HomeMy WebLinkAboutSWG040162_Emails_20240208
Peck, Kaitlin
From:Peck, Kaitlin
Sent:Thursday, February 8, 2024 12:17 PM
To:Dyanna McMullen; Michelle Keys; aaron.weldon@duke-energy.com
Cc:Farkas, Jim J; Holland, Brianna; svc_post_construction_stormwater; Eplin, Jerry W
Subject:SWG040162; PNG Line 477 (Union/Stanly)
Attachments:SWG040162_Cover Letter & COC_20240208.pdf; SSW-GPSWG04-20100616-DWQ-
SPU.pdf
Good Afternoon,
th
On February 8, 2024, the DEMLR received your application for a Utility Line Project to be covered under the State
Stormwater General Permit Number SWG040000. In accordance with your application, we are forwarding herewith the
subject Certificate of Coverage Number SWG040162, along with a copy of the General Permit, for the construction of a
linear utility line project with associated incidental built-upon area. The General Permit is issued pursuant to the
requirements of North Carolina General Statute 143-215.1 and Title 15A NCAC 2H .1000, the stormwater management
rules.
Please take notice that this Certificate of Coverage is not transferable except by action to and approval by DEMLR. The
DEMLR may require modification or revocation and reissuance of the Certificate of Coverage.
This permit does not affect the legal requirement to obtain other permits which may be required by the Division of
Energy, Mineral and Land Resources, the Division of Water Resources, Coastal Area Management Act, or any other
Federal, State, or Local agency, law, rule, or ordinance.
The original signed permit package and approved plans are being mailed to the permittee, Aaron Weldon, at the
following address (NOTE: An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Piedmont Natural Gas
Attn: Aaron Weldon
525 South Tryon Street
Charlotte, NC 28202
We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point, it will be kept on file at the Mooresville Regional Office. If you have any
questions, or need additional information concerning this matter, please contact us at postconstruction@deq.nc.gov.
Reminder: Please be aware that per 15A NCAC 02H .1044(2), the Erosion & Sediment Control (E&SC) permit for this site
cannot be closed out until the as-built stormwater plans for this project are approved by our office.
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construc?on Stormwater Permi?ng Group
North Carolina Department of Environmental Quality
postconstruc?on@deq.nc.gov
1
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Thursday, February 8, 2024 11:04 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Just a heads up, the package was delivered at 9:30 this morning. If you have any questions, please let me know.
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confiden?al informa?on. If you have received this email—including any a?achments—in error, please no?fy
the sender promptly and delete the email and any a?achments from all of your systems.
From: Dyanna McMullen
Sent: Wednesday, February 7, 2024 8:57 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Perfect! I’ll overnight them out today. Thank you for working with us on this one!
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
2
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confiden?al informa?on. If you have received this email—including any a?achments—in error, please no?fy
the sender promptly and delete the email and any a?achments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Wednesday, February 7, 2024 8:27 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Yes, 2 copies of the plansheets.
Please direct all post-construction permitting questions and correspondences to our new group email address,
postconstruction@deq.nc.gov.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Wednesday, February 7, 2024 8:19 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
3
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Just to clarify, I thought we were just going to swap out the first page of the application with the notarized signature still
intact on page 2.
I’ll get the large scale plots of the plans out today. 2 copies, correct?
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confiden?al informa?on. If you have received this email—including any a?achments—in error, please no?fy
the sender promptly and delete the email and any a?achments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Wednesday, February 7, 2024 7:52 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Ignore my comment about the discrepancy. You can go ahead and send in the plansheets and the original, notarized
application.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
4
From: Peck, Kaitlin
Sent: Wednesday, February 7, 2024 7:45 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Dyanna,
There is one small discrepancy. On the application, the BUA is listed as 2.57 ac, whereas the plansets are listed as 2.54
ac.
Once, you are able to correct this, go ahead and send in the plan sets and the application in (with a notarized original
signature)!
Thank you for being patient throughout this process. I am going to go ahead and process this in our system as well so we
can also get you to upload your e-documents.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Tuesday, February 6, 2024 4:11 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
5
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin, please see attached for the updated plan and application per your request. If you have any questions please let
me know.
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confiden?al informa?on. If you have received this email—including any a?achments—in error, please no?fy
the sender promptly and delete the email and any a?achments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Tuesday, February 6, 2024 10:34 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Dyanna,
When measured at a 1” = 200’, the plan sheets show a BUA area of approx. 1.84 ac and a project area of approx.. 56.9
ac, which does not match what is on the application (see comments of the measurements in the pdf. Attached).
