Loading...
HomeMy WebLinkAboutNCC240058_Site Plan or Location Map_20240109 \ ....."---__ \ \ �Ck#il Read�SR 1406 ` CONSTRUCTION SCHEDULE DATE. PAGE: \ I.Obtain all necessary permits and plan approvals.Erosion and Sediment Connol(E&SC)permit and a Certificate of Coverage l / - -- -- -- \ (COC) stbe obtained before any laM disturbing activities ocpr.Appy of the MSC permit,the COC ands hard copy of the C/ \ planmust he k.on site,preferably in a permits box,md accessible during inspection � � - 2.Innalleravel=ru on on entrances fast,then silt fences,reinforced silt fence \ _ umlen and wastes. A B C D E F" G "H" \ \ 3.Finish in nearing and grubbing any necessary areas on the lots smey are stattM. Y� \ \ // �/ ) 4.Begin lot grading and exc..,activities5. house construction activities. u u R� A \ \ / �1 / / 6.Finish all rough grod'condnue hy and house tr ' I \ % li R I ✓! iP �' % I \ \ \ / 216 7.I ll driveways,walks and patios. sADDI{g rO \ \ /� B.Beg Go Fading of lot ¶'HOUS¶ ti ��' �� HOUSE% HWJJ H HOUSE Q RyAfAA2 \ \ / 9. Igres & Ich g d bl g fl g' 31tart.the installation of sod an the lot.The silt fence will �9 \ \\ \ / Ica I 1 I h 1 added 'n8 ins stabdmud dak HOUSE uk N \ 7---- _ '11/ \D IQ 10.Th shall vd If vwPec- of vie erovov and.sedimm Imeasmea and comPleh the fogOWing RAY .� L '.� L' '.� L•, '_u [� AY L NO Y L• combined If'pa f found he DEMLRwebsite w C8 gNLEf1r EOE CURa RO r AY RDA AY o I \\ \ ------\--- _/12 / / U r CURB AYLEoc ROADWAY \ \ \ Z I w I hops:/tw dry. g bo nd' gy mineral and land resou otter progreMnpdes consmreHon program. 0 \\ 4_ / 1 r Twelve ng of complete P forms shall be kept ins d available for inspection at all times It is recommended copy be kept in a permits ROCKFISH ROAD b \ \ \\ \ �- -� / �19/ / a I / NCAC 04E 0504 General Permit NCG 010000 NPDES for ConstructionSJ Sections ISA NCAC 04A.0101 tM1rough ISA Notes: RR1 through 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland / / 29 3 O I1.Self-inspecYons for erosion and maimenpim control measures are mbe performed w least oroeevery seven calendar nays and boundary and/or around protected Dees,providing a radius of aueaat 1.25 feet for each sot- L+ III within 24 hours of very rain event of greater than l inch.Any needed repairs shall be made immediate) LEGEND inch of Dunk diameter. . \ ....\ �- j R Y m maintain measures as 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on / ✓ $,� r I \ -20'-69[„/' �5MT / Jcsigncd.All ESC mcasmcs sM1ull be mmnlaincJ as specified in the comnumtmn Jdails on this plm.Arein Knugc shell be installedNII \ -/ - / 1 - scntiguo San dfeedtland wifrsor ba for achlot shetlow///,,,,,, at the projecm site for mwnorwg. gram en I ry, p points.If lots ere �I' ITI L AINAb UM Inspection and final acceptance letters.When the project is complete,thepermmees shell pnmet DEMLR to close out the E&SC SILT(FENCE DIRECTION contiguous and have different land owners or builders.each lot should have individual Silt SST 'e \� _ _ ' / / Plan.ARer DLMLR infomrsthe permmttee ofdre pmjenclose ow,via inspetion report,the pamittee shall visit Fences. I `S '28� I I ( 2 d ((i0I"msubmit an elemooic rvotice of temminatioo O .ASIW annual 1 fire will be charged SILT rENceourLEr t� 3.Install red Silt Fence within l0 feet of property line to ensure there is no conflict with a \ 0 \ 1\ ey.ne govM (e-N T7 general permit aBe ENrRAN required grope y \ Q until the a-NOT has been Bleed ow. EMEseptic system.It Is the responsibility of the builder to ensure the installation of sediment py21pP1 \\� - -� cuRD INLET