Loading...
HomeMy WebLinkAboutSWA000217_Stormwater Report_20231130 STORMWATER MANAGEMENT REPORT for LAUDER PARCEL Prepared for: Mattamy Homes, LLC. Highway NC 27 E Coats, NC 27521 Underfoot Project #: C22008.00 1st Submittal: April 21, 2023 2nd Submittal: November 29, 2023 ,. ,\N C A ROl/,,' p �oFE°ssioti.111 40 / 61. A°RCS ,: 11/29/2023 - Mike Roselli, PE 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 : NGINEERING TABLE OF CONTENTS TABLE OF CONTENTS 1 1. INTRODUCTION 2 1 .1 PROJECT INFORMATION 2 1 .2 PURPOSE 3 2. STORMWATER CALCULATIONS 4 2.1 STORMWATER MANAGEMENT REQUIREMENTS 4 2.2 HYDROLOGY METHODOLOGY 4 2.3 HYDRAULICS METHODOLOGY 5 2.4 PRE-POST METHODOLOGY 6 2.5 WATER QUALITY DESIGN 6 3. CONCLUSIONS 7 APPENDIX A: DRAINAGE AREA MAPS A APPENDIX B: FEMA FLOODPLAIN MAP B APPENDIX C: SOIL SURVEY REPORT AND MAP C APPENDIX D: SCM DESIGN CALCULATIONS D APPENDIX E: ROUTING CALCULATIONS E APPENDIX F: INLET CALCULATIONS F APPENDIX G: EROSION CONTROL CALCULATIONS G Forward Thinking. Grounded Design. www.underfootengineering.com 1 I I underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 1i ENGINEERING 1 . INTRODUCTION 1.1 PROJECT INFORMATION Parcel Lauder is a +/- 41.35 acre project located in northeast Town of Coats in Harnett County, North Carolina. The site is located between Ebenezer Church Road and the northern side of NC Highway 27. The existing parcel is identified as Harnett County PIN 1600-45-4440 (49.32 acre). The parcels are zoned SFR-3-TNDO and will be developed within that zoning designation. The project is proposing the development of one hundred forty-eight (148) residential - single family as well as the associated utilities and infrastructure. The site is in the Cape Fear River Watershed and in the Upper South River basin - Upper Black River Sub-basin (Stream Index: 18-68-12-1, classified C; Sw). The site is comprised mostly of fallow covered area throughout the property. Most of the topography is sloping West to East, generally draining to three (3) points of interest (POI). Please refer to the Drainage Area Map included in Appendix A. The FEMA mapped floodplain per FIRM Panel 3720160000K is dated 10/03/2006. Wetlands cut through the northern part of the parcel (wooded area along border). Site soils consist predominantly of Norfolk loamy sand (NoB), Wagram loamy sand (WaC), Rains sandy loam (Ra), Wagram loamy sand (WaB), Bibb soils (Bb), and Wehadkee loam (Wh). Norfolk loamy sand is considered "A" soils, Wagram loamy sand considered "A" soils, Rains sandy loam condsidered "D" soils, Bibb soils considered "D" soils, and Wehadkee loam considered "D" soils. Please refer to the FEMA Firm Panel Map and Soils Maps included in Appendix B and C, respectively. Forward Thinking. Grounded Design. www.underfootengineering.com 2 I I underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 11► ENGINEERING �o �O JAG SITE LOCATION • :�•' � fr ►A <0 • _ ••„,mow F�:_ tr O y AjC t!JGfi '0O'0?� Figure 1: Aerial View of Site (not to scale) 1.2 PURPOSE The purpose of this Stormwater Management Report is to verify that all North Carolina Department of Environmental Quality post construction stormwater management requirements regarding water quantity and water quality as set forth in Post Construction Stormwater Program Chapter A-1 are being met. The Stormwater Management Report has been prepared by Underfoot Engineering, 1149 Executive Circle, Suite C, Cary NC 27511, in accordance with the requirements and suggestions of the Town of Coats, Harnett County, and other accepted engineering standards and practices. Additionally, the project shall meet the Erosion Control requirements set forth by NCDEQ. Forward Thinking. Grounded Design. www.underfootengineering.com 3 I I underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 1i ENGINEERING 2. STORMWATER CALCULATIONS 2.1 STORMWATER MANAGEMENT REQUIREMENTS This project is subject to regulations contained in Harnett County Stormwater Management Requirements, as well as the North Carolina Department of Environmental Quality (NCDEQ). The proposed development is required to meet all sections of these regulations. The purpose of these stormwater management calculations is to verify that these post construction stormwater management requirements regarding water quantity and water quality are being met. To meet stormwater runoff control requirements, post development peak discharge rates for this development will not exceed the pre-development peak discharge rate of the 1- year, 10-year, and 25-year 24-hour storms. Calculations will be run to identify the peak flow under existing and proposed conditions. Onsite stormwater SCMs will be used to mitigate the increase in run-off associated with the proposed development. As this site is in the Cape Fear River Basin Watershed (STREAM INDEX 18-68-12-1), Systems must control runoff from 1 .0 inch of rainfall and be designed for 85 percent (%) Total Suspended Solids (TSS) removal (Stormwater Management Rules 15A NCAC 2H .1000). This stormwater study was conducted using the natural drainage features and existing impervious areas as depicted by an existing field survey, as well as the proposed impervious areas based on the site design. Drainage areas were based on field survey and GIS data and proposed development within those drainage areas. 2.2 HYDROLOGY METHODOLOGY Formulation of the 1-year, 10-year, and 25-year peak flows for the pre-development and post-development drainage areas were generated with HydraFlow.The SCS Method was used to develop peak flows for the Type II, 24-hour storm events in the Coats area. This method requires three basic parameters: a weighted curve number (CN), Rainfall Depth (P), and drainage area in acres (A). Forward Thinking. Grounded Design. www.underfootengineering.com 4 I I underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 1i ENGINEERING The curve number values and drainage areas were computed using information taken directly from the field survey and GIS information and TR-55 Table of Curve Numbers. The rainfall depth was determined from the NOAA Atlas 14 rainfall data. 2.3 HYDRAULICS METHODOLOGY Computer simulated reservoir routing of the 1-year, 10-year, 25-year, and 100-year design storms utilized stage-storage and stage-discharge functions was completed in HydraFlow. Stage-storage functions were derived from the proposed grading of the proposed SCM. A non-linear regression relation for surface area versus elevation was derived for the SCM. This relation estimates the incremental volume of the basin to the stage or elevation of the basin. Stage-discharge functions were developed to size the proposed outlet structure for the SCM's. The resulting pre-development and post- development flows out of the proposed SCM's, and for untreated areas, are then analyzed to ensure that there is no increase in run-off during the required design storms. The HydraFlow modeling results are provided as appendices to this report. Forward Thinking. Grounded Design. www.underfootengineering.com 5 I I underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 1i ENGINEERING 2.4 PRE-POST METHODOLOGY Pre-Post Calculations Project: Lauder Parcel Q1 (CFS) Q10(CFS) Q25 (CFS) Pre-Development 12.85 53.10 74.69 Post-Dev. Without Detention 16.82 63.91 88.53 O Post-Dev. With Detention 0.21 2.81 8.56 a- Post-Dev. Bypass 0.90 18.17 29.00 Pre-Post Difference -11.74 -32.12 -37.13 Pre-Development 16.06 62.58 87.58 m Post-Dev. Without Detention 11.17 58.57 84.63 Post-Dev. With Detention 0.00 1.01 1.75 O Post-Dev. Bypass 0.01 1.45 3.90 Pre-Post Difference -16.05 -60.12 -81.93 Pre-Development 2.12 7.63 10.52 Post-Development 0.00 0.03 0.14 Pre-Post Difference -2.12 -7.60 -10.38 Pre-post numbers include run-off from on-site areas. Attenuation for the on-site development (POI #1, #2 & #3) is provided in two proposed wet ponds and exceeds the overall pre-post requirement for the entire site for the 1-year, 10- year, 25-year 24-hour storm event, as well as provides 1' min of freeboard in the 100-year event. 2.5 WATER QUALITY DESIGN As stated above there are three (3) drainage area POI for the site. These are provided on the drainage area maps in Appendix A. To treat for stormwater runoff to meet the water quality requirements, two (2) stormwater wet ponds are proposed. The proposed wet pond will reduce the TSS concentration by 85% per the NCDEQ Stormwater Control Measure Design Manual. Forward Thinking. Grounded Design. www.underfootengineering.com 6 I I underfoot 1149 Executive Circle-Suite C, Cary, NC 27511 919.576.9733 I NCBELS C-3847 1i ENGINEERING 3. CONCLUSIONS The final SCM designs are based on the Simple Method for the First 1" volume calculation and NCDEQ's Stormwater Design Manual, specifically meeting the required Minimum Design Criteria (MDC) as outlined and appropriate. The design also takes into account the attenuation required to ensure that the site meets the pre-post requirement for peak flow from the 1-year, 10-year, and 25-year, 24-hour peak flow. The outlets were designed to discharge the runoff resulting from the first 1" of rainfall over 2 to 5 days to meet water quality guidelines. There is no proposed increase in peak runoff, for the site as a whole for any of the design storms. Based on the routing study, the proposed SCMs has sufficient volume to safely pass the 100-year storm without overtopping the dam and provide 1 ' minimum of freeboard. Please refer to Appendices for all supporting calculations and documentation. Forward Thinking. Grounded Design. www.underfootengineering.com 7 APPENDIX A: DRAINAGE AREA MAPS ligi..11.11 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com alIN — — — — 1 DRAINAGE AREA NOTES DATEP LAN REVISIONS REVISION BY / P !' e �RB$ \ 1 2023.08.10 NCDEQ EC COMMENTS JT ��, •OI#1A DRAINAGE AREA NOTES 2 2023.11.30 NCDEQ SIM COMMENTS JT GP G', FIRM MAP 8 PANEL NUMBER:CTOB R 03. EFFECTIVE FEMA MAP DATE:OCTOBER 03,2006 CP CP PARCEL SIZE:ERVIOUS SF(49.32 ATOTACI .CP CP/ EXISTING IMPERVIOUS AREA TOTAL:O SF(0 AC) % ___ EXISTING IMPERVIOUS AREA PERCENTAGE:0.0% nr/ " s`s TIME OF CONCENTRATION \"- `-_ � V DAK1AT,= 11.4MIN. LIMIT OF DISTURBANC / Pp ^ „�y-- T� `-__ _____ DA M2BT, = 16.89.8 MI N. FEMA 100-YEAR HOODPLAIN /7/' r iI ' _-- 811 0 MIRANDA PAIGE LILES FLOWERS �• Cp i / ------ _ -- --- - __ / Plr✓ 7600-46-2214.000 gp cP / ;'�j�/' %;' - -- _ - KNOW WHAT'S BELOW / PID.0716000185 _ ___ ALWAYS CALL 811 D.B. 3704 PAGE 363 P/ / - '�`, / BEFORE YOU DIG / ADDRESS N. CHESTER / Its fast.Its tree.Its the law. / COATS,NC 27521 / / - :-\‘`,.., PROJECT: 71M PROPERTIES OF N.C.LLC / // `� ti>P ^` PIN. 1600-37-1527000 1 CP PID.'071600018505 CP / / ;� ; , MARY ELLEN✓OHNSON LA U D E R D.P. 4111 PAGE 371 _ '- 2 LADDER PIN MAP 12005 PAGE 255 1 CP_/ / / D / l / L'' �2 1600-57-13BS000 WE S ARG WA / ' l l / PID:0716000215 PARCEL ADDRESS 656 EBENEZER _ MCP— sa ACRES I / / i \`'.. BOOK 96E PACE 158 ADDRESS N.C. HWY. r CHURCH RD. A n CP / / ' COATS, N.C.27521 RBF / . % PROP.RIP / %/ / �, 27E CONSTRUCTION \ " Cp ENGTHIY,START DRAWINGS N 86'43'40"E 84.36"(17E) s —�� WIDTH 6 END WIDTH' / -1 COATS, NC.27521 5 —� / 20 THICKNESS:1') 1 / RB — ' PRE DA 1 A ,/ II • �� / \AREA=2470 AC j(� / STAND/N6 WATER/MARSH - / PROP.RIP RA. CN=59.1 /J ... / WETLCN/ (LENGTH:75',START / / /�� / / rrs A / WIDTH:7.5',END WIDTi: 25',THICKNES- / r / / / NC 27/ /- 7 / / 27 COATS,NC27 27521 / / / — / " or — -' // /; �%// \ / PROJECT#: C22008 _ r DRAWN BY:R IEWED BY: JT MAR _ _ - L — � / /y�� / /// I I '' I SET'SUBMITTAL 2023:605 - SCALE: 1=100 ----`_ " - _----- i 2-2<--_-_ - / / "' ( I seo1 START STREAM FOR REVIEW / �` — — AND APPROVAL ELIZABETH M. ROCHE ------ - /-;--;--_-_�___--_______,-�___.-' / I '�� RYAN✓ ROCHE �— % ;•� / i �-_— - -�"� / //� j PREPARED FOR: PIN >600-26-8872 000 _�---=_^-____� // I �, , o PrO:O71s0002nO1 s .------ „ =-c;_--___= / //� I o` D.B. 4163 PACE 777-778 � - -- - --- _=''S ` MAP/2018 PAGE 29 / - %\ —_ /_--; ;';:// I {.,% ADDRESS 5267 N.C. - is f_ ---- -'i_:;;,; I I _ HEAT 27E - - J = IMIT OF DISTURBANCE Ti COATS, NC. 27521 �"-- -- = _ `--- / I � �t— , , mattamy O LIMO OF DISTURBANCE TYP. g I ( / - - v ,,, r a - - � �- t P�R� D� 1 B — �- �'1 i -_____� �2/� _ \ ME.-2289 IF, CN 68.8 \ii(LE REF I -_ _-- __-____ \ \ \ \ \\L ,WIDTH.:, ART H gi PREPARED BY: ` ','HI IM :1' 'ROP.RIP RAP Qo \\----- \`-__ (LENGTH:9',START /� m ,yI 1 WIDTHS',END WIDTH: 15,THICKNESS:1.) w '� '' - _ _ ` ` I \ "0 �'� FEMA 100-YEAR FLOOOPLAIN • w S I -- �' I1 1 0 - WETLANDS AREA WB-1 11 u I •011B / i // �v �, underfoot RRr BEN H L E U {� �+ / WIDTH 6 ENO'�'I C"` / /. /Il \ \ ___ _ __� / / / / \1'( / 27,;ICKNESS.IT ! ENGINEERING i N 755932"W // --- I V i\ / _ / )/,; A 1149 EXECUTIVE CIRCLE 100.01 (TIED / — — `� '_ CARY,NC 27511 `�`�P R E DA-2��==__ / / ;�-�_'I—___W�LidE08�FJYR 919.576.9733 ! - /,„-- AREA=1.73 AC-- - i j ___ -- NCBEL3 C384 CBOLA C683 ,//'/ ;'4� '8.07 AOti E 74.23' 7 N / \ � / CANOS'AREA 1Y8-3 l ME./CN 6 } g -p I I / / /, R�O.G�S AC.' ,1 EX ROW SEALED: ii 0f- __ �'—��_Te / -1 : ,� -�`u�.KBS R MOC� \�, ,,,,, 1 i 4 / _;,,; H O A R � I Ms % n _ 1 J —Z 0- -05� ®4 I. 5°" - SO�gpe°ssO /ti y "-- __ - _ __ - �y 2 T ON _ Oa 1„ �� \ — _ NrRascc rox — �! — 5� — � 4� e \\ EX ROW_T EA:ROWJ-` 8. 0 �,1`:F040 68¢'"S�4;; S \\ DOVE HOMES LLC „,''oy'9 6L A.RO s, \ Q PIN. 1600-45-9277.000 ,,„"10137f.30 u CARDINAL FARMS �� COT PIMARY07IE�EN JOHNSON0 1600-25-7539000 PID: NC HIGHWAY 27- E.STEWART STREET MARYELLEN✓OHNSONLAUDERSI IEEE TRACT AREA: 150.9 AC. (PER 0- AP LAUDER MAP6 2020 PACE tHPRE-DEVELOPMENT '. 0718000 RE POSTED SPEED LIMIT:55 MPHA6� ADDRESS DELMA GRIMES RD.QD.B.2575 PAGE 925 HAR600-CO. 4400100'PUBLIC R/W P9/ 1500-45-4440000 dADDRESS 57E NC HWY. st COATS NC 2752>R27E PID:0716000217 c; O DRAINAGE AREA (24'WIDTH-ASPHALT) ,P 100 50 0 100 200 BOOK 96E PAGE 138 ��O MAP COATS, NC 27521 (DB 285 PG 365) D.B. 310 PAGE 418 R \ ADDRESS NC.HWY 27E R COATS, N.C.27521 trz% GRAPHIC SCALE NORTH o ,'0 x 1 OF 2 J 1 PLAN REVISIONS alIN rDRAINAGE AREA NOTES # DATE REVISION BY — — — 1 1 2023.08.10 NCDEQ EC COMMENTS JT �\ DRAINAGE AREA NOTES �P 2 2023.11.30 NCDEQ STM COMMENTS JT P _ ' P ' C• RB5 \ FIRM MAP&PANEL NUMBER:3720160000K EFFECTIVE FEMA MAP DATE:OCTOBER 03.2006 CP C'/. , 'O. - - "� �' PARCEL SIZE:2,148,474 SF(49.32 AC) CP y� CI' / �- PROPOSED IMPERVIOUS AREA TOTAL:656680 SF(15.08 AC) 1 PROPOSED IMPERVIOUS AREA PERCENTAGE:30.6% / P CP/ ,' \ PROP.RETAINING WALL#8(BY OTHERS ,,CP "'"- ' 1 BYPASS LIMIT OFDISTURBANC / CF POST/L71`l 1 A'/BYI ASS // AREA 9.'A.Af �� ' CN=54.2 � \ / �/p. �P % / % /_.#. � P P.RETAINING WALL#9(BY OTHERS) 811. / / — '�� ` v`-L .� RQ111 FEW 100-YEAR FLOODPLAIN CP -- MIRANDA PAIGE LILES 7 � N V� \��� A\ KNOW WHAT'S BELOW FLOWERS ,� Pi' �- �, �rA� ALWAYS CALL 811 PIN 1600-48-2214.000 CP CP PID:0716000185 cP jIt � V A \\ ' = BEFORE YOU DIG D.B 3704 PAGE 363 P/ `��I(, _• It's cast.It's tree.It's the law. / ADDRESS' 193 CHESTER ` " y / ✓ sk PROJECT: / COATS, NC 27521 / ��� I i- ��`T�",.�p"� •�0 /� //� / /� t:RETAIN #7(BY/ 4 �� ' j LA U D E R TZM PROPERTIES N LLC # 1 '`r �� \ MARY ELLEN JOHNSON PIN: 1600-57-1527000 \ CP �,/ PID:071600018505 CP / �� - _ � LAUDER PIN' PARCEL AP 4111 PAGE 25 / / 1600-57->385000 CONSTRUCTION MAP 7fY 2005 PAGE 255 71 1 CP_/ - / - _�'`r .4, / ���� PID. 0716000215 W/-irSAREA WA v�:.,, ADDRESS 656 EBENEZER _ MCP— /.s4 acRES o i � \ 1r �\ g BOOK 96E PAGE 138 CHURCH RD. \ — — a CP ,r' �:� 1 \„ ADDRESS'N.C. HWY. COATS, NC 2752> RBF GP• .�. PROP RIP �� A S / 46�� 27E DRAWINGS _/ ENGTH 7Y,START N 86'43'40"E 84.35"(77E) _ WIDTH:6',END WIDTH: - \ \\ \ ` COATS, N.C.27521 \ RB „/ 20',THICKNESS:1') /� 'Q,{ / `'��\ STAND/NG WATER MARSH �' PROP.RIP- ti �� 0 1, ,, �• / / WElLANI TH 7 5'H:15',START , �`216 - \ \ /\� WIDTH 7.5',ENDWIDTH ,,, NC 27 E 25 THICKNES �� � --1,' I i�, /' , COATS,NC 27521 �� / \w, /,ti��] �L� �qvv� i� 1� �\�\ / //ti // I�o .A�1\\�.\� \ �?'SI PROJECT#: C22008 �// /, DRAWN BY: JT e _�� I ��� REVIEWED BY: MAR RBF ���� \,,,,,__ � ry �c_____ /\//)/ I - 1ST SUBMITTAL: 2023,06.E te \+ -- av' — �6� 17 :� � r FOR REVIEW _� PROP.RETAINING WALL#2(BY OTHERS)-- iL Vw �r AND APPROVAL o RYAN J. ROCHE EAM �'i1ry � yT ' :=��',Le j�'� 5� 4 1 - ,� I ! ` 21'S PREPARED FOR: START STRELIZABETH M ROCHE /� I --- cm-0.2 , � \Q PIN: 1600 26 8872.000 I 11 _ I� _ \-- PlD 071600021701 �� �, - _ �s D.B. 4163 PAGE 777-778 I //, tl MAP 2018 PAGE 29 L�� tf'1:�I `\- -- - /� `��-- _� ► ,<�C / !9.5 \ \� ADDRESS 5267 N.C. - — - - --- '_ �� �Cf / ' mattam 0 HWY 27E \ ` ' j WIT OF DISTURBANCE 9 COATS NC. 27521 �'�` z2s AIRING A(L�- ) I 0/ et I ,. � I Y LIMIT OF DISTURBANCE(TYP. I1 II LIO1 , / / /, I '✓ < I t Ii m PROP.RETAINING WALL#1(BY OTHERSr� \. V 1 ._— —` — _ - -- / /> ' ' M \•� 10' ry�o_ i1 • - N;- — �C/V"t i�t��'LTi \ -1 �I I1 I PREPARED BY gi N W.iyi�-'d19 .1I1� CIO: �I � GP ,r �' ►s>!, �� �� - - A ...\�M' / , (LE t ART- QoI I REF _ - F, 1 WIDiFIF,9'�,DWIr H: !� / � 3U THI I(N 1' Q / 'ROP RIP RAP l �\1 Ill 1 , (LENGTH 9 START WIDTH: END WIDTH. �� \ _/\ \ fEAE4700RFLPU/N4kL — �i I WETLANDS AREA WB-1 cT i ri 4fr-i--N iikL • -- , underfoot <LIS /1, L`\:�\_ _ �a ( II / � ENGINEERING < // �i - I ENGTHIE.STA 1 �r��1H�� \ o ������� _ OTH END W (7 I- /�� ��� I I A` �� 71 �� - ,1 I, - ,._ - 1149 EXECUTIVE CIRCLE �" / �.�� \I� I Io C CARY,NC 27511 I � � 919.5769733 O AREA-0.22 AC I li ��� - `A NCBELS C3847 NCBOLA C683 �T DA� 2 BYPASS CN=39.0 ME I 1 71 1 If POST DA 1 B BYPASS,,,,A �,-) SEALED g \ //--- ,-'. �' j I I- ' di i I L - / i� _ /� AREA N aZ�Crrw-ruo�AREAwe 34 Ex ROW \�NCARo", 1 --- = _ -� - `z z -_lNd;_ NJ yrJ- w�- __ wJ _,Y+d,- wig - ._ — � --- — �E���040 68�.°Tv .___ - ,_ --� '�G IRE �4. — ?-- GP — — — .' (� FLA.RO�. \\ Ex Row�T ,iii,,`"101371,30 d \\ ^ DOPE HOMES LLC d HOUSE \ U' PIN 1500-45-9277000 PID.'071600021702 n IEE-: o MRDINAL FARMS 'IN: \ NC HIGHWAY 27- E.STEWART STREET MARY ELLEN JOHNSON LAUDER ��_ LOT 1 MARY ELLEN JOHNSON POST-DEVELOPMENT Q600-25-7839.000 PID: TRACT AREA. 150.9 AC (PER 6p `7 LAUDER MAP 1 2020 PAGE0716000216 \ POSTED SPEED LIMIT:55 MPH ,o (Alto" DB 2575 PAGE 925 HARNETT CO. G.LSJ pS 267 I DRAINAGE AREA 4 70RESS•5210 NC HWY. \ 100'PUBLIC HA PIN: 1600-45-4440.000 d ADDRESS'DELMA GRIMES RD. 100 50 0 100 200 i PID:0716000217 </(','O COATS, NC 27521 A MAP 27E (24'WIDTH-ASPHALT) R COATS, NC 27521 \ (DB 285 PG 365) BOOK 96E PAGE 138 �� D.B. 510 PAGE 418 O GRAPHIC SCALE NORTH ADDRESS NC HWY.27E 2 OF 2 o \ COATS, NC 27521 �,A x 0 J APPENDIX B: FEMA FLOODPLAIN MAP millish."11. 11116117 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com National Flood Hazard Layer FIRMette - FEMA _Legend 78°39'22"W 35°25'10"N SEE EIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT • • r II } 2� Without Base Flood Elevation(BFE) • 4 i Zone A,V.A99 i / r ) With BFE or Depth Zone AE,AO,AH,VE,AR t •� SPECIAL FLOOD - \ • -I HAZARD AREAS Regula..1 I: I 4,444, . 0 - tory Floodway / ,� e• . I T 0.2%Annual Chance Flood Hazard,Areas • , , , �- of 1%annual chance flood with average A,• • • T1 depth less than one foot or with drainage It areas of less than one square mile zonex IFuture Conditions 1%Annual Chance Flood Hazard zonex �'AArea with Reduced Flood Risk due to �• 1. ' + OTHER AREAS OF Levee.See Notes.zone x • a� FLOOD HAZARD , j Area with Flood Risk due to Leveezone D • y .,• NO SCREEN Area of Minimal Flood Hazard zonex !i ~� , Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard ZoneD tit S GENERAL ----- Channel,Culvert,or Storm Sewer 1 I ? FEE 20g g STRUCTURES III 1 1 1 1 Levee,Dike,or Floodwall _• -7^_^ A 0 20.2 Cross Sections with 1%Annual Chance HARNETT COUNTY t0•5 Water Surface Elevation TOWN AREA OF MINIMAL FLOODHAZARD aciiI� 370328 e- Coastal Transect TO V`N COATS ZOne X I1 •s13 - Base Flood Elevation Line(BFE) 37 558 Limit of Study "PP1111 Jurisdiction Boundary I) �3'9 FEET OTHER — Coastal Transect Baseline 3 poi i()norm _norm ii Profile Baseline FEATURES Hydrographic Feature ' t'i1. 1 0/i/)DDb . II� .\ , Digital Data Available 40111' ' No Digital Data Available N ~�. IN—� .11. MAP PANELS Unmapped 11,...... The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. ' 1 ,� \ • _ • l IS A lit *4....-...-.:...—_-__1_,,,2, iQ4 FFFr This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. 4 ' . The basemap shown complies with FEMA's basemap • �� " JggZr accuracy standards 11 The flood hazard information is derived directly from the �I authoritative NFHL web services provided by FEMA.This map was exported on 1/18/2023 at 2:31 PM and does not reflect changes or amendments subsequent to this date and time.The NFHL and effective information may change or � •� ! 2 • become superseded by new data over time. It y" i th 7 t79.9 This map image is void if the one or more of the following map . ' F6.4.7. elements do not appear:basemap imagery,flood zone labels, I I A legend,scale bar,map creation date,community identifiers, 78°38'45"W 35°24'41"N FIRM panel number,and FIRM effective date.Map images for Feet 1.6 00D unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap:USGS National Map:Orthoimagery:Data refreshed October,2020 APPENDIX C: SOIL SURVEY REPORT AND MAP I P ......... 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for States Department of RCS Agriculture and other Harnett County Federal agencies, State Naturalagencies including the North Carolina Resources Agricultural Experiment Conservation Stations, and local Service participants LAUDER PARCEL i IV" -VA% „lot_ 4:41;ii4,- : !NOAk0 ?ram. 0 =========000 ft ....4k 1 ___._.... ,____ October 3, 2022 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs)or your NRCS State Soil Scientist(http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice)or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface 2 How Soil Surveys Are Made 5 Soil Map 8 Soil Map 9 Legend 10 Map Unit Legend 11 Map Unit Descriptions 11 Harnett County, North Carolina 13 Bb—Bibb soils, frequently flooded 13 NoB—Norfolk loamy sand, 2 to 6 percent slopes 14 Ra—Rains sandy loam, 0 to 2 percent slopes 15 W—Water 17 WaB—Wagram loamy sand, 0 to 6 percent slopes 17 WaC—Wagram loamy sand, 6 to 10 percent slopes 18 Wh—Wehadkee loam, frequently flooded 19 References 22 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report Soil Map N 712900 713000 7131W 713200 713300 713400 713500 35°25'12"N 35°25'12"N `W:ram. jp;.• ....i. • _ .16 i Bb 1.1"d Bb WaC .• - i jh g ._ R WaC R Re --"10111111111*,----.-- • 4 ,4 414 \� WaC R Q • , -=W HyTu ay fxy.0047_didtho�kc�aOQ° R 35°24'42"N I 35°24'42"N 712900 713W0 7131W 7132W 713300 7134W 7135W 3 3 OI N 'P.," Map Scale:1:4,440 if printed on A portrait(8.5"x 11")sheet. Meters N 0 50 100 200 300 A ,3,,z �et 0 200 400 800 1200 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 17N WG584 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 14 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soilsit Very Stony Spot Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot ,..,. Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstandingof the detail of mapping and accuracyof soil p Soil Map Unit Points pp 9 .• Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Blowout Water Features scale. -_- Streams and Canals kg Borrow Pit Transportation Please rely on the bar scale on each map sheet for map * clay Spot 1.44 Rails measurements. 0 Closed Depression o,/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service .r US Routes Web Soil Survey URL: Gravelly Spot Major Roads Coordinate System: Web Mercator(EPSG:3857) ® Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator • Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 46 Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more It Mine or Quarry accurate calculations of distance or area are required. 4 Miscellaneous Water This product is generated from the USDA-NRCS certified data as O Perennial Water of the version date(s)listed below. v Rock Outcrop Soil Survey Area: Harnett County,North Carolina + Saline Spot Survey Area Data: Version 20,Sep 8,2022 Sandy Spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. • Sinkhole Date(s)aerial images were photographed: Apr 24,2022—May 31 Slide or Slip 9,2022 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Bb Bibb soils,frequently flooded 6.3 12.8% NoB Norfolk loamy sand,2 to 6 20.5 41.5% percent slopes Ra Rains sandy loam,0 to 2 0.2 0.4% percent slopes W Water 1.4 2.8% WaB Wagram loamy sand,0 to 6 5.0 10.1% percent slopes WaC Wagram loamy sand,6 to 10 15.9 32.3% percent slopes Wh Wehadkee loam,frequently 0.1 0.2% flooded Totals for Area of Interest 49.3 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not 11 Custom Soil Resource Report mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Harnett County, North Carolina Bb—Bibb soils, frequently flooded Map Unit Setting National map unit symbol: 3snw Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Bibb, undrained, and similar soils: 80 percent Johnston, undrained, and similar soils: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bibb, Undrained Setting Landform: Flood plains Landform position (two-dimensional):Toeslope Down-slope shape: Concave Across-slope shape: Linear Parent material: Sandy and loamy alluvium Typical profile A -0 to 6 inches: sandy loam Cg1 - 6 to 60 inches: sandy loam Cg2- 60 to 80 inches: loamy sand Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): High (1.98 to 5.95 in/hr) Depth to water table:About 0 to 12 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: A/D Hydric soil rating: Yes Description of Johnston, Undrained Setting Landform: Flood plains Down-slope shape: Concave Across-slope shape: Linear Parent material: Sandy and loamy alluvium 13 Custom Soil Resource Report Typical profile A -0 to 30 inches: mucky loam Cg1 -30 to 34 inches: loamy fine sand Cg2-34 to 80 inches: fine sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class:Very poorly drained Runoff class: Ponded Capacity of the most limiting layer to transmit water(Ksat): High (1.98 to 5.95 in/hr) Depth to water table:About 0 inches Frequency of flooding: NoneFrequent Frequency of ponding: Frequent Available water supply, 0 to 60 inches: High (about 9.