HomeMy WebLinkAboutNCC233693_ESC Approval Submitted_20231215 em�ss.— ,,.stait ,„
ROY COOPER -=
Governor '� �- c�'
\&4:1
ELIZABETH S.BISER �,�,� � _, ,a,
Secretaryc,.,,,,v ,x s
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
December 13, 2023
LETTER OF APPROVAL WITH MODIFICATIONS •
Anchor Land Investments,LLC
ATTN: John Licktieg,Land Development Manager
8620 River Road
Wilmington,NC 28412
RE: Project Name: Eagle Cove Subdivision
Acres Approved: 71.90
Project ID: CUMBE-2024-757
County: Cumberland, City: Hope Mills, Address: Corporation Drive
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Drafting and Design Services,Inc.
Date Received by DEMLR: November 15, 2023
Plan Type: New—Residential
Dear Mr. Licktieg:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval
shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken,
as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will
be required(G.S. 113A-54.1)(b).
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit. After the form is reviewed and found to be complete,you will receive a link with payment
instructions for the$120 annual permit fee. After the fee is processed,you will receive the COC via email.
As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain
the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Paul Clark at paul.clark@ncdenr.gov.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three business
days. A$120 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to
the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in
the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO 1 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
tJ' ..-4, North Carolina Department of Enviromental Quality I Division of Energy.Mineral and Land Resources
Fayetteville Regional Office I22S Greenn Street,Suite 71d I Fayetteville,North.Catalina 28301
NON":F:CtJ,i.IJN=.
Department at EmUaaaceaWi aver 910.433.3300
Letter of Approval with Modifications
Anchor Land Investments,LLC
December 13,2023
Page 2 of 2
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land-disturbance, as called for on the
application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee.In addition,it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
41647.4/49
Evangelyn Lowery-Jacobs
Environmental Engineer
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
ec: Michael T. Blakley,Drafting and Design Services, Inc.
David Reeves, Town of Hope Mills Inspections Office
cc: DEMLR-Fayetteville Regional Office
Letter of Approval with Modifications
Anchor Land Investments,LLC
December 13,2023
Page 2 of 2
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Eagle Cove Subdivision
Project Number: CUMBE-2024-757
County: CUMBERLAND
Provide two full-size copies of plan sheets corresponding to the e-mail/PDF received in the DEMLR office
on December 12,2023, prior to beginning any land disturbing activity.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities