Loading...
HomeMy WebLinkAboutNCC240079_Site Plan or Location Map_20240110 �/ ' �- _ --I_ \ \ ` �J�.i--..„\ �Ir rw rr. a�-,,:w�,,,�f.7'�fWw�fw��,rf,;./ I W \ \ `� � 1.:a ` OPO j/ J \ \ ,00 rF --�� hI� oo rr `■-.■�'�' W •• ww �i.-.� \ \\ R - �, __ \ • -- -,00 yf. ` -----1 w W w w + --�- ,CONSTRUCTION SEQUENCE r EROSION CONTROL NOTES ACTIVELY UNDERWAY AGAINST EROSION DUE TO _Il DLO O '� - F \ • -- -- `_„� 'Po •■ �•� •�\ �- -- \ RAIN,WIND AND RUNNING WATER WITHIN 14 DAYS. r M1LTpN5R Y92 I 'N�6w < \ ■ -- - w oo w�-w y`P8'� w \1 OBTAIN ALL NECESSARY PERMITS AND APPROVALS //1. ALL INLET OUTLET PROTECTION WILL BE CHECKED USE SEEDING AND MULCHING,EROSION CONTROL �J solutions I - I®N �' w AND HOLD ALL, CONFERENCE. %' FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY MATTING,AND/OR SODDING AND STAKING IN GREEN 8] _ - + ,\ \\\ �' w: I •_�■• \ ON SITE. SEDIMENT WILL BE REMOVED FROM THE SPACE AREAS AND OTHERWISE APPROPRIATE engineering I land SUIV2YIng 00 w 2. INSTALL STONE CONSTRUCTION ENTRANCE, CMI _ ♦ ♦ `�,00 rf ` INLET PROTECTION DEVICES WHEN THE STORAGE MEASURES.USE EARLY APPLICATION OF GRAVEL  - a ` TEMPORARY SILT FENCE,TEMPORARY SILT FENCE -- aas mirepe wne.wne M.fyevevme,rI ze8os \ \ '�■- -�''- Tay - -- zsa \ ♦ _ / _ OUTLETS,TEMPORARY DIVERSION BERMS,& CAPACITY HAS BEEN APPROXIMATELY ED FILLED BASE ON AREAS TO BE PAVED. omwlwu+2F6m fax 1910-1M3m Itarserumerl GtMa _ -I- I 1 j y.. : - - - TEMPORARY CHECK DAMS WHERE SPECIFIED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE .� 9. DO NOT REMOVE ANY EROSION AND SEDIMENT w,w.mYwwwonacom / 3. CLEAR AND GRUB THE SITE AS NEEDED. -IL \ '-- SEDIMENT POOL NO LONGER DRAINS PROPERLY. CONTROL DEVICES UNTIL THE PROTECTED AREA HAS ' I \ �W + • �` 4 ROUGH OOEDINGGRA AREAS SITE AND NAINA GRASSED. SEDIMENT WILL BE REMOVED FROM BEHIND THE UNDERGONE FINAL STABILIZATION AND PERMANENT I ■ 2ti:i \ SEDIMENT FENCE WHEN IT BECOMES ABOUT 05' • VEGETATION HAS BEEN ESTABLISHED,IT 15 /j 1 __ __ 5. INSTALL UTILITIES AND CONSTRUCT THE HOME. ,a DEEP AT THE FENCE.THE SEDIMENT FENCE WILL BE RECOMMENDED THAT NCDEO APPROVE THE ACTION «SITE o /w ` REPAIRED AS NEEDED TO MAINTAIN A PROPER PRIOR TO REMOVAL. W•• \ �, -- 6. PERFORM FINE GRADING. • �, \ BARRIER. 10.THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED 7. INSTALL LANDSCAPING. l • - - 2. TEMPORARY EROSION CONTROL FACILITIES AND OR CONCURRENTLY WITH THE INITIATION OF \\\tlLlllrf�/// �iW w -- �\ - - 8. FERTILIZE,SEED AND MULCH ALL REMAINING -`♦ / \� OCONSTRUCTION ACTIVITY. ' pp `` % ��W " / OS4 `a5-- _ 9. DISTURBED RSITE STABILIZATION,SEEK NCDEO APPROVAL • SHALL BE NSTALLEDRBEFORE ANY EARTHPERAPON 11'SHHALL TAKLE APRECE ENCE GOER CALLT OIHL EREASURES `OQMf��$'g'•RQ.