HomeMy WebLinkAboutNCC233748_Site Plan or Location Map_20231220 EROSION CONTROL PLAN
PIN: 9850-90-3099
DAYID JORDAN FITZNUGiH CONSTRUCTION TIME FRAME
KAREN WANG FI ITZI IU N 8 MOS.(AUG 2023-MAR 2024 PIN: 9159-99-6989
LIMIT OF DISTURBANCE ROB CAPONE, TRUSTEE
LOT 1 18,900 SQ FT MAUREEN KOWI, TRUSTEE
TRIPLE CROWN FARMS LOT6
DB 6135-I1O9 TRIPLE CROWN FARMS
PB 119-I12-116 DIE 6121-808
PB 119-112-1I6
p,N
PIN: 9159-89-183 `\M\� CO.9OQ SO-
PATRICIA
PATRICIA K SZOGAS O r _
LOT 2 5IRNI4AM WOODS
DB 5516-456 CV
PB 39-8 c\i\�)
p f0
1
/ Si' p 5� t� PRO OSa■,
440 8 TCIC vpr-
.//r1121REQUIRED GROUND STABILIZATION TIMEFRAME
DStablize within this
lit - •"\ t� Site Area Description many calender days Timeframe Variations
PROPOSED - x after ceasing land
DWELLING disturbance
ONCRET / (a)Perimeter dikes
al WASHO
1411 TWISTED OAK DR. swales,ditches,and 7 None
��„� BH2NHAM WOODS SUBDIVISION perimeter slopes
LOT 1 (b)High Quality
PROPOSED CHAPEL HILL NC Water(HQZ)Zones 7 None
—0 WELL �� CHAPEL HILL TOWNSHIP If slopes are 10'or less in length
ET (c)Slopes Steeper
r co. „IO UNIVERSTY LAKE PROTECTED WATERSHED than 3:1 7 and are not steeper than 2:1 14
/ /- days are allowed
�O SCALE=1"=30'0" 7 days for slopes greater 50'in
ili LTFENCE length and with slopes steeper
SILTFENC
(d)Slopes 3:1 to 4:1 14 than 4-1 7 days for perimeter
ZIII SILTFENC dikes,swales,ditches,perimeter
I7�� slopes and HOW Zones 10 days
for Fall's Lake Watershed
OUTLET DISTURBED AREAS 7 days for perimeter dikes,
I CALCULATED FROM swales,ditches,perimeter slopes
P _ 111 Q P - tl,
_ POLYAGONAL MEASUREMENT (e)Area with slopes 1d and HQWZone 10 days for Falls
�� Rai - it flatter than 4-1
Z� Lake Watershed unless there is
ilgoie HOUSE 3,100 zero slpoe
DRIVE AND WALKS 12,150 Note:After the permanent cessation of construction activities,any areas with
` ADDITIONAL CLEARING 2,444 temporary ground stabilization shall be converted to permanent ground
stabilization as soon as practicable but in no case longer than 90 calender days
OR • TOTAL OF LAND DISTURBANCE 18,900 after the last land disturbing activity.Temprary ground stilization shall be
if
UG��O maintained in a manner to render the surface stable against acclerated eriosion
GP GON$ � �'0 5 —EAM BU ER until permanent ground stabilization is achieved.
Z4" R, CONSTRCCTION ENTRANCE
- 14'X 20'X 6"ABC STONE ON COMPACTED EARTH
% imp KEEP GRADE TO MAX.3%
20 X 14 CONSTRUC . ON
Ilk )1,
7-14 DAY STABILIZATION TIMETABLE
ENTRANCE
SEE ATTACHED SILTFENCE DETAILS 2
�O
4/