Loading...
HomeMy WebLinkAboutNCC233675_ESC Approval Submitted_20231218 city of OI'1ifJ e 300 W Crowell Street, Monroe, NC 28112 Engineering monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 December 8,2023 Brian Johnson Mattamy Carolina Corporation 2127 Ayrsley Town Blvd., Suite 202 Charlotte,NC 28273 RE: LETTER OF APPROVAL EROSION AND SEDIMENT CONTROL SUBMITTAL Project Name: Blair Place Submittal No.: PREN202202303 Disturbed Area: 35.33 Acres Location: 2514 Fowler Secrest Road Submitted by: Matthew Kirchner,P.E. Date Received: December 1,2023 New Submittal: Revision: X Dear Mr. Johnson: The City of Monroe Engineering Department has reviewed the subject erosion and sedimentation control plan. The noted plan has been reviewed and is found to be acceptable; therefore, you are issued this Letter of Approval and Certificate of Plan Approval. Plan approvals shall expire within three(3)years following the date of this approval if no land disturbing activity has been undertaken, as required by the City of Monroe Code of Ordinance Chapter 158.16(G). The Certificate of Approval,NCGO1 permit, Certificate of Coverage (COC) and record of inspections must be posted at a conspicuous location on the job site. The erosion control permit can be issued prior to an approved Stormwater Management Permit once all erosion control requirements are met. However, any changes to the plan during the Stormwater Management Permit approval process that significantly alters the erosion control plan shall be addressed through a revision submittal. The developer proceeds at their own risk prior to receiving all approvals associated with site development.If you proceed prior to approval of all plans you are doing so at your own risk. Please contact the Permit Center to ensure you have all approvals needed to begin. Chapter 158.16(H)of the City Ordinance requires that a copy of the approved erosion control plan be on file at the job site. In addition,the City maintains the right of entry for periodic inspection as indicated in Chapter 158.17(D) of the City Ordinance and by the G.S. 113A-61.1(a). This letter is due notice of such inspection. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. city of OI'1ifJ e 300 W Crowell Street, Monroe, NC 28112 Engineering monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land disturbing activity. This approval does not supersede any other permit or approval. The erosion control permit can be issued prior to an approved Stormwater Management Permit once all erosion control requirements are met. However, any changes to the plan during the Stormwater Management Permit approval process that significantly alters the erosion control plan shall be addressed through a revision submittal. The developer proceeds at their own risk prior to receiving all approvals associated with site development. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. Please notify us to set up a preconstruction meeting prior to disturbing any land. If a preconstruction is not set up it will be a violation. Sincerely, Tonya Griffin Engineering Associate—Plan Review cc: Zachary Ross, City of Monroe-Erosion Control Inspector, 300 West Crowell St.,Monroe,NC 28112 Matthew Kirchner,P.E.,Eagle Engineering, 2013A Van Buren Avenue,Indian Trail,NC 28079 File