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7w Hydrologic Soil Group: A/D Hydric soil rating: Yes NoB—Norfolk loamy sand, 2 to 6 percent slopes Map Unit Setting National map unit symbol: 2v75y Elevation: 30 to 450 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 200 to 280 days Farmland classification: All areas are prime farmland Map Unit Composition Norfolk and similar soils: 83 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Norfolk Setting Landform: Flats on marine terraces, broad interstream divides on marine terraces Landform position (three-dimensional):Talf Down-slope shape: Convex, linear Across-slope shape: Convex, linear Parent material: Loamy marine deposits Typical profile Ap- 0 to 8 inches: loamy sand E- 8 to 14 inches: loamy sand Bt- 14 to 65 inches: sandy clay loam 14 Custom Soil Resource Report BC- 65 to 80 inches: sandy clay loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 40 to 72 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: A Hydric soil rating: No Ra—Rains sandy loam, 0 to 2 percent slopes Map Unit Setting National map unit symbol: 2v760 Elevation: 30 to 330 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 200 to 280 days Farmland classification: Prime farmland if drained Map Unit Composition Rains, undrained, and similar soils: 58 percent Rains, drained, and similar soils:24 percent Minor components: 8 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Rains, Undrained Setting Landform: Flats on marine terraces, broad interstream divides on marine terraces, carolina bays on marine terraces Landform position (three-dimensional): Dip, talf Down-slope shape: Linear Across-slope shape: Linear Parent material: Loamy marine deposits Typical profile A -0 to 6 inches: sandy loam Eg- 6 to 12 inches: sandy loam Btg- 12 to 65 inches: sandy clay loam BCg- 65 to 80 inches: sandy clay loam Properties and qualities Slope: 0 to 2 percent 15 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.20 to 1.98 in/hr) Depth to water table:About 0 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: A/D Hydric soil rating: Yes Description of Rains, Drained Setting Landform: Flats on marine terraces, broad interstream divides on marine terraces, carolina bays on marine terraces Landform position (three-dimensional): Dip, talf Down-slope shape: Linear Across-slope shape: Linear Parent material: Loamy marine deposits Typical profile Ap- 0 to 6 inches: sandy loam Eg- 6 to 12 inches: sandy loam Btg- 12 to 65 inches: sandy clay loam BCg- 65 to 80 inches: sandy clay loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.20 to 1.98 in/hr) Depth to water table:About 12 to 36 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: B Hydric soil rating: Yes Minor Components Pantego, undrained Percent of map unit: 8 percent Landform: Broad interstream divides, flats, stream terraces Landform position (three-dimensional):Tread, talf Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: Yes 16 Custom Soil Resource Report W—Water Map Unit Composition Water: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w Hydric soil rating: No WaB—Wagram loamy sand, 0 to 6 percent slopes Map Unit Setting National map unit symbol: 3sqq Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Wagram and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wagram Setting Landform: Ridges on marine terraces, broad interstream divides on marine terraces Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy marine deposits Typical profile Ap- 0 to 8 inches: loamy sand E- 8 to 24 inches: loamy sand Bt- 24 to 75 inches: sandy clay loam BC- 75 to 83 inches: sandy loam 17 Custom Soil Resource Report Properties and qualities Slope: 0 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 60 to 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2s Hydrologic Soil Group: A Hydric soil rating: No Minor Components Bibb, undrained Percent of map unit: 3 percent Landform: Flood plains Landform position (two-dimensional):Toeslope Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: Yes Johnston, undrained Percent of map unit:2 percent Landform: Flood plains Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: Yes WaC—Wagram loamy sand, 6 to 10 percent slopes Map Unit Setting National map unit symbol: 3sqr Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Farmland of statewide importance Map Unit Composition Wagram and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. 18 Custom Soil Resource Report Description of Wagram Setting Landform: Ridges on marine terraces, broad interstream divides on marine terraces Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy marine deposits Typical profile Ap- 0 to 8 inches: loamy sand E- 8 to 24 inches: loamy sand Bt- 24 to 75 inches: sandy clay loam BC- 75 to 83 inches: sandy loam Properties and qualities Slope: 6 to 10 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 60 to 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3s Hydrologic Soil Group: A Hydric soil rating: No Wh—Wehadkee loam, frequently flooded Map Unit Setting National map unit symbol: 3sqv Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost-free period: 210 to 265 days Farmland classification: Not prime farmland Map Unit Composition Wehadkee, undrained, and similar soils: 80 percent Wehadkee, drained, and similar soils: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. 19 Custom Soil Resource Report Description of Wehadkee, Undrained Setting Landform: Depressions on flood plains Down-slope shape: Concave Across-slope shape: Linear Parent material: Loamy alluvium Typical profile A -O to 7 inches: loam Bg- 7 to 58 inches: loam Cg- 58 to 84 inches: sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 0 to 12 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 10.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6w Hydrologic Soil Group: B/D Hydric soil rating: Yes Description of Wehadkee, Drained Setting Landform: Depressions on flood plains Down-slope shape: Concave Across-slope shape: Linear Parent material: Loamy alluvium Typical profile A -0 to 7 inches: loam Bg- 7 to 58 inches: loam Cg- 58 to 84 inches: sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 0 to 12 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 10.4 inches) 20 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Hydric soil rating: Yes 21 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 22 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 23 APPENDIX D: SCM DESIGN CALCULATIONS millishi_,.. 11116117 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com EXISTING CONDITIONS Project Name: Lauder Parcel Project Number: C22008 Date: 11/29/2023 Designed By: JT Checked By: MAR DRAINAGE AREA = PRE DA-1A Total Area: 24.70 AC. LAND COVER HSG CN AREA (SF) AREA(AC) Water - 0 34770 0.80 Woods - Good Condition A 30 369751 8.49 Woods - Good Condition D 77 241 165 _ 5.54 Fallow- Good Condition A 74 430463 9.88 WEIGHTED CURVE NUMBER = 59.1 DRAINAGE AREA = PRE DA-1B Total Area: 24.24 AC. LAND COVER HSG CN AREA (SF) AREA(AC) Water - 0 66185 1 .52 Impervious - 98 18732 0.43 Woods - Good Condition A 30 115684 2.66 Woods - Good Condition D 77 3239 0.07 Fallow- Good Condition A 74 847416 19.45 Fallow- Good Condition D 90 4574 0.11 WEIGHTED CURVE NUMBER = 68.8 DRAINAGE AREA = PRE DA-2 Total Area: 2.10 AC. LAND COVER HSG CN AREA (SF) AREA(AC) , Impervious - 98 3976 0.09 Woods - Good Condition A 30 14083 0.32 Fallow- Good Condition A 74 68904 1 .58 Fallow- Good Condition D 90 4704 0.11 WEIGHTED CURVE NUMBER = 69.1 POST DEVELOPMENT CONDITIONS Project Name: Lauder Parcel Project Number: C22008 Date: 11/29/2023 Designed By: JT Checked By: MAR DRAINAGE AREA= POST DA-1A Total Area: 17.62 AC. LAND COVER HSG CN AREA (SF) AREA(AC) Impervious - 98 317992 7.30 Open Space-Good Condition A 39 379855 8.72 Open Space-Good Condition D 80 69863 1.60 WEIGHTED CURVE NUMBER= 67.2 DRAINAGE AREA= POST DA-1A BYPASS Total Area: 9.74 AC. LAND COVER HSG CN I AREA (SF) AREA(AC) Impervious - 98 11813 0.27 Water - 0 33224 0.76 Open Space-Good Condition A 39 1211741 2.78 Open Space-Good Condition D 80 17679 0.41 Woods-Good Condition A 30 86791 1.99 Woods-Good Condition D 77 153416 3.52 WEIGHTED CURVE NUMBER= 54.2 DRAINAGE AREA= POST DA-1B Total Area: 20.02 AC. LAND COVER HSG CN AREA (SF) AREA(AC) Impervious - 98 334346 7.68 Open Space-Good Condition A 39 528268 12.13 Open Space-Good Condition D 80 9280 0.21 WEIGHTED CURVE NUMBER= 62.1 DRAINAGE AREA= POST DA-1B BYPASS Total Area: 3.45 AC. LAND COVER HSG CN AREA (SF) AREA(AC) Open Space-Good Condition A 39 137799 3.16 Open Space-Good Condition D 80 12507 0.29 WEIGHTED CURVE NUMBER= 42.4 DRAINAGE AREA= POST DA-2 BYPASS Total Area: 0.22 AC. LAND COVER HSG CN AREA (SF) AREA(AC) Impervious - 98 1125 0.03 Open Space-Good Condition A 39 8278 0.19 WEIGHTED CURVE NUMBER= 39.0 C-3:WET DETENTION BASIN DESIGN PROJECT INFORMATION