HomeMy WebLinkAboutNCC233674_ESC Approval Submitted (2)_20231213 N CDEMLR - FRO FApplication Approval with Modifications Needed CRM:0133005
SVC_DoNotReply-DEQ term its <DoNotReply-DEQ l:?rm its@deq.nc.gov>
Thu 11/30/2023 2:05 PM
To:Lake Lure Cam Aground, LLC <tim @ en be rglowoutdoorresort.com>;Tim Murphy <tim @ er berglowoutdoorresort.com>
Cc:Dzioba,TaNeesha C <taneesha.dzioba@deq.nc.gov>;Sham blin, Bryan <bryan.sham blin@deq.nc.gov>;Christiansen, Laura N
<laura.christiansen@deq.nc.gov>
0 1 attachments(108 KB)
Certificate of Approval 11-30-2023.pdf;
.‘,‘,, if-lr•CIATaN .,
q +° Si.,
t.� PRIf IZ I l l 4 .i
' M V QUA
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
11-30-2023
Lake Lure Cam Aground, LLC
95 Pinewood Trail
M ill Spring, NC 28756
RE: Project Name Em berglow 0 Ltdoor Resort RV Expansion
Acres Approved: 1.8
Application ID: PA-001409
P erm it Number: PO IK-2024-00101
Address: Rock Spring Road (SR 1311)
City: Mill Spring
County: Polk
River Basin: Broad
Stream Classification:C:Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: Corn m eecial
Dear Lake Lure Cam pground, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
m odifications and hereby issue this Letter of Approval with Modifications. The M odifications Required for Approval are
listed on the attached page.The Certificate of Approval m ust be posted at the job site. This plan approval shall expire
three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNO) form requesting a Certificate of Coverage (CO g under the NCG010000 Construction General Perm it.After the form
is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual perm it
fee.After the fee is processed, you will receive the CO Cvia em ail.As the Financially Responsible Party shown on the FRO
form sabm fitted for this project,you M UST obtain the CO C prior b Gorn m eicem ent of any land disturbing
activity.The eNO [form mg b e a ccessed a tdeq.nc.gov/NCG01. Please d irectquestions a bout t heeNO [form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the
new responsible party must obtain a newCO C
Title 15A NCAC 4B .0118(a) and the NCG01 perm it require that the following documentation be kept on file at the job site:
1. The approved E&S plan as well as any approved deviation.
2. The NCG01 perm it and the CO C once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure corn pliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is perform mce-oriented, requiring protection of existing natural
resources and adjoining properties. If,following the corn m eicem ent of this project,the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure
corn pliance with the Act.
Acceptance and approval of this plan is conditioned upon your corn pliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity.
This approval does not supersede any other perm it or approval.
Please note that this approval is based in part on the accuracy of the inform ation provided in the Financial
Responsibility/0 wiership Form,which you provided. You are requested to file an am ended form if there is any change in
the information included on the form. This perm it allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this perm it and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Modifications Required for Approval:
Hatch or color on the plans where the 7-or 14-day ground stabilization requirem efts apply per Section [[.B.2 of the
perm t and for inspection, recordkeeping,and reporting requirem eats
Provide construction and m antenance details for the proposed silt fence outlets.
Your cooperation is appreciated.
Sincerely,
Laura Christiansen, El
North Carolina Department of Environmental Q Lality
Division of Energy, Mineral & Land Resources
Land Q uality Section
Enclosures: Certificate of Approval
M odifications Required for Approval
North Carolina Department of Environm eital Q uality I Division of Energy, Mineral and Land Resources
Asheville Regional 0 fice 12090 U.S.70 Highway 1 Swannanoa NC,28778-8211
aErre � 828 296 4500
Em al correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.