Loading...
HomeMy WebLinkAboutNCC240192_Site Plan or Location Map_20240122 8 7 6 5 4 3 2 1 1.GENERALNOTES: rffi 1. DURING C NG CONSTRUCTION AND UPON COMPLETION OF WORK,CONTRACTOR 8. ALL DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT 16. ALL STORMWATER INLETS LOCATED IN CONNECTING,DOWN GRADIENT, SHALL REMOVE ALL EVIDENCE OF WORK INCLUDING DIRT,ASPHALT,TIRE SOIL STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL AND PAVED AREAS SHALL HAVE PROTECTIVE MEASURES INSTALLED TO TRACKS,ETC.AND LEAVE THE SITE IN A CLEAN AND ORDERLY CONDITION. WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY, PREVENT A DISCHARGE OF SEDIMENT TO THE STORM SEWER SYSTEM RMF ENGINEERING,INC. DURING AND UPON COMPLETION,CONTRACTOR SHALL SWEEP ASPHALT WITH THE EXCEPTION OF THE AREAS MARKED ON THE PLANS THAT AND/OR UNIVERSITY OWNED STORMWATER CONTROL MEASURE(SCM) PAVEMENT AND CONCRETE SIDEWALK,AND KEEP THE SITE IN A NEAT AND REQUIRE SOIL STABILIZATION WITHIN 7 DAYS. DEVICES.IN THE EVENT THAT SEDIMENT FROM THE CONSTRUCTION SITE 8081 ARCO CORPORATE DRIVE H ORDERLY CONDITION.ALL MUD AND CONSTRUCTION DEBRIS IS TO BE IS DISCHARGED TO THE STORM SEWER SYSTEM,THE CONTRACTOR SHALL SUITE 300 H REMOVED IMMEDIATELY FROM ROAD.CONTRACTOR MAY INSTALL 9. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED IMMEDIATELY REMOVE THE SEDIMENT AND CLEAN THE AFFECTED AREAS RALEIGH,NC 27617 STABILIZED CONSTRUCTION ENTRANCE TO SITE AS REQUIRED.ENTRANCE AND REPAIRED AS NECESSARY WITHIN 24 HOURS OF ANY STORM EVENT TO PREVENT A DISCHARGE INTO UNIVERSITY OWNED SCMS.IN THE EVENT MAY NOT IMPEDE REQUIRED TRAFFIC LANES TO REMAIN OPEN. OF GREATER THAN.50 INCHES OF RAIN PER 24 HOUR PERIOD. THAT SEDIMENT FROM THE SITE IS DISCHARGED INTO A UNIVERSITY P:919-941-9876 F:919-941-9957 OWNED SCM(S),THE CONTRACTOR SHALL IMMEDIATELY REMOVE THE 2. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO 10. CONTACT JAKE TERRELL FOR ALL EROSION AND SEDIMENT CONTROL SEDIMENT AND IMPLEMENT ALL ACTIONS NECESSARY TO RESTORE THE BEGINNING ANY LAND DISTURBING ACTIVITY.WHERE CLEARING AND MEASURE MAINTENANCE CONCERNS. SCM(S)TO FUNCTIONING STATUS.CERTIFICATION,FROM A LICENSED NC GRUBBING IS REQUIRED TO INSTALL SOME EROSION CONTROL DEVICES, EMAIL: jmterrel@ncsu.edu, PE,ATTESTING TO THE FUNCTIONING STATUS OF THE AFFECTED SCM(S) N C STATE UNIVERSITY CONTRACTOR SHALL AT A MINIMUM INSTALL THE DEVICES AND PHONE: 919-515-2030 SHALL BE PROVIDED BY THE CONTRACTOR. CONSTRUCTION ENTRANCE(AS NEEDED)AROUND THE PERIMETER OF THE 17. SHEETS C-509F AND C-510F NOT INCLUDED IN DRAWING PACKAGE.SHEETS SITE.CONTRACTOR IS RESPONSIBLE FOR INSTALLING ADDITIONAL 11. THE PROJECT SITE IS LOCATED WITHIN THE NEUSE RIVER BASIN. INDICATE SHARED LAYDOWN AND STAGING AREA FOR ALL PACKAGES EROSION AND SEDIMENT CONTROL DEVICES TO CONTAIN SEDIMENT THAT ARE A PART OF THE"NCSU ELECTRICAL