Loading...
HomeMy WebLinkAboutNCC240173_Site Plan or Location Map_20240118 ,...........,... .„ k. f DUKE , wiiiiih, iiiviAtik1141613 air._ .-- •4911111r$0711111- , it_ ARV V Ire ,, ''' EITZiro-AP411641/44.1141 .: 41" 1411164Nralk ''‘ It/ ENERGY® voiNie. a PROJECT LOCATION PROGRESS �' , ' BLACK CREEK-WILSON 115 KV EAST - RAISE LINE NORTH do SOUTH CAROLINA STATE MAP AND INSTALL SWS FOR CITY OF WILSON TAP EROSION & SEDIMENT CONTROL & ACCESS PLAN WILSON COUNTY, NORTH CAROLINA PROJECT NARRATIVE THE PROPOSED BLACK CREEK-WILSON 115 KV SWITCH INSTALLATION PROJECT IS LOCATED IN SHEET LIST: WILSON COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES THE INSTALLATION OF TWO(2) SWITCHES,GRAVEL PADS,UPGRADING ASSOCIATED ACCESS AND IMPROVEMENTS TO EXISTING COVER SHEET SHT 1 OF 14 STRUCTURES ALONG 1.9 MILES OF THE EXISTING BLACK CREEK-WILSON 115 KV TRANSMISSION OVERALL PROJECT LAYOUT SHT 2 OF 14 LINE.THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY. EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 14 THE PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT EROSION&SEDIMENT CONTROL PLAN SHT 4 OF 14 CHANGE THE EXISTING LAND USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION EROSION&SEDIMENT CONTROL PLAN SHT 5 OF 14 CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED EROSION&SEDIMENT CONTROL PLAN SHT 6 OF 14 CONSTRUCTION LIMITS.PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL EROSION&SEDIMENT CONTROL PLAN SHT 7 OF 14 BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF EROSION&SEDIMENT CONTROL PLAN SHT 8 OF 14 DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION EROSION&SEDIMENT CONTROL PLAN SHT 9 OF 14 CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY EROSION&SEDIMENT CONTROL DETAILS 1 SHT 10 OF 14 ACCESS ROUTES,WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN LATITUDE: 35.65519 8O EROSION&SEDIMENT CONTROL DETAILS 2 SHT 11 OF 14 FOR PERMITTING USE ONLY BY NCDEQ.THE PROJECT IS ANTICIPATED TO START IN JANUARY 2024. LONGITUDE: -77.893618° EROSION&SEDIMENT CONTROL DETAILS 3 SHT 12 OF 14 NCGDETAIL1 SHT 1F14 NCGO101 DETAIL 2 SHT 14 OF 14 GLesween Hills Five Points '"Fan ,3 1 sandy Creek GENERAL NOTES -05 Pal rlorPark US: - 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE a \\\ - esuno FOR REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. )`'" Lincoln Heigh. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. • 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE MIGRATORY BIRD HOTLINE a CONTRACTORS RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, 4 STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY < EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 'X.' SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, Z 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT centertrrea iunemn CZ-r SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO 0 OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO i4� BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. cai: CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR LL SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 0 ENERGY. 5. PROJECT IS LOCATED IN THE NEUSE RIVER BASIN. THE PROJECT IS SUBJECT TO STATE-REGULATED O BUFFER REQUIREMENTS. r CC 6. SEE SHEET 10&11 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING 1, 0 SCHEDULE. SPILL REPORTING HOTLINE 7. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS to 8. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER • REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR J OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS F 9. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF Fn IN JURISDICTIONAL WETLANDS AND/OR STREAMS. 10 THE DUKE ENERGY SPILL REPORTING HOTLINES AT: z 10. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR CAROLINAS&MIDWEST:800.527.3853 0 SURFACE WATER WITHOUT CONTAINMENT. Black Creek e., FLORIDA:866.769.1266 Z 11. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. LU 12. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE Z DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. W W 13. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND Cl) COVER SHALL BE USED FOR STABILIZATION. CONTACTS VICINITY MAP OWNER: ENGINEER: I— DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. CO SCALE:1:5,000 KHADIJAH HASAN ANDREW DAHLMAN W 411 FAYETTEVILLE STREET 4805 LAKE BROOK DRIVE,SUITE 200 RALEIGH,NC 27601 GLEN ALLEN,VA 23060 u� 67-4712 ,— CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR PH:DIJA(336) .HASAN40-4312 ADPH HLM(804) N@DE (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING KHADIJAH.HASAN@DUKE-ENERGY.COM ADAHLMAN@DEWBERRY.COM Z CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. 0 CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED - THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA S § 8:1ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER �'' I ""rCAF9 r'• TITLE BLACK CREEK-WILSON 115KV EAST- z w IMMEDIATELY. ;=pQpO e58/p4,,..;:' �� Dewberry® C� DUKE RAISE LINE AND INSTALL SWS FOR CITY Q• SEAL OF WILSON TAP NCIMORG _ 1 •, Dewberry Engineers Inc. ENERGY U 2610 WYCLIFF ROAD 14 9;•�... RA EIGH10NC 27607 PROGRESS COVER SHEET m A p PHONE: 919.881.9939 0 01/15/2024 ISSUED FOR CONSTRUCTION FAX: sis0929 z3 411 FAYETTEVILLE STREET /1/:r/ 124 NCBELS#F-0929 RALEIGH N.C.27601 REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50130753 www.dewberry.com TELEPHONE NO.(919)546-2090 SUED DRAWING E21007601 SHEET 1 OF 14