If you can show the measurements you are getting from Cad on the site plans (signed and sealed), then that is fine.
Take care,
6
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Tuesday, February 6, 2024 9:52 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Morning Kaitlin, I’m not sure I understand the comment. The plans are at 1”=200’ scale when plotted on a 34”x22”
sheet. If you print it at half size onto an 11”x17” page, it would be 400 scale. We have both a graphic scale on the sheet
as well as the scale noted in the title block. We do not have the acreages of the project area or BUA listed on the plan
sheet, but if you would like us to do that I can. The area numbers provided were directly from taking the square footages
out of the cadd drawings. Please let me know if there is any other way we can clarify this for you so we can push
towards a speedy resolution. Thank you.
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confiden?al informa?on. If you have received this email—including any a?achments—in error, please no?fy
the sender promptly and delete the email and any a?achments from all of your systems.
7
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Tuesday, February 6, 2024 7:36 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Good Morning,
The values for the area of both the BUA and the project area shown on the plan sheets do not match the values
provided on the application. Please review the plan sets with a scale and revise.
If you have any questions, please out to me via email.
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construc?on Stormwater Permi?ng Group
North Carolina Department of Environmental Quality
postconstruc?on@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Friday, February 2, 2024 4:54 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good afternoon, attached is the updated exhibit and application that we discussed in our call this morning. The total
acreage in Union County is 69.24 acres, with 2.57 acres associated with the 2 sites in the county. If you have any
questions or need anything else, please let me know. Thanks and have a great weekend!
Dyanna
8
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confiden?al informa?on. If you have received this email—including any a?achments—in error, please no?fy
the sender promptly and delete the email and any a?achments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Friday, February 2, 2024 11:44 AM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Dyanna and Michelle,
We were able to look things over, please show the project area as the two stations and LOD of the line between them.
Once I am able to review them, please send in the hard copies of these plansheets.
Thanks!
Kaitlin Peck
Environmental Specialist
Post-Construc?on Stormwater Permi?ng Group
North Carolina Department of Environmental Quality
postconstruc?on@deq.nc.gov
9
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Friday, February 2, 2024 8:23 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: Re: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Received and accepted
Get Outlook for iOS
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Friday, February 2, 2024 8:21:48 AM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
I just sent out a link for a 15 minute teams call at 10:45. Let me know if you did not receive it. Hopefully we can get this
all sorted!
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
10
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Thursday, February 1, 2024 3:35 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>; Holland, Brianna
<brianna.holland@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
8:30 a.m. – 10:00 a.m.
10:30 a.m. – 11 a.m.
1 p.m. – 1:30 p.m.
2 p.m. – 3 p.m.
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, February 1, 2024 3:32 PM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>; Holland, Brianna
<brianna.holland@deq.nc.gov>
11
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
What is your availability for tomorrow or Monday? I am going to try to schedule a short teams meeting for us and
Brianna Holland (our other engineer, we are trying to sort this out since Jim is away).
Thanks,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Thursday, February 1, 2024 2:41 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>; Holland, Brianna
<brianna.holland@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin & Brianna,
Is there anyway we can have a quick discussion; it would probably be less than 10-15 minutes just so all is clear on what
is needed. It seems like all the time we’re taking trading emails and there are still questions or things that are unclear, it
would be easier and quicker to get this resolved. At least, we can determine if we have to do additional time-consuming
action items.
Can we please just have a brief call?
Michelle Keys, PMP
Project Manager II
12
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, February 1, 2024 2:31 PM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Holland, Brianna <brianna.holland@deq.nc.gov>; Michelle Keys
<MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Hi Dyanna,
The whole 17 miles is your project area, not your BUA. That is what I meant by that answer. So the BUA would be the
actual BUA you are putting on site (and any existing BUA) and the project area would be the 17 miles.
To clarify, we are not asking for the easement, we are asking for the project line delineation to scale, so that the area’s
measurements can be confirmed. The project area can be the limits of disturbance, the offset from the transmission
line, etc., it just needs to be consistent with the areas provided throughout the submittal.
Thank you,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
13
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Thursday, February 1, 2024 2:18 PM
To: Holland, Brianna <brianna.holland@deq.nc.gov>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys
<MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Thanks Brianna.