DISTRIBUTION UPGRADE; WITHIN THE PROTECTED WORK AREA AS NEEDED.CLEAR ONLY AS 12. EROSION CONTROL DEVICES MAY NOT BE REMOVED UNTIL AFTER NCDEQ E&SC PLAN PROJECT NO:WAKE-2022A20"PROJECT.LAYDOWN REQUIRED TO INSTALL EROSION CONTROL DEVICES. ESTABLISHMENT PERIOD(UP TO ONE YEAR AFTER PROJECT COMPLETION). AREAS WITH PROPER EROSION CONTROL MEASURES WERE REVIEWED CONTRACTOR MAY CONTRACT NCSU GROUNDS FOR REMOVING SILT AND APPROVED AS PART OF THE PACKAGE 1 DRAWING SET(SCO# 3. TREE PROTECTION IS REQUIRED FOR ALL TREES NEAR CONSTRUCTION FENCE AFTER ESTABLISHMENT PERIOD,AND SHALL CONTACT GROUNDS 19.21163-01 F). NOT IDENTIFIED TO BE REMOVED ON THE C-100 DRAWINGS.CONTRACTOR FOR PROPOSAL. IS RESPONSIBLE FOR REPLACING ANY TREE THAT IS DAMAGED DURING CONSTRUCTION. 13. CONTRACTOR IS RESPONSIBLE FOR DEWATERING TRENCH AT ALL TIMES. CONTRACTOR SHALL DISCHARGE WATER FROM THE TRENCH TO 4. NO STOCKPILING IS PERMITTING WITHIN THE DRIPLINE OF EXISTING TREES. SEDIMENT BAGS PER DETAIL C ON C-513 OR TO SEDIMENT TANKS PER THE SPECIFICATIONS.SEDIMENT BAGS SHALL BE PLACED IN STABILIZED AND 5. EQUIPMENT UTILIZED DURING THE CONSTRUCTION ACTIVITY ON SITE VEGETATED AREA DOWNSTREAM OF CONSTRUCTION. /� G THE POTENTIAL OR ACTUAL POLLUTION OF THE SURFACE OR GROUND 14. CONTRACTOR SHALL LIMIT THE AMOUNT OF OPEN TRENCH PER THE WATERS.FUELS,LUBRICANTS,COOLANTS,AND HYDRAULIC FLUIDS,OR PHASING DRAWINGS.OPEN TRENCH EXCAVATION SHALL NOT EXCEED 200 ANY OTHER PETROLEUM PRODUCTS,SHALL NOT BE DISCHARGED ONTO FT AT ANY TIME WITHOUT WRITTEN APPROVAL FROM EOR. THE GROUND OR INTO SURFACE WATERS.SPENT FLUIDS SHALL BE CLEANED UP AND DISPOSED OF IN A MANNER SO AS NOT TO ENTER THE 15. CONTRACTOR SHALL INSTALL AND MAINTAIN APPROPRIATE EROSION AND WATERS,SURFACE,OR GROUND. SEDIMENT CONTROL MEASURES TO ENSURE SEDIMENT DOES NOT LEAVE THE SITE DURING ALL PHASES OF CONSTRUCTION.ANY SEDIMENT 6 LOCATE ALL STOCKPILES AT LEAST 50 FEET AWAY FROM STORM DRAIN DEPOSITED OUTSIDE THE PROJECT WORK AREA,INCLUDING TRACKING INLETS AND SURFACE WATERS. OUT,SHALL BE IMMEDIATELY CLEANED UP BY SWEEPING AND/OR REMOVING THE MATERIAL BY HAND.ACCUMULATED SEDIMENT ON HARD 7. CONCRETE MATERIALS ONSITE,INCLUDING EXCESS CONCRETE,MUST BE SURFACES SHALL NOT BE WASHED INTO STORM DRAINS,GUTTERS OR CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, RECEIVING WATERS.ALL INSTALLED EROSION AND SEDIMENT CONTROL WETLANDS,OR BUFFERS.NO CONCRETE OR CEMENT SLURRY SHALL BE MEASURES SHALL BE REMOVED ONCE THE PROJECT AREA IS FULLY DISCHARGED FROM THE SITE. STABILIZED. F FVII- IIIIIII . III -r Iw- �_ .. _ .� IIFNOIIIIIIIIIIIIIIIIIIII l ��: 0 _ 00 . 1: - I Iarr�Itl (ice: .4! :3- _____ ....„.a.rhimi-- E _ i 1 1 .1 I 11111.,I.•••W 1 i. . ...... o 505 -506- �, �_► -,_ r� _� _, �� meDm '01,r r�� er< I .,,t,(-`''"'ILl�'�� �� ��'LOD -� o `> o 7f47,,., �tr o®all aell likAsip �� LO ` 1 + `_ LOD 'IIIIIIIII' 'O ; ' �_LOD �' I! „1\17 LOD - _.r'I Or COB l ,'�.