 City State/Province/Region Apex NC Postal/Zip Code Country 27539 United States 8.Consultant Name (Optional) First and Last name 9.Consultant E-mail anau@thenauco.com This person will be copied on all correspondence. 10.Consultant Telephone No. 19196244875 11.Billing E-mail (For Annual Fee correspondence) mkahm@smithdouglas.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 919-948-8390 Default is legally responsible person telephone D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Plan Approval Information ...................................................................................................................................................................... 1. Date E&SC Plan 02/13/2024 Approved* 2. E&SC Plan Project WAYNE-2024-0106 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4.State DEQ Office* Washington(WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can include the beginning point and end point coordinates in the"Notes"box below). 5. E&SC Plan approval Ietter.pdf 294.15KB Approval letter or Must be PDF format Grading Permit 6.Signed FRO Financial Responsibility/Ownership Form 2023-12-21 Signed FRO.pdf 96.28KB Must be PDF format 7.Site Location Map Must be PDF format(limit 20 MB) CO-COVER CO-COVER SHEET.pdf 678.43KB Please do not upload entire set of E&SC plans. 8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application.Include additional waterbodies if necessary. 9. NOI Certification 2024-02-14_NCG01-eNO1-Certification-Form- Form 317.37KB Signed.pdf Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is,to the best of my knowledge and belief,true, accurate,and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person'(signing on behalf of Legally Responsible Person named in Part B) Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. 'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* G. Michael Kahm Title Vice President Organization Legally Responsible Entity SDH Raleigh, LLC Date* 02/15/2024 F. Tracking and COC Info NOI Tracking No. 182882 NC Reference No. NCG01-2024-0444 Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SIP(passed from workflow if eNOI approved) Certificate of NCC240444 Coverage(COC) No.* Uses NOI number until approved,then uses NUMBER incremented by SIP(formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC240444-2024 Invoice Due Date 3/16/2024 Initial Fee $ 120.00 Fee increased to$120,effective October 3,2023 Invoice Status OPEN