<•�,/2� Q- • \\\ ♦ U TO REMOVE ALL TEMPORARY MEASURES. ` DISTURBANCE OPERATIONS TAKE PLACE OR AT THE CONSTRUCTION ACTIVITIES. = 4 ry�=9 �pyPryp^ \ ♦ 10.ALL EROSION CONTROL MEASURES SHALL BE ,.T EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 12.THE PERM(TTEE SHALL BE HELD RESPONSIBLE FOR SEA MAINTAINED AS OUTLINED IN THE DETAILS WITH TEMPORARY&PERMANENT EROSION CONTROL THE ACTIONS AND PERFORMANCE OF ANY OTHER , p4'Po? JONN ROPD 2] \ ...,\ - - - -. O THE NCDEO -.. THE PLANS AND ACCORDING T MEASURES SHALL BE CONSTRUCTED PER THE v- PARTIES PERFORMING WORK ON THIS PROJECT. EROSION CONTROL MANUAL. 13.ALL EROSION AND SEDIMENT CONTROL PRACTICES U16 2 0012p2 • - / DETAILS HEREIN,OR SHALL BE CONSTRUCTED IN \p SC SR \ . .! - ' ACCORDANCE WITH THE NORTH CAROLINA EROSION `` WILL BE CHECKED FOR STABILITY AND OPERATION kGINE„••'Ur • \ ^• , MANUgEDIMENT CONTROL PLANNING AND DESIGN 'I, BUT NW NO CASEYLESSOTHAN ONCE IEVERYI WEEK. �/„COTT gRVVV _ __ SILT FENCE - • V. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE I) C,P ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY ////rrl MO _ ---- ---- - a BEG-43NG3AN0 NORTH OUTLET \-,- s I TO MAINTAIN ALL PRACTICES AS DESIGNED _ _ ', o o BEGINNINGFIANYALAND MINIMUM ACTIVITIES.ITIESIOR TO ) 14 PURSUANT TO G 5 113A 57(2).THE ANGLE FOR 5-'�J`-z3 CHECK DAM z a __NV71N L280.00 05 18 CL RCP a., 2.0 AC CONSTRUCTION \5 REMOVE AL SOILS AND ONEDIPEBTC TRACKED A KEDI ORE / ' GRADEDTHAN SLOPES AND FILLS SHALL BE NO GREATER VICINITY MAP 7� J� 1T5 W/WEIR OUT 2]]00. 1 \. SILTO FENCE THE ANGLE THAT CAN BE RETAINED BY r�T 700 T70 "A7 71T0 YtfO- --- - h -8G ` n LIMITS :ONSTRUC VEGETATIVE COVER OR OTHER ADEQUATE EROSION '_ - - PAVEMENT AREAS.REMOVAL SHALL BE ON A DAILY T , CONTROL DEVICES OR STRUCTURES.IN ANY EVENT, ro IN CENTER - \ TL . --. BASIS WHEN TRACKING OCCURS. /. SLOPES LEFT EXPOSED WILL,WITHIN 7 OR 14 REVISIONS NOT TO SCALE O c 280' \ - 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY(50) CALENDAR DAYS OF COMPLETION OF ANY PHASE 73 ] - /�\ wj zIFEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR OF GRADING,BE PLANTED OR OTHERWISE PROVIDED N -- \ /. 1 Px66 ''• : \ A DRAINAGE CHANNEL.IF REMAINING FOR MORE THAN WITH TEMPORARY OR PERMANENT GROUND COVER 2B0 _ FFF��� N /, \\ • ;� SEVEN DAYS,STABILIZE THE STOCKPILES BY DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN VEGETATIVE COVER,TARPS,OR OTHER MEANS EROSION.PURSUANT TO G.S.113A-57(3), p II -- n ,, � • N.1 �� CONTROL EROSION FROM ALL STOCKPILES BY PROVISIONS FOR PERMANENT GROUND COVER O � O l ZB ry6h SAM ADAMS DRIVE CHECK DAM �rI PLACING SILT BARRIERS AROUND THE PILES. SUFFICIENT TO RETAIN EROSION MUST BE LEGEND: I I ---- I 50'V UTILITY PUBLIC CE STREET&_ M1,0- N 1 72 TEMPORARY STOCKPILES LOCATED ON PAVED ' ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN RIP • _ - ,y : O� N/CENTER OO EIP-EXISTING IRON PIPE