This project is complicated as it traverses 2 counties, only one of which requires the state SWG04 review. The 17 miles
and 224 acres is the entire project length. We don’t, at this time, have a comprehensive document showing all of the
B&D for the easement since some of it is in very old prescriptive easement that was not changed. The survey group we
contracted with has individually recorded documents from the linework we provided for each parcel for recordation
purposes. Can we give you copies of all of the recorded easement documents?
As for the BUA area question, please see the attached email. If I’m supposed to revise the application in some way other
than what I was directed to, I’d be happy to. Again, should this apply to ALL of the regulator stations along the whole
pipeline, even the ones that are not in Union County?
This all might be easier to discuss over the phone. If you can, please give me a call and hopefully we can hash all this out.
Thanks.
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
14
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Holland, Brianna <brianna.holland@deq.nc.gov>
Sent: Thursday, February 1, 2024 1:49 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys
<MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from brianna.holland@deq.nc.gov. Learn why this is important
External Email
Dyanna,
For further clarification, we need to be able to manually confirm the areas provided to us in the application.
The project area should be able to be measured with a scale and the area confirmed. Providing a metes/bounds or
dimensioned boundaries is helpful for this. Additionally, ensure that it is clear what the boundaries are, and that the
entire area is clearly shown in a way that can be confirmed.
Per Kaitlin’s email:
BE sure to include the ENTIRE project area in the map frame to provide clear bounds of what the project area is
(the 17 miles we discussed previously). Currently the line appears to extend beyond the map frame past the
(MLV-1? It is not labeled in the “Key Map”). This project area, including the line between the two areas of BUA,
should have bearings and distances so that we are able to verify the project area.
o To follow up on this, if the project area is 17 miles, a clearly delineated project area of those 17 miles
needs to be provided so that the square footage/acreage can be confirmed.
On the application, you have it listed that there is 224.5 ac of BUA (Number 8). Please revise this to the correct
amount so that I can work to verify this on your site plans.
o To follow up on this, I believe 224.5 ac was listed as the project area, which would make this site 100%
impervious, which I don’t believe is your intention.
Thanks!
Brianna Holland
Environmental Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-9218
brianna.holland@deq.nc.gov (email preferred)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
15
Please direct all post-construction permitting questions and correspondences to our new
group email address, postconstruction@deq.nc.gov
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, February 1, 2024 1:39 PM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Hi Dyanna,
My workload is heavy right now, so I may not have time to make a phone call for a while. (I have been emailing people in
response to their voicemails). Please email me any questions/concerns that you have so we can try to get them worked
through.
Thanks,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Thursday, February 1, 2024 1:31 PM
To: Michelle Keys <MKeys@kleinfelder.com>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
16
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hey Kaitlin, I called last night and again just now looking to touch base with you on what exactly you’re looking for in this
exhibit. Please give me a call back when you can so we can talk it though. Thanks! 410.689.0782
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, OH, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Wednesday, January 31, 2024 2:14 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Hi Kaitlin,
Dyanna is out on a field visit today in another State. I’ll see if I can contact her and see if she can make the changes you
requested or if someone else can assist in her absence.
We’ll get back as soon as possible as Piedmont is calling me daily
????.
Thank you,
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
17
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Wednesday, January 31, 2024 2:10 PM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Dyanna and Michelle,
I am having trouble verifying the BUA and project area on your site plans.
BE sure to include the ENTIRE project area in the map frame to provide clear bounds of what the project area is
(the 17 miles we discussed previously). Currently the line appears to extend beyond the map frame past the
(MLV-1? It is not labeled in the “Key Map”). This project area, including the line between the two areas of BUA,
should have bearings and distances so that we are able to verify the project area.
On the application, you have it listed that there is 224.5 ac of BUA (Number 8). Please revise this to the correct
amount so that I can work to verify this on your site plans.
Please send me back your revised plans in a .pdf so I can look them over. Additionally, your revised application, (I can
print the application out so that I can add it to your existing application).
Thanks,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
18
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Wednesday, January 31, 2024 11:22 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good Morning Kaitlin,
Hope all is well. Just checking to see if you have everything you need now, if so, when can we expect to get the
approval? I believe you should have received the hard copy and check this morning by 10:30 a.m..
Thank you,
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Tuesday, January 30, 2024 8:23 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
19
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Whichever! I am currently receiving his mail, so it will still go to me.
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Tuesday, January 30, 2024 8:21 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Thanks Kaitlin. Since Jim is on vacation, should I send the package to your attention instead of his? I’ll get these in the
mail today along with the check.
