Loading...
HomeMy WebLinkAboutNCC233674_ESC Approval Submitted (2)_20231213 N CDEMLR - FRO FApplication Approval with Modifications Needed CRM:0133005 SVC_DoNotReply-DEQ term its <DoNotReply-DEQ l:?rm its@deq.nc.gov> Thu 11/30/2023 2:05 PM To:Lake Lure Cam Aground, LLC <tim @ en be rglowoutdoorresort.com>;Tim Murphy <tim @ er berglowoutdoorresort.com> Cc:Dzioba,TaNeesha C <taneesha.dzioba@deq.nc.gov>;Sham blin, Bryan <bryan.sham blin@deq.nc.gov>;Christiansen, Laura N <laura.christiansen@deq.nc.gov> 0 1 attachments(108 KB) Certificate of Approval 11-30-2023.pdf; .‘,‘,, if-lr•CIATaN ., q +° Si., t.� PRIf IZ I l l 4 .i ' M V QUA North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 11-30-2023 Lake Lure Cam Aground, LLC 95 Pinewood Trail M ill Spring, NC 28756 RE: Project Name Em berglow 0 Ltdoor Resort RV Expansion Acres Approved: 1.8 Application ID: PA-001409 P erm it Number: PO IK-2024-00101 Address: Rock Spring Road (SR 1311) City: Mill Spring County: Polk River Basin: Broad Stream Classification:C:Aquatic Life, Secondary Contact Recreation, Fresh water Plan Type: Corn m eecial Dear Lake Lure Cam pground, LLC, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with m odifications and hereby issue this Letter of Approval with Modifications. The M odifications Required for Approval are listed on the attached page.The Certificate of Approval m ust be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNO) form requesting a Certificate of Coverage (CO g under the NCG010000 Construction General Perm it.After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual perm it fee.After the fee is processed, you will receive the CO Cvia em ail.As the Financially Responsible Party shown on the FRO form sabm fitted for this project,you M UST obtain the CO C prior b Gorn m eicem ent of any land disturbing activity.The eNO [form mg b e a ccessed a tdeq.nc.gov/NCG01. Please d irectquestions a bout t heeNO [form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a newCO C Title 15A NCAC 4B .0118(a) and the NCG01 perm it require that the following documentation be kept on file at the job site: 1. The approved E&S plan as well as any approved deviation. 2. The NCG01 perm it and the CO C once it is received. 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure corn pliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is perform mce-oriented, requiring protection of existing natural resources and adjoining properties. If,following the corn m eicem ent of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure corn pliance with the Act. Acceptance and approval of this plan is conditioned upon your corn pliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other perm it or approval. Please note that this approval is based in part on the accuracy of the inform ation provided in the Financial Responsibility/0 wiership Form,which you provided. You are requested to file an am ended form if there is any change in the information included on the form. This perm it allows for a land-disturbance, as called for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a violation of this perm it and may require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Modifications Required for Approval: Hatch or color on the plans where the 7-or 14-day ground stabilization requirem efts apply per Section [[.B.2 of the perm t and for inspection, recordkeeping,and reporting requirem eats Provide construction and m antenance details for the proposed silt fence outlets. Your cooperation is appreciated. Sincerely, Laura Christiansen, El North Carolina Department of Environmental Q Lality Division of Energy, Mineral & Land Resources Land Q uality Section Enclosures: Certificate of Approval M odifications Required for Approval North Carolina Department of Environm eital Q uality I Division of Energy, Mineral and Land Resources Asheville Regional 0 fice 12090 U.S.70 Highway 1 Swannanoa NC,28778-8211 aErre � 828 296 4500 Em al correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.