SILT FENCE SURFACES MUST BE NO LESS THAN FIVE FEET 14 WORKING DAYS OR 90 CALENDAR DAYS E8B r OUTLET l �- SILT FENCE �+ FROM THE DRAINAGE/GUTTER LINE AND SHALL BE s (WHICHEVER IS SHORTER)FOLLOWING COMPLETION O ERB-EXISTING REBAR _ rv: - COVERED IF LEFT MORE THAN 24 HOURS. W OF CONSTRUCTION DEVELOPMENT. ERs A- - OUTLET r 1 -282 �f /fr ■7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT 15.CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL 'NO ER$-EXISTING RAILROAD SPIKE C SILT�ENC S'I���T-- ^� 2� -- N I 1 CONTROL DEVICES IN PLACE UNTIL THE '" EROSION CONTROL MEASURES SHOWN AND ANY N/F CO NOW POINT .{IS- {{�� W/WEIR{{ .{I�� 2a5/ OUTLET O ,Z \/ S SILT FENCE O CONTRIBUTING DRAINAGE AREA HAS BEEN /d ADDITIONAL MEASURES REQUIRED TO CONTROL THE T�-T1U -T� TN CECK DAM \� OUTLET STABILIZED.INSPECT TEMPORARY EROSION AND SEDIMENT DURING THE COURSE OF CONSTRUCTION Ir- -_-- / /q ■" SEDIMENT CONTROL DEVICES ON A DAILY BASIS '� 16.ALL SEEDED AREAS WILL BE FERTILIZED,RESEEDED R/W-RIGHT OF WAY LIMITS OF CONSTRUCTION rp IN CENTER I ,j 4 > ^/��� //� • 1 ■ AND REPLACE DETERIORATED,DAMAGED,OR -:'W AS NECESSARY,AND MULCHED ACCORDING TO THE PROPERTY LINE 3.2 AC O O aJ I CHECK DAM 1 �I CHECK DAM I -- .ITOl� ROTTED EROSION CONTROL DEVICES IMMEDIATELY. DETAILS HEREIN. QI 74 1 N W/WEIR > y//WEIR CH K DAM J" B. TEMPORARILY OR PERMANENTLY STABILIZE ALL 17 THE CONTACT PERSON FOR EROSION CONTROL -ovE - -OLD PROPERTY LINE 1 r IN CENTER - _ I ♦ DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, W- ISSUES THAT ARISE ON SITE IS SHAUN GARDNER. 0 SETBACK PROPERTY LINE 1 I ro I i k . IN {{ �l O / / / a" SITE BUILDING CONSTRUCTION OPERATIONS ` 1 __ Bo� > IN CENTER_ _ dI49p �/ S W WEI ♦♦� �y� AND ALL DENUDED AREAS IN WHICH ONDING OR CONTACT 910 988 8172 _ t1 T T < i rv • w a r NOT' - RIGHT-OF-WAY UWAY j II - - >I I w O /�� a a W W .2REW w W w W w W w W W ` II 71 4INCENTER STORM -w WATER LINE SILT(1 • OIUTLETNCE k o U� 69 70 II // ■ ■ ♦'. ,♦ /\ oo \ W W \ ` .'" W w W .'" W .'" J w `A -// OVERHEAD UTILITY I I F!F» gg L > •/ �/ ■ • \ ,, a ----WETLANDS =I o _.W/CHECK O AIO-AID AIO I II T O I O SILT FENCE„.. ."'", ♦w -SLOPE50 •BEORGSTEEP- w♦♦ \ w o WEIR �.�/-^ �-TREE LINE C CK DAM I / ♦ R0�BUILDIN 4` \ B$ �S US BS SS < I ..-SUITABLE SOILS IN CENTER CHECK DAM' THAT EXTEND TEN ` \ ,aow�100 YEAR FLOOD ZONE yI UvS o W/WEIR OUTLET ' -.' FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN 0 \ I i I 7S 4 II T I 1 �� 0' GREEN S75 TEMPORARY EROSION CONTROL BLANKET / NG\\ `28T MINOR CONTOUR / ll It IN C N CENTER 7 ,.OR EQUAL SUBSTITUTE. '-LOC-LIMIT$OF CONSTRUCTION •�EI� h ENTER SILT FENCE z I �� ♦■ Cw s oc'6 \ PROJECT NAME -290-MAJOR CONTOUR II-- I CHECK DAM 11V _ W/WEIR` 4 /OUTLET i / ,� p \ DIV DIVERSION BERM `ii DOT i ". I `�J X, • L �-�•�`\ OS4W 0 j\ \p, \ �` \ -SF-SEDIMENT FENCING / J r CHECK DAM `• y • DIV DIV �Ly� W/WEIR \ OUTLET 0010 SPOT ELEVATION I II I F-'^ �G '��' '6.,, 00 SILT FENCE 2"I2 •♦ ^�� 9 SILT FENCE BENCHMARK SILT FENCE LOC-LAC-LOCH L,iC-LOC LOCH LS1- LOC. W W IN CENTER�f. !