Loading...
HomeMy WebLinkAboutNCC233561_ESC Approval Submitted (2)_20231201 c',vN'Y."� NEW HANOVER COUNTY 44, 0'i ENGINEERING _ 230 Government Center Drive, Suite 160,Wilmington, NC 28403 I- ill2 i I`00 P:(910)798-7139 I F: (910)798-7805 I NHCgov.com 4/ABLISHEo'� Tim Lowe, County Engineer November 27,2023 Paramounte Engineering,Inc. 122 Cinema Drive Wilmington,NC 28403 Attn: Mr. Robert Balland,PE RE: Myrtle Grove Village Dear Mr. Balland: We have reviewed the application and submittal package for the above referenced project and have issued a stormwater permit. Any deviations from the approved plans will require re-submission. Deviations may be requested but may not be constructed without the issuance of a revised stormwater permit. All other local, state, and federal permits will be obtained before starting work. The approval issued by the County is that the application and supporting documents are complete and in accordance with the requirements of the ordinance. Nothing whatsoever in the approval should be construed as or be deemed to create additional duties on the part of the County of New Hanover that are the responsibilities of the Owner and the design professional. If there is a need for a change in ownership, an"Ownership Change Form"must be submitted and a fee of $100.00 will be required. Please be advised,if the land disturbance exceeds one acre,the project will need a Sedimentation& Erosion Control Permit prior to the disturbance. Please note: 1. The owner shall arrange for adequate construction observation by a design professional who shall, upon project completion, certify upon completion of the construction required by the stormwater permit, the design professional's certification must be delivered to the County. The County may visit the project and observe the progress of the work. However, nothing whatsoever in the visit and observation of the project should be construed as or be deemed to create additional duties on the part of the County of New Hanover that are the responsibilities of the Owner and the Design Professional. 2. The County shall not allow final plats to be recorded and certificates of occupancies to be issued for and project(s) until the County has accepted the construction completion certification, or until a surety in the form and amount acceptable to the County has been posted by the Owner. Certificates of occupancies cannot be issued until temporary and/or permanent drainage facilities have been installed and have been certified as being sufficient to protect the proposed improvements by the Design Professional. If you have any questions regarding the foregoing information,please contact our office. Sincerely, Digitally signed by Galen M Jamison,PE r�DN:C=US,E=gjamison@nhogov.00m,OU=New Galen M Jamison, PEnover County Engineering,CN="Galen M Jamison, Date12023.11.27 13:45:35-05'00' Galen M. Jamison,PE Chief Project Engineer New Hanover County GMJ/pdj cc: ENERGOV# STMW-19-0050