control measures does not impact the septic system and repair area(s). eJ+URcy ROAD sit-ton ? \ \ x••l \ 4.At leas[one other sdediatedEntrance/Exit is to be installed per lot. r\ I \ 5.Waste bins and other areas dedicated for managing budding material waste shall be at \ \ 27/ �•J \ 11 least 50 feet away from stone drain inlets or drainage ditches unless it can be shown that rJ \ A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY noother alternative exists.if this separation cannot be achieved,these areas must be ...;141 , \ 2 D_ - 2(I DRAINAGSEMENT NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR contained behind Silt Fence. \\ �� / _ - 6.Inlets downstream of disturbances should be protected:streets should be swept when 198 COMPLETED AS AN EXCEL SPREADSHEET. sediment from the construction activity is present. Mr '1,,,......... ` /� AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED -\NC-Environmental.jpeg T.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures am 11L,� EROSION AND _ .3 provided on additional sheets.Erosion and sediment control details are not drawn to irate. b SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 16A ___ ____ \ i� / ^6 6 \� NCAC 04B.0131 STATES THAT•...DOCUMENTATION SHALL BE ACCOMPLISHED BY TYPICAL LOT LAVOUT WITH CURB AND GUTTER 7B2 / \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY Of THE - / \ .Ar_ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, \ a / \ `F OPEN \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DATE: PAGE: PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION _ - - I 36/ / / / / \SPACE\ \ CONTROL PLAN." \ / / VICINITY MAP ' - \ \ �i �` \\\� 25 \�0 g j \ \ /�yy N.T.S. \I LIMITS C) \ \ �oa 9 - 4,41 �r FBI ,O\ M. - .;�v ao2 70 Log,\ rci eUV \ \ QJ / . . - ".Tht,cane le 4olI\ ^�•�"krts, 46 10 --- CONSTRUCTION ��: � ' �/ O \ Lot Plan \ /00 -� l"y. DATE: PAGE: � v C.: LIMITS \ �' p r.� '9\ S't Sock/watt Silt Sock/wattle NOTE: / V. , `it 11 7. FLow�� mI Araeml» FL MI Arcamba ,. providing equivalent protection \ �. .. �!. ;; ` 4Dt Plan \ / ��-�illr '..�--pp`Pry` e- a -fl ea maY he aubatW�'ta •• \ - _ g'.B: z. fig annamywrampm >.. '93 do _ \ Consimcbon Maintenance, II Stokes 'I Stakes 3. MI installed parad•el'lto ` 72 \ , �� 4111111.___\,..., \ 1 1.Clear the entrance and exit area of all vegetation,roots and other objectionable 1.Per NCGA1inspect t k and afterh1inch or SECTION SECTIONgra beyond„)the be, \ \ \ material and properly grade t greater rainfall: k y required pimmediately. nal areas 2.Place the gravel to the speufic grade and dimensions shown on the plans and 2.Maintain thegravel pdi condition t prevent mud sediment land disturbance.Houle lThee madsoed ft eedge of the ` \ 1 / �Ga \ \ \ smooth it. from leaving the construction site.This may require periodic �O wwame(il mould be tumeahs slightly upslope to 1L6 •l / / , #e202*------- ' 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone. <o one, 8Md'' runoff going fie den tosift / ' \ \ \ 4.Use geotexfle fabrics in ortler to improve stabilityotthe fountlafon in locations 3.Immetliately remove all oblectionable materials spilletl,washetl or �ii! i LI 4. Oak or other durable hard.,srtkes with a 2 � C \ subject to seepage or highwaertable. trackeaontopublicroatlwe inch x 2 inch cross section should be driven W W vertically plumb,through the Me \ \ 'a \ I / \ \ CONSTRUCTION ENTRANCE/EXIT maxim me Trench in w8 feet if the slit Oa.In a 0 inch • Woad Mulch fir Corn >[ yrnnnd 4•Min. trench. .