Loading...
HomeMy WebLinkAboutSW5230902_Stormwater Report_20240103 Stormwater Management Report FOREST HILLS Louisburg, North Carolina August 8, 2023 Revised January 2, 2024 ��.,•K N CA• RD • AL 2 642 = t tiq N P • Prepared By: The Nau Company, PLLC PO Box 810 Rolesville, North Carolina, 27571 (919) 625-3090 tnau@thenauco.com NCBELS License # P-0751 Stormwater Management Report January 2, 2024 Forest Hills INTRODUCTION This report presents the stormwater management design for the proposed improvements at the Forest Hills Subdivision in Franklin County, North Carolina. The site is within the Town of Louisburg's ETJ and will be annexed into the Town of Louisburg. The site is located on Hawthorn Street at the intersection with NC Highway 561 northeast of the Town of Louisburg. BACKGROUND Forest Hills is a proposed 50 acre development that will consists of 64 single family lots. The project includes construction of the water, sewer, storm drainage, road network and other infrastructure to support the development of the single-family lots. Water and sewer services will be provided by the Town of Louisburg. The proposed subdivision will have a stormwater control measure (SCM) that will meet State requirements for stormwater quality. The roads within the subdivision will be built to the Town of Louisburg standards and will ultimately be owned and maintained by the Town of Louisburg. Stormwater runoff will be conveyed to the stormwater control measure by utilizing a storm sewer piping network. REQUIREMENTS Stormwater Permits for the Town of Franklinton are issued by the North Carolina Division of Environmental Quality (NCDEQ). The relevant NCDEQ requirements for high density projects found in 15A NCAC 02H .1003 (3) are summarized below: • Treatment requirements -SCMs shall be designed, constructed, and maintained so that the project achieves either"runoff treatment" or "runoff volume match" as those terms are defined in Rule .1002 of this Section. • On-site stormwater- Stormwater runoff from off-site areas and existing development shall not be required to be treated in the SCM. Runoff from off-site areas or existing development that is not bypassed shall be included in the sizing of on-site SCMs at its full built-out potential. • MDC for SCMs -SCMs shall meet the relevant MDC set forth in Rules .1050 through .1062 of this Section except in accordance with Item (6) of this Rule. The relevant MDC for wet ponds in 15A NCAC 02H .1053 are summarized below: • Main Pool Surface Area and Volume -The main pool of the wet pond shall be sized using either: o the Hydraulic Retention Time (HRT) Method; or o the SA/DA and Average Depth Method. • Main Pool Depth -The average depth of the main pool shall be three to eight feet below the permanent pool elevation. The applicant shall have the option of excluding the submerged portion of the vegetated shelf from the calculation of average depth. 1 Stormwater Management Report January 2, 2024 Forest Hills • Sediment Storage -The forebay and main pool shall have a minimum sediment storage depth of six inches. • Location of inlet(s) and outlet-The inlet(s) and outlet shall be located in a manner that avoids short circuiting. • Forebay-A forebay that meets the following specifications shall be included; o Forebay volume shall be 15 to 20 percent of the volume in the main pool; o The forebay entrance shall be deeper than the forebay exit; o The water flowing over or through the structure that separates the forebay from the main pool shall flow at a nonerosive velocity; and o If sediment accumulates in the forebay in a manner that reduces its depth to less than 75 percent of its design depth, then the forebay shall be cleaned out and returned to its design state. • Vegetated shelf-The main pool shall be equipped with a vegetative shelf around its perimeter. The minimum width of the vegetated shelf shall be six feet and the slope shall be no steeper than 6:1 (horizontal to vertical). • Drawdown time -The design volume shall draw down to the permanent pool level between two and five days. • Protection of the receiving stream -The wet pond shall discharge the runoff from the one- year, 24-hour storm in a manner that minimizes hydrologic impacts to the receiving channel. • Trash rack-A trash rack or other device shall be provided to prevent large debris from entering the outlet system. • Vegetation -The following criteria apply to vegetation in and around the wet pond: o The dam structure, including front and back embankment slopes, of the pond shall be vegetated with non-clumping turf grass; trees and woody shrubs shall not be allowed; and o The vegetated shelf shall be planted with a minimum of three diverse species of herbaceous, native vegetation at a minimum density of 50 plants per 200 square feet of shelf area. The design storm for this project is the one inch 24-hour rainfall. It should be noted that limiting post-development runoff to pre-development rates is not required by NCDEQ. However, this report presents the results of pre-development and post-development runoff calculations for each analysis point for reference. This project receives offsite runoff that is not bypassed around the proposed SCM. Therefore, NCDEQ requires the entire offsite area that flows into the SCM be assumed to have 100% BUA or have all upstream offsite properties enter into a legal agreement to limit the impervious. This design assumes all upstream offsite areas that drain to the SCM have 100% BUA. 2 Stormwater Management Report January 2, 2024 Forest Hills PROPOSED STORMWATER CONTROL MEASURE One wet pond is proposed to meet the State stormwater requirements. Refer to the construction drawings for details of the SCM. METHODOLOGY Drainage Areas and SCS Curve Numbers Drainage areas were delineated based on proposed and existing topography using CAD software. Land use types were measured using CAD software and SCS curve numbers were applied to each land use type within the drainage area to calculate a weighted, composite SCS Curve Number. Curve numbers for the various land use types were taken from NRCS TR-55 and are included as an appendix to this report. Times of Concentration The minimum time of concentration used for calculation of peak flows was 5 minutes. For times of concentration more than 5 minutes, a simplified TR-55 method was used. The simplified method calculates the time of concentration only using sheet flow time and channel flow time—shallow concentrated flow time is disregarded. Since channel dimensions vary along the channel flow path, channel parameters were selected for the entire length of channel flow that yield a flow velocity of approximately 4.5 feet per second. A flow velocity of 4.5 feet per second is greater than or equal to actual flow velocities expected in the pipes or open channels along the flow path and therefore will yield a runoff higher that what would be expected at the analysis point. Runoff and Pond Routing Runoff flowrates and volumes for the proposed SCM were calculated using the Hydrology Studio software program. The software utilizes the SCS Methodology to determine peak flow rates and performs routing calculations to determine detention results by the Storage-Indication method. Rainfall Depths The following rainfall depths used in the calculations for this report were taken from the NOAA Precipitation Frequency Data Server(PFDS). A printout of this rainfall data is included as an appendix to this report. Rainfall event Rainfall Depth(inches) Design storm 1.00 1-year,24-hour 2.83 2-year,24-hour 3.42 10-year, 24-hour 4.94 25-year, 24-hour 5.84 100-year,24-hour 7.27 3 Stormwater Management Report January 2, 2024 Forest Hills Pre-Development and Post-Development Drainage Areas Drainage area maps showing the pre-development and post-development drainage areas are included as an attachment to this report. Note that the drainage areas are based field topography where available and GIS topography outside the limits of field topography. ANALYSIS POINTS The analysis point for the project was selected based on the location where surface flow leaves the site. The analysis point for this project is