Loading...
HomeMy WebLinkAboutNCC240230_ESC Approval Submitted_20240126 1/23/24,5:50 PM Jennings Environmental PLLC Mail-Fwd: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104053 Jennings Zan Price <zan@jenningsenv.com> Environmental Fwd: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0104053 Greg Jennings <greg@jenningsenv.com> Mon, Jan 22, 2024 at 10:45 AM To: Zan Price<zan@jenningsenv.com> Forwarded message From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Date: Mon, Jan 22, 2024 at 10:42 AM Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0104053 To: North State Environmental, Inc<b.spaugh@nsenv.com>, Jennings Environmental PLLC<greg@jenningsenv.com> AK, �tNE51'ATF�• al AA! po � iiirN =:; �o. S q T. l fS QUAM\ACT# North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 01-22-2024 North State Environmental, Inc 2889 Lowery Street Winston Salem, NC 27101 RE: Project Name: Pilot Mountain State Park- Bean Shoals, Crossing Improvements and Home Creek Stream Restoration Acres Approved: 13.3 Application ID: PA-002210 Permit Number: SURRY-2024-0102 Address: Hauser Road City: Pinnacle County: Surry River Basin: Yadkin - Pee Dee Stream Classification: WS-IV: Water Supply IV Plan Type: New Plan Dear North State Environmental, Inc, https://mail.google.com/mail/u/0/?ik=d463bfe9a6&view=pt&search=all&permmsgid=msg-f:1788806029752729069&simpl=msg-f:1788806029752729069 1/3 1/23/24,5:50 PM Jennings Environmental PLLC Mail-Fwd: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104053 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee.After the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOlform may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOlform to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a newCOC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. General Comments: 1. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 48 .0120] 2.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 48 .0110] 3.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 4.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee https://mail.google.com/mail/u/0/?ik=d463bfe9a6&view=pt&search=all&permmsgid=msg-f:1788806029752729069&simpl=msg-f:1788806029752729069 2/3 1/23/24,5:50 PM Jennings Environmental PLLC Mail-Fwd: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104053 payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT)to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Your cooperation is appreciated. Sincerely, Nicole Chiles, El -Assistant Regional Engineer Winston Salem Regional Office North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Attachments: Certificate of Approval �D_E Q� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC,27105 336 776 9800 [h.......Em+a-twrtY GYHE� Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. � SURRY-2024-0102 Pilot Mountain State Park-Bean Shoals.pdf 119K https://mail.google.com/mail/u/0/?ik=d463bfe9a6&view=pt&search=all&permmsgid=msg-f:1788806029752729069&simpl=msg-f:1788806029752729069 3/3