Loading...
HomeMy WebLinkAboutNCC233672_ESC Approval Submitted_20231213 1 ate • 441* ! ROY COOPER 1;-.*d r. �\ E -,F Governor s� �tl'` ELIZABETH S.BISER * Secretary 'Ra,014,0 'r BRIAN WRENN NORTH CAROLINA Director Environmental Quality November 10, 2022 LETTER OF APPROVAL WITH MODIFICATIONS The Reserve at Barefoot Landing, LLC ATTN: Mr. Edward Johnson P.O. Box 3608 Mooresville, NC 28117-3608 RE: Project Name: THE RESERVE AT BAREFOOT LANDING Acres Approved: 26.8 Project ID: MCDOW-2023-009 County: McDowell City: Marion Address: Upton Landing Rd. River Basin: Catawba Stream Classification: Forsyth Creek- Class C Submitted By: JMG &Associates, LLC - Mr. John Gast, PE Date Received by LQS: October 14, 2022 Plan Type: Institutional Dear Mr. Johnson, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received,you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. D „_ North Carolina Department of Environmental Quality # Division of Energy,Mineral and Land Resources ,) Asheville Regional Office 12090 US.Highway 70 I Swannanoa,North Carolina 28778 u .MaEnwwauw\ /l/ 828.296.4500 Letter of Approval with Modification Mr. Edward Johnson November 10, 2022 Page 2 of 5 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, J 4 Fred Walker, PE Engineer III Division of Energy, Mineral, and Land Resources Letter of Approval with Modification Mr. Edward Johnson November 10, 2022 Page 3 of 5 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Mr. John Gast, PE (jgast5@gmail.com) Ms. Shawna Riddle - NCDEQ LQS (shawna.riddle@ncdenr.gov) Mr. Landon Davidson, PG - NCDEQ DWR (landon.davidson@ncdenr.gov) Mr. Joey Winston - NCDEQ DWR 'oe .winston@ncdenr. og_v) cc: Regional Office file } pf ki Letter of Approval with Modification Mr. Edward Johnson November 10, 2022 Page 4 of 5 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: THE RESERVE AT BAREFOOT LANDING Project ID: MCDOW-2023-009 County: McDowell For final plan approval please provide to this office the requested documents and revised plan sets that address the comments listed below. Construction activities can not begin for this project until final approval is received from the Asheville Regional Office Land Quality Section. 1. Provide revised notarized Financial Responsibility/Ownership form with Parts A.9, B.1, and B.2.(a) completed to match information on file with the N.C. Secretary of State. {G.S. 113A-54.1.(a)} 2. Provide copy of current deed. {G.S. 113A-54.1.(a)) 3. Provide construction details for all proposed E&SC measures. {G.S. 113A-57.3) 4. Due to proximity to receiving trout stream remove generic fertilizer rates and instruct contractor to apply fertilizer per soil test recommendations. Provide detail for soil preparation. {G.S. 113A-57.3} 5. Provide proposed contours for the entire site. {G.S. 113A-57.4} 6. Provide all design runoff calculations for E&SC measure sizing and supporting documentation. A 25-year design storm event is required for runoff calculations. {15A NCAC 04B .0108} 7. Due to proximity to receiving stream and size of drainage area super silt fence must be used for perimeter control. {G.S. 113A-57.3} 8. Provide a phased approach in the construction sequencing to limit the extent of acreage open at one time. {15A NCAC 04B .0106(a)(3)} 9. Stream buffers are measured from top of bank, show top of bank for perineal stream and required stream buffer. {15A NCAC 04B .0106(a)(1)} 10. Provide permanent outlet structures for stormwater system. {15A NCAC 04B .0106(a)(4)) 11. Revise construction sequence to include the following language: notify NCDEQ LQS inspector 48 hrs before project starts; for larger or complex add phasing to sequence a maximum limit of_acres, including any clearing and grubbing. Please include in the sequence that any clearing and grubbing, shall be limited to the active -acre phase. Prior to moving into the next phase, all erosion and sediment control measures specified on the next phase must be installed. Sediment basins and traps must be stabilized immediately upon construction. Once all measures on the next phase have been installed and the active phase has been stabilized, construction activities may progress into the next phase; for larger phased projects, a site inspection should be requested at the completion of each phase of land- . disturbance. A new phase may not be disturbed until a Sedimentation Inspection Report is issued documenting that the previous phase has adequate temporary or Letter of Approval with Modification Mr. Edward Johnson November 10, 2022 Page 5 of 5 permanent ground cover; install inlet protection by the end of the workday for all constructed SW inlets; specify order in which significant E&SC measures must be installed and related areas in which they protect i.e. TCE, then perimeter controls, stabilized outlets, then conveyances, proceed with clearing and grubbing for Phase X, install additional measures X, then XX, then XXX for Phase Il, continue to add stabilization and seeding for areas not stabilized; site must be "storm ready" before any extended breaks in construction activities including weekends. {15A NCAC 04B .0106(a)(3)} 12. Provide verification that post-construction stormwater permitting has been approved, applied for, or is not required for this project. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities 0 fD C CD `� lz n -. ¢ 0 el a = 2 Cfl N = ►-dE .p. p -• �' (11) P:/ cr © A, �h " �- A' rD N c O O v H )111.1 NliNIND et) CD . p n H ` 1 o � CDC = CD L a CD ° y M Uc\ BEAT r w cL, L__ o C oln 11: la -. ,..4. 0_, AJC) = O O cp A_ O A, J J „t cA 4 5 Iz• )-i :5 CD 5 cA P.,: = c ° A, L.74--1 P7li CAD l44 ti e•,- = n w — ,..1 ›. . . 1:3 C 8' ,) C n -.. ... -p. - �" ° n vt = 2 ,� n I N y MI' AD = ;DI) W =.' Cr = c CD (7 1 f•D5 )7:$: ; 00 7:1= G i9 O CA �- o `- CID