Loading...
HomeMy WebLinkAboutNCC223550_MODIFICATION Supporting Doc (ADDL LOTS)_20231229 Engineering Department Wake Forest Town Hall—3rd Floor 301 S Brooks Street TOWN of Wake Forest, NC 27587 WAKE FOREST P:919-435-9510 www.wakeforestnc.gov EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL December 29,2023 Lennar ATTN: Robert Smart 1100 Perimeter Park Dr Morrisville, NC 27560 RE: Project Name: Rosedale Permit Number: 2023-00003061 Location: • 1500 Foal Run Trl • 1502 Foal Run Trl • 1504 Foal Run Trl • 1506 Foal Run Trl • 1508 Foal Run Trl • 1512 Foal Run Trl • 1514 Foal Run Trl • 1516 Foal Run Trl • 1518 Foal Run Trl • 1520 Foal Run Trl • 1674 White Rose Ln • 1678 White Rose Ln • 1682 White Rose Ln • 1675 White Rose Ln • 1671 White Rose Ln • 1679 White Rose Ln • 5541 Mill Dam Rd • 5545 Mill Dam Rd • 5549 Mill Dam Rd • 1840 Winter Jasmine Ln • 1844 Winter Jasmine Ln • 1848 Winter Jasmine Ln • 1837 Winter Jasmine Ln • 1841 Winter Jasmine Ln • 1845 Winter Jasmine Ln Acres Approved:3.39 Submitted By: Agnieszka Nau Date Approved: December 29,2023 Created with idtPlans Review Rosedale Page 1 of 2 12/29/23 Dear Robert Smart: This office has reviewed the subject erosion and sedimentation control plan.We find the plan to be acceptable and hereby issue this Letter of Approval.The land disturbance permit will be issued after you have obtained a Certificate of Coverage,as outlined below, and provided a copy to this office.The land disturbance permit shall expire two(2)years from the date of issuance and can be renewed in one-year increments. Per Section 12.3.2 of the Unified Development Ordinance(UDO),a copy of the approved erosion control plan shall be on file at the job site.Also,this letter provides you notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973,this office may require revisions to the plans and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal,State,and Local water quality laws, regulations,and rules.This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form.You are requested to file an amended form if there are any changes in the information. Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities).The Town does not distribute the NCG01 permit; instead,you will have to obtain the permit from NC DEMLR.To receive a Certificate of Coverage,you must submit an electronic Notice of Intent with this approval letter.The NCG01 permit requires that the following documentation be kept on file at the job site: • The approved E&SC plans as well as any approved deviations • The NCG01 permit and the Certificate of Coverage • Records of inspections made during the previous 12 months Sincerely, )¢aa.‘.c2 0)&46;14- Jessica Watkins Engineering Technician Created with idtPlans Review Rosedale Page 2 of 2 12/29/23