R - �, __ \ • -- -,00 yf. ` -----1 w W w w + --�- ,CONSTRUCTION SEQUENCE r EROSION CONTROL NOTES ACTIVELY UNDERWAY AGAINST EROSION DUE TO _Il
DLO O '� - F \ • -- -- `_„� 'Po •■ �•� •�\ �- -- \ RAIN,WIND AND RUNNING WATER WITHIN 14 DAYS. r
M1LTpN5R Y92 I 'N�6w < \ ■ -- - w oo w�-w y`P8'� w \1 OBTAIN ALL NECESSARY PERMITS AND APPROVALS //1. ALL INLET OUTLET PROTECTION WILL BE CHECKED USE SEEDING AND MULCHING,EROSION CONTROL �J solutions
I - I®N �' w AND HOLD ALL,
CONFERENCE. %' FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY MATTING,AND/OR SODDING AND STAKING IN GREEN
8] _ - + ,\ \\\ �' w: I •_�■• \ ON SITE. SEDIMENT WILL BE REMOVED FROM THE SPACE AREAS AND OTHERWISE APPROPRIATE engineering I land SUIV2YIng
00 w 2. INSTALL STONE CONSTRUCTION ENTRANCE, CMI
_ ♦ ♦ `�,00 rf ` INLET PROTECTION DEVICES WHEN THE STORAGE MEASURES.USE EARLY APPLICATION OF GRAVEL
 - a ` TEMPORARY SILT FENCE,TEMPORARY SILT FENCE -- aas mirepe wne.wne M.fyevevme,rI ze8os
\ \ '�■- -�''- Tay - -- zsa \ ♦ _ / _ OUTLETS,TEMPORARY DIVERSION BERMS,& CAPACITY HAS BEEN APPROXIMATELY ED FILLED BASE ON AREAS TO BE PAVED. omwlwu+2F6m fax 1910-1M3m Itarserumerl GtMa
_ -I- I 1 j y.. : - - - TEMPORARY CHECK DAMS WHERE SPECIFIED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE .� 9. DO NOT REMOVE ANY EROSION AND SEDIMENT w,w.mYwwwonacom
/ 3. CLEAR AND GRUB THE SITE AS NEEDED.
-IL \ '-- SEDIMENT POOL NO LONGER DRAINS PROPERLY. CONTROL DEVICES UNTIL THE PROTECTED AREA HAS
' I \ �W + • �` 4
ROUGH
OOEDINGGRA AREAS SITE AND
NAINA GRASSED.
SEDIMENT WILL BE REMOVED FROM BEHIND THE UNDERGONE FINAL STABILIZATION AND PERMANENT I
■ 2ti:i \ SEDIMENT FENCE WHEN IT BECOMES ABOUT 05' • VEGETATION HAS BEEN ESTABLISHED,IT 15 /j
1 __ __ 5. INSTALL UTILITIES AND CONSTRUCT THE HOME. ,a DEEP AT THE FENCE.THE SEDIMENT FENCE WILL BE RECOMMENDED THAT NCDEO APPROVE THE ACTION
«SITE o /w ` REPAIRED AS NEEDED TO MAINTAIN A PROPER PRIOR TO REMOVAL.
W•• \ �, -- 6. PERFORM FINE GRADING. • �, \ BARRIER. 10.THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED
7. INSTALL LANDSCAPING.
l • - - 2. TEMPORARY EROSION CONTROL FACILITIES AND OR CONCURRENTLY WITH THE INITIATION OF \\\tlLlllrf�///
�iW w -- �\ - - 8. FERTILIZE,SEED AND MULCH ALL REMAINING -`♦ / \�
OCONSTRUCTION ACTIVITY. '
pp `` % ��W " / OS4 `a5-- _ 9. DISTURBED
RSITE STABILIZATION,SEEK NCDEO APPROVAL • SHALL BE NSTALLEDRBEFORE ANY EARTHPERAPON 11'SHHALL TAKLE APRECE ENCE GOER CALLT OIHL EREASURES `OQMf��$'g'•RQ.<•�,/2�
Q- • \\\ ♦ U TO REMOVE ALL TEMPORARY MEASURES. ` DISTURBANCE OPERATIONS TAKE PLACE OR AT THE CONSTRUCTION ACTIVITIES. = 4 ry�=9
�pyPryp^ \ ♦ 10.ALL EROSION CONTROL MEASURES SHALL BE ,.T EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 12.THE PERM(TTEE SHALL BE HELD RESPONSIBLE FOR SEA
MAINTAINED AS OUTLINED IN THE DETAILS WITH TEMPORARY&PERMANENT EROSION CONTROL THE ACTIONS AND PERFORMANCE OF ANY OTHER ,
p4'Po? JONN ROPD 2] \ ...,\ - - - -. O THE NCDEO -..
