November 2, 2023
LETTER OF APPROVAL
Garman Homes,LLC
ATTN: Stacy Brown
2501 Renaissance Park Place, Suite 200
Cary':NC 27513
RE: Project Name: Serenity Lots for Garman Homes-Lots 144-170&248-268
Acres Approved: 7.64
Project ID: HARNE-2024-018
County: Harnett
' City: Hectors Creek Towship
Address: Piney Grove Rawls Road
River Basin: Cape Fear
Stream Classification: HQW
Submitted by: McKim&Creed,Inc.
Date Received by LQS: August 21,2023
Plan Type: NEW-Residential
Dear Sir/Madam:
The subject erosion and sedimentation control plan has been approved by default. The Sedimentation
Pollution Control Act(hereinafter"Act")states that this plan must be filed a minimum of 30 days(15 days
for revised plans)prior to the activity and the approving authority must approve or disapprove the submitted
plan within 30 days(15 days for revised plans)of receipt of G.S. 113A-54.1.The Act further states that if
the approving authority fails to approve or disapprove the submitted plan within the 30-day(15 days for
revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be
posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no
land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic
Notice of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete,you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive
the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project,you MUST obtain the about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future,the new responsible party must obtain a
new COC.
C .+ ".:DE
North Carolina Department of Eczvirnnmental Quality I Division of Energy,Mineral and Land Resources
Fayetteville Regianal Office f 225 Green Street,Suite Z14I Fayetteville,North Carolina 28301
ond...ma b... .ndm 92raIIy _ jelell 910.33,3300
Title 15A NCAC 4B.0118(a)and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
This letter gives the notice required by G.S. 1I3A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties.If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations,and rules.In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity.This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land-disturbance, as called for on the
application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee.In addition,it would be helpful if you notify
this office of the proposed starting date for this project.Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
v.
othy I,.I,aBo far E
Regional Engineer
DEMLR
Enclosures: Certificate of Approval
McKim&Creed,Inc.(via email)
Jay Sikes, Harnett County(via email)
Fayetteville Regional Office—DEMLR file
Fayettev
''� North Carolina.DepartmentilleRe gionalOffi
of225 EnvironmentalGretStreet
Quality
l 4 Division( Fayettev of EnergyilleNorth,MineralCarolina and Land2$301 Resources
'/QRTf-t,HOl,IMA
ce. n . ,
MINIrbIltht al ellfrOnnViltdi°vu' eV/ 910.4'33.3300
v