Loading...
HomeMy WebLinkAboutNCC240056_ESC Approval Submitted_20240109 CERTIFICATE OF PLAN APPROVAL v:;ruT* Ems : (it.1114M t- 7 e4S1 SQunmv:e= The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). Blake Farm Parcel H Balke Farm Boulevard, US Highway 17, Hampstead, NC 28443 Project Name and Location November 16, 2023 -1AZOK;42 --- Date of Plan Approval Assistant Regional Engineer DEQ-,1 Certificate of Coverage Number