located on the far eastern corner of the parcel where the stream crosses under Highway NC561. RESULTS Runoff Volume Two runoff volumes were calculated as part of this design. One runoff volume the Water Quality Volume which is for the entire area that drains to the SCM and the other volume is the Runoff Treatment Volume which is the volume from the net increase in BUA The runoff volumes for this project were calculated by the simple method and are summarized below. Runoff Volume Drainage area Impervious area Impervious% Runoff volume Water Quality 39.25 ac 20.25 ac 51.6% 73,282 CF Volume Runoff Treatment 8.26 ac 8.26 ac 100% 28,470 CF Volume 4 Stormwater Management Report January 2, 2024 Forest Hills Peak Flow Attenuation Although peak flow attenuation is not required for this project, pre-development and post- development flows were calculated for several storm events for reference. The table below summarizes the pre-development and post-development data for selected storm events. Detailed routing information can be found in the appendix to this report. ANALYSIS POINT DRAINAGE AND RUNOFF DATA Development Condition Drainage area SCS CN Time of Q(1) Q(2) Q(10) concentration Pre-Development 53.68 acres 73 21.3 minutes 40.8 cfs 64.1 cfs _132.5 cfs Post-Development to 39.25 acres 86 17.4 minutes 72.2 cfs 96.3 cfs 159.7 cfs SCM Post-Development SCM 14.43 acres 76 10.0 minutes 20.5 cfs 30.2 cfs 57.6 cfs bypass Post-Development SCM 25.7 cfs 37.5 cfs 139.0 cfs outfall flowrate Post-Development 29.0 cfs 45.2 cfs 161.9 cfs Pond Surface Area The required pond surface area was determined based on NCDEQ Stormwater Design Manual for the Piedmont and Mountain area. The impervious percentage of the onsite drainage area was used to determine the required surface area. The pond surface area data is summarized in the table below. SCM1 Drainage area 26.29 acres Impervious area 8.11 acres Impervious percentage 27.7% Pond average depth 3.0 feet Required surface area 12,531 SF Surface area provided 18,833 SF *Pond surface area calculations are included in the Appendix to this report. 5 Stormwater Management Report January 2, 2024 Forest Hills SCM Dewatering Time The required pond dewatering time was based on the NCDEQ Stormwater Design Manual and was calculated using the falling head equation assuming vertical pond sides. The pond dewatering time is summarized in the table below. SCM1 Required dewatering time 2 to 5 days Design storm 1 inch Calculated dewatering time 3.1 days Pond dewatering time calculations are included in the Appendix to this report. Pond Average Depth and Forebay Volume Pond average depth was calculated using equations 2 and 3 in the NCDEQ Stormwater Design Manual for Wet Ponds. The interior of the ponds were graded so that the forebays are between 15%and 20%of the main pool volume. The results of the average depth and forebay volume calculations are summarized below. Calculations are included in the appendix to the report. Pond Average Depth Pond ID Average Depth SCM1 3.3 feet (by equation 2) SCM1 4.1 feet (by equation 3) Pond Forebay Volumes Pond ID Forebay Volume SCM1 19.5% (total of both forebays) Erosion at Pond Inlets and Outlets Flows into and out of the stormwater control measures should not produce erosion for the 10-year storm. Riprap energy dissipaters are used to eliminate erosion at the pond inlets and outlets. Data for the riprap dissipaters are summarized below. Calculations are included in the appendix to the report. Location Length Width Thickness Riprap size Inlet pipe on north 20.0' 7.5' 22" Class I side of pond Inlet pipe on south 28.0' 10.5' 22" Class I side of pond Pond outlet 12.0' 6.0' 22" Class B 6 Stormwater Management Report January 2, 2024 Forest Hills Pond Freeboard The pond is required to have at least 1 foot of freeboard between the 100-year water surface elevation in the pond and the top of the embankment. The table below summarizes the freeboard for each pond. Pond ID Top of berm elevation 100-year WSEL Freeboard SCM1 220.0 218.9 1.1 feet Riser Anti-Flotation Device An anti-flotation device was designed to counteract the buoyant forces on the pond riser. The riser anti-flotation block was sized to provide a factor of safety for buoyancy of at least 1.5. Calculations for the anti-flotation block are included in the Appendix to the report. Nutrient Loading Nutrient loading calculations for this project were performed with the SNAP Tool v4.2 provided by NCDEQ. The output from this tool is included in the appendix to this report. The output calculated by the spreadsheet for nutrient loading is summarized in the table below: Post-BMP TN Loading 2.27 Ib/ac/yr Post-BMP TP Loading 0.46 lb/ac/yr CONCLUSION Based on the results of this analysis and design data contained in the construction drawings, we believe that the NCDEQ requirements will be met for the proposed development. Additional details can be found in the Appendix. 7 APPENDICES Appendix A Drainage Area Maps Appendix B Hydrology Studio Output Appendix C Wet Pond Supporting Calculations Appendix D Energy Dissipater/Riprap apron Calculations Appendix E SNAP Tool Output Appendix F Supporting Documentation APPENDIX A DRAINAGE AREA MAPS r 1 i = 2 csiLri; I/ / / /// 2------_- -- ', 1 I \v-i - \I I I V A 1 A\ \\ \ V \ / v I 1 I I i I 1 I 1 1 \ V V V / -\ Cw ° / I \ CI) " �i' �J l� I I oLnan ' � zdoe �� /// / / - - / I A H > xM� / / ----- A F I f I A I �amz 1,"Z.-_ A Ay I / \ .‘,..6. '\''''- --"k - .r A-tr lifrir A 4' 11-40/1P."1/ / :—7/ I `,,, Fn 1,s.. %,,,ssi;,,,,/, rifit ,./ .44,?,,..., ,,,,,,ir ,,,,,_, c. -111:1\k Ni, /////'/'/ :///,,, ,14f.: ,if 4/://:„417- \t-r;--''--------(/ . \ • \ isx 4,1,1 /77 ; SX\ S,N / ,/,,, ...-' ,.., ,„:,\)--, ,, ,,,,_ E \ \ Ns ''. '\: - / ," # , ,e", ' z:' __ / (ONSITE ONLY) �/ > �� (OFFSITEA \\I\ 4 /, , ,#,A ///_ :,/, f#740, A, //I � ONLY) ; y 1 / t# `` ...`xv/J I . /— ///\ \ / 1/ \ 0 / ,. _-----\\\; /1// /t A thisN' // / / /I/, //.//' #.. 11';// / fr- /13,19,:;" ,,—,„:-7_-_;'—_5,.. ---:-\\'5*.'4—; ;;:----';--. :\- er ,....s., ...... ____...... , ,,, ...--- v., Lz rfr/::,:,_, / 0„..:, tio, , +/A , ,........-„, -,.----- - H n 0 , , t,,,,,T.?- ,, ,) -...,_ %:/__,,,,__-.<0,=\—\tr-\--::1— ----' /\\ \ L.L., , , \ c, 5 z / / -" /dam' \ \ \ 1 W '% / w 1,,. 4,,;-‘;714,,,/o' 4 v 7 fo„,_4 1,7 A ' cc ,000.4 ,%.''',,,#"--7 ,...,,..---- 111' . 1\14/7 .... , / , , ,../_,,,,e--:,;.-;--___ _- ,,, / r-'''---- --,4 / G ---- _ ///f/- / l / I A o�� \ V I / / / �� — % � / / , � � — V A \ v _ v 1\ \ \i PROJECT NO: \ ,A:!.'" / / 1 / i——— ' \ ,DESIGN BY: \ \--____-----.,_ \�� I '/ / / —_\ i \ \ INC / \ \ I =sk; I I / �\ �/ I \\ \\ 1 i --\ \\ \ / I / I \ i' / \ `�\ I ,DRAWN BY: -- \ \ ' / �— \ \ \ INC / / / / \ \ I I SCALE: / / / _ \ l / 1 1"=100' i— I I I l // // / // ii �i / \\ \ / I DATE: / / 2024-01-02 I / A / 100 0 50 100 zoo 1 SCALE:1"=100' SHEET NO: SCM1.1 PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION 1 r 1 / / / / / --- — •- --- \ v____/\---- // // _, ' \ \ \ \ \ \ II I I i >, r_s-' it U/ / //z/________________________ _i_________ --) i , \) 1 ) i ) ) V\ - l-t--' -g11----51 / , / / i I / �� — // I(n.7 �,J t _ Dp Ln J 1 J ���_\ , Ic li I I" _Ale I -1`I/1 ' /1 / / �/I 1 1 .mom —� � \ �� 111_' V 1�' �� POND BYPASS ' J amz ll • • \ ' / fL T� , -��� I I �`v 14.43 AC 1 ././.- -..........vM 'NI - Ai•-..-es.'-'%Ar_ss,, ,.....:__-,,101/._,„---_, ,,,„.-ss -0- .--..... ...i......t..,..-;.) ..,Aliti,,,,.\ \, `)Vrt'!-7;2.41):47.0'.41`.". , % '\ 1-- / i / AII 1,Ao0l, A 0 ,;I'y 011 .9/.�i',/,-44i�/ ,�f ';toy, v )y 4 1 `y �\ A ,,,r, - ) () ff/-.• . ,+i I. Imo- , i :. P � • �.1� _ I�'_',A.- - F JjJ Ir11 I-wn T V ( 1 (� ! ) �/_ / y �; � v� j1�,1� II �� I rllDp y - j `t � I j / ��� �� / w I v.# A,�II° i� yl,���,,��' II I, 11 0 I 1 - 1/4���� 01 i► r �Ci'Ir P 0, 1 1 �, III ,��1�I�I 11E a_ I4‘ 1 s/i, q !� Iry IIII, 1� _9I,Jf t►•:L '1411 % i I�I� %II'�il i I �� 1 • • ) / / I ri ���- y1 Ni�� r��, �/r j j1� I �. . V \ / i o I0 J I 1 1oj,- �i� 1 rr - �t . A fir, I /,I���� ill f.�i �= I _._I-lOrlv �/��11� 1.1 �0'r rf�rvv��v, f6 v, t000v 0 >—y \ 4 \\ p�/iii-1 Po. : .. 