-EI� \ \ To 1/2 nelght or l09 s. Inv wattevenlstam,sng ed.',wre.ble).wnen NTRENCHED INBTPllATION ENTRENCHED >Inspxtaeln ecWwa in pea behind e silt 6� \\ ete blocks MRENOHED eecntincn orgrea eererca me THISxmreuunw„xmvarmsawuarx.ar,a. concreaNetoM1 shall NG u6aM ISOMETRIC a den Weeklyt WM d .� \\ \\\�\\ \\\ EAU€ \\ \ \ \ \1. SODDING LAY SOD INA STAGGERED , accumulated sediment and any debris as #(1# # mr uneenmea Socks or,* o»wn DMmaNr ^zm;SOCK imn'(450 Lr ow )(ono.m) s^JSmWO Or COMPOSI needed to allow.X. c 9 ceay.e,ge ee or \ \\ \ \ \\\\ -'\ \ \ \\\ \\\ N \\ �.� \ .+-� oN>raowettan Hnnnv Bhemnww� a Be «nv.swuate so......... �� ORM TER d� �siNtsaek/"�„mn c�°y c chi is l (mi) (aFss m) (aoo'm) ° \ \ \\TREA�TMEfV� Ilk* \ \\ \ \e anpa µprwamM n>PEdE>warkont f cantle eT"Wate gz.,0. i;;" ac;ae" '22=„ g-„, a. Stit maa>amha>es Reinstall il shagb i ulnen > \ \ \ \ ��a`� \\\ \ \ \\ \ ilf m/ml Iimkm) Iimiml /m/m) p I disturbance is corn,. n a fie \ \\ � \ \ o`v 5 \ \ � e.TCREDCORRECLY.ee ,bowAO actin M• • SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION - / // \\\\\\\\\\\ \� - \ P� p N \ \\ I 1 \ \ \ DATE: Wire Fence Filter Fabric PAGE: • (.-....-/ \\ \ \\\ ` ` .1g / ^� \ \ 1\ I I I I \ \ \ \ steel Post s...Eras g brc awwre ten .re Fence Wire B9ckfll trench \ ` r \ I I 1 morn thoroughly = \I\) ) \\ �\ \ \ *SI �B / 1 I I \ \ Y Steel Postav Uvwpe �\\\\ \ 1 1`\ 1\\\\\\\��- \ \ \\ // / 1 I i I \ \ w�ui T.m A>,~Esap> ,txli MOW WREN Die Son is E MmWEa Plastic or1 : \ \\\�\\'\k �\\ \ /\�\\\\\;\ 14/ / I / J 1 , 1 \ \ \ He not Ly ro u"ol u�wni awiu ESTABLISHED.igecHxS.SEF a. Wire Les te�4 •, GROUND STABILIZATION \ �\� \\ \ \ _ � �-��/\ / // / / I I I \ \ \\ APPEARANCE FGOOD SOD A SITE AREA STABILIZATION \ ` \ �/ / \ Li__:,_17.,i!LL11(...,1'11,L__I''.1i1),1_'1'.,....;_ill) DESCRIPTION TIME FRAME EXCEPTIONS \ _\ �/ // / II \ \ \. A �;anggeaerch �� �� -A � �oPEm�/ � /� 1 VA \ ...,17:10,::e�LFBer Fab.a / PERIMETER DIKES, 7 DAYS NONE \\ \ \ Y /�� \ \ \ \ \ aces1. shanmm�the sea men h regg our rengg�>ywhm'uti Coosa sEcr env EwSWALES,DITCHES 1 \ \\ / I ` \\ \ \ \2.canmay m�w,tlw h�l°nhs orw,tor: fence does not exceed 24 np�lw above �e.lH 9herrenua &SLOPES \ \� \ \\�\ � /�N III �� .- amnnrn n..»aaorM.r nmcentM cause of Ow ram HIGH QUALITY 7 DAYS NONE \ • securely...roieen�r ct.old ataa'w the post wane feet mi to rl p-la me eye post. WATER ZONES `\ I/ barength filterrbembyhw;m mesh fastened securely to the upslope side of me posts.Extend fiance: (HOW) r� \ ` \\\���� , 1 \ \ \ \ N N \ pin"spevt seelmew fences at least once a week and seer each 1 4.Support Side of Me strength.a°>ce got or reaterremal.Make as required repar>Immediately. SLOPES STEEPER 7 DAYS IF SLOPES ARE \ ,, I\ \ General the Erosion Control Notes standard the wire mesh sh st.tt w�aplaeeave�cna 2.a Should fa.of fence compae�taar,decompose, THAN 3:1 10'OR LESS IN n \� / 1 ( �1 \ \ \ \ o 5.When a wry fie srosmam�m is orze space posts amammtm orare>t apart.sapoon»owe be amen ae rot lacenpmmpnv \/ \� \\ J I \ \ \ \ rycurExtra atrngg nierfebec wigs font poM spacing does not require a wire mesh supportfenoe..ourely or become m deposits as neussary to LENGTH AND ARE Ncl 1.Only the areas shown shall be disturbed. 