- =_ �f ' fLA ' ,o I ' �" t 1 _ 111qD r� 508Offe \l'ai, \ . 17.i:_ z) ....... ,;_ 60,0 \1,', a',I •_,-"C ' . _ ` 1 ) 4 � ital.,` ^ �' } •° <- ®®: '- ®•ra -�-,1. . - - . ■ IIIajm ` ■� i _ I ® Q C-504- I \ '! 1 Iskyie› w 61..,...\* L 11 �11III • II - _ ii 11111"4- - I ,\. .n on' • � o`• ` � '� .�� IP• Neki"....---\tirl Au jir ij[ 'I �^•'�i WO�� _ • REV DESCRIPTION DATEDATE Cam..•'' _ _ _ _ _ _ _ _ IIj. ��«_....- _y r ,. _.-,. ._ Z- • L L=�>ss •- /�t I - ,� / -.�' REVISIONS 1 �1 _ �C . m_o � `.i,� 1.-..4' PIY,y1"IIIIID ........ .�.-i... ��� I ^�� �� c SEE _ lal o Cc _ _ _ _ -- - �t --,._�_�1111m Y��h�l�ll�':�IAllllllll��aLn ' ,:.....� °IIIIIi1111111A ��I CONSTRUCTION C-501-I . ... --_ _ .._....._......_---------------- . t.QO- Ikkikkakkikk1�11..,. _ •"- k:•4,w«=: :wwr.�.i1..:.- ININIL• .... ..........,1. lb DOCUMENTS I , � Q __ I - - - -- 1W W"'�"WIV'" Ij-•.w6 wL■. maw,. o ���W------ - IIIIIIIIIIIIIIIIITr - �� - -5 0 2- mil- ________611.0.....qt:_ • iN_ii � _ oA .mTMo..EE o.AMFE" EEa..,i Aril i i i i iiioii i i �••Ca • m _ _____- - --.1.7..----- _ _ _ �� - _ ` NCApO/' _ o - r Tom_ - / Ilk - / ®� IJ I b .. _ I ....... 11l I - cr.:pESslo ,y ` / I W.1 m A ������-m • 1�is • .40 ...I, dig ripilvtiling ,'.•rot Alt�'Ap d n ,rk 7 111 101 CC 1 ❑ O I _ O =J e .■ �� ,,1W• J _ m LCD. • .. 1111111 li '1 :Ih+ ! _ ! .� ., � p� - m -r3 1 ' ® , nI l fc .�wrt�. O•'��IwF7I��� «. �* •♦ . + i 0 `/ m m 1o� ��f A` 3� • °N P'�c 0 0 0 Ij. V itl[ir) • 0 \ .11 � , - • !� :gib `•� ilk •` S.gOP""- C5 �' ., f O • O ■r,� lrL. mz72oz31) pi 00[1 $ rr � � 1,1 Rom ' I .[ B 7 J 11 O • _ , jI �I ' I II 11 L DRAWN BY DCK DATE. 10/26/2023 B ( \ .i ` e - / /, � ` I m w i�,• . rt. DESIGNED BY: ETL SCALE: 1"=120•0. IJ.r,I:b • ( rod T�. till , 7.. 1 to CHECKED BY: MSB RMF JOB NO 220173.B0 / Lr 1p LOD m• y,� i (� ',1 - j�, PROJ MGR. GAC NCSU JOB#. 201920030 0 • O • II r Ij ' r SCO#: 1921183A11 CODE#:41924 ITEM#:303 N ..� - • L._ - PROJECT NAME: _ Ill •• �ii 1 ♦' IF '� Tom1_._ ' :11111: m � i..�. \ T �o� �� 1 ._ • LI/ - oa, ��IIIIII III � y - I _ _ ELECTRICAL \�� = - P I / II{^..�..."•1 a :: o' III D G �* • ■ �'� DISTRIBUTION UPGRADE- •': _ - n �� �'' ""' �' `„ titi• ■ 11. DISTRIBUTION PACKAGE 4 IL, o1:2 I ii= �``�l (.. \.-\ ` • . / �mowI iimpi n11111=MMIrtlioil, ' ��", .1 _ DRAWING TITLE'. m cam,.,,. pigii,l�\ �.'._ - \ /-�,''_ ' ter. ��, 1 , A 1� / :•,� mnu i �' �� �� �._ y'� - 1 fs �- OVERALL EROSION& A m \� ® \.\..-..-. \ ` •..-� GRAPHIC SCALE _ � _ MI + I -� ■ j� SEDIMENT CONTROL Z �I �' • \�i\*� ._ \ _ _ • I. . J. PLAN w _ -\ �• '..• r 120 60 0 120 240 04 :a n 11 I m ® ._.._„_, `\ r' D 1 I NA l 'TSCALE iu. ° ,0� • ' �� - - - 11 {f If H 6f (UNIT OF MEASURE:FEET e g 1 / -Lljll 1. - _ •`^" :////` L3 ( DRAWING NUMBER: E C-500-I 8 7 6 5 4 3 2 1