4' t111,Al- �Ii�_44 400 r Or 0 r t, �. ���� I is= DA TO PO 111t/ ���-*'� j �rr�rvrrrOrv�r�r°�' -) v .. \ , \ �/tj� �/�I' I �! ONSITE ONLY �: 1�� �%' ��l! , j vo\�v�\vv"<' ' a - _ IN �Itr d �� 26.29AC '/i1 191 �04,0v ;o`, I DA TO POND 0 #4 ` "'W"i% _ �� !' °`vw° v `°�� l [III � � � r (, ��'1•1 j _ ' ,� � //% t.)i 0'' , �\\\\`\\�,)• P\A O .y�� / I F. IOFFSITE ONLY1NI'0,a ' A I ,�L9Y-Ti 1 ii, dr, _ fir,. ' \voo,Avvov vo•�••�..� ; ` — �� \ / /� I, _.� III — f r \ \. 0\ N\�-...��. 1 \ _ I . �' - - I -- 12.97 AC ',6 Ar / I I A 4� " ' 0 r `�r ,�, ,�> / \se ,�._ II , ��p — v t. rrO�rOrr rr�:!i.�.�?`vv�. �. POND BYPASS �-____._ -,-,...._:___,...,\,.:- _ �� �- JIr / III �%S ��� �1rr1r1rr` �c�r•��/, I \ ��� �</� ///� Ir�� '!^ /� �)�I y_ .�� feel firerAv��4 ri 14.43 AC n // / / i 1/ Ire 1 col i, .46 , 0VS\%t ���% I /„%' 1/4 0��1 I e,�I, ����`ArAr�I���1Avv 'v` ¢ ���qS � � _ i/ / �/T •may Q LDL cL.N•s,,, 11„7..-/-- --eAfo.:, 7,0 �� `�� \, ��/%���;oo ,�� .��Aoo • � 5 4/-` :INI' Iii \ _ ,1�� l' I "...'' i/��/ ma _ t� i( L,z z 1 \tom- ` \ i / \i. v,- 141/4 N II',r4��-/- yKA` ,i�� ,� i���V 1 A�/� i /I( A I�I ,,1 �10,,,,� �� / �/d/, //J/ ca A v� \__ W In �.1�� aC v®vems, �i� 1vJ\ve �', v v. -,�v, �; �� t �/*-- // i. w N) ',A,,r \ // / +" .\ I -- _ /'�/mow./i ii/ \. \, -'. a fr----- ` ., ;�'�L ;,_� 4.,-",i;,._ \\\ �' \� / ..-„,;"-.1,,,. 1 JIB. �'-1 I ` / �r�// %*''/ \ \ / ALU o. ' i .�.� a -t�.� /��I i Illr ■ o /- II ram? 1 v _ — — �\ r,411 `� 4010, �;r0 0� \ v of III y : 4.il♦1 - ' / iv ) \� � -._ - ._ ' '14\''' , --;01;04;) �� / I� ��� �r� / III 1 ,' ��, \ (\ '\ , ' '11111011111 r , (\b S' I \ ,_ ,,. : 1:.,.:),,),, lOrt.P.'' j \ - \ \ ' \ \ ( I‘C / \ \ / 1 1 1 \ \ \ \ \ 1 I\/\\ 'PROJER NO: \ TNC / \\� i \ \� \ \\\ I \� \\ / \_// 'I\\\ 'DESIGN BV: 4__-_i-L____ � \ I rar e* I I / \ I \ \� I 'A\ '\, ` \\ DRAWNBY:1 TNG\ \,___y ill \ I} SCALE: ' A-' ) ---) I "=100' ' ) ��� \\ \ / /- / / �� I\ / \ \ \\\ / /! / DATE: 202A-01-02 �V �\ / i i i /i / , / I / /; / 100 a so 0o zoo I I SCALE:1"=100' SHEET NO: SCM2.1 PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION APPENDIX B HYDROLOGY STUDIO OUTPUT Basin Model Project Name: Hydrology Studio v 3.0.0.29 01-02-2024 Pre AP1 Post DA1.1 Post DA1.2 17171 Post SCM +I ► `'t ' PostAP1 Hydrograph by Return Period Project Name: Hydrology Studio v 3.0.0.29 01-02-2024 Hyd. Hydrograph Hydrograph Peak Outflow(cfs) No. Type Name 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 NRCS Runoff Pre AP1 40.79 64.06 132.5 249.7 2 NRCS Runoff Post DA1.1 72.21 96.26 159.7 257.5 3 Pond Route Post SCM 25.73 37.45 139.0 248.1 4 NRCS Runoff Post DA1.2 20.52 30.17 57.55 102.9 5 Junction PostAP1 29.03 45.23 161.9 315.9 Hydrograph 1 -yr Summary Project Name: Hydrology Studio v 3.0.0.29 01-02-2024 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 NRCS Runoff Pre AP1 40.79 12.12 148,486 ---- 2 NRCS Runoff Post DA1.1 72.21 12.07 213,797 ---- 3 Pond Route Post SCM 25.73 12.32 207,599 2 217.13 94,917 4 NRCS Runoff Post DA1.2 20.52 12.00 47,264 ---- 5 Junction Post AP1 29.03 12.30 254,863 3,4 Hydrograph 2-yr Summary Project Name: Hydrology Studio v 3.0.0.29 01-02-2024 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 NRCS Runoff PreAP1 64.06 12.12 221,558 ---- 2 NRCS Runoff Post DA1.1 96.26 12.07 285,618 ---- 3 Pond Route Post SCM 37.45 12.30 279,058 2 217.88 120,612 4 NRCS Runoff Post DA1.2 30.17 12.00 68,492 ---- 5 Junction Post AP1 45.23 12.10 347,551 3,4 Hydrograph 10-yr Summary Project Name: Hydrology Studio v 3.0.0.29 01-02-2024 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 NRCS Runoff Pre AP1 132.5 12.10 439,404 ---- 2 NRCS Runoff Post DA1.1 159.7 12.07 480,475 ---- 3 Pond Route Post SCM 139.0 12.13 473,642 2 218.52 145,886 4 NRCS Runoff Post DA1.2 57.55 11.98 130,228 ---- 5 Junction Post AP1 161.9 12.12 603,869 3,4 Hydrograph 100-yr Summary Project Name: Hydrology Studio v 3.0.0.29 01-02-2024 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 NRCS Runoff PreAP1 249.7 12.10 820,179 ---- 2 NRCS Runoff Post DA1.1 257.5 12.05 792,421 ---- 3 Pond Route Post SCM 248.1 12.10 785,318 2 218.94 162,964 4 NRCS Runoff Post DA1.2 102.9 11.98 235,635 ---- 5 Junction Post AP1 315.9 12.05 1,020,953 3,4 APPENDIX C WET POND SUPPORTING CALCULATIONS APPENDIX C STORMWATER CONTROL MEASURE SUPPORTING CALCULATIONS FOREST HILLS January 2, 2024 SCM #1 - Wet Pond SPREADSHEET v1.00 SCS CN CALCULATIONS PRE-DEVELOPMENT Drainage Area ID1 FOREST HILLS Drainage are to analysis point on southeast side of site January 2, 2024 Hydrologic Soil Group C ONSITE LAND COVERS ONSITE DRAINAGE AREA IMPERVIOUS LAND COVERS Area SCS CN Avg%Imp [sq ft] [ac] Weighted CN Road (pavement only) 0 0.00 0 Parking 0 0.00 0 Roof 0 0.00 0 Driveway 0 0.00 0 Sidewalk 98 0 0.00 0 Deck/patio 0 0.00 0 Other impervious 0 0.00 0 Other impervious 0 0.00 0 PERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Lawn/grass/open space 74 0 0.00 0 Grass(within R/W) 74 0 0.00 0 Woods 70 1,730,525 39.73 68 Natural wetland 70 0 0.00 0 Riparian buffer 70 0 0.00 0 Other pervious 0 0 0.00 0 Other pervious 0 0 0.00 0 COMPOSITE LAND COVERS Area SCS CN Avg%Imp [sq ft] [ac] Weighted CN Commercial area 94 85 0 0.00 0 Industrial area 91 72 0 0.00 0 Residential area (1 acre lots) 79 20 42,850 0.98 2 Residential (1/4 acre lot) 83 38 0 0.00 0 Residential (1/3 acre lot) 81 30 0 0.00 0 _ OTHER ONSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN SCM 0 0.00 0 Open Water 0 0.00 0 ONSITE TOTALS 1,773,375 40.71 70 TOTAL ONSITE IMPERVIOUS 0 0.00 OFFSITE LAND COVERS OFFSITE DRAINAGE AREA COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Impervious 98 0 0.00 0 Pervious 74 0 0.00 0 Woods 70 0 0 0.00 0 Riparian buffer 70 0 0 0.00 0 60' Road R/W 84 40 0 0.00 0 Roof 98 100 0 0.00 0 Driveway/sidewalk 98 100 0 0.00 0 Residential (1/2 acre lot) 80 25 564,825 12.97 80 Residential (1/3 acre lot) 84 40 0 0.00 0 OFFSITE TOTALS 564,825 12.97 80 Area TOTAL DRAINAGE ARA [sq ft] [ac] Composite CN 2,338,200 53.68 73 POST-DEVELOPMENT TOTAL POND DA Drainage Area ID1 FOREST HILLS DA to pond January 2, 2024 Hydrologic Soil Group C ONSITE LAND COVERS ONSITE DRAINAGE AREA IMPERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Road (pavement only) 113,600 2.61 10 Parking 0 0.00 0 Roof 145,425 3.34 12 Driveway 36,750 0.84 3 Sidewalk 98 21,500 0.49 2 Deck/patio 0 0.00 0 All impervious 0 0.00 0 Other impervious 0 0.00 0 PERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Lawn/grass/open space 74 759,725 17.44 49 Grass(within R/W) 74 0 0.00 0 Woods 70 0 0.00 0 Natural wetland 70 0 0.00 0 Riparian buffer 70 0 0.00 0 Other pervious 0 0 0.00 0 Other pervious 0 0 0.00 0 COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Commercial area 94 85 0 0.00 0 Industrial area 91 72 0 0.00 0 Residential area (1 acre lots) 79 20 0 0.00 0 Residential (1/4 acre lot) 83 38 42,850 0.98 3 Residential (1/3 acre lot) 81 30 0 0.00 0 OTHER ONSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN SCM 25,175 0.58 0 Open Water 0 0.00 0 ONSITE TOTALS 1,145,025 26.29 79 TOTAL ONSITE IMPERVIOUS 317,275 7.28 OFFSITE LAND COVERS OFFSITE DRAINAGE AREA COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Impervious 98 0 0.00 0 Pervious 74 0 0.00 0 Woods 70 0 0 0.00 0 Riparian buffer 70 0 0 0.00 0 60' Road R/W 84 40 0 0.00 0 Roof 98 100 0 0.00 0 Driveway/sidewalk 98 100 0 0.00 0 Residential (1/2 acre lot) 98 100 564,825 12.97 98 Residential (1/3 acre lot) 84 40 0 0.00 0 OFFSITE TOTALS 564,825 12.97 98 Area TOTAL DRAINAGE ARA [sq ft] [ac] Composite CN 1,709,850 39.25 86 POST-DEVELOPMENT TOTAL POND DA Drainage Area ID2 FOREST HILLS Pond Bypass January 2, 2024 Hydrologic Soil Group C ONSITE LAND COVERS ONSITE DRAINAGE AREA IMPERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Road (pavement only) 0 0.00 0 Parking 0 0.00 0 Roof 42,050 0.97 7 Driveway 300 0.01 0 Sidewalk 98 0 0.00 0 Deck/patio 0 0.00 0 All impervious 0 0.00 0 Other impervious 0 0.00 0 PERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Lawn/grass/open space 74 586,025 13.45 69 Grass(within R/W) 74 0 0.00 0 Woods 70 0 0.00 0 Natural wetland 70 0 0.00 0 Riparian buffer 70 0 0.00 0 Other pervious 0 0 0.00 0 Other pervious 0 0 0.00 0 COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Commercial area 94 85 0 0.00 0 Industrial area 91 72 0 0.00 0 Residential