THE PLANS AND ACCORDING T MEASURES SHALL BE CONSTRUCTED PER THE v- PARTIES PERFORMING WORK ON THIS PROJECT.
EROSION CONTROL MANUAL. 13.ALL EROSION AND SEDIMENT CONTROL PRACTICES U16
2 0012p2 •
- / DETAILS HEREIN,OR SHALL BE CONSTRUCTED IN \p SC SR \ . .! - ' ACCORDANCE WITH THE NORTH CAROLINA EROSION `` WILL BE CHECKED FOR STABILITY AND OPERATION kGINE„••'Ur
• \ ^• , MANUgEDIMENT CONTROL PLANNING AND DESIGN 'I, BUT NW NO CASEYLESSOTHAN ONCE IEVERYI WEEK. �/„COTT gRVVV
_ __ SILT FENCE - •
V. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE I) C,P ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY ////rrl MO
_ ---- ---- - a BEG-43NG3AN0
NORTH OUTLET \-,- s I TO MAINTAIN ALL PRACTICES AS DESIGNED
_ _ ', o o BEGINNINGFIANYALAND MINIMUM
ACTIVITIES.ITIESIOR TO ) 14 PURSUANT TO G 5 113A 57(2).THE ANGLE FOR 5-'�J`-z3
CHECK DAM z a __NV71N L280.00 05 18 CL RCP a., 2.0 AC CONSTRUCTION \5 REMOVE AL SOILS AND ONEDIPEBTC TRACKED
A KEDI ORE / ' GRADEDTHAN SLOPES AND FILLS SHALL BE NO GREATER
VICINITY MAP 7� J� 1T5 W/WEIR OUT 2]]00. 1 \. SILTO FENCE THE ANGLE THAT CAN BE RETAINED BY r�T 700 T70 "A7 71T0 YtfO- --- - h -8G ` n LIMITS :ONSTRUC VEGETATIVE COVER OR OTHER ADEQUATE EROSION '_
- - PAVEMENT AREAS.REMOVAL SHALL BE ON A DAILY T , CONTROL DEVICES OR STRUCTURES.IN ANY EVENT,
ro IN CENTER - \ TL . --. BASIS WHEN TRACKING OCCURS. /. SLOPES LEFT EXPOSED WILL,WITHIN 7 OR 14 REVISIONS
NOT TO SCALE O c 280' \ - 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY(50) CALENDAR DAYS OF COMPLETION OF ANY PHASE
73 ] - /�\ wj zIFEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR OF GRADING,BE PLANTED OR OTHERWISE PROVIDED
N -- \ /. 1 Px66 ''• : \ A DRAINAGE CHANNEL.IF REMAINING FOR MORE THAN WITH TEMPORARY OR PERMANENT GROUND COVER
2B0 _ FFF��� N /, \\ • ;� SEVEN DAYS,STABILIZE THE STOCKPILES BY DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN
VEGETATIVE COVER,TARPS,OR OTHER MEANS EROSION.PURSUANT TO G.S.113A-57(3),
p II -- n ,, � • N.1 �� CONTROL EROSION FROM ALL STOCKPILES BY PROVISIONS FOR PERMANENT GROUND COVER
O � O l ZB ry6h SAM ADAMS DRIVE CHECK DAM �rI PLACING SILT BARRIERS AROUND THE PILES. SUFFICIENT TO RETAIN EROSION MUST BE
LEGEND: I I ---- I 50'V UTILITY PUBLIC CE STREET&_ M1,0- N 1 72 TEMPORARY STOCKPILES LOCATED ON PAVED ' ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN
RIP
• _ - ,y : O� N/CENTER
OO EIP-EXISTING IRON PIPE SILT FENCE SURFACES MUST BE NO LESS THAN FIVE FEET 14 WORKING DAYS OR 90 CALENDAR DAYS
E8B r OUTLET l �- SILT FENCE �+ FROM THE DRAINAGE/GUTTER LINE AND SHALL BE s (WHICHEVER IS SHORTER)FOLLOWING COMPLETION
O ERB-EXISTING REBAR _ rv: - COVERED IF LEFT MORE THAN 24 HOURS. W OF CONSTRUCTION DEVELOPMENT.