Project Name: Lauder Parcel Project Location: Coats,NC Project Number: C22008 Date: 11/29/2023 Project Designer: JT Checked By: - DRAINAGE AREA INFORMATION Drainage Area Name, DA-1A Drainage Area(DA)= 774,725 SF 17.7852 Impervious Area(IA)= 322,334 SF 7.39977 Percent Impervious(I)= 41.61 Water Quality Design Storm= 1 INCHE(S) REQUIRED STORAGE VOLUME-SIMPLE METHOD Determine Rv Value= 0.05+0.009(I)= 0.42 IN/IN Storage Volume Required= 27,403 CF Based on Simple Method REQUIRED SUFACE AREA SA/DA= 1.21 From SA/DA Table 1 in Stormwater Design Manual Min Req'd Surface Area= 9,374 SF(at Permanent Pool) WET POND ELEVATIONS Top of Dam Elevation= 216.00 FT Emergency Spillway Elevation= 214.80 FT Temporary Pool Elevation= 212.00 FT Permanent Pool Elevation= 211.00 FT Bottom of Pond Elevation= 208.00 FT Sediment Cleanout,Bottom Elevation= 207.50 FT PERMANENT POOL AREA AND BASIN VOLUME; Area of Permanent Pool= 27,883 SF Elev. 211.00 Area of Bottom of Vegetated Shelf= 25,902 SF Area of Bottom of Pond= 22,708 SF Volume of Main Pool= 132,053 CF Volume of Forebay= 26,411 CF Volume of Main Pool(Exluding Vegetated Shelf)= 105,642 CF Percentage of Forebay to Main Pool= 20.0 % OK PERMANENT POOL SURFACE AREA Is Permenant Pool Surface Area Sufficient(yes/no)? Yes Proposed Surface Area= 27,883 SF Required surface Area= 9,374 SF AVERAGE DEPTH Depth of Pond= 3.50 ft Depth(dist.btwn.bot.of shelf&btm.of pond,excludes sediment; Average Depth= 3.77 ft Based on Equation 3 in Wet Pond MDC Use Average Depth of= 3.50 ft C-3:WET DETENTION BASIN DESIGN CONT'D 1.0 INCH VOLUME ELEVATION Contour Incremental Accumulated Contour Area Volume Volume,S Stage,Z sq ft cu ft cu ft ft 211.00 27,883 0 0 0.0 Required Temporary Pool Volume= 27,403 CF 212.00 30,976 29,413 29,413 1.0 Permanent Pool Elevaton= 211.00 213.00 33,109 32,034 61,447 2.0 Temporary Pool Elevation= 212.00 214.00 35,298 34,195 95,642 3.0 Provided Temporary Pool Volume= 28,987 CF 215.00 37,543 36,411 132,053 4.0 216.00 39,841 38,683 170,736 5.0 212.00 30,104 28,987 5.00 -1 ORIFICE SIZING O2 Days= 0.1677 CFS Q5 Days= 0.0671 CFS Orifice Size= 3.00 IN Driving Head(Ha)= 0.27 FT Q ommoe= 0.128 CFS Drawdown Time= 2.63 DAYS less than 5 days(yes/no)? Yes greater than 2 days(yes/no)? Yes ANTI FLOTATION CALCULATIONS Outside Length= 5.00 FT Outside Width= 5.00 FT Inside Length= 4.00 FT Inside Width= 4.00 FT Bottom Thickness= 0.50 FT Top of Riser= 214.80 FT Invert of Riser= 208.00 FT Area= 25.0 SF (Outside Dim.=5-ft x 5-ft,Inside Dim.=4-ft x 4-ft) Volume= 183 CF (Water Displaced-Top of Riser to Bottom of Riser) Weight= 11,388 LBS (Weight Water Displaced) Factor of Safety= 1.25 WT Req'd of Anti-Flotation Device= 14,235 LBS Volume of Concrete Req'd= 162.5 CF (Unit WT of Concrete=150 pcf)Submerged Concrete Unit Weight 87.6 pcf Depth Provided= 3.60 FT Volume Provided= 163.7 CF (4-ft x 4-ft Box filled 4-ft deep with concrete) WT of Anti-Flotation Device Provided= 14,340 LBS OK Invert of Anti-Flotation Device= 204.40 FT SCM 1 - STM 100 FOREBAY/STORAGE TABLE CONTOUR CONTOUR INCREMENTAL CUMULATIVE ELEVATION (FT) AREA (SF) VOLUME (CF) VOLUME (CF) 208 3296 0 0 - 209 3808 3,552 3,552 210 4357 4,083 7,635 211 5327 4,842 12,477 SCM 1 - STM 200 FOREBAY/STORAGE TABLE ELEVATION (FT) AREA (SF) VOLUME (CF) VOLUME (CF) - 208 3688 0 0 209 4215 3,952 3,952 210 4776 4,496 8,447 211 5785 5,281 13,728 SCM 1 - MAIN POOL/STORAGE TABLE CONTOUR INCREMENTAL CUMULATIVE CONTOUR AREA VOLUME VOLUME ELEVATION (FT) (SF) (CF) (CF) 208 12247 0 0 209 131 1 1 12,679 12,679 - 210 14001 13,556 26,235 211 15398 14,700 40,935 C-3:WET DETENTION BASIN DESIGN PROJECT INFORMATION Project Name: Lauder Parcel Project Location: Coats,NC Project Number: C22008 Date: 11/29/2023 Project Designer: JT Checked By: - DRAINAGE AREA INFORMATION Drainage Area Name, DA-1 B Drainage Area(DA)= 871,894 SF Impervious Area(IA)= 334,346 SF Percent Impervious(I)= 38.35 Water Quality Design Storm= 1 INCHE(S) REQUIRED STORAGE VOLUME-SIMPLE METHOD Determine Rv Value= 0.05+0.009(I)= 0.40 IN/IN Storage Volume Required= 28,709 CF Based on Simple Method REQUIRED SUFACE AREA SA/DA= 1.31 From SA/DA Table 1 in Stormwater Design Manual Min Req'd Surface Area= 11,422 SF(at Permanent Pool) WET POND ELEVATIONS Top of Dam Elevation= 221.00 FT Emergency Spillway Elevation= 219.50 FT Temporary Pool Elevation= 217.10 FT Permanent Pool Elevation= 216.00 FT Bottom of Pond Elevation= 213.00 FT Sediment Cleanout,Bottom Elevation= 212.50 FT PERMANENT POOL AREA AND BASIN VOLUME; Area of Permanent Pool= 26,293 SF Elev. 216.00 Area of Bottom of Vegetated Shelf= 23,881 SF Area of Bottom of Pond= 19,970 SF Volume of Main Pool= 119,597 CF Volume of Forebay= 23,919 CF Volume of Main Pool(Exluding Vegetated Shelf)= 95,678 CF Percentage of Forebay to Main Pool= 20.0 % OK PERMANENT POOL SURFACE AREA Is Permenant Pool Surface Area Sufficient(yes/no)? Yes Proposed Surface Area= 26,293 SF Required surface Area= 11,422 SF AVERAGE DEPTH Depth of Pond= 3.50 ft Depth(dist.btwn.bot.of shelf&btm.of pond,excludes sediment; Average Depth= 3.69 ft Based on Equation 3 in Wet Pond MDC Use Average Depth of= 3.50 ft C-3:WET DETENTION BASIN DESIGN CONT'D 1.0 INCH VOLUME ELEVATION Contour Incremental Accumulated Contour Area Volume Volume,S Stage,Z sq ft cu ft cu ft ft 216.00 26,293 0 0 216.0 Required Temporary Pool Volume= 28,709 CF 217.00 30,032 28,139 28,139 217.0 Permanent Pool Elevaton= 216.00 218.00 32,595 31,301 59,440 218.0 Temporary Pool Elevation= 217.10 219.00 25,214 28,823 88,263 219.0 Provided Temporary Pool Volume= 30,495 CF 220.00 37,889 31,334 119,597 220.0 221.00 40,610 39,237 158,834 221.0 217.10 29,177 30,495 5.00 -1 ORIFICE SIZING Ozooys= 0.1765 CFS Os pays= 0.0706 CFS Orifice Size= 3.00 IN Driving Head(Ho)= 0.30 FT Q ormce= 0.135 CFS Drawdown Time= 2.62 DAYS less than 5 days(yes/no)? Yes greater than 2 days(yes/no)? Yes ANTI FLOTATION CALCULATIONS Outside Length= 5.00 FT Outside Width= 5.00 FT Inside Length= 4.00 FT Inside Width= 4.00 FT Bottom Thickness= 0.50 FT Top of Riser= 219.80 FT Invert of Riser= 213.00 FT Area= 25.0 SF (Outside Dim.=5-ft x 5-ft,Inside Dim.=4-ft x 4-ft) Volume= 183 CF (Water Displaced-Top of Riser to Bottom of Riser) Weight= 11,388 LBS (Weight Water Displaced) Factor of Safety= 1.25 WT Req'd of Anti-Flotation Device= 14,235 LBS Volume of Concrete Req'd= 162.5 CF (Unit WT of Concrete=150 pcf)Submerged Concrete Unit Weight 87.6 pcf Depth Provided= 3.60 FT Volume Provided= 163.7 CF (4-ft x 4-ft Box filled 4-ft deep with concrete) WT of Anti-Flotation Device Provided= 14,340 LBS OK Invert of Anti-Flotation Device= 209.40 FT SCM 2 - STM 300 FOREBAY/STORAGE TABLE CONTOUR CONTOUR INCREMENTAL CUMULATIVE ELEVATION (FT) AREA (SF) VOLUME (CF) VOLUME (CF) 213 3310 0 0 - 214 3803 3,557 3,557 215 4326 4,065 I 7,621 216 5311 4,819 12,440 SCM 2 - STM 600 FOREBAY/STORAGE TABLE CONTOUR CONTOUR INCREMENTAL CUMULATIVE ELEVATION (FT) AREA (SF) VOLUME (CF) VOLUME (CF) 213 3114 0 0 214 _ 3594 3,354 3,354 215 4103 3,849 7,203 216 5073 4,588 11,791 SCM 2 - MAIN POOL/STORAGE TABLE CONTOUR INCREMENTAL CUMULATIVE CONTOUR AREA VOLUME VOLUME ELEVATION (FT) (SF) (CF) (CF) 213 11487 0 0 214 12402 11,945 11,945 215 13347 12,875 24,819 216 15030 14,189 39,008 APPENDIX E: ROUTING CALCULATIONS I P ......... 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 6 7 9 \/ 11 12 VII CD CD Legend Hyd. Origin Description 1 SCS Runoff PRE DA-1A 2 SCS Runoff POST DA-1A 3 Reservoir DA-1A W/DETENTION 4 SCS Runoff POST DA-1A BYPASS 6 SCS Runoff PRE DA-1B 7 SCS Runoff POST DA-1B 8 Reservoir DA-1B W/DETENTION 9 SCS Runoff POST DA-1B BYPASS 11 SCS Runoff PRE-DA 2 12 SCS Runoff POST DA-2 BYASS Project: C22008- Hydraflow.gpw Wednesday, 11 /29/2023 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 12.85 22.16 53.10 74.69 113.15 PRE DA-1A 2 SCS Runoff 16.82 27.85 63.90 88.53 132.46 POST DA-1A 3 Reservoir 2 0.057 0.177 2.832 8.672 19.20 DA-1A W/DETENTION 4 SCS Runoff 0.899 3.921 18.17 29.00 49.10 POST DA-1A BYPASS 6 SCS Runoff 16.06 26.89 62.58 87.54 131.13 PRE DA-1B 7 SCS Runoff 11.17 21.83 58.57 84.63 130.95 POST DA-1 B 8 Reservoir 7 0.000 0.129 1.004 1.750 14.91 DA-1 B W/DETENTION 9 SCS Runoff 0.004 0.020 1.450 3.895 9.205 POST DA-1 B BYPASS 11 SCS Runoff 2.114 3.417 7.632 10.52 15.61 PRE-DA 2 12 SCS Runoff 0.000 0.001 0.027 0.139 0.433 POST DA-2 BYASS Proj. file: C22008- Hydraflow.gpw Wednesday, 11 /29/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.85 2 722 38,906 PRE DA-1A 2 SCS Runoff 16.82 2 718 35,868 POST DA-1A 3 Reservoir 0.057 2 1446 5,440 2 212.18 35,325 DA-1A W/DETENTION 4 SCS Runoff 0.899 2 720 5,910 POST DA-1A BYPASS 6 SCS Runoff 16.06 2 726 58,622 PRE DA-1B 7 SCS Runoff 11.17 2 718 27,637 POST DA-1B 8 Reservoir 0.000 2 n/a 0 7 216.98 27,637 DA-1B W/DETENTION 9 SCS Runoff 0.004 2 1440 73 POST DA-1 B BYPASS 11 SCS Runoff 2.114 2 720 5,180 PRE-DA 2 12 SCS Runoff 0.000 2 n/a 0 POST DA-2 BYASS C22008 - Hydraflow.gpw Return Period: 1 Year Wednesday, 11 /29/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 1 PRE DA-1A Hydrograph type = SCS Runoff Peak discharge = 12.85 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 38,906 cuft Drainage area = 17.620 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.40 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1A Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 14.00 - 14.00 12.00 - 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 - - 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. No. 1 PRE DA-1A Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.73 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 5.85 + 0.00 + 0.00 = 5.85 Shallow Concentrated Flow Flow length (ft) = 478.00 0.00 0.00 Watercourse slope (%) = 5.