area (1 acre lots) 79 20 0 0.00 0 Residential (1/4 acre lot) 83 38 0 0.00 0 Residential (1/3 acre lot) 81 30 0 0.00 0 _ OTHER ONSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN SCM 0 0.00 0 Open Water 0 0.00 0 ONSITE TOTALS 628,375 14.43 76 TOTAL ONSITE IMPERVIOUS 42,350 0.97 OFFSITE LAND COVERS OFFSITE DRAINAGE AREA COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Impervious 98 0 0.00 0 Pervious 74 0 0.00 0 Woods 70 0 0 0.00 0 Riparian buffer 70 0 0 0.00 0 60' Road R/W 84 40 0 0.00 0 Roof 98 100 0 0.00 0 Driveway/sidewalk 98 100 0 0.00 0 Residential (1/2 acre lot) 98 100 0 0.00 0 Residential (1/3 acre lot) 84 40 0 0.00 0 OFFSITE TOTALS 0 0.00 0 Area TOTAL DRAINAGE ARA [sq ft] [ac] Composite CN 628,375 14.43 76 POST-DEVELOPMENT TOTAL POND DA Totals FOREST HILLS Total drainage areas January 2, 2024 Hydrologic Soil Group C ONSITE LAND COVERS ONSITE DRAINAGE AREA IMPERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Road (pavement only) 113,600 2.61 6 Parking 0 0.00 0 Roof 187,475 4.30 10 Driveway 37,050 0.85 2 Sidewalk 98 21,500 0.49 1 Deck/patio 0 0.00 0 All impervious 0 0.00 0 Other impervious 0 0.00 0 PERVIOUS LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Lawn/grass/open space 74 1,345,750 30.89 56 Grass(within R/W) 74 0 0.00 0 Woods 70 0 0.00 0 Natural wetland 70 0 0.00 0 Riparian buffer 70 0 0.00 0 Other pervious 0 0 0.00 0 Other pervious 0 0 0.00 0 COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Commercial area 94 85 0 0.00 0 Industrial area 91 72 0 0.00 0 Residential area (1 acre lots) 79 20 0 0.00 0 Residential (1/4 acre lot) 83 38 42,850 0.98 2 Residential (1/3 acre lot) 81 30 0 0.00 0 OTHER ONSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN SCM 25,175 0.58 0 Open Water 0 0.00 0 ONSITE TOTALS 1,773,400 40.71 78 TOTAL ONSITE IMPERVIOUS 359,625 8.26 OFFSITE LAND COVERS OFFSITE DRAINAGE AREA COMPOSITE LAND COVERS Area SCS CN Avg% Imp [sq ft] [ac] Weighted CN Impervious 98 0 0.00 0 Pervious 74 0 0.00 0 Woods 70 0 0 0.00 0 Riparian buffer 70 0 0 0.00 0 60' Road R/W 84 40 0 0.00 0 Roof 98 100 0 0.00 0 Driveway/sidewalk 98 100 0 0.00 0 Residential (1/2 acre lot) 98 100 564,825 12.97 98 Residential (1/3 acre lot) 84 40 0 0.00 0 OFFSITE TOTALS 564,825 12.97 98 Area TOTAL DRAINAGE ARA [sq ft] [ac] Composite CN 2,338,225 53.68 83 RUNOFF VOLUME BY SIMPLE METHOD WATER QUALITY RUNOFF VOLUME January 2, 2024 FOREST HILLS SCM #1 -Wet Pond Runoff Volume by the Simple Method taken from NCDEQ Storm water Design Manual Part B Input Data Onsite Impervious area 7.28 acres Offsite Impervious area 12.97 acres Total Impervious area 20.25 acres Drainage area A 39.25 acres Impervious fraction la 0.516 Design storm rainfall depth Rd 1.00 inches Output Runoff coefficient Rv 0.51 Runoff volume V 73,282 cubic feet R„ = 0.05 + 0.9xIA V = 3630 x RD x RV xA RUNOFF TREATMENT VOLUME RUNOFF TREATMENT VOLUME January 2, 2024 FOREST HILLS SCM #1 -Wet Pond Runoff Volume by the Simple Method taken from NCDEQ Storm water Design Manual Part B Input Data Existing BUA 0.00 acres Proposed BUA 8.26 acres Net BUA Increase 8.26 acres Impervious fraction la 1.000 Design storm rainfall depth Rd 1.00 inches Output Runoff coefficient Rv 0.95 Runoff volume V 28,470 cubic feet R„ = 0.05 + 0.9XIA V = 3630 x RD X RV XA WET POND SURFACE AREA REQUIREMENT REQUIRED WET POND SURFACE AREA January 2, 2024 FOREST HILLS SCM #1 -Wet Pond Drainage area 26.29 acres Percent impervious 27.7% Permanent pool depth 3.0 ft Required pond surface area 0.29 acres Required pond surface area 12,531 sq.ft. Permanent Pool Average Depth (ft) Impervious 3.0 4.0 5.0 6.0 7.0 8.0 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 _' 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 1 100 3.55 2.79 2.52 2.34 2.04 1.75 Interpolation Average Depth Impervious 3.0 3 3.0 20 0.84 0.84 0.84 27.709002 1.09 1.09 1.17 30 1.17 1.17 1.17 Notes: SA/DA values taken from NCDEQ Stormwater Design Manual Section C-3, page 7 (revised 4/18/2017) Per wet pond guidance MDC 1,the required surface area does not include the area of the forebay(s) WATER SURFACE ELEVATION FOR DESIGN RUNOFF VOLUMES DESIGN VOLUME WATER SURFACE ELEVATIONS January 2, 2024 FOREST HILLS SCM #1 -Wet Pond Elevation at WQ Volume 216.50 Calculated pond surface area at above elevation 32,692 SF Calculated pond volume at above elevation 73,427 CF Calculated WQ Volume from simple method 73,282 CF Elevation at Runoff Treatment Volume 215.06 Calculated pond surface area at above elevation 28,332 SF Calculated pond volume at above elevation 29,842 CF Calculated Runoff Treatment Volume 28,470 CF POND ELEVATION AND CONTOUR DATA 214.0 25,165 SF 0.0 0 0 216 31,141 SF 2.0 56,306 CF 56,306 CF 218 37,344 SF 4.0 68,485 CF 124,791 CF 220 43,773 SF 6.0 81,117 CF 205,908 CF DEWATERING TIME CALCULATION POND DEWATERING TIME January 2, 2024 FOREST HILLS SCM #1 -Wet Pond Dewatering time calculated by the falling head equation Input Data Pond surface area 25,165 sq.ft. Orifice diameter 6.00 in. Orifice coefficient 0.60 Orifice elevation 214.00 Initial elevation 216.50 Results Orifice area 0.1963 sq.ft. Dewatering time 4,535.7 min. Dewatering time 75.6 hours Dewatering time 3.1 days Dewatering time = Areapond — (.✓Initial pond elevation x s/final pond elevation) x 12 Areaorifice x Cd g AVERAGE DEPTH AND FOREBAY VOLUME FOREBAY VOLUME & AVERAGE DEPTH CALCULATIONS January 2, 2024 FOREST HILLS SCM #1 -Wet Pond DATA FOR MAIN POOL FROM BOTTOM OF POND TO BOTTOM OF SHELF Elev Area [SF] Incr vol [CF] 208 3,837 0 210 7,895 11,732 Enter data up to and including 212 12,240 20,135 the bottom of the shelf 213 14,521 13,381 MAIN POOL TOTAL VOLUME(UP TO BOTTOM OF SHELF) 45,248 DATA FOR MAIN POOL FROM BOTTOM OF SHELF TO TOP OF SHELF(NOT INCLDUDING FOREBAYS) Bottom of shelf 213 1 14,521 0 Permanent pool elev 214 18,833 16,677 Top of shelf 214 18,833 0 TOTAL VOLUME OF POND SHELF(BETWEEN TOP AND BOTTOM OF SHELF) 16,677 DATA FOR FOREBAY#1 FROM BOTTOM OF FOREBAY TO TOP OF SHELF Elev Area [SF] Incr vol [CF] 211 200 0 212 1,031 616 213 1,428 1,230 214 2,092 1,760 Total Volume of Forebay#1 3,605 DATA FOR FOREBAY#2 FROM BOTTOM OF FOREBAY TO TOP OF SHELF Elev Area [SF] Incr vol [CF] 210 100 0 212 2,251 2,351 213 2,904 2,578 214 4,239 3,572 Total Volume of Forebay#2 8,500 DATA FOR FOREBAY#3 FROM BOTTOM OF FOREBAY TO TOP OF SHELF Elev Area [SF] Incr vol [CF] Total Volume of Forebay#3 0 Total Volume of Forebays 12,105 CF Average Depth by Equation 3 Main Pool Volume 61,925 CF Perimeter of perm pool 715 FT Forebay%of main pool 19.5% Width of shelf 6.00 FT Max depth over shelf 1.00 FT Average Depth by Equation 2 Vol over shelf 2,145 CF Vol at Permanent Pool 61,925 CF SA at bottom of shelf 14,521 CF SA at Permanent Pool 18,833 SF Vol at Permanent Pool 61,925 CF Average Depth 3.29 FT Average depth 4.12 FT ANTI-FLOTATION BLOCK CALCULATIONS ANTI FLOTATION BLOCK January 2, 2024 FOREST HILLS SCM #1 -Wet Pond Constants Unit weight of water 62.4 lb/cf Unit weight of concrete 144.0 lb/cf Riser Data Length Width Area Inside domensions 4.00 ft 4.00 ft 16.0 SF Outside dimensions 5.00 ft 5.00 ft 25.0 SF Cross sectional riser area 9.0 SF Riser inside height 4.0 ft Volume of concrete in riser 36 CF Riser base area 25.0 SF (same as riser outside dimensions) Riser base thickness 0.5 ft Volume of concrete in base 13 CF Total volume of concrete in riser+base 49 CF Total bouyant weight of riser 3,958 lbs Water displaced by riser 100 CF Weight of water displaced 6,240 lbs Anti-Flotation Block Data Length of anti-flotation block 6.0 ft Width of anti-flotation block 6.0 ft Thickness of anti-flotation block 1.5 ft Volume of anti-flotation block 54 CF Total weight of anti-flotation block 7,776 lbs Factor of Safety Weight of riser+anti-flotation block 11,734 lbs Weight of water displaced by riser 6,240 lbs Factor of safety against flotation 1.88 APPENDIX D ENERGY DISSIPATER/RIPRAP APRON CALCS Forest Hills Subdivision DESIGN OF RIPRAP OUTLET PROTECTION FES 100 August 8, 2023 OUTLET FLOWRATE 58.4 cfs PIPE DIAMETER 42 inches OUTLET PIPE SLOPE 1.50 % NUMBER OF PIPES 1 PIPE SEPARATION 0 feet ZONE FROM GRAPH 3 PIPE AREA 9.62 sq. ft. FLOW VELOCITY 11.1 ft/sec MATERIAL NCDOT Class I riprap LENGTH 28.00 feet WIDTH 10.50 feet STONE DIAMETER 13 inches THICKNESS 22 inches Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity 6 - • i �. ' Ili , -- t .