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
20
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Tuesday, January 30, 2024 7:42 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Thank you! And yes, it arrived yesterday.
Please direct all post-construction permitting questions and correspondences to our new group email address,
postconstruction@deq.nc.gov.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Monday, January 29, 2024 3:55 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
21
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin, please see attached for the revised plan sheet. We will send 2 copies, along with copies of the recorded
easement deed for this site.
Can you please let me know if the application from Aaron has arrived yet? Thanks
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Monday, January 29, 2024 8:26 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Dyanna,
Please add the following to this plan sheet.
Project boundary delineation labeled with accurate bearings and distances.
Thank you,
Kaitlin Peck
Environmental Specialist
22
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Friday, January 26, 2024 2:49 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Please find attached the updated site plan you requested. 2 hard copies of this plan will be included in the package that
will be sent to your office, along with the check. Please let me know if you have any comments on the plan before we
mail it. Thanks.
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, January 25, 2024 10:58 AM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
23
External Email
Will do.
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Thursday, January 25, 2024 10:55 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin,
We’re in the process of cutting a new check for the application. Since the other checks are not going to be needed, our
accountant will need the checks back to be voided. Can you please send them to the following address?
Kleinfelder
Attn: Annette Pridgen
200 Regency Forest Drive
Suite 225
Cary, NC 27518
Thank you,
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
24
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, January 25, 2024 7:58 AM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Yes, that is fine!
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Wednesday, January 24, 2024 3:45 PM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
25
Dyanna,
I asked already and she stated it can be one application. I forgot to inform you of the response.
Thanks,
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Wednesday, January 24, 2024 3:40 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
OK, if that’s the case, I am going to consolidate the 2 sites into one application. Is that acceptable? (I’m writing check
requests and want to make sure we’re right).
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
26
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Wednesday, January 24, 2024 3:37 PM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
Some people who received this message don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Hi Dyanna,
The whole 17 mile pipeline.
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Wednesday, January 24, 2024 2:43 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: \[External\] RE: General Permit - SWG04 PNG Line 477 (Union/Stanly)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
I’m updating the applications and exhibit per your comments and am just looking for a point of clarification. You
commented
Please note that the entire project area, not just the areas of the project that are proposing to add BUA,
must be included in submittal materials (NOI, plans, etc…).
This is a clip from the Line 129 Tieover exhibit.
27
This is from the application, with the BUA being the 1.33 acres noted in note 2 above:
Should the application be for this 1.33 acres or should I apply for it to be the 224.5 acres that encompasses the entire
17-mile pipeline? I just want to make sure it’s right. Thanks!
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Wednesday, January 24, 2024 1:42 PM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: General Permit - SWG04 PNG Line 477 (Union/Stanly)
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Good Afternoon,
We received your application for a new post-construction stormwater permit on 12/4/23. At this time, the submission is
not administratively complete and cannot be accepted for review in its current condition. Please provide the following
28
submittal items within 30 calendar days (by close of business on 2/23/24) so that we may accept the project and begin
the review process, otherwise, the project will be returned as administratively incomplete.
For the Line 129 Tie-over Submittal:
1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section
12.14(e)(2)):
Please be aware that, effective October 3, 2023, our permit application fee structure is as follows:
New Permit or Major Modification for a project with one (1) or fewer SCMs = $1,000
New Permit or Major Modification for a project with two (2) SCMs = $1,250
New Permit or Major Modification for a project with three (3) SCMs = $1,750
New Permit or Major Modification for a project with four (4) or more SCMs = $2,250
Minor Modification = $250
Renewal = $750
Transfer = $750
Renewal & Transfer Combination = $1,500
General Permit = $700
Per the submittal items, this project will require an application fee of $700 as this application is for a
General Permit. Please provide a new application fee check in this amount so that we may process your
application. We will void and return the provided application fee check to the permittee (unless a
different return address is indicated by close of business tomorrow).
2x hard copies of the Application with the following corrections made:
Please provide the applicant’s original, notarized and sealed signature in this section of the Application.
Please provide the email of the applicant.
2x hard copies of the plan sheets with the following corrections made:
A clear vicinity map showing the direction and distance to the nearest town or city, street name, street
number and the nearest intersection of two major roads.
Wetland delineation or a note stating that there are no wetlands located on site.
Please note that the entire project area, not just the areas of the project that are proposing to add BUA,
must be included in submittal materials (NOI, plans, etc…).