� OUTLET / F `� •UTILITY POLE I ••• • \' /�} \.'♦ W 0 `s Wz W l \ BB \ pG�O OUTLETW W W w w C GUY WIRE W/ I / • V- LIMITS OF CONSTRUCTION�♦ 0 ,\'',.,:',,, ` w �W lW MEADOWS o d . ` dG�O L 1.8 AC 62 ♦♦y ,. / m WETLANDS IN CENTER I C L LOC OC OC-LOC LOC LOC \' l �' L - � W '," I��51a�51G �Ia oo p(]�C AC-- ��L �8 �� �� �r(ASPHALT EWEIR DAM /�7 9 II Old DIVr Dr1Y DIV- -ON DN -DIV \ � f - /-� L`IiECK DAM `♦a,` y a,`a, s. y✓ /.,, /.y��w\r� WEIR • SUITABLE SEPTIC SOILS I CII INW/WTEIR R OUTLET CHE DAM SILT FENCE 1 1 :_ I♦♦ J 2T6 p0 IN\§ENTER ♦` �" rgV W W N. �( �W W W �\ CHECK DAM SILT FENCE 11� 0 CHECK DAM W IR W WEIR OUTLET \ 1 \'. ` ,�, ,�, I IN CENTER _ I 0 ROCK PIPE INLET PROTECTION I \ . 2s Y 1 \ - -` "'/�"� "' ' kHECK DAM f W OUTLET6 CENTER 1 II O � \ `F L _%\ CN CENTER SILT FENCE 64 \\ - _. WIWyWWSILT FENCE /WEIR J �y < II W/WEIR OUTLET O 1'I `_� h `„ �, .� la L< II t _FDIV IV IV $FDIV- II II 67 I 66 -�'� 65 �1• J W o.-4AI�4Ia $Ia I0" D < 2 SF 7� U 'F 1�. I II 11 \\ 9. .' w \.. \ ��i20'DRAINAGE II `\ �`Ak`y - I 81 aB !: EASEMENT iQ r�� 77 •9 `� �� , - ' �`� �$ ♦ E EROSION I w \ II p F Q II 2sL I -28j '\ �� LIMITS OF CONSTRUCTION�.! ` i , 84w CHECK DAM 2 �i / m 1.8 AC SILT FENCE r W/WEIR \ d O 1 - "' r ro, Know what's below. IN CENTER �� �. �' ,� / _ CONTROL PLAN OUTLETI ° -- It 11- - _.aa "u-� lit ::- �� w, , • I LOTS 56,58-62,& Call beforeyou sR-s� D st°Iv sOry V7,, 64 78 O V -a J ���_�10] _ ____ � 61 -� dig. rv- Iv v • �� o oDQI �DRUSH LAN _ry a L�- ( L ' • �N `�J w -50'OR/UTILITY ACCE PUBLIC STREET& ---- m_ti3 w 0 ` �� O TCHECK � O \ SO �./ _ o ` NOTIFICATION OF COMBINED SELF MONITORING AND 20'GRAVEL "F�\1\ Vie,'• / `goo rf w' SELF INSPECTION FORM AI< \ ENTRANCE TYP q • N 292 - -SS 1 , \ 1\ \ \ • /Y� • I Cl CLIENT THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN N OUI-- t TET�_^JErI-�D1TT Otil - 1 ��5-1y p1''\� \\\ 60 • I IN WCENTEIR �xC1'• / ♦♦�♦, 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR - _ PIO 1 _\\�+ PHALANDEDOFPTHBING PROJECTTIES TO MAKEECT A SURE THATECT THEAFTER APPROVEDEACH I A �SFAIO SFAld SFAIO�T C �I♦' \ I PRECISION EROSION AND SEDIMENTATION CONTROL PLAN IS BEING O\ I o \ m • / SIL FENCE FOLLOWED.RULES DETAILING THE DOCUMENTATION OF THESE -�,� \S 78 f �� �I >I \m p N• \ \� O\N/ I� ♦��T� \ I CUSTOM HOMES INSPECTIONS TOOK EFFECT OCTOBERE 1,2010. I , \ 1 CHECK DAM/ TO SIMPLIFY DOCUMENTATION OF SELF-INSPECTION REPORTS \ II I €I � my � / ' ' ..I� - / AND NPDES SELF MONITORING REPORTS.DWO AND DEMLR I N. �lO�'� N \ c' II I< /Al> / pN� W/ \ iV" ♦ Wy I AND RENOVATION, } / DEVELOPED