\; , . I1 ; Tom' I I 1 ; I ; I • • 1 -T- 4- ,� , 1I , , , { , IK' ae 6 .rd " 1 i 0• S 10 15' 20 25 DIAMETER (Ft.) Forest Hills Subdivision DESIGN OF RIPRAP OUTLET PROTECTION FES 200 August 8, 2023 OUTLET FLOWRATE 24.3 cfs PIPE DIAMETER 30 inches OUTLET PIPE SLOPE 2.80 % NUMBER OF PIPES 1 PIPE SEPARATION 0 feet ZONE FROM GRAPH 3 PIPE AREA 4.91 sq. ft. FLOW VELOCITY 11.4 ft/sec MATERIAL NCDOT Class I riprap LENGTH 20.00 feet WIDTH 7.50 feet STONE DIAMETER 13 inches THICKNESS 22 inches Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity 6 - • i �. ' Ili , -- t .\; , . I1 ; Tom' I I 1 ; I ; I • • 1 -T- 4- ,� , 1I , , , { , IK' ae 6 .rd " 1 i 0• S 10 15' 20 25 DIAMETER (Ft.) Forest Hills Subdivision DESIGN OF RIPRAP OUTLET PROTECTION SCM1 January 2, 2024 OUTLET FLOWRATE 140.0 cfs PIPE DIAMETER 24 inches OUTLET PIPE SLOPE 1.00 % NUMBER OF PIPES 1 PIPE SEPARATION 0 feet ZONE FROM GRAPH 2 PIPE AREA 3.14 sq. ft. FLOW VELOCITY 11.4 ft/sec MATERIAL NCDOT Class B riprap LENGTH 12.00 feet WIDTH 6.00 feet STONE DIAMETER 6 inches THICKNESS 22 inches Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class II 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full-flow velocity 6 — • i Ililf -- I 1 ; Tom' I I 1I ; I I • • 1 ; -T- 4- ,� , 1I , , , { , IK' ae 6 .rd " 1 i 0• S 10 15' 20 25 DIAMETER (Ft.) APPENDIX E SNAP TOOL OUTPUT Project Information Complete this sheet if required by your reviewing authority. Contact them for any questions. Grey boxes/text are optional. SNAPv4.2.0 LOCATION Project Name(optional): Forest Hills Parcel ID(optional): Submission Date(optional): date Nutrient Management Watershed: Tar Pamlico menu Local Jurisdiction/Reviewing Agency: State/Federal menu Subwatershed: Upper_Tar_River menu Project Latitude Coordinates(optional): N Phosphorus Delivery Zone: Tar- Upper 03020101 menu Project Longitude Coordinates(optional): W Nitrogen Delivery Zone: Tar- Upper 03020101 menu — PROJECT DETAILS Development Land Use Type: Single Family Residential menu Disturbed Area: 1,325,000 ft2 Part of Common Development Plan? no yin Project Activity: New Development menu Designated Downtown Area? no y/n Project Drains to SA Waters? no yin Public Linear Road/Sidewalk Project? .no yin Pre-Project Land Use: fallow/open menu Project Owner Type: Private menu 1 Project Description(optional): STORMWATER DETAILS (Falls ONLY)Onsite Reduction%Req. % Project Uses LID/Runoff Volume Match? y/n Existing BUA/Development Onsite? yin Local Gov't nutrient req's same as State? yin Local Gov't cutoff date for Existing BUA: date Project Drains to Regional SCM? yin Nitrogen Export Rate Target: 2.20 Ib/ac/yr Total Nitrogen Offset Credits Needed: Ib/yr Phosphorus Export Rate Target: 0.80 Ib/ac/yr Total Phosphorus Offset Credits Needed: Ib/yr SNAP v4.2.0 Project Area and Offsite Land Cover Characteristics Precipitation Louisburg Station: Copy i Paste VALUES ONLY for Best Results Click here to scroll down to error messages on this sheet. PROJECT AREA LAND COVERS TN EMC (mg/L) TP EMC (mg/L) Pre-Project Area (ft2) Post-Project Area (ft2) Change pre-to-post(ft2) 1 Roof 1.18 0.11 187,475 187,475 Roadway 1.64 0.34 113,600 113,600 Parking/Driveway/Sidewalk 1.42 0.18 58,550 58,550 Protected Forest 0.97 0.03 0 Managed Pervious/Landscaping 2.48 1.07 1,773,375 1,388,575 -384,800 Offsite or Existing Roof 1.18 0.11 0 Offsite or Existing Roadway 1.64 0.34 0 Offsite or Existing Parking/Driveway/Sideww 1.42 0.18 0 Offsite Protected Forest 0.97 0.03 0 • Offsite Managed Pervious 2.48 1.07 564,825 564,825 0 CUSTOM LAND COVER 1 0 CUSTOM LAND COVER 2 0 CUSTOM LAND COVER 3 0 LAND TAKEN UP BY SCM 1.18 0.11 25,175 25,175 Total (Regulated & UnReg)Area 2,338,200.00 2,338,200.00 Project (Regulated)Area 1,773,375.00 1,773,375.00 SCM Characteristics Stormwater Control Measure (SCM) Characteristics Click here too to Copy a Paste VALUES ONLY SCM101's Land Cover Data SNAP v4.2.0 for Best Results Catchment ID 1 1 1 Drains to Drains to SCM ID 101 102 103 7 Type of SCM Wet Pond rHydrologic soil group at SCM location C ' SCM Description Wet pond ftDesign Storm Size(inches/24hrs) 1.00 ■ Percent of Full Size 100% Annual Effluent 72% 0% 0% Annual Overflow 16% 0% 0% I. %Annual ET/Infiltrated 13% 0% 0% ElCustom%Annual Effluent I r� Custom%Annual Overflow rCustom%Annual ET/Infiltrated mil l SCM Effluent TP EMC(mg/L) 0.13 0.00 0.00 III SCM Effluent TN EMC(mg/L) 0.86 0.00 0.00 ■ Custom Effluent TP EMC 1.1 Custom Effluent TN EMC r SCM Land Cover TP EMC(mg/L) 0.11 0.00 0.00 L SCM Land Cover TN EMC(mg/L) 1.18 0.00 0.00 rThis SCM Drains to Numbered SCM 0 0 0 Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 101 SCM 102 SCM 103 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics L. Error Check-Min/Max Size: lim Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: - SCM ID: 101 102 103 TArea Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 101 (ft2) SCM 102 (ft2) SCM 103 (ft2) Roof 145,425 Roadway 113,600 Parking/Driveway/Sidewalk 58,250 Protected Forest Managed Pervious/Landscaping 759,725 Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidewalk Offsite Protected Forest Offsite Managed Pervious 564,825 CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM 25,175 TOTAL AREA DRAINING TO SCM (ft2): 1,667,000 0 0 CATCHMENT AREA(ft2): 1,667,000 SCM Characteristics Stormwater Control Meast. Click here too to Click here too back to the Click here to review Errors Summary Data top SNAP v4.2.0 I . Catchment ID 2 2 2 Drains to Drains to SCM ID 201 > 202 > 203 r Type of SCM 1 Hydrologic soil group at SCM location 1 SCM Description 1 Design Storm Size(inches/24hrs) L_ Percent of Full Size [ I I I Mom %Annual Effluent 0% 0% 0% M %Annual Overflow 0% 0% 0% I. %Annual ET/Infiltrated - 0% 0% 0% . Custom %Annual Effluent F-- Custom %Annual Overflow ICustom %Annual ET/Infiltrated SCM Effluent TP EMC(mg/L) 0.00 0.00 0.00 SCM Effluent TN EMC (mg/L) _J 0.00 0.00 0.00 . Custom Effluent TP EMC . Custom Effluent TN EMC rSCM Land Cover TP EMC(mg/L) 1 0.00 0.00 0.00 1 SCM Land Cover TN EMC(mg/L) I 0.00 0.00 0.00 1 This SCM Drains to Numbered SCM 0 0 0 L Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 201 SCM 202 SCM 203 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: SCM ID: 201 202 203 Area Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 201 (ft2) SCM 202(ft2) SCM 203(ft2) Roof Roadway Parking/Driveway/Sidewalk Protected Forest Managed Pervious/Landscaping Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidew Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft2): 0 0 0 CATCHMENT AREA(ft2): 0 SCM Characteristics Stormwater Control Measi SNAP v4.2.0 I . Catchment ID 3 3 3 Drains to Drains to SCM ID 301 > 302 > 303 r Type of SCM hydrologic soil group at SCM location ' SCM Description ' Design Storm Size(inches/24hrs) Percent of Full Size %Annual Effluent 0% 0% 0% M %Annual Overflow 0% 0% 0% I. %Annual ET/Infiltrated ill 0% 0% 0% Custom%Annual Effluent ITCustom%Annual Overflow Custom%Annual ET/Infiltrated 111.1 SCM Effluent TP EMC(mg/L) 0.00 0.00 0.00 SCM Effluent TN EMC(mg/L) J 0.00 0.00 0.00 Custom Effluent TP EMC Custom Effluent TN EMC r SCM Land Cover TP EMC(mg/L) 1 0.00 0.00 0.00 SCM Land Cover TN EMC(mg/L) I 0.00 0.00 0.00 This SCM Drains to Numbered SCM 0 0 0 L Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 301 SCM 302 SCM 303 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: SCM ID: 301 302 303 Area Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 301 (ft2) SCM 302(ft2) SCM 303(ft2) Roof Roadway Parking/Driveway/Sidewalk Protected Forest Managed Pervious/Landscaping Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidew Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft2): 0 0 0 CATCHMENT AREA(ft2): 0 SCM Characteristics Stormwater Control Measi SNAP v4.2.0 I . Catchment ID 4 4 '\ 4 Drains to Drains to SCM ID 401 > 402 1/ 403 Type of SCM hydrologic soil group at SCM location ' SCM Description ' Design Storm Size(inches/24hrs) Percent of Full Size %Annual Effluent 0% 0% 0% M %Annual Overflow 0% 0% 0% I. %Annual