ERs A- - OUTLET r 1 -282 �f /fr ■7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT 15.CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL
'NO ER$-EXISTING RAILROAD SPIKE C SILT�ENC S'I���T-- ^� 2� -- N I 1 CONTROL DEVICES IN PLACE UNTIL THE '" EROSION CONTROL MEASURES SHOWN AND ANY
N/F CO NOW POINT
.{IS- {{�� W/WEIR{{ .{I�� 2a5/ OUTLET O ,Z \/ S SILT FENCE O CONTRIBUTING DRAINAGE AREA HAS BEEN /d ADDITIONAL MEASURES REQUIRED TO CONTROL THE
T�-T1U -T� TN
CECK DAM \� OUTLET
STABILIZED.INSPECT TEMPORARY EROSION AND SEDIMENT DURING THE COURSE OF CONSTRUCTION
Ir- -_-- / /q ■" SEDIMENT CONTROL DEVICES ON A DAILY BASIS '� 16.ALL SEEDED AREAS WILL BE FERTILIZED,RESEEDED
R/W-RIGHT OF WAY LIMITS OF CONSTRUCTION rp IN CENTER I ,j 4 > ^/��� //� • 1 ■ AND REPLACE DETERIORATED,DAMAGED,OR -:'W AS NECESSARY,AND MULCHED ACCORDING TO THE
PROPERTY LINE 3.2 AC O O aJ I CHECK DAM 1 �I CHECK DAM I -- .ITOl� ROTTED EROSION CONTROL DEVICES IMMEDIATELY. DETAILS HEREIN.
QI
74 1 N W/WEIR > y//WEIR CH K DAM J" B. TEMPORARILY OR PERMANENTLY STABILIZE ALL 17 THE CONTACT PERSON FOR EROSION CONTROL
-ovE - -OLD PROPERTY LINE 1 r IN CENTER - _ I ♦ DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, W- ISSUES THAT ARISE ON SITE IS SHAUN GARDNER.
0
SETBACK PROPERTY LINE 1 I ro I i k . IN {{ �l O / / / a" SITE BUILDING CONSTRUCTION OPERATIONS `
1 __ Bo� > IN CENTER_ _ dI49p �/ S W WEI ♦♦� �y� AND ALL DENUDED AREAS IN WHICH ONDING OR CONTACT 910 988 8172
_ t1 T T < i rv •
w a r NOT'
- RIGHT-OF-WAY UWAY j II - - >I I w O /�� a a W W .2REW w W w W w W w W W `
II 71 4INCENTER
STORM
-w WATER LINE SILT(1 • OIUTLETNCE k o U� 69 70 II // ■ ■ ♦'. ,♦ /\ oo \ W W \ ` .'" W w W .'" W .'" J w `A
-// OVERHEAD UTILITY I I F!F» gg L > •/ �/ ■ • \ ,, a
----WETLANDS =I o _.W/CHECK
O AIO-AID AIO I II T O I O SILT FENCE„.. ."'", ♦w -SLOPE50 •BEORGSTEEP- w♦♦ \ w
o
WEIR
�.�/-^ �-TREE LINE C CK DAM I / ♦ R0�BUILDIN 4` \
B$ �S US BS SS <
I
..-SUITABLE SOILS IN CENTER CHECK DAM' THAT EXTEND TEN ` \
,aow�100 YEAR FLOOD ZONE yI UvS o W/WEIR OUTLET ' -.' FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN 0
\ I i I 7S 4 II T I 1 �� 0' GREEN S75 TEMPORARY EROSION CONTROL BLANKET / NG\\
`28T MINOR CONTOUR / ll It IN C N CENTER 7 ,.OR EQUAL SUBSTITUTE. '-LOC-LIMIT$OF CONSTRUCTION •�EI� h ENTER SILT FENCE z I �� ♦■ Cw s oc'6 \ PROJECT NAME
-290-MAJOR CONTOUR
II-- I CHECK DAM
11V _ W/WEIR` 4 /OUTLET i / ,� p \
DIV DIVERSION BERM `ii DOT i ". I `�J X, •
L �-�•�`\ OS4W 0 j\ \p, \ �` \
-SF-SEDIMENT FENCING / J r CHECK DAM `• y •
DIV DIV �Ly� W/WEIR \
OUTLET
0010 SPOT ELEVATION I II I
F-'^ �G '��' '6.,, 00 SILT FENCE 2"I2 •♦ ^�� 9 SILT FENCE
