Loading...
HomeMy WebLinkAboutNCC231999_Modification Review_20240109 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 1/9/2024 8:50:52 AM(ADD TO FILE Submittal) Approve by bethany.georgoulias 1/9/2024 3:10:47 PM(Construction COC ADD TO FILE Review-NCC231999) • The task was assigned to bethany.georgoulias.The due date is:January 12,2024 5:00 PM 1/9/2024 8:50:53 AM Ago Permit for Construction Activities DEQMODIFICATION 0itltl 0000 Certificate of NCC231999 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) Information associated with this permit: Project Name Hoke Loop Ridge(formerly Liberty Pointe) Address Hoke Loop Road, Fayetteville, NC County Cumberland Latitude 35.0400 Longitude -79.0790 Permittee Listed D.R. Horton, INC. Legally Responsible Tracey Davis Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2023-1999 E&SC Plan ID CUMBE-2023-158 Original NOI Tracking 147213 No.* Date COC Issued* 06/30/2023 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Modification* Closed-Out Lots/Outparcels in E&SC Plan Additional Lots/Outparcels Approved-E&SC Revised Other Revision(s)to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons(List) Addional Explanation More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. Lots 21-48,57-64,97-106,(All lots located in Phase 2) You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) Hoke Loop Ridge Phase 2 LOA.pdf 1.05MB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date. North Carolina General Statute 143-215.6B(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person' "This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature Type Name* Christopher Ahlers Title* Division Stormwater Compliance Specialist 11 Organization* DR Horton, Inc. Date* 01/09/2024 Email Address* cahlers@drhorton.com Email for confirmation Telephone Number* 3363126567 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for confirmation (Optional) Original Permittee tmdavis1@drhorton.com Email Original Site Contact tmdavis1@drhorton.com Email Review Date 01/09/2024 Rescinded Since Submitted?