For the MLV 1 Site Submittal:
29
1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section
12.14(e)(2)):
Please be aware that, effective October 3, 2023, our permit application fee structure is as follows:
New Permit or Major Modification for a project with one (1) or fewer SCMs = $1,000
New Permit or Major Modification for a project with two (2) SCMs = $1,250
New Permit or Major Modification for a project with three (3) SCMs = $1,750
New Permit or Major Modification for a project with four (4) or more SCMs = $2,250
Minor Modification = $250
Renewal = $750
Transfer = $750
Renewal & Transfer Combination = $1,500
General Permit = $700
Per the submittal items, this project will require an application fee of $700 as this application is for a
General Permit. Please provide a new application fee check in this amount so that we may process your
application. We will void and return the provided application fee check to the permittee (unless a
different return address is indicated by close of business tomorrow).
2x hard copies of the Application with the following corrections made:
Please provide the applicant’s original, notarized and sealed signature in this section of the Application.
Please provide the email of the applicant.
2x hard copies of the plan sheets with the following corrections made:
A clear vicinity map showing the direction and distance to the nearest town or city, street name, street
number and the nearest intersection of two major roads.
Wetland delineation or a note stating that there are no wetlands located on site.
Please note that the entire project area, not just the areas of the project that are proposing to add BUA,
must be included in submittal materials (NOI, plans, etc…).
NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that
may be brough up during the engineering review.
If these items are received within the stipulated timeframe, we can accept the project and begin the review process.
Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our
two reviewer positions is currently vacant).
30
Hard copies should be mailed to the following address:
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
If you have any questions, please contact Kaitlin Peck at post-construction@nc.deq.gov or at (919) 707-9209.
Thank you,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Wednesday, January 24, 2024 12:12 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
31
Hi Kaitlin,
This is an upgrade to the existing line and we are replacing the line in construction.
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Wednesday, January 24, 2024 11:45 AM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
You don't often get email from kaitlin.peck@deq.nc.gov. Learn why this is important
External Email
Good Morning Michelle and Dyanna,
To clarify, are you all constructing/replacing the pipeline between the two sites or just doing two upgrades to an existing
pipeline?
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
32
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Wednesday, January 24, 2024 10:15 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Dyanna McMullen
<DMcMullen@kleinfelder.com>
Subject: RE: \[External\] Application Status - SWG-04 permits
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good morning Jim & Kaitlin,
Just wanted to check in to see if you have everything you need. Do you think we’ll be able to get it done prior to Jim’s
vacation?
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Thursday, January 18, 2024 4:03 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
33
Kaitlin & Jim,
The proposed equipment installations located at the Line 129 site are considered incidental to the Line 477 since their
sole purpose is supporting the gas transmission main being installed and would not be needed if the utility upgrade
were not being performed. The proposed launcher is equipment that needs to be installed as part of the Federally
mandated update to gas transmission systems, requiring the ability to do in-line inspections for public safety. The
regulator station that will also be installed is a transfer location for gas flowing through the transmission main to be
diverted into the distribution system serving local PNG customers. The BUA of this site was reviewed and minimized to
the maximum extent practicable in accordance with PNG operational guidelines.
I’ve attached PDF copies of the documents that were included in the submission package. If you have any questions or
need any other information, please let me know.
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, January 18, 2024 10:53 AM
To: Michelle Keys <MKeys@kleinfelder.com>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
External Email
Michelle and Dyanna,
Can you provide some insight on what the regulator station is? (in reference to Line 129 launcher). Additionally, can you
provide your reasoning for why this BUA should be considered “incidental”? (For general permits, typically only
incidental BUA is permitted).
Also, after speaking to Jim, you can either permit both of the sites under one permit, or two permits (one for each site),
it is up to you. Please let me know what route you would like to take so I can send out the appropriate additional
information that is needed.
34
If you could email me pdf files for the NOI, USGS maps, and plansheets relevant for this project, this will help expedite
this review while we are waiting to send and receive additional information/get this project in our system.
Thank you,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Thursday, January 18, 2024 9:04 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Dyanna McMullen
<DMcMullen@kleinfelder.com>
Subject: RE: \[External\] Application Status - SWG-04 permits
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hello Kaitlin and Jim:
I just wanted to follow-up to see the status of where this is in the process. I don’t recall seeing an update from this past
Monday and Piedmont is requesting an update so we can provide information to the contractor onsite.
I appreciate both of your willingness to assist in providing a response.
I look forward to hearing back.
