Loading...
HomeMy WebLinkAboutNCC233748_Site Plan or Location Map_20231220 EROSION CONTROL PLAN PIN: 9850-90-3099 DAYID JORDAN FITZNUGiH CONSTRUCTION TIME FRAME KAREN WANG FI ITZI IU N 8 MOS.(AUG 2023-MAR 2024 PIN: 9159-99-6989 LIMIT OF DISTURBANCE ROB CAPONE, TRUSTEE LOT 1 18,900 SQ FT MAUREEN KOWI, TRUSTEE TRIPLE CROWN FARMS LOT6 DB 6135-I1O9 TRIPLE CROWN FARMS PB 119-I12-116 DIE 6121-808 PB 119-112-1I6 p,N PIN: 9159-89-183 `\M\� CO.9OQ SO- PATRICIA PATRICIA K SZOGAS O r _ LOT 2 5IRNI4AM WOODS DB 5516-456 CV PB 39-8 c\i\�) p f0 1 / Si' p 5� t� PRO OSa■, 440 8 TCIC vpr- .//r1121REQUIRED GROUND STABILIZATION TIMEFRAME DStablize within this lit - •"\ t� Site Area Description many calender days Timeframe Variations PROPOSED - x after ceasing land DWELLING disturbance ONCRET / (a)Perimeter dikes al WASHO 1411 TWISTED OAK DR. swales,ditches,and 7 None ��„� BH2NHAM WOODS SUBDIVISION perimeter slopes LOT 1 (b)High Quality PROPOSED CHAPEL HILL NC Water(HQZ)Zones 7 None —0 WELL �� CHAPEL HILL TOWNSHIP If slopes are 10'or less in length ET (c)Slopes Steeper r co. „IO UNIVERSTY LAKE PROTECTED WATERSHED than 3:1 7 and are not steeper than 2:1 14 / /- days are allowed �O SCALE=1"=30'0" 7 days for slopes greater 50'in ili LTFENCE length and with slopes steeper SILTFENC (d)Slopes 3:1 to 4:1 14 than 4-1 7 days for perimeter ZIII SILTFENC dikes,swales,ditches,perimeter I7�� slopes and HOW Zones 10 days for Fall's Lake Watershed OUTLET DISTURBED AREAS 7 days for perimeter dikes, I CALCULATED FROM swales,ditches,perimeter slopes P _ 111 Q P - tl, _ POLYAGONAL MEASUREMENT (e)Area with slopes 1d and HQWZone 10 days for Falls �� Rai - it flatter than 4-1 Z� Lake Watershed unless there is ilgoie HOUSE 3,100 zero slpoe DRIVE AND WALKS 12,150 Note:After the permanent cessation of construction activities,any areas with ` ADDITIONAL CLEARING 2,444 temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calender days OR • TOTAL OF LAND DISTURBANCE 18,900 after the last land disturbing activity.Temprary ground stilization shall be if UG��O maintained in a manner to render the surface stable against acclerated eriosion GP GON$ � �'0 5 —EAM BU ER until permanent ground stabilization is achieved. Z4" R, CONSTRCCTION ENTRANCE - 14'X 20'X 6"ABC STONE ON COMPACTED EARTH % imp KEEP GRADE TO MAX.3% 20 X 14 CONSTRUC . ON Ilk )1, 7-14 DAY STABILIZATION TIMETABLE ENTRANCE SEE ATTACHED SILTFENCE DETAILS 2 �O 4/