Loading...
HomeMy WebLinkAboutNCC233754_ESC Approval Submitted_20231220 0 siAr ROY COOPER. (gr . Governor µ, +' a ELIZABETHS...BISER ski „:20 we Secretary414 ;Oe+: WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality November 2, 2023 LETTER OF APPROVAL Garman Homes,LLC ATTN: Stacy Brown 2501 Renaissance Park Place, Suite 200 Cary':NC 27513 RE: Project Name: Serenity Lots for Garman Homes-Lots 144-170&248-268 Acres Approved: 7.64 Project ID: HARNE-2024-018 County: Harnett ' City: Hectors Creek Towship Address: Piney Grove Rawls Road River Basin: Cape Fear Stream Classification: HQW Submitted by: McKim&Creed,Inc. Date Received by LQS: August 21,2023 Plan Type: NEW-Residential Dear Sir/Madam: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act(hereinafter"Act")states that this plan must be filed a minimum of 30 days(15 days for revised plans)prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days(15 days for revised plans)of receipt of G.S. 113A-54.1.The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day(15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. C .+ ".:DE North Carolina Department of Eczvirnnmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regianal Office f 225 Green Street,Suite Z14I Fayetteville,North Carolina 28301 ond...ma b... .ndm 92raIIy _ jelell 910.33,3300 Title 15A NCAC 4B.0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 12 months. This letter gives the notice required by G.S. 1I3A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties.If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations,and rules.In addition, local city or county ordinances or rules may also apply to this land-disturbing activity.This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition,it would be helpful if you notify this office of the proposed starting date for this project.Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, v. othy I,.I,aBo far E Regional Engineer DEMLR Enclosures: Certificate of Approval McKim&Creed,Inc.(via email) Jay Sikes, Harnett County(via email) Fayetteville Regional Office—DEMLR file Fayettev ''� North Carolina.DepartmentilleRe gionalOffi of225 EnvironmentalGretStreet Quality l 4 Division( Fayettev of EnergyilleNorth,MineralCarolina and Land2$301 Resources '/QRTf-t,HOl,IMA ce. n . , MINIrbIltht al ellfrOnnViltdi°vu' eV/ 910.4'33.3300 v