Loading...
HomeMy WebLinkAboutNCC233541_ESC Approval Submitted_20231201 ROY COOPER o 4 Governor ELIZABETH S.BISER �\� Secretary kir � WILLIAM E. TOBY VINSON,JR. Interim Director NORTH CAROLINA Environmental Quality November 28, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Union Electric Membership Corporation Attention: Gregory S. Andress, Executive VP and General Manager 1525 Rocky River Road Monroe,North Carolina 28110 RE: Project Name: Trinity Substation Acres Approved: 9.79 Project ID: UNION-2020-006 County: Union, City: Monroe Address: Walters Mill Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Joe Ervin,PE, Pike Engineering, LLC Date Received by LQS: November 14, 2023 Plan Type: Revised Dear Mr. Andress: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOl) foini requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the faun is reviewed and found to be complete,you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 peiinit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 D ) 704-663-1699 Letter of Approval with Modifications Union Electric Membership Corporation November 28, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other peurrit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended four if there is any change in the information included on the form. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, fir Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Joe Ervin, PE Letter of Approval with Modifications Union Electric Membership Corporation November 28, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Trinity Substation Project ID: UNION-2020-006 County: Union 1. Plan revision was received to correct the Financial Responsible Entity name on the Financial Responsibility/Ownership Faun (FRO). clj 6 CZ CZ WC 04 E 1 0 01 et CA EMI te a ,cA °� CA 0 z N C--- ° c'aeFSc..) --.4 CAR � '4771'-i,'"t.' =`\/' . .2 en -1. -4-4,,,, c..) -- ps0 J :s , t ° fir. �z F ° • ° ° 4) 0 Ns w ° y ta ° ° . 1., -4., 4.1 ••=4 C0 (NI - - 0 ° 0