ET/Infiltrated ill 0% 0% 0% Custom%Annual Effluent ITCustom%Annual Overflow Custom%Annual ET/Infiltrated 111.1 SCM Effluent TP EMC(mg/L) 0.00 0.00 0.00 SCM Effluent TN EMC(mg/L) J 0.00 0.00 0.00 Custom Effluent TP EMC Custom Effluent TN EMC r SCM Land Cover TP EMC(mg/L) 1 0.00 0.00 0.00 SCM Land Cover TN EMC(mg/L) I 0.00 0.00 0.00 This SCM Drains to Numbered SCM 0 0 0 L Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 401 SCM 402 SCM 403 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: SCM ID: 401 402 403 Area Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 401 (ft2) SCM 402(ft2) SCM 403(ft2) Roof Roadway Parking/Driveway/Sidewalk Protected Forest Managed Pervious/Landscaping Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidew Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft2): 0 0 0 CATCHMENT AREA(ft2): 0 SCM Characteristics Stormwater Control Measi SNAP v4.2.0 I . Catchment ID 5 5 5 Drains to Drains to SCM ID 501 > 502 > 503 Type of SCM hydrologic soil group at SCM location ' SCM Description ' Design Storm Size(inches/24hrs) Percent of Full Size %Annual Effluent 0% 0% 0% M %Annual Overflow 0% 0% 0% I. %Annual ET/Infiltrated ill 0% 0% 0% Custom%Annual Effluent ITCustom%Annual Overflow Custom%Annual ET/Infiltrated 111.1 SCM Effluent TP EMC(mg/L) 0.00 0.00 0.00 SCM Effluent TN EMC(mg/L) J 0.00 0.00 0.00 Custom Effluent TP EMC Custom Effluent TN EMC r SCM Land Cover TP EMC(mg/L) 1 0.00 0.00 0.00 SCM Land Cover TN EMC(mg/L) I 0.00 0.00 0.00 This SCM Drains to Numbered SCM 0 0 0 L Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 501 SCM 502 SCM 503 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: SCM ID: 501 502 503 Area Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 501 (ft2) SCM 502(ft2) SCM 503(ft2) Roof Roadway Parking/Driveway/Sidewalk Protected Forest Managed Pervious/Landscaping Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidew Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft2): 0 0 0 CATCHMENT AREA(ft2): 0 SCM Characteristics Stormwater Control Measi SNAP v4.2.0 I . Catchment ID 6 6 6 Drains to Drains to SCM ID 601 602 603 r Type of SCM hydrologic soil group at SCM location 1 SCM Description 1 Design Storm Size(inches/24hrs) Percent of Full Size I %Annual Effluent 0% 0% 0% M %Annual Overflow 0% 0% 0% I. %Annual ET/Infiltrated 0% 0% 0% Custom%Annual Effluent ITCustom%Annual Overflow Custom%Annual ET/Infiltrated 111.1 SCM Effluent TP EMC(mg/L) 0.00 0.00 0.00 SCM Effluent TN EMC(mg/L) J 0.00 0.00 0.00 Custom Effluent TP EMC Custom Effluent TN EMC r SCM Land Cover TP EMC(mg/L) 1 0.00 0.00 0.00 SCM Land Cover TN EMC(mg/L) I 0.00 0.00 0.00 This SCM Drains to Numbered SCM 0 0 0 L Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 601 SCM 602 SCM 603 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: SCM ID: 601 602 603 Area Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 601 (ft2) SCM 602(ft2) SCM 603(ft2) Roof Roadway Parking/Driveway/Sidewalk Protected Forest Managed Pervious/Landscaping Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidew Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM TOTAL AREA DRAINING TO SCM (ft2): 0 0 0 CATCHMENT AREA(ft2): 0 SCM Characteristics Stormwater Control Measi SNAP v4.2.0 I . Catchment ID SCM ID Type of SCM hydrologic soil group at SCM location ' SCM Description ' Design Storm Size(inches/24hrs) Percent of Full Size %Annual Effluent M %Annual Overflow I. %Annual ET/Infiltrated Custom%Annual Effluent ITCustom%Annual Overflow Custom%Annual ET/Infiltrated 111.1 SCM Effluent TP EMC(mg/L) SCM Effluent TN EMC(mg/L) Custom Effluent TP EMC Custom Effluent TN EMC rSCM Land Cover TP EMC(mg/L) SCM Land Cover TN EMC(mg/L) This SCM Drains to Numbered SCM LCatchment Routing I Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: IIIError Checks-SCM Type: ISCM ID: Allowable Total Land Use Total Land Use Area Post-Project Untreated SCM Drainage Area Land Covers z Area to be Treated Based z Treated By All SCMs (ft ) z Land Area (ft2) on Post-Project Areas (ft2) ..roof 145,425 187,475 42,050 Roadway 113,600 113,600 0 Parking/Driveway/Sidewalk 58,250 58,550 300 Protected Forest 0 0 0 Managed Pervious/Landscaping 759,725 1,388,575 628,850 Offsite or Existing Roof 0 0 0 Offsite or Existing Roadway 0 0 0 Offsite or Existing Parking/Driveway/Sidew 0 0 0 Offsite Protected Forest 0 0 0 Offsite Managed Pervious 564,825 564,825 0 CUSTOM LAND COVER 1 0 0 0 CUSTOM LAND COVER 2 0 0 0 CUSTOM LAND COVER 3 0 0 0 LAND TAKEN UP BY SCM 25,175 25,175 0 TOTAL AREA DRAINING TO SCM (ft2): 1,667,000 2,338,200 671,200 CATCHMENT AREA(ft2): Nutrient Export Summary Landcover Et SCM Data Review Errors/Advisories Avg Annual precip (in) = 45.63 Total (Regulated+ 2,338,200 Unregulated)Area (ft2)= Project (Regulated) 1,773,375 Area (ft2) = Net BUA(Project Area 359,625 Net BUA indicates new development or expansion. BUA only ft2)= Custom Landcovers are present: no Total Nitrogen Export Target 89.56 Scaled to Project Area (Ib/yr): Total Area Total Area Project Area Project Area (Onsite+ Post-Project Post-Project Nutrient Export Summary (Onsite Only) Offsite) before before Pre-Project Pre-Project Treatment Treatment _ I Area (All Landcover Types)(acres) 53.6777 40.7111 53.6777 40.7111 Percent Built-Upon Area(BUA) (%) 0% 0% 15% _I 15% Built-Upon Area (BUA)(sqft) 0 0 359,625 _ 272,753 Annual Runoff Volume(ft3/yr) 400,095 303,447 1,589,597 _ 1,492,948 Annual Runoff%Change I 297% _ 392% Total Runoff Change(cuft/yr) 1,189,501 1,189,501 Total Nitrogen EMC(mg/L) 2.48 2.48 1.59 1.53 _ Total Nitrogen Load Leaving Site(Ib/yr) 61.96 46.99 157.72 I 142.75 otal Nitrogen Loading Rate(Ib/ac/yr) 1.15 1.15 2.94 3.51 Total Nitrogen%Change Pre-to-Post 155% 204% Total Nitrogen Change(Ib/yr)Pre-to-Post 95.76 95.76 Total Phosphorus EMC(mg/L) 1.07 1.07 0.37 t 0.33 Total Phosphorus Load Leaving Site(Ib/yr) 26.73 20.27 37.09 30.63 LTotal Phosphorus Loading Rate(Ib/ac/yr) 0.50 0.50 0.69 0.75 Total Phosphorus%Change Pre-to-Post 39% _ 51% Total Phosphorus Change (Ib/yr)Pre-to-Post 10.36 10.36 L SCM/Catchment Summary SCM ID and Type Volume TN Reduction TP Reduction TN Out I TP Out Reduction(%) (%) (%) (Ibs/ac/yr) (Ibs/ac/yr) Catchment 1 12.66% 44.97% 57.47% 1.88 0.32 101:Wet Pond 12.66% 44.97% _ 57.47% 1.88 0.32 102:NA 0.00% 0.00% i 0.00% 0.00 0.00 103:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 2 0.00% 0.00% 0.00% 0.00 0.00 201:NA 0.00% 0.00% 0.00% 0.00 0.00 202:NA 0.00% 0.00% 0.00% 0.00 0.00 203:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 3 0.00% 0.00% 0.00% 0.00 0.00 301:NA 0.00% 0.00% 0.00% 0.00 0.00 302:NA 0.00% 0.00% _ 0.00% 0.00 0.00 303:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 4 0.00% 0.00% 0.00% 0.00 0.00 401:NA 0.00% 0.00% _ 0.00% 0.00 0.00 402:NA 0.00% 0.00% 0.00% 0.00 0.00 403:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 5 0.00% 0.00% _ 0.00% 0.00 0.00 501:NA 0.00% 0.00% 0.00% 0.00 0.00 502:NA 0.00% 0.00% 0.00% 0.00 0.00 503:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 6 0.00% 0.00% 0.00% 0.00 0.00 601:NA 0.00% 0.00% 0.00% 0.00 0.00 602:NA 0.00% 0.00% _ 0.00% 0.00 0.00 603:NA i 0.00% 0.00% 0.00% 0.00 0.00 SNAP v4.2.0 Errors/Advisories SCM Area (ft2) = 25,175 SCM Treated Area (ft2) = 1,667,000 Catchment Routing: No errors Treating Runoff from Offsite Area or Existing BUA drains to an SCM. See Existing BUA or Offsite: yes Users'Manual for instructions to determine nutrient reduction needs and reduction provided by SCMs. Disturbed Area (ft2) = 1,325,000 Total Phosphorus Export Target 32.57 Scaled to Project Area (Ib/yr): Total Area 1 Project Area Total Area Project Area Total Area Project Area Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project SCM-Treated SCM-Treated Untreated Untreated after Treatment after Treatment Area Only Area Only Areas Areas 53.6777 I 40.7111 38.2691 25.3025 15.4086 _ 15.4086 15% I 15% 19% 29% 6% 6% 359,625 _ 272,753 317,275 317,275 42,350 _ 42,350 1,419,367 ` 1,334,957 1,174,077 1,089,667 245,290 245,290 255% I 340% 1,019,272 1,031,510 1.12 1.12 0.98 0.97 1.75 + 1.75 98.85 92.81 72.03 65.98 26.82 I 26.82 1.84 2.28 1.88 2.61 1.74 1.74 60% 98% 36.89 �82 0.23 0.23 0.17 0.16 0.53 0.53 20.45 18.89 12.31 10.75 8.14 8.14 