HomeMy WebLinkAboutSW1190702_Email_20230228 Peck, Kaitlin From:Farkas, Jim J Sent:Tuesday, February 28, 2023 10:16 AM To:Amber Henson Subject:RE: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Fast-Track option (https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/post-construction-program/new-permits-permit-modifications and 15A NCAC 02H .1043 & .1044). The Fast-Track process breaks the standard review process into two parts. The first part, the Authorization to Construct (ATC), is an administrative type review where we determine if what is proposed has the potential to/can meet the rules/requirements. Approval of the ATC allows the project to be constructed and then, once construction has finished, the second part of the Fast-Track process, the Final Approval, is entered into. As-builts are submitted during the Final Approval and this is when the technical review is performed. We review what was actually built in the field and determine if what was built meets the rules/requirements or not (if not, special conditions may be added to the permit or, in more severe cases, compliance & enforcement actions may be taken). The Fast-Track process is beneficial in that it allows a project to be permitted quicker than can be done through the standard process (with the standard process, reviews can take up to 90 calendar days, but with the Fast-Track, reviews can only take up to 30 calendar days). The drawbacks of the Fast-Track process are that 2 reviews and two review fees are required to get the permit, certain projects are not eligible (See Part A of the Application & 15A NCAC 02H .1043(1)), and that there is more risk involved with this option (compliance with the rules/requirements is not evaluated until the site has been built and, at that point, changes to the design can be very costly). If you are interested in pursuing the Fast-Track option, you will need to complete and submit 2x original signed hard copies of the Fast-Track ATC form (at the link above) and any of the items required per Part F of that form that have not already been provided (we can cannibalize items that have already been submitted for SW1221002 for the Fast-Track application or you can provide new copies). Applying for a permit for this project through the Fast-Track process rescinds the standard application (for SW1221002) as a project can only be permitted through one permitting process (either standard or Fast-Track, but not both). A new application fee will be required for the ATC application. If you have any other questions, please let me know. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 1 From: Amber Henson <amber.henson@greshamsmith.com> Sent: Tuesday, February 28, 2023 10:07 AM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: RE: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Jim, I just left you a voicemail. Though, I wanted to follow up via email, in case it’s easier for you to respond here. Our client is currently very interested in moving this project to the Fast-Track permitting option. Is this something that I should discuss and handle with you? Or can you give me further instructions on how to proceed in this direction? Thanks for all your help! Amber Henson Gresham Smith D: 615.770.8116 M: 615.499.8050 From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Wednesday, February 22, 2023 1:38 PM To: Amber Henson <amber.henson@greshamsmith.com> Subject: RE: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Yes, it is taking longer than expected. If the issue persists tomorrow, you can email me the electronic files and I will manually enter them when I get the chance. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Amber Henson <amber.henson@greshamsmith.com> Sent: Wednesday, February 22, 2023 2:37 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: RE: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. 2 Jim, Laserfiche is still asking for a login on my end – can you please confirm that it still down for maintenance? If it is back up and running, I need instructions or help getting around the login, please. Thank you, Amber Henson Gresham Smith D: 615.770.8116 M: 615.499.8050 From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Tuesday, February 21, 2023 12:55 PM To: Amber Henson <amber.henson@greshamsmith.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; mreisman@flyavl.com; Nathan Hudgens <nathan.hudgens@greshamsmith.com>; Michelle Dove <michelle.dove@greshamsmith.com> Subject: RE: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion We received it. Laserfiche is currently down for maintenance and should be up and running tomorrow. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Amber Henson <amber.henson@greshamsmith.com> Sent: Tuesday, February 21, 2023 1:52 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; mreisman@flyavl.com; Nathan Hudgens <nathan.hudgens@greshamsmith.com>; Michelle Dove <michelle.dove@greshamsmith.com> Subject: RE: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon Jim, We have resubmitted our hard copy package to your office via FedEx and have received confirmation that the resubmittal package as been delivered. If you could please confirm that you have received this package that would be great. 3 We would also like you to be aware of the Laserfiche Outage (DEQ’s document management software) that is currently hindering our ability to complete the electronic portion of the resubmittal. I just had a phone call with Mike Smith confirming that the outage is causing the issue of resubmitting today, but advised to try again tomorrow. Please note that we will be attempting to make this electronic upload again tomorrow and will follow-up with you once we have successfully submitted. Please let me know if there is anything further that you would like for us to do. Thank you, Amber Henson Gresham Smith D: 615.770.8116 M: 615.499.8050 From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Monday, January 23, 2023 2:37 PM To: mreisman@flyavl.com; Nathan Hudgens <nathan.hudgens@greshamsmith.com>; Amber Henson <amber.henson@greshamsmith.com>; Michelle Dove <michelle.dove@greshamsmith.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: \[EXTERNAL\] RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application th for the subject project on October 25, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, October 25, 2022 11:44 AM To: mreisman@flyavl.com; nathan.hudgens@greshamsmith.com; amber.henson@greshamsmith.com; 4 michelle.dove@greshamsmith.com Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Good morning, We received your post-construction stormwater permit application for the above mentioned project on 10/25/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW1221002 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov This E-mail, and any attachments thereto, is intended only for use by the addressee(s) named herein and may contain proprietary, legally privileged, confidential or copyrighted information belonging to the sender. If you are not the intended recipient of this E-mail, you are hereby notified that any use of, reliance on, disclosure, dissemination, distribution or copying of the contents of this email, and any attachments thereto, in whole or in part, is strictly prohibited. If you have received this E-mail in error, please immediately notify me by phone or by return E-mail and permanently delete the original and any copy of any E-mail and any printout thereof. Mail delivered by Gresham Smith mail system. This E-mail, and any attachments thereto, is intended only for use by the addressee(s) named herein and may contain proprietary, legally privileged, confidential or copyrighted information belonging to the sender. If you are not the intended recipient of this E-mail, you are hereby notified that any use of, reliance on, disclosure, dissemination, distribution or copying of the contents of this email, and any attachments 5 thereto, in whole or in part, is strictly prohibited. If you have received this E-mail in error, please immediately notify me by phone or by return E-mail and permanently delete the original and any copy of any E-mail and any printout thereof. Mail delivered by Gresham Smith mail system. This E-mail, and any attachments thereto, is intended only for use by the addressee(s) named herein and may contain proprietary, legally privileged, confidential or copyrighted information belonging to the sender. If you are not the intended recipient of this E-mail, you are hereby notified that any use of, reliance on, disclosure, dissemination, distribution or copying of the contents of this email, and any attachments thereto, in whole or in part, is strictly prohibited. If you have received this E-mail in error, please immediately notify me by phone or by return E-mail and permanently delete the original and any copy of any E-mail and any printout thereof. Mail delivered by Gresham Smith mail system. 6