November 27,2023
Paramounte Engineering,Inc.
122 Cinema Drive
Wilmington,NC 28403
Attn: Mr. Robert Balland,PE
RE: Myrtle Grove Village
Dear Mr. Balland:
We have reviewed the application and submittal package for the above referenced project and have issued
a stormwater permit. Any deviations from the approved plans will require re-submission. Deviations may
be requested but may not be constructed without the issuance of a revised stormwater permit. All other
local, state, and federal permits will be obtained before starting work.
The approval issued by the County is that the application and supporting documents are complete and in
accordance with the requirements of the ordinance. Nothing whatsoever in the approval should be
construed as or be deemed to create additional duties on the part of the County of New Hanover that are
the responsibilities of the Owner and the design professional.
If there is a need for a change in ownership, an"Ownership Change Form"must be submitted and a fee of
$100.00 will be required.
Please be advised,if the land disturbance exceeds one acre,the project will need a Sedimentation&
Erosion Control Permit prior to the disturbance.
Please note:
1. The owner shall arrange for adequate construction observation by a design professional who
shall, upon project completion, certify upon completion of the construction required by the
stormwater permit, the design professional's certification must be delivered to the County. The
County may visit the project and observe the progress of the work. However, nothing
whatsoever in the visit and observation of the project should be construed as or be deemed to
create additional duties on the part of the County of New Hanover that are the responsibilities
of the Owner and the Design Professional.
2. The County shall not allow final plats to be recorded and certificates of occupancies to be
issued for and project(s) until the County has accepted the construction completion
certification, or until a surety in the form and amount acceptable to the County has been
posted by the Owner. Certificates of occupancies cannot be issued until temporary and/or
permanent drainage facilities have been installed and have been certified as being sufficient to
protect the proposed improvements by the Design Professional.
If you have any questions regarding the foregoing information,please contact our office.
Sincerely,
Digitally signed by Galen M Jamison,PE
r�DN:C=US,E=gjamison@nhogov.00m,OU=New
Galen M Jamison, PEnover County Engineering,CN="Galen M Jamison,
Date12023.11.27 13:45:35-05'00'
Galen M. Jamison,PE
Chief Project Engineer
New Hanover County
GMJ/pdj