0.38 1 0.46 0.32 0.42 0.53 0.53 -23% -7% -6.28 -1.39 Falls Lake ONLY: Onsite Reduction Compliance Check Nitrogen Phosphorus Onsite%Reduction Requirement Export Target Scaled to Area(Ib/yr) 89.56 32.57 Export Load Post-Project Before Treatment 142.75 30.63 Total Reduction Need (Ib/yr) Onsite Reduction Need (Ib/yr) Onsite Export Target(Ib/yr) Project Area Post-Project After Treatment 92.81 18.89 Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form SNAP v4.2.0 Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: http://deq.nc.gov/about/divisions/water-resources/planning/non poi nt-sou rce-ma nagement/n utrient-offset-information PROJECT INFORMATION Applicant Name: Project Name: Forest Hills Project Address: Date: (mm/dd/yyyy) Development Land Use Type: Single Family Residential • County: Project Activity Type: New Development Project Area(sqft): 1,773,375 Project Latitude: 0.000000 Post-Project Built-Upon Area%: 15.38% Project Longitude: 0.000000 WATERSHED INFORMATION Nutrient Management Watershed: Tar Pamlico N Target Export Rate(Ib/ac/yr): 2.20 Subwatershed: Upper_Tar_River P Target Export Rate(Ib/ac/yr): 0.80 Nitrogen Delivery Zone: Tar-Upper 03020101 Nitrogen Delivery Factor: 100% Phosphorus Delivery Zone: Tar-Upper 03020101 Phosphorus Delivery Factor: 100% PERMANENT NUTRIENT OFFSET REQUEST Post-Project Nitrogen Calculations-Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TN Export TN Remaining TN Permanent Additional Total TN TN Untreated TN Treated TN Delivery Offsets Permanent Load(Ib/yr) Target Load Load(Ib/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(lb/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 142.8 89.6 92.8 3.2 100.0% 3.2 3.2 Post-Project Phosphorus Calculations-Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TP Export TP Remaining TP Permanent Additional Total TP TP Untreated TP Treated TP Delivery Offsets Permanent Load(Ib/yr) Target Load Load(Ib/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) Offsets(Ib/yr) (Ib/yr) i Buy(Ib/yr) 30.6 32.6 18.9 0.0 100.0% 0.0 0.0 LOCAL GOVERNMENT AUTHORIZATION Local Government Name:I Staff Name: Phone: Staff Email: Date: Local Government Authorizing Signature: APPENDIX F SUPPORTING DOCUMENTATION NOAA PFDS RAINFALL DATA 8/16/2019 P recipitation Frequency Data Server NO AA Atlas 14,Volume 2,Version 3 RALEIG H DURHAM WSFO AP w*OF Station ID: 31-7069 f-V Location name: M crrisville, North Carolina, USA* • Latitude: 35.8706°, Longitude: -78.7864° i ltillif % �!i Elevation: �'"`°°` Elevation(station metadata):416 ft** ., *source:ESRI M Ts **source:USG S PO NT PRECIPITATIO NFREQ LENCY ESTIMATES G M.Bonnin,D.M atin,B.Lin,T.Parzybok,M Yekta,and D.Riley NO PA,National Weather Service,Silver Spring,M ayland PF tabular I PF graphical I M Ts & aerials PF tabular PDS-based point precipitation frequency estimates w th 90% confidence intervals (in inches)1 LAverage recurrence interval(years) Duration - 1 2 5'I I _I 0 2 5 5 0 1 00 2 00 5 00 1000 5-m in 0.394 0.461 0.530 0.587 0.647 0.689 0.727 0.758 0.792 0.819 (0.362-0.429) (0.423-0.503) (0.487-0.577) (0.539-0.639) (0.591-0.703) (0.626-0.748) (0.657-0.789) (0.682-0.825) (0.707-0.862) (0.724-0.892) 10-m it 0.630 0.738 0.848 0.939 1.03 1.10 1.16 1.20 1.25 I 1.29 (0.578-0.686) (0.677-0.804) (0.780-0.924) (0.861-1.02) (0.941-1.12) (0.998-1.19) (1.04-1.25) (1.08-1.31) (1.12-1.36) (1.14-1.41) 15-m n 0.787 0.927 1.07 1.19 1.31 1.39 1.46 1.52 1.58 1.62 (0.723-0.857) (0.850-1.01) (0.987-1.17) (1.09-1.29) (1.19-1.42) (1.26-1.51) (1.32-1.59) (1.36-1.65) (1.41-1.72) (1.43-1.76) 30-m n 1.08 1.28 1.53 1.72 1.94 2.09 2.24 2.36 2.51 2.62 (0.991-1.18) (1.18-1.40) (1.40-1.66) (1.58-1.87) (1.77-2.10) (1.90-2.27) (2.02-2.43) (2.12-2.57) (2.24-2.73) (2.32-2.86) 60-m n 1.35 1.61 1.96 2.24 2.58 2.84 3.08 I 3.31 3.60 3.83 (1.24-1.47) (1.47-1.75) (1.80-2.13) (2.06-2.44) (2.35-2.80) (2.58-3.08) (2.78-3.35) (2.98-3.60) (3.21-3.92) (3.38-4.17) 2-hr 1.56 1.86 2.29 2.65 3.08 3.43 3.76 4.09 4.51 4.84 (1.42-1.71) (1.71-2.04) (2.09-2.51) (2.40-2.90) (2.78-3.36) (3.09-3.74) (3.36-4.11) (3.64-4.46) (3.97-4.92) (4.23-5.29) 3-hr 1.65 1.98 2.44 2.84 3.33 3.75 4.15 4.56 5.11 5.55 (1.51-1.81) (1.81-2.17) (2.23-2.68) (2.59-3.10)J (3.02-3.64) I (3.38-4.09) I (3.71-4.53) (4.06-4.97) (4.49-5.57) (4.83-6.06) 6-hr 2.00 2.39 2.95 3.44 4.06 4.57 5.09 5.62 1 6.33 6.92 (1.84-2.18)_ (2.20-2.61) (2.72-3.22) (3.15-3.74) (3.70-4.40) (4.14-4.96) (4.57-5.51) (5.00-6.08) (5.56-6.85) (6.01-7.50) 12-hr 2.37 2.84 3.52 4.11 4.89 5.56 6.22 6.93 7.88 8.69 (2.19-2.58) (2.62-3.09) (3.24-3.82) (3.78-4.47) (4.46-5.30) (5.03-5.98) (5.58-6.70) I (6.13-7.45) (6.87-8.47) (7.46-9.35) 24-hr 2.83 3.42 4.27 4.94 5.84 6.55 7.27 8.01 9.01 9.79 (2.65-3.04)_ (3.20-3.67) (3.99-4.58) (4.61-5.29) (5.43-6.25) (6.08-7.01) (6.73-7.80) (7.39-8.60) (8.28-9.69) (8.97-10.6) 2-day 3.26 3.92 4.86 5.58 6.55 7.31 8.07 8.85 9.90 10.7 (3.04-3.50) (3.66-4.22) (4.53-5.23) (5.19-6.00) (6.08-7.05) (6.76-7.86) (7.45-8.70) (8.14-9.54) (9.06-10.7) (9.77-11.6) 3-day 3.45 4.14 5.10 5.86 6.87 7.67 8.47 9.29 10.4 11.2 (3.22-3.70) (3.86-4.44) (4.76-5.48) (5.46-6.29) (6.38-7.38) (7.11-8.24) (7.83-9.12) (8.55-10.0) (9.53-11.2) (10.3-12.1) 4-day 3.63 4.35 5.35 6.13 7.19 8.03 8.88 9.73 10.9 11.8 (3.40-3.90) (4.07-4.67) (5.00-5.73) (5.73-6.58) (6.69-7.72) (7.45-8.61) (8.21-9.54) (8.97-10.5) (9.99-11.7) (10.8-12.7) 7-day 4.21 5.02 6.10 6.95 8.10 9.01 9.94 10.9 12.2 13.2 (3.96-4.50) (4.72-5.36) (5.73-6.51) (6.52-7.42) (7.57-8.65) (8.40-9.63) (9.23-10.6) (10.1-11.7) (11.2-13.1) (12.1-14.2) 10-day 4.79 5.69 6.83 7.72 8.92 9.86 10.8 11.8 13.1 14.1 (4.50-5.11) (5.35-6.07) (6.41-7.29) (7.24-8.23) (8.35-9.52) (9.20-10.5) (10.1-11.6) I (10.9-12.6) (12.1-14.0) i (12.9-15.1) 1 20-day 6.39 7.54 8.90 9.98 11.5 12.6 13.8 15.0 16.6 17.8 (6.01-6.82) (7.09-8.04) (8.36-9.50) (9.36-10.7) (10.7-12.2) (11.8-13.5) (12.8-14.8) (13.9-16.0) (15.3-17.8) (16.3-19.2) 30-day 7.93 9.33 10.8 12.0 13.5 14.7 15.9 17.1 18.6 19.8 (7.48-8.44) (8.78-9.92) (10.2-11.5) (11.3-12.8) (12.7-14.4) (13.8-15.7) (14.8-17.0) (15.9-18.2) (17.3-20.0) (18.3-21.3) 45-day 10.1 11.8 13.6 I 14.9 I 16.6 1 17.9 19.2 20.5 22.1 23.4 (9.61-10.7) (11.3-12.5) (12.9-14.3) I, (14.1-15.7) (15.7-17.5) 1, (16.9-18.9) (18.1-20.4) (19.2-21.7) (20.7-23.5) 1 (21.8-24.9) 1 60-day 12.2 14.2 16.0 17.4 19.2 20.5 21.8 23.1 24.7 25.9 (11.6-12.8) (13.5-14.9) (15.2-16.8) (16.5-18.3) (18.2-20.2) (19.4-21.7) (20.6-23.1) (21.8-24.4) (23.2-26.2) (24.3-27.5) 1 Precipitation frequency(PF)estim des in this table are based on frequency analysis of partial duration series(PDS). Num hers in parenthesis are PF estim des at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estim axes(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estim des at upper bounds are not checked against probable m adm un precipitation(PM P)estim des and m ay be higher than currently valid PM Pvalues. Please refer to NO PA Atlas 14 docum art for m cre inform aion. Back to Top https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htm Pst=nc&sta=31-7069&data=depth&units=english&series=pds 1 /4 8/16/2019 P recipitation Frequency Data Server PF graphical PDS-based depth-duration-frequency (DDF) curves Latitude: 35.8706°, Longitude: -78.7864° 30 1 I I I I I oil I 1 1 1 1 ' Average recurrence 25 interval (years) t _c 20 2 a v I 5 c 15 1004 25 p 50 .O 10 - too ai a 200 5 _ 500 0 — . C C• _ C_ C_ C_ - - - 6- I- >, >.>, >+ A T A TT E E E c E ry A 6 N v v v-o -0 -o v v v-o IA Oo in M o .-I N r rV 4 r- O N o in v o ID Duration 30 25 -- -- '2 L Duration lEE EP — 2-day— 3-da.