A COMBINED FORM.THE SELF INSPECTION ♦ ^� -II O `_ p\ C WEIR V / / PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING " • I I I / 4\- \m IN CENTER r , _ J ,PROGRAM OF THE NPDES STORM WATER PERMIT FOR lw w \ II Rj I --. O \�'A \ N L ��♦♦ ♦• ` /� • -- \ \ O4- I LLC j CONSTRUCTION ACTIVITIES THE FOCUS OF THE y - CHECK DAM 1 FFF"' Ki 59 \ N�R` / / SELF INSPECTION REPORT IS THE INSTALLATION AND -"� r< > \ \ •• MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL WLT FENCE Fi W/WEIR I 56 • > ' - ♦- / • \ 206 Shoreline Drive / MEASURES ACCORDING TO THE APPROVED PLAN.H HOF OUTLET oCOO SILT FENCE • W IN CENTER " OpZ��,� ouTLET �" '�-- / - Raeford,North Carolina 28376 / SEC 0 S SHOULD BE CONDUCTED AFTEREACH PHASE _ DIVERSION BERM II V-I UNITS OF CONSTRUCTION „ 58 yV \µR 1\\...„\t, `// THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND -- __ w /TOBE SEEDED 1,9 AC A' y O \• \ ✓��O ♦ �♦♦ / Phone:(910)988-8172 COVER IS ESTABLISHED.THE FORM CAN BE ACCESSED AT: ♦• r< I WITHIN 7 DAYS(TYP) < I'I / > y\\ 1 _ :'♦ / HTTP://PORTAL.NCDENR.ORG/WEB/LR/EROSION • Fi DIV-DIV DIV DIV > / 5F I CHECK DAM__ ___ ♦ _ / / / IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM. _t t/2" �� L LOOC-�L_OC--,I 74 W/WEIR 1 ���- A. 1 w I �I �� i _ B/P'" I F o --/ LL IN CENTER ,N„d ♦� w / / PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT(910) to 4 CHECK DAM N� W J / / -� 433-3300. < G/ _ PROJECT INFORMATION - I CHECK DAM/ > / W/WEIR > SILT FENCE 'y / m / I I W/WEIR*SILT SILT FENCE IN CENTER --A OUTLET / % - ♦♦ _ L • I 1 yl IN CNTER`jl��I/OUTLET SILT FENCES 1.\/ \ ••�• - -- -_ • GROUND STABILIZATION CHART / 6 IV-DI �1 OUTLET lb / T - _ - p5 DESIGNED BY: CALEB u V DIV DIV-DIV DIV DIV DIV <ENTE \ / 1 532]LF®1 229.24 CL IV RCP / - L =L =LL�-L =L =L L0 LO L -LoC \ INV IN. 280.25 - DRAWN BY: CALEB M • a INV OUT: 2]9.60 _ _ SITE AREA STABILIZATION STABILIZATION TIME _ ,/ I ` /DESCRIPTION TIME FRAME FRAME EXCEPTIONSI • CHECKED BY: SCOTi PERIMETER DIKES. ISWALES,DITHCES 7 DAY$ NONEAINAGPROJECT NUMBER: 1490 • AND SLOPES ` IEq / / • I I \ \ \ '� HIGH QUALITY " - / / �� /' \ 5 `� /• • DRAWING SCALE ONER(HOW) 7 DAYS NONE _ I I _ �-' ( 1 O. • - \ _282 24 \ / ' -CO36 I I 3 ZONES IF SLOPES ARE 10'OR 35 I I / '_4 \ S \ 26 0 / / • I I I \ / I -' L` i `, HORIZONTAL:1"=50' • 9 SLOPES STEEPER LESS IN LENGTH AND AREI THAN 3:1 7 DAYS NOT STEEPER THAN 2:1, I , \-. / ry / / I I 1 y■ , y 14 DAYS ARE ALLOWED DATE RELEASED 7-DAYS FOR SLOPES GRAPHIC SCALE SLOPES 3:1 OR 14 DAYS GREATER THAN 50 FEET 40 FLATTER IN LENGTH 1' SEPTEMBER 26,2023 ALL OTHER AREAS EXCEPTEFUR m Ellz11 11 - WITH SLOPES FLATTER c 14 DAYS PERIMETERS AND NC GRIDNAD83(2011) o SHEET NUMBER THAN 4.1 HOW ZONES) IN FEET) R SN0 1 inch= 50 ft. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-3.0 0