Thank you,
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
35
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Friday, January 12, 2024 9:12 AM
To: Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
External Email
Good Morning Michelle,
Jim (jim.farkas@deq.nc.gov) said that the package was received sometime in December (he is teleworking today and will
th
be able to get the exact date when he is in the office on Monday) and is hoping to get to it before Jan. 29 (he is out of
office from 1/29/24 2/7/24) but if not will as soon as he returns to the office.
Take care,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Friday, January 12, 2024 8:50 AM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
36
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good Morning Kaitlin,
One other question, PNG wants to confirm when the package was received by your office, so we have an idea of the
th
timeline. Mooresville received it on November 30 because we Fed-ex the application. When do you show
receipt? We are currently in construction and Union County will not approve the permit until we have the SWG-04 back
from the State (your office). So, we are just trying to see how that will impact the schedule and trying to avoid delays
and potential Change orders.
Do you have any idea on when Jim will start his review on eligibility?
Thank you for your help in responding to these questions.
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Michelle Keys
Sent: Thursday, January 11, 2024 3:26 PM
To: 'Peck, Kaitlin' <kaitlin.peck@deq.nc.gov>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
Okay, thanks. Just making sure I cover all the questions
????
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
37
o| 704-378-9183
m| 404-307-1900
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, January 11, 2024 3:25 PM
To: Michelle Keys <MKeys@kleinfelder.com>
Cc: svc_post_construction_stormwater <postconstruction@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
External Email
Michelle,
So the Fast-Track option is no longer available (and did’t apply to general permits), but the general permits (which are
different from standard permits) tend to take approximately around the same time that the fast-tracks used to.
“Please be aware that, effective October 1, 2023, the Fast-Track permitting option has been eliminated (The Fast-Track
option is still available for those projects that have filed their Fast-Track application on or before the effective date). For
this project, you will need to apply for post-construction stormwater coverage through the Standard permitting option”.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
38
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Thursday, January 11, 2024 3:21 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin,
When I sent the email to you an automatic message came back. Is there a way to Pay for a Fast-Track Review?
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, January 11, 2024 3:20 PM
To: Michelle Keys <MKeys@kleinfelder.com>
Subject: RE: \[External\] Application Status - SWG-04 permits
External Email
You too!
39
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deq.nc.gov
From: Michelle Keys <MKeys@kleinfelder.com>
Sent: Thursday, January 11, 2024 3:18 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater <postconstruction@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hi Kaitlin,
Thank you for answering my follow-up questions via phone call. We look forward to hearing back soon.
Have A Great Rest of your Day!
Michelle Keys, PMP
Project Manager II
9009 Perimeter Woods Dr, Suite E
Charlotte, NC 28216
o| 704-378-9183
m| 404-307-1900
40
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent: Thursday, January 11, 2024 3:10 PM
To: Dyanna McMullen <DMcMullen@kleinfelder.com>
Cc: Michelle Keys <MKeys@kleinfelder.com>; Farkas, Jim J <Jim.Farkas@deq.nc.gov>;
svc_post_construction_stormwater <postconstruction@deq.nc.gov>
Subject: RE: \[External\] Application Status - SWG-04 permits
External Email
Hi Dyanna,
Jim is looking over this application right now to check for eligibility. I will reach out to you once it gets passed off for
admin review.
Thanks,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
From: Dyanna McMullen <DMcMullen@kleinfelder.com>
Sent: Thursday, January 11, 2024 2:15 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Cc: Michelle Keys <MKeys@kleinfelder.com>
Subject: \[External\] Application Status - SWG-04 permits
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good afternoon Kaitlin,
I’m trying to find the status of 2 permits I send in to the Mooresville office accidently back at the end of November.
When I called to check on them they told me all the state post-construction permits go to the central office. The two
permits are for our client, Piedmont Natural Gas, both for Line 477; One for the Line 129 Tie-over, one for the MLV1. I’ve
attached copies of the applications for your reference.
41
If you could please let me know 1) if you have the applications, 2) what their permit numbers are for future reference,
and 3) what the standard review times are, I would appreciate it. Thanks for your help!
Dyanna
Dyanna McMullen (she/her), P.E. (MD, NC, NJ, PA, VA, WV)
Project Manager II
1745 Dorsey Road, Suite J
Hanover, MD 21076
d| 410.689.0782
o| 410.850.0404
f | 410.850.0049
This email may contain confidential information. If you have received this email—including any attachments—in error, please notify
the sender promptly and delete the email and any attachments from all of your systems.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
42