-...... - — 4-day — 7-day— 10-day— 20-day— 30-day— 45-day— 60-day 0 I I I I I I I - 24-hr 1 2 5 10 25 50 100 200 500 1000 — Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT): Fri Aug 16 18:48:37 2019 Back to Top M aps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htm Pst=nc&sta=31-7069&data=depth&units=english&series=pds 2 /4 8/16/2019 P recipitation Frequency Data Server arch Triangle Park 5 RA LEIG H DURHAM INTL IRPORT Ralam In tI Airport i- _ II 3km ' Y'fr - 2mi / — ^- 91 tI.;ca t Ir9 Large scale terrain 0 iston-Sal em • • Durham Rocky Mount Greensboro �i�eleigh • • RTH CARCLINA Greenville •Charlotte + Fayetteville• •Jacksonvill 1i Large scale map I instonS lem o Greensboro rham /� 'Rocky Mount 0 091aleigh Greenville ® North Carolina ariotte Fa PttFvill, CIN. 100km Jacksonville n 60m i Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?st=nc&sta=31-7069&data=depth&units=english&series=pds 3 /4 8/16/2019 P recipitation Frequency Data Server N Winston-Salem • • Greensboro Durham• Rocky Mount Raleigh • • Greenville North Carolina • Charlotte • Fayetteville 111 100km • Jacksonville 60m i Back to Top US Departm Ent of Corn m ece National 0 manic and Atm cspheric Adm histration National Weather Service National Water Center 1325 East West Highway Silver Spring,M D20910 Q testions?:HDSC.Q testions@noaa.gov Disclaim e https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htm Rst=nc&sta=31-7069&data=depth&units=english&series=pds 4 /4 NRCS DOCUMENTATION Chapter 2 Estimating Runoff Technical Release 55 Urban Hydrology for Small Watersheds Table 2-2a Runoff curve numbers for urban areas 1i Curve numbers for ------------------ Cover description ----------------- -----hydrologic soil group------- Average percent Cover type and hydrologic condition impervious area 22 A B C D Fully developed urban areas (vegetation established) Open space(lawns,parks,golf courses,cemeteries,etc.)a': Poor condition(grass cover<50%) 68 79 86 89 Fair condition(grass cover 50%to 75%) 49 69 79 84 Good condition(grass cover>75%) 39 61 74 80 Impervious areas: Paved parking lots,roofs,driveways,etc. (excluding right-of-way) 98 98 98 98 Streets and roads: Paved;curbs and storm sewers(excluding right-of-way) 98 98 98 98 Paved;open ditches(including right-of-way) 83 89 92 93 Gravel(including right-of-way) 76 85 89 91 Dirt(including right-of-way) 72 82 87 89 Western desert urban areas: Natural desert landscaping(pervious areas only) v 63 77 85 88 Artificial desert landscaping(impervious weed barrier, desert shrub with 1-to 2-inch sand or gravel mulch and basin borders) 96 96 96 96 Urban districts: Commercial and business 85 89 92 94 95 Industrial 72 81 88 91 93 Residential districts by average lot size: 1/8 acre or less(town houses) 65 77 85 90 92 1/4 acre 38 61 75 83 87 1/3 acre 30 57 72 81 86 1/2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acres 12 46 65 77 82 Developing urban areas Newly graded areas (pervious areas only,no vegetation)5' 77 86 91 94 Idle lands(CN's are determined using cover types similar to those in table 2-2c). 1 Average runoff condition,and Ia=0.2S. 2 The average percent impervious area shown was used to develop the composite CN's.Other assumptions are as follows:impervious areas are directly connected to the drainage system,impervious areas have a CN of 98,and pervious areas are considered equivalent to open space in good hydrologic condition.CN's for other combinations of conditions may be computed using figure 2-3 or 2-4. 3 CN's shown are equivalent to those of pasture.Composite CN's may be computed for other combinations of open space cover type. 4 Composite CN's for natural desert landscaping should be computed using figures 2-3 or 2-4 based on the impervious area percentage (CN=98)and the pervious area CN.The pervious area CN's are assumed equivalent to desert shrub in poor hydrologic condition. 5 Composite CN's to use for the design of temporary measures during grading and construction should be computed using figure 2-3 or 2-4 based on the degree of development(impervious area percentage)and the CN's for the newly graded pervious areas. (210-VI-TR-55,Second Ed.,June 1986) 2-5 Chapter 2 Estimating Runoff Technical Release 55 Urban Hydrology for Small Watersheds Table 2-2c Runoff curve numbers for other agricultural lands 11 Curve numbers for ----------------------------- Cover description --------- hydrologic soil group--------- Hydrologic Cover type condition A B C D Pasture,grassland,or range—continuous Poor 68 79 86 89 forage for grazing.21 Fair 49 69 79 84 Good 39 61 74 80 Meadow—continuous grass,protected from — 30 58 71 78 grazing and generally mowed for hay. Brush—brush-weed-grass mixture with brush Poor 48 67 77 83 the major element.3i Fair 35 56 70 77 Good 30 v 48 65 73 Woods—grass combination(orchard Poor 57 73 82 86 or tree farm).5/ Fair 43 65 76 82 Good 32 58 72 79 Woods.si Poor 45 66 77 83 Fair 36 60 73 79 Good 30 v 55 70 77 Farmsteads—buildings,lanes,driveways, — 59 74 82 86 and surrounding lots. 1 Average runoff condition,and Ia=0.2S. 2 Poor: <50%)ground cover or heavily grazed with no mulch. Fair: 50 to 75%ground cover and not heavily grazed. Good: >75%ground cover and lightly or only occasionally grazed. 3 Poor: <50%ground cover. Fair: 50 to 75%ground cover. Good: >75%ground cover. 4 Actual curve number is less than 30;use CN=30 for runoff computations. 5 CN's shown were computed for areas with 50%woods and 50%grass(pasture)cover.Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor: Forest litter,small trees,and brush are destroyed by heavy grazing or regular burning. Fair: Woods are grazed but not burned,and some forest litter covers the soil. Good: Woods are protected from grazing,and litter and brush adequately cover the soil. (210-VI-TR-55,Second Ed.,June 1986) 2-7 Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Sheet flow For sheet flow of less than 300 feet,use Manning's kinematic solution(Overtop and Meadows 1976)to Sheet flow is flow over plane surfaces.It usually compute Tt: occurs in the headwater of streams.With sheet flow, 0 8 the friction value(Manning's n)is an effective rough- _ 0.007(nL) ness coefficient that includes the effect of raindrop Tt (P 10.5 s0 4 [eq.3-3] impact;drag over the plane surface; obstacles such as 2 litter,crop ridges,and rocks;and erosion and trans- where: portation of sediment.These n values are for very shallow flow depths of about 0.1 foot or so.Table 3-1 Tt = travel time(hr), gives Manning's n values for sheet flow for various n = Manning's roughness coefficient(table 3-1) surface conditions. L = flow length(ft) P2 = 2-year, 24-hour rainfall(in) s = slope of hydraulic grade line Table 3-1 Roughness coefficients(Manning's n)for (land slope,ft/ft) sheet flow This simplified form of the Manning's kinematic solu- Surface description n li tion is based on the following: (1)shallow steady uniform flow, (2)constant intensity of rainfall excess Smooth surfaces(concrete,asphalt, (that part of a rain available for runoff), (3)rainfall gravel,or bare soil) 0.011 duration of 24 hours,and(4)minor effect of infiltra- Fallow(no residue) 0.05 tion on travel time.Rainfall depth can be obtained Cultivated soils: from appendix B. Residue cover<_20% 0.06 Residue cover>20% 0.17 Shallow concentrated flow Grass: Short grass prairie 0.15 After a maximum of 300 feet,sheet flow usually be- Dense grasses 2J 0.24 comes shallow concentrated flow.The average veloc- Bermudagrass. 0.41 ity for this flow can be determined from figure 3-1,in Range(natural) 0.13 which average velocity is a function of watercourse Woods:3i slope and type of channel.For slopes less than 0.005 Light underbrush 0.40 ft/ft,use equations given in appendix F for figure 3-1. Dense underbrush 0.80 Tillage can affect the direction of shallow concen- trated flow.Flow may not always be directly down the 1 The n values are a composite of information compiled by Engman watershed slope if tillage runs across the slope. (1986). 2 Includes species such as weeping lovegrass,bluegrass,buffalo grass,blue grams grass,and native grass mixtures. After determining average velocity in figure 3-1,use 3 When selecting n,consider cover to a height of about 0.1 ft.This equation 3-1 to estimate travel time for the shallow is the only part of the plant cover that will obstruct sheet flow. concentrated flow segment. Open channels Open channels are assumed to begin where surveyed cross section information has been obtained,where channels are visible on aerial photographs, or where blue lines(indicating streams)appear on United States Geological Survey(USGS)quadrangle sheets. Manning's equation or water surface profile informa- tion can be used to estimate average flow velocity. Average flow velocity is usually determined for bank- full elevation. (210-VI-TR-55,Second Ed.,June 1986) 3-3