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.61 0.00 0.00 Travel Time (min) = 2.21 + 0.00 + 0.00 = 2.21 Channel Flow X sectional flow area (sqft) = 16.00 0.00 0.00 Wetted perimeter(ft) = 14.00 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =6.52 0.00 0.00 Flow length (ft) ({0})1292.0 0.0 0.0 Travel Time (min) = 3.30 + 0.00 + 0.00 = 3.30 Total Travel Time, Tc 11.40 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 2 POST DA-1A Hydrograph type = SCS Runoff Peak discharge = 16.82 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 35,868 cuft Drainage area = 17.620 ac Curve number = 67.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — 1 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 3 DA-1A W/ DETENTION Hydrograph type = Reservoir Peak discharge = 0.057 cfs Storm frequency = 1 yrs Time to peak = 1446 min Time interval = 2 min Hyd. volume = 5,440 cuft Inflow hyd. No. = 2 - POST DA-1A Max. Elevation = 212.18 ft Reservoir name = SCM 1 Max. Storage = 35,325 cuft Storage Indication method used. DA-1A W/ DETENTION Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 16111- 0.00 III0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 35,325 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Pond No. 1 - SCM 1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=211.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 211.00 27,883 0 0 1.00 212.00 30,976 29,413 29,413 2.00 213.00 33,109 32,034 61,447 3.00 214.00 35,298 34,195 95,642 4.00 215.00 37,543 36,411 132,053 5.00 216.00 39,841 38,683 170,736 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 3.00 12.00 Inactive Crest Len(ft) = 16.00 Inactive Inactive Inactive Span(in) = 18.00 3.00 48.00 0.00 Crest El.(ft) = 214.80 0.00 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 208.00 212.00 213.00 0.00 Weir Type = 1 --- --- --- Length(ft) = 54.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.74 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 211.00 0.00 0.00 0.00 --- 0.00 --- --- --- --- --- 0.000 1.00 29,413 212.00 12.42 oc 0.00 0.00 --- 0.00 --- --- 0.000 2.00 61,447 213.00 12.42 oc 0.22 ic 0.00 --- 0.00 --- --- --- --- --- 0.221 3.00 95,642 214.00 13.94 oc 0.32 ic 13.62 ic --- 0.00 --- --- --- --- --- 13.94 4.00 132,053 215.00 20.18 is 0.19 is 15.22 ic --- 4.77 --- --- 20.18 5.00 170,736 216.00 22.86 is 0.04 is 3.29 ic --- 19.53 s --- --- 22.86 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 4 POST DA-1A BYPASS Hydrograph type = SCS Runoff Peak discharge = 0.899 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 5,910 cuft Drainage area = 9.740 ac Curve number = 54.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A BYPASS Q (cfs) Hyd. No. 4 -- 1 Year Q(cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 6 PRE DA-1B Hydrograph type = SCS Runoff Peak discharge = 16.06 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 58,622 cuft Drainage area = 24.240 ac Curve number = 68.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.80 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1 B Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - \- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 11 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. No. 6 PRE DA-1B Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.65 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 10.29 + 0.00 + 0.00 = 10.29 Shallow Concentrated Flow Flow length (ft) = 514.00 682.00 0.00 Watercourse slope (%) = 2.44 5.14 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) =2.52 3.66 0.00 Travel Time (min) = 3.40 + 3.11 + 0.00 = 6.51 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 16.80 min 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 7 POST DA-1 B Hydrograph type = SCS Runoff Peak discharge = 11.17 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 27,637 cuft Drainage area = 20.020 ac Curve number = 62.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 8 DA-1 B W/ DETENTION Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 7 - POST DA-1B Max. Elevation = 216.98 ft Reservoir name = SCM 2 Max. Storage = 27,637 cuft Storage Indication method used. DA-1 B W/ DETENTION Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 12.00 I 12.00 10.00 - 10.00 8.00 8.00 T 6.00 6.00 4.00 — — 4.00 2.00 - 2.00 1311111111111111111111111.M.=M 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 27,637 cuft Pond Report 14 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Pond No. 2 - SCM 2 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=216.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 216.00 26,293 0 0 1.00 217.00 30,032 28,139 28,139 2.00 218.00 32,595 31,301 59,440 3.00 219.00 25,214 28,823 88,263 4.00 220.00 37,889 31,334 119,597 5.00 221.00 40,610 39,237 158,834 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 3.00 4.00 Inactive Crest Len(ft) = 16.00 Inactive Inactive Inactive Span(in) = 18.00 3.00 10.00 0.00 Crest El.(ft) = 219.80 0.00 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 213.00 217.10 218.50 0.00 Weir Type = 1 --- --- --- Length(ft) = 66.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 1.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 216.00 0.00 0.00 0.00 --- 0.00 --- --- --- --- --- 0.000 1.00 28,139 217.00 12.76 is 0.00 0.00 --- 0.00 --- --- 0.000 2.00 59,440 218.00 12.76 is 0.21 is 0.00 --- 0.00 --- --- --- --- --- 0.208 3.00 88,263 219.00 12.76 is 0.31 is 0.77 ic --- 0.00 --- --- --- --- --- 1.087 4.00 119,597 220.00 12.76 is 0.39 is 1.54 ic --- 4.77 --- --- 6.703 5.00 158,834 221.00 22.84 is 0.05 is 0.28 ic --- 22.50 s --- --- 22.83 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 9 POST DA-1 B BYPASS Hydrograph type = SCS Runoff Peak discharge = 0.004 cfs Storm frequency = 1 yrs Time to peak = 1440 min Time interval = 2 min Hyd. volume = 73 cuft Drainage area = 3.450 ac Curve number = 42.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B BYPASS Q (cfs) Hyd. No. 9-- 1 Year Q (cfs) 0.10 1 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 11 PRE-DA 2 Hydrograph type = SCS Runoff Peak discharge = 2.114 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 5,180 cuft Drainage area = 2.100 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.80 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE-DA 2 Q (cfs) Hyd. No. 11 -- 1 Year Q(cfs) 3.00 3.00 2.00 2.00 1.00 - 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 17 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. No. 11 PRE-DA 2 Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.73 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 9.08 + 0.00 + 0.00 = 9.08 Shallow Concentrated Flow Flow length (ft) = 74.00 0.00 0.00 Watercourse slope (%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.61 0.00 0.00 Travel Time (min) = 0.76 + 0.00 + 0.00 = 0.76 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 9.80 min 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 12 POST DA-2 BYASS Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 0.220 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-2 BYASS Q (cfs) Hyd. No. 12 -- 1 Year Q(cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - - 0.00 0 20 40 60 80 100 120 Hyd No. 12 Time (min) 19 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 22.16 2 722 61,714 PRE DA-1A 2 SCS Runoff 27.85 2 718 56,744 POST DA-1A 3 Reservoir 0.177 2 1444 24,907 2 212.69 51,488 DA-1A W/DETENTION 4 SCS Runoff 3.921 2 720 12,229 POST DA-1A BYPASS 6 SCS Runoff 26.89 2 726 90,969 PRE DA-1B 7 SCS Runoff 21.83 2 718 47,126 POST DA-1B 8 Reservoir 0.129 2 1444 14,245 7 217.53 44,573 DA-1B W/DETENTION 9 SCS Runoff 0.020 2 914 704 POST DA-1B BYPASS 11 SCS Runoff 3.417 2 720 8,009 PRE-DA 2 12 SCS Runoff 0.001 2 1440 13 POST DA-2 BYASS C22008 - Hydraflow.gpw Return Period: 2 Year Wednesday, 11 /29/2023 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 1 PRE DA-1A Hydrograph type = SCS Runoff Peak discharge = 22.16 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 61,714 cuft Drainage area = 17.620 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.40 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1A Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 1 16.00 16.00 12.00 12.00 8.00 8.00 4.007 4.