Loading...
HomeMy WebLinkAboutNCC233766_ESC Approval Submitted_20231221 Nadeen Dashti From: Jones,Jerry R <Randall.Jones@deq.nc.gov> Sent: Friday, December 15, 2023 9:27 AM To: Biles, Lyn; Nadeen Dashti Subject: FW: NC DEMLR - FROF Application Approval, Stevens Towing Site Expansion (Express) CRM:0109025 Attachments: Certificate of Approval - Friday, December 15, 2023 917 AM.docx; NCG01 Fact Sheet_Rev 2022_v2.pdf Follow Up Flag: Follow up Flag Status: Flagged Categories: Current Forwarding sediment permit. (New email format) J. Randall Jones, Jr., PE Environmental Engineer Division of Energy, Mineral, and Land Resources Department of Environmental Quality 252-948-3900 office (primary) 919-280-0148 work cell randall.jones@deq.nc.gov 943 Washington Square Mall Washington, NC 27889 awry a hwra.nwwa Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov> Sent: Friday, December 15, 2023 9:25 AM To: Stevens Towing Co of NC, LLC<simon@ebarge.net> Cc:Jones,Jerry R<Randall.Jones@deq.nc.gov>; Pullinger, Robert C<chris.pullinger@deq.nc.gov>; Dumpor,Samir <samir.dumpor@deq.nc.gov> Subject: NC DEMLR- FROF Application Approval, Stevens Towing Site Expansion (Express) CRM:0109025 1 0, SfAT ` MAY zqaA 44 1.;51 (1.1 essemil( 12. �776 ? QLIAM V10t North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 12-15-2023 LETTER OF APPROVAL Stevens Towing Co. of NC, LLC Attn: Mr. Simon Rich, Ill, General Manager 125 Dye Plant Rd Edenton, North Carolina 27932 RE: Project Name: Stevens Towing Site Expansion Acres Approved: 5.0 Application ID: PA-001786 Permit Number:CHOWA-2024-0100 Address: Dye Plant Rd City: Edenton County: Chowan River Basin: Chowan Stream Classification: B: Primary Contact Recreation, Fresh Water; NSW: Nutrient Sensitive Waters Plan Type: New Plan (Express) 2 Dear Mr. Rich, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1.The approved E&SC plan as well as any approved deviation. 2.The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, J. Randall Jones,Jr, PE for Samir Dumpor, PE North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section 3 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington NC, 27889 r�oRrr C�uaourw 252-946-6481 grr Orrrt d EIwYwwMel Orr•Ir Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 4