6.fastenge filter directly to posts.Wire or plastic rep ties>hout..e a minimum of 50 punmensm Remove forge next lain and reduce pressure on e NOT STEEPER -� 1 \ \ \\ M 2.All disturbed a shall be grassed and s renceVTake ceamawle undermining mafmceaurlW adequate \ \\ �� I l �\ \ oCQ mulched ass s possible d maintained 7.excavate the trench aeproxlmately 4 Inchesw.anal inches Beep along the prapasea line of the voSteam c.arw THAN 2:1, 14 \ �� �\ \ \ until pemanent cover s established. fencing matenal>and anmable sediment aep>it> DAYS ARE \ �\ \\ ` \ q� 9.PoB. ack511 tram �„nch with mroexl,overs of fabric along the manerfa.ande of the trench. Remove aeamren area mgraaama>laabl:en Ina Senn pnrM ALLOWED --�\ \ \\\ N N \\� N' eankm me trench with soil plats,a.e,ge tinerrabnc and v .Tn ecompaction nrge 6ankfiu.a e barrier. 4 drainage area has properly r.Itleal ro>wfence performance SLOPES 3:1 OR 14 DAYS 7 DAYS FOR `- - - \ \ \\ Z attach filter n9 trees. FLATTER SLOPES GREATER �- \ \ \ � \ �\ \\ \� \\ THAN 50'IN �� \ �i \ ANC-Env.,fees fol.jpeg LENGTH / \�- \ \\\\ \ \ \\ \ SILT FENCE _ \\ 1 _ �\ \N\ _ . FFFFCTItFu F 1 r,,.r, ALL OTHER AREAS 14 DAYS NONE(EXCEPT _ WITH SLOPES FOR PERIMETERS /� \ N:--- ---- -� \ \ \\ _ FLATTER THAN 4:1 AND HQW ZONES) / ' \\ \\ �� \\ \ \� - DATE: 4 MIN. FENCE PAGE: \ �/ \ / / \ \ \ \\ -\ \\ \\\\\ �� _ \ � � \\ / / / \� �� 11 �J � _ PAGE 1 of2 \-- _7_ �_ \ / \ \ \. \ \ 11 \ \ TOTAL DISTURBED ACREAGE. 0.42 ACRES 1 I i LOT EROSION CONTROL PLAN - �� / ( \.,,,,\ \ \\ \ j LOTS 9-11 STEEL ABOVETHE WASHED THE aHED ,^�\\\ ) \\ \ \\ �� BLACKHAWK HARDWWIRE ARE CLOTH FRONT VIEVY - ��^_��.\ �- / 1 \ \\\ 1 ' )/ LANDING FENCE \ / FOR \\\ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION DREAM FINDERS FILTER OF STEEL FENCE WASHED STONE 2 FILTER FABRIC INTO soup GROUND POST SET MAX CLOTH IN TRENCH General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be z6T ON GROUND NOTES: ~2 APART MIN' AND HARDWARE relocated on the lotto insure that the potential for sedimentation mnoff is eliminated as much as possible.Silt fences and ravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper round stabilizing cover. HOMES L LC 8aro1 1.Hardware cloth and gravel should overlay the silt fence aueaat 12 P P 9 99 9, 9 9 P P 9 9 �c o�� inches. Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all MCLAUCH LI N TOWNSHIP HOKE COUNTY a 2.Stone outlets should be placed on low elevation areas of silt fence objectionable materials spilled,washed,or tracked onto public roadways. and based on field conditions. Slit Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE: 1"=100' NOVEMBER 2023 MAINTENANCE: that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. of 1.Per retCG-0i,inspect oufiComt atplete lestteiewrekpnd aim eachimmediately. Sodding The sod should bemaintained to insure that the take holds in the areas beingd.The sod should be watered as necessary to maintain adequate moisturethe root zone and t dormant of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE HARDWARE CLOTH FILTER FABRIC IN TRENCH greeter rainfall event Complete any required repairs immediately. q- properly grassrecommendations ry quote in proven dormancyquote gro too 0 50 100 200 400 2.Freshen stone when sediment accumulation exceeds 6 inches. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 3.Keep mesh free of debris to provide adequate flow. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI SECTION viEw 4.Remove sediment when half of stone outlet is covered. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 5.Replace stone as needed to facilitate de-watering. ..\NC-Envlr entotJpey Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fencw/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:11/27/2023 7:36 AM LAST PLOTTED:11/27/2023 7:42 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H.2 H CONSTRUCTORS\23-1367-03 BLACKHAWK LANDING-EC\PLANS\BLACKHAWK EC-LOTS 9-11.DWG