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 2 POST DA-1A Hydrograph type = SCS Runoff Peak discharge = 27.85 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 56,744 cuft Drainage area = 17.620 ac Curve number = 67.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - i - A - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 3 DA-1A W/ DETENTION Hydrograph type = Reservoir Peak discharge = 0.177 cfs Storm frequency = 2 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 24,907 cuft Inflow hyd. No. = 2 - POST DA-1A Max. Elevation = 212.69 ft Reservoir name = SCM 1 Max. Storage = 51,488 cuft Storage Indication method used. DA-1A W/ DETENTION Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 - - 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 51,488 cuft 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 4 POST DA-1A BYPASS Hydrograph type = SCS Runoff Peak discharge = 3.921 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 12,229 cuft Drainage area = 9.740 ac Curve number = 54.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1A BYPASS Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 4 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 6 PRE DA-1B Hydrograph type = SCS Runoff Peak discharge = 26.89 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 90,969 cuft Drainage area = 24.240 ac Curve number = 68.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.80 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1 B Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 I ice- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 6 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 7 POST DA-1 B Hydrograph type = SCS Runoff Peak discharge = 21.83 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 47,126 cuft Drainage area = 20.020 ac Curve number = 62.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 —' — — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 8 DA-1 B W/ DETENTION Hydrograph type = Reservoir Peak discharge = 0.129 cfs Storm frequency = 2 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 14,245 cuft Inflow hyd. No. = 7 - POST DA-1B Max. Elevation = 217.53 ft Reservoir name = SCM 2 Max. Storage = 44,573 cuft Storage Indication method used. DA-1 B W/ DETENTION Q (cfs) Hyd. No. 8 -- 2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 44,573 cuft 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 9 POST DA-1 B BYPASS Hydrograph type = SCS Runoff Peak discharge = 0.020 cfs Storm frequency = 2 yrs Time to peak = 914 min Time interval = 2 min Hyd. volume = 704 cuft Drainage area = 3.450 ac Curve number = 42.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B BYPASS Q (cfs) Hyd. No. 9-- 2 Year Q(cfs) 0.10 1 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 ..._ 0.01 ....,.... 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 11 PRE-DA 2 Hydrograph type = SCS Runoff Peak discharge = 3.417 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 8,009 cuft Drainage area = 2.100 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.80 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE-DA 2 Q (cfs) Hyd. No. 11 -- 2 Year Q (cfs) 4.00 - 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 11 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 12 POST DA-2 BYASS Hydrograph type = SCS Runoff Peak discharge = 0.001 cfs Storm frequency = 2 yrs Time to peak = 1440 min Time interval = 2 min Hyd. volume = 13 cuft Drainage area = 0.220 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-2 BYASS Q (cfs) Hyd. No. 12 -- 2 Year Q (cfs) 0.10 1 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 53.10 2 722 139,554 PRE DA-1A 2 SCS Runoff 63.90 2 718 127,858 POST DA-1A 3 Reservoir 2.832 2 812 94,913 2 213.33 72,655 DA-1A W/DETENTION 4 SCS Runoff 18.17 2 718 38,204 POST DA-1A BYPASS 6 SCS Runoff 62.58 2 724 199,392 PRE DA-1B 7 SCS Runoff 58.57 2 718 117,505 POST DA-1B 8 Reservoir 1.004 2 1142 80,823 7 218.94 86,485 DA-1 B W/DETENTION 9 SCS Runoff 1.450 2 720 5,332 POST DA-1 B BYPASS 11 SCS Runoff 7.632 2 720 17,468 PRE-DA 2 12 SCS Runoff 0.027 2 722 223 POST DA-2 BYASS C22008 - Hydraflow.gpw Return Period: 10 Year Wednesday, 11 /29/2023 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 1 PRE DA-1A Hydrograph type = SCS Runoff Peak discharge = 53.10 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 139,554 cuft Drainage area = 17.620 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.40 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 ) - . 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 2 POST DA-1A Hydrograph type = SCS Runoff Peak discharge = 63.90 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 127,858 cuft Drainage area = 17.620 ac Curve number = 67.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 T 40.00 40.00 30.00 - 30.00 20.00 20.00 10.00 10.00 ____ i ...E-7_ 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 3 DA-1A W/ DETENTION Hydrograph type = Reservoir Peak discharge = 2.832 cfs Storm frequency = 10 yrs Time to peak = 812 min Time interval = 2 min Hyd. volume = 94,913 cuft Inflow hyd. No. = 2 - POST DA-1A Max. Elevation = 213.33 ft Reservoir name = SCM 1 Max. Storage = 72,655 cuft Storage Indication method used. DA-1A W/ DETENTION Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 -. 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 72,655 cuft 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 4 POST DA-1A BYPASS Hydrograph type = SCS Runoff Peak discharge = 18.17 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 38,204 cuft Drainage area = 9.740 ac Curve number = 54.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A BYPASS Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 6 PRE DA-1B Hydrograph type = SCS Runoff Peak discharge = 62.58 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 199,392 cuft Drainage area = 24.240 ac Curve number = 68.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.80 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1 B Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 ■ 50.00 ---- 50.00 40.00 ---- 40.00 30.00 30.00 20.00 ---- II 20.00 IN IN 10.00 ---- 1•1 I 10.00 ME__ 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 7 POST DA-1 B Hydrograph type = SCS Runoff Peak discharge = 58.57 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 117,505 cuft Drainage area = 20.020 ac Curve number = 62.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — A 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 8 DA-1 B W/ DETENTION Hydrograph type = Reservoir Peak discharge = 1.004 cfs Storm frequency = 10 yrs Time to peak = 1142 min Time interval = 2 min Hyd. volume = 80,823 cuft Inflow hyd. No. = 7 - POST DA-1B Max. Elevation = 218.94 ft Reservoir name = SCM 2 Max. Storage = 86,485 cuft Storage Indication method used. DA-1 B W/ DETENTION Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 L""' 0.00 — � 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 86,485 cuft 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 9 POST DA-1 B BYPASS Hydrograph type = SCS Runoff Peak discharge = 1.450 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 5,332 cuft Drainage area = 3.450 ac Curve number = 42.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B BYPASS Q (cfs) Hyd. No. 9-- 10 Year Q (cfs) 2.00 - i 2.00 • 1.00 - 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 11 PRE-DA 2 Hydrograph type = SCS Runoff Peak discharge = 7.632 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 17,468 cuft Drainage area = 2.100 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.80 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE-DA 2 Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 8.00 - 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 12 POST DA-2 BYASS Hydrograph type = SCS Runoff Peak discharge = 0.027 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 223 cuft Drainage area = 0.220 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-2 BYASS Q (cfs) Hyd. No. 12 -- 10 Year Q(cfs) 0.10 1 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - t 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 41 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 74.69 2 720 194,719 PRE DA-1A 2 SCS Runoff 88.53 2 718 178,186 POST DA-1A 3 Reservoir 8.672 2 746 145,214 2 213.72 86,152 DA-1A W/DETENTION 4 SCS Runoff 29.00 2 718 58,819 POST DA-1A BYPASS 6 SCS Runoff 87.54 2 724 275,299 PRE DA-1B 7 SCS Runoff 84.63 2 718 169,261 POST DA-1B 8 Reservoir 1.750 2 1016 131,801 7 219.73 111,005 DA-1BW/DETENTION 9 SCS Runoff 3.895 2 718 9,895 POST DA-1B BYPASS 11 SCS Runoff 10.52 2 718 24,076 PRE-DA 2 12 SCS Runoff 0.139 2 720 460 POST DA-2 BYASS C22008 - Hydraflow.gpw Return Period: 25 Year Wednesday, 11 /29/2023 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 1 PRE DA-1A Hydrograph type = SCS Runoff Peak discharge = 74.69 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 194,719 cuft Drainage area = 17.620 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.40 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1A Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 80.00 i 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 2 POST DA-1A Hydrograph type = SCS Runoff Peak discharge = 88.53 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 178,186 cuft Drainage area = 17.620 ac Curve number = 67.