BENCHMARK SILT FENCE LOC-LAC-LOCH L,iC-LOC LOCH LS1- LOC. W W IN CENTER�f. !� OUTLET / F `�
•UTILITY POLE I ••• • \' /�} \.'♦ W 0 `s Wz W l \
BB \ pG�O OUTLETW W W w w
C GUY WIRE W/ I / •
V- LIMITS OF CONSTRUCTION�♦ 0 ,\'',.,:',,,
` w �W lW MEADOWS
o
d . ` dG�O L 1.8 AC 62 ♦♦y ,. / m
WETLANDS IN CENTER I C L LOC OC OC-LOC LOC LOC \' l �' L - � W ',"
I��51a�51G �Ia oo p(]�C AC-- ��L �8 �� �� �r(ASPHALT EWEIR DAM /�7 9 II Old DIVr Dr1Y DIV- -ON DN -DIV \ � f - /-� L`IiECK DAM `♦a,` y a,`a, s. y✓ /.,, /.y��w\r�
WEIR
•
SUITABLE SEPTIC SOILS I CII INW/WTEIR R OUTLET CHE DAM SILT FENCE 1 1 :_ I♦♦ J 2T6 p0 IN\§ENTER ♦` �" rgV W W N. �( �W W W �\
CHECK DAM SILT FENCE 11�
0 CHECK DAM W IR W WEIR OUTLET \ 1 \'. ` ,�, ,�,
I IN CENTER _ I
0
ROCK PIPE INLET PROTECTION I \ . 2s Y 1 \ - -` "'/�"� "'
' kHECK DAM f W
OUTLET6 CENTER 1 II O � \ `F L _%\ CN CENTER SILT FENCE 64 \\ - _. WIWyWWSILT FENCE /WEIR J �y < II W/WEIR OUTLET O 1'I `_� h `„ �, .� la
L< II t _FDIV IV IV $FDIV- II II 67 I 66 -�'� 65 �1• J W
o.-4AI�4Ia $Ia I0" D < 2 SF
7� U
'F 1�. I II 11 \\ 9. .' w \.. \ ��i20'DRAINAGE II `\ �`Ak`y -
I
81 aB
!: EASEMENT
iQ r�� 77 •9 `� �� , - ' �`� �$ ♦ E EROSION
I w
\ II p F Q II 2sL I -28j '\ �� LIMITS OF CONSTRUCTION�.! `
i
, 84w
CHECK DAM 2 �i / m 1.8 AC
SILT FENCE r W/WEIR \ d O 1 - "' r ro,
Know what's below. IN CENTER �� �. �' ,� / _ CONTROL PLAN
OUTLETI ° -- It 11- - _.aa "u-� lit
::- �� w, , •
I LOTS 56,58-62,&
Call beforeyou sR-s� D st°Iv sOry V7,, 64 78
O V -a J ���_�10] _ ____ � 61 -�
dig. rv- Iv v
•
�� o oDQI �DRUSH LAN _ry a
L�-
( L ' •
�N `�J w -50'OR/UTILITY ACCE PUBLIC STREET& ---- m_ti3 w 0 ` �� O TCHECK � O \
SO �./
_ o `
NOTIFICATION OF COMBINED SELF MONITORING AND 20'GRAVEL "F�\1\ Vie,'•
/ `goo rf w'
SELF INSPECTION FORM AI< \ ENTRANCE TYP q • N 292 - -SS 1 , \ 1\ \ \ • /Y� • I Cl CLIENT
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN N OUI-- t TET�_^JErI-�D1TT Otil - 1 ��5-1y p1''\� \\\ 60 •
I IN WCENTEIR �xC1'• / ♦♦�♦,
2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR - _ PIO 1 _\\�+
PHALANDEDOFPTHBING PROJECTTIES TO MAKEECT A SURE THATECT THEAFTER
APPROVEDEACH
I A �SFAIO SFAld SFAIO�T C �I♦' \ I PRECISION
EROSION AND SEDIMENTATION CONTROL PLAN IS BEING O\ I o \ m • / SIL FENCE
FOLLOWED.RULES DETAILING THE DOCUMENTATION OF THESE -�,� \S 78 f
�� �I >I \m p N•
\ \� O\N/ I� ♦��T� \ I CUSTOM HOMES
INSPECTIONS TOOK EFFECT OCTOBERE 1,2010. I , \ 1 CHECK DAM/ TO SIMPLIFY DOCUMENTATION OF SELF-INSPECTION REPORTS \ II I €I � my � / ' ' ..I� -
/ AND NPDES SELF MONITORING REPORTS.DWO AND DEMLR I N. �lO�'� N \ c' II I< /Al> / pN� W/ \ iV" ♦ Wy I AND RENOVATION,
} / DEVELOPED A COMBINED FORM.THE SELF INSPECTION ♦ ^� -II O `_
p\ C WEIR V /
/ PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING " •
I I I / 4\- \m IN CENTER r , _
J ,PROGRAM OF THE NPDES STORM WATER PERMIT FOR lw w \ II Rj I --. O \�'A \ N L ��♦♦ ♦• ` /� • -- \ \ O4- I LLC
j CONSTRUCTION ACTIVITIES THE FOCUS OF THE y - CHECK DAM 1 FFF"' Ki 59 \ N�R` /
/ SELF INSPECTION REPORT IS THE INSTALLATION AND -"� r< > \ \ ••
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL WLT FENCE Fi W/WEIR I 56 • > ' - ♦- / • \ 206 Shoreline Drive
/ MEASURES
ACCORDING TO THE APPROVED PLAN.H HOF OUTLET oCOO SILT FENCE • W
IN CENTER " OpZ��,� ouTLET �" '�-- / - Raeford,North Carolina 28376
/ SEC 0 S SHOULD BE CONDUCTED AFTEREACH PHASE _ DIVERSION BERM II V-I UNITS OF CONSTRUCTION „ 58 yV \µR 1\\...„\t,
`// THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND -- __ w /TOBE SEEDED 1,9 AC A' y O \• \ ✓��O ♦ �♦♦ / Phone:(910)988-8172
COVER IS ESTABLISHED.THE FORM CAN BE ACCESSED AT: ♦• r< I WITHIN 7 DAYS(TYP) < I'I / > y\\ 1 _ :'♦ /
HTTP://PORTAL.NCDENR.ORG/WEB/LR/EROSION •
Fi DIV-DIV DIV DIV > / 5F I CHECK DAM__ ___ ♦ _ / /
/ IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM. _t t/2" �� L LOOC-�L_OC--,I 74
W/WEIR 1 ���- A.
1
w
I �I �� i _
B/P'" I F o --/
LL IN CENTER ,N„d ♦� w / /
PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT(910) to 4 CHECK DAM N� W J / / -�
433-3300. < G/ _ PROJECT INFORMATION
- I CHECK DAM/ > / W/WEIR > SILT FENCE 'y /
m / I I W/WEIR*SILT SILT FENCE IN CENTER --A OUTLET / % - ♦♦ _ L
• I 1 yl IN CNTER`jl��I/OUTLET SILT FENCES 1.\/ \ ••�• - -- -_ •
GROUND STABILIZATION CHART / 6 IV-DI �1 OUTLET lb / T - _ - p5 DESIGNED BY: CALEB
u V DIV DIV-DIV DIV DIV DIV <ENTE \
/ 1
532]LF®1 229.24 CL IV RCP
/ - L =L =LL�-L =L =L L0 LO L -LoC \ INV IN. 280.25 - DRAWN BY: CALEB
M •
a INV OUT: 2]9.60 _ _
SITE AREA STABILIZATION STABILIZATION TIME _ ,/ I ` /DESCRIPTION TIME FRAME FRAME EXCEPTIONSI • CHECKED BY: SCOTi
PERIMETER DIKES. ISWALES,DITHCES 7 DAY$ NONEAINAGPROJECT NUMBER: 1490
•
AND SLOPES ` IEq / / • I I \ \ \
'� HIGH QUALITY " - / / �� /' \ 5 `� /• •
DRAWING SCALE
ONER(HOW) 7 DAYS NONE _ I I _ �-' ( 1 O. •
- \ _282 24 \ / '
-CO36 I I
3 ZONES IF SLOPES ARE 10'OR 35 I I / '_4 \ S \ 26 0 / / • I I
I \ / I -' L` i `, HORIZONTAL:1"=50'
•
9 SLOPES STEEPER LESS IN LENGTH AND AREI
THAN 3:1 7 DAYS NOT STEEPER THAN 2:1, I , \-. / ry / / I I 1 y■ ,
y 14 DAYS ARE ALLOWED DATE RELEASED
7-DAYS FOR SLOPES GRAPHIC SCALE
SLOPES 3:1 OR 14 DAYS GREATER THAN 50 FEET 40
FLATTER IN LENGTH 1' SEPTEMBER 26,2023
ALL OTHER AREAS EXCEPTEFUR m Ellz11
11
- WITH SLOPES FLATTER c 14 DAYS PERIMETERS AND NC GRIDNAD83(2011) o SHEET NUMBER
THAN 4.1 HOW ZONES) IN FEET)
R SN0 1 inch= 50 ft.
THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-3.0