Loading...
HomeMy WebLinkAboutSWA000229_Application Form_20231228 3. The Applicant is the (check all that apply): ® Property Owner ❑ Lessee (Attach a copy of the lease agreement& complete Item 4.) [' Purchaser(Attach a copy of the pending sales agreement&complete Item 4.) ❑ Developer(Attach a copy of the development agreement&complete Item 4.) 4. If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant IS the Property Owner): Property Owner Name/Organization:Empowered to Succeed Ministries Signing Official &Title:Debra Stewart(Registered Agent) Street Address:PO Box 1743 City:Dunn State:NC Zip:28334 Mailing Address (if applicable):141 Union Grove Church Road City:Dunn State:NC Zip:28334 Phone: (919) 890-1160 Fax: ( Email:stewartdebra81@gmail.com 5. The licensed Design Professional that will be retained for the duration of the project, who may provide information on the Applicant's behalf, and who will prepare and certify the as-built package: Consulting Engineer/Landscape Architect:J. Stephen Janowski Consulting Firm: Rivers &Associates, Inc. Mailing Address:107 E. Second Street City:Greenville State:NC Zip:27835 Phone: (919 ) 594-1626 Fax: ( Email:sjanowski@riversandassociates.com 6. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name &Title: Organization: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( Email: E. PROJECT INFORMATION 1. Specify the type of project(check one): ❑ Low Density ® High Density 2. Briefly summarize how the stormwater runoff will be treated/conveyed: Stormwater for this development will be conveyed to a wet detention pond through permanent ditches and stormwater sewer pipes and detailed in the plans. 3. Stormwater runoff from this project drains to the Cape Fear River basin(s). 4. Receiving water information (if more than 3 receiving waters, provide additional information on an attached sheet): Receiving Receiving Receiving Water 1 Water 2 Water 3 Receiving Stream Name Mngo Swamp Stream Classification C;Sw Stream Index Number 18-68-12-2 Stormwater Fast Track ATC Application Form Page 3 of 9 Feb. 10, 2018 5. Project area and density information: Total Property Area 273,121 sf Total Surface Water Area 0 sf Considered to include: • the normal pool of impounded structures; • the area between the banks of streams and rivers;and • the area below the Normal High Water(NHW)line or Mean High Water(MHW)line. Total Coastal Wetlands Area 0 sf Considered to include: coastal wetlands landward from the NHW(or MHW)line. Total Project Area 273,121 sf Excludes the surface water area and coastal wetland area identified above. May or may not be the same as Property Area. Built-Upon Area (BUA)associated with Existing Development 0 sf "Existing development"means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 58,549 sf Includes proposed new BUA that is not associated with existing development. "BUA"is defined in N.C.G.S. 143-214.7(b2). It includes, but is not limited to:buildings, roads,parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H.1050(1). Project Density w/Existing Development: Project Density=[New BUA]/[Total Project Area—Existing BUA]x 100 or 21.4% w/o Existing Development: Project Density=[New BUA]/Total Project Area]x 100 6. Anticipated construction start date 09/01/2024 7. Is the project located within 5 miles of a public airport? ® No ❑ Yes If`Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.pdf and DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Track ATC Application Form Page 4 of 9 Feb. 10, 2018