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 90.00 ) 90.00 — 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 ! A — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 3 DA-1A W/ DETENTION Hydrograph type = Reservoir Peak discharge = 8.672 cfs Storm frequency = 25 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 145,214 cuft Inflow hyd. No. = 2 - POST DA-1A Max. Elevation = 213.72 ft Reservoir name = SCM 1 Max. Storage = 86,152 cuft Storage Indication method used. DA-1A W/ DETENTION Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 I 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 _ ,..... 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 86,152 cuft 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 4 POST DA-1A BYPASS Hydrograph type = SCS Runoff Peak discharge = 29.00 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 58,819 cuft Drainage area = 9.740 ac Curve number = 54.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A BYPASS Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 30.00 I 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 6 PRE DA-1B Hydrograph type = SCS Runoff Peak discharge = 87.54 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 275,299 cuft Drainage area = 24.240 ac Curve number = 68.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.80 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1 B Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 90.00 90.00 — 80.00 80.00 70.00 70.00 60.00 60.00 1 50.00 50.00 1 40.00 40.00 30.00 30.00 20.00 20.00 10.00 J10.00 _ ......_ 0.00 . _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 7 POST DA-1 B Hydrograph type = SCS Runoff Peak discharge = 84.63 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 169,261 cuft Drainage area = 20.020 ac Curve number = 62.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 90.00 I 90.00 — 80.00 80.00 70.00 70.00 60.00 - 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 ! —..." s — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 8 DA-1 B W/ DETENTION Hydrograph type = Reservoir Peak discharge = 1.750 cfs Storm frequency = 25 yrs Time to peak = 1016 min Time interval = 2 min Hyd. volume = 131,801 cuft Inflow hyd. No. = 7 - POST DA-1B Max. Elevation = 219.73 ft Reservoir name = SCM 2 Max. Storage = 111,005 cuft Storage Indication method used. DA-1 B W/ DETENTION Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 - 10.00 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 111,005 cuft 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 9 POST DA-1B BYPASS Hydrograph type = SCS Runoff Peak discharge = 3.895 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 9,895 cuft Drainage area = 3.450 ac Curve number = 42.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B BYPASS Q (cfs) Hyd. No. 9 -- 25 Year Q (cfs) 4.00 i 4.00 3.00 3.00 2.00 2.00 1.00 - 1.00 • 0.00 - - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 9 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 11 PRE-DA 2 Hydrograph type = SCS Runoff Peak discharge = 10.52 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 24,076 cuft Drainage area = 2.100 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.80 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE-DA 2 Q (cfs) Hyd. No. 11 --25 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 ' - 8.00 6.00 - 6.00 4.00 - 4.00 2.00 — 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 12 POST DA-2 BYASS Hydrograph type = SCS Runoff Peak discharge = 0.139 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 460 cuft Drainage area = 0.220 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.55 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-2 BYASS Q (cfs) Hyd. No. 12 --25 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 s - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 52 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 113.15 2 720 293,322 PRE DA-1A 2 SCS Runoff 132.46 2 716 268,069 POST DA-1A 3 Reservoir 19.20 2 728 235,062 2 214.81 124,969 DA-1A W/DETENTION 4 SCS Runoff 49.10 2 718 98,212 POST DA-1A BYPASS 6 SCS Runoff 131.13 2 724 409,982 PRE DA-1B 7 SCS Runoff 130.95 2 718 263,848 POST DA-1B 8 Reservoir 14.91 2 740 226,017 7 220.19 126,930 DA-1B W/DETENTION 9 SCS Runoff 9.205 2 718 19,620 POST DA-1B BYPASS 11 SCS Runoff 15.61 2 718 35,788 PRE-DA 2 12 SCS Runoff 0.433 2 718 992 POST DA-2 BYASS C22008 - Hydraflow.gpw Return Period: 100 Year Wednesday, 11 /29/2023 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 1 PRE DA-1A Hydrograph type = SCS Runoff Peak discharge = 113.15 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 293,322 cuft Drainage area = 17.620 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.40 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1A Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 • 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 2 POST DA-1A Hydrograph type = SCS Runoff Peak discharge = 132.46 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 268,069 cuft Drainage area = 17.620 ac Curve number = 67.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 -t 20.00 20.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 3 DA-1A W/ DETENTION Hydrograph type = Reservoir Peak discharge = 19.20 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 235,062 cuft Inflow hyd. No. = 2 - POST DA-1A Max. Elevation = 214.81 ft Reservoir name = SCM 1 Max. Storage = 124,969 cuft Storage Indication method used. DA-1A W/ DETENTION Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 I 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 124,969 cuft 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 4 POST DA-1A BYPASS Hydrograph type = SCS Runoff Peak discharge = 49.10 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 98,212 cuft Drainage area = 9.740 ac Curve number = 54.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 A BYPASS Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 50.00 j 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00j ft................. 10.00 0.00 - s - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 6 PRE DA-1B Hydrograph type = SCS Runoff Peak discharge = 131.13 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 409,982 cuft Drainage area = 24.240 ac Curve number = 68.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.80 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA-1 B Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 • 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 7 POST DA-1 B Hydrograph type = SCS Runoff Peak discharge = 130.95 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 263,848 cuft Drainage area = 20.020 ac Curve number = 62.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 rni-.--,...----- 0.00 s — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 8 DA-1 B W/ DETENTION Hydrograph type = Reservoir Peak discharge = 14.91 cfs Storm frequency = 100 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 226,017 cuft Inflow hyd. No. = 7 - POST DA-1B Max. Elevation = 220.19 ft Reservoir name = SCM 2 Max. Storage = 126,930 cuft Storage Indication method used. DA-1 B W/ DETENTION Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs) 140.00 140.00 120.00 I 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 kii... 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) Hyd No. 8 Hyd No. 7 111111111 Total storage used = 126,930 cuft 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 9 POST DA-1 B BYPASS Hydrograph type = SCS Runoff Peak discharge = 9.205 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 19,620 cuft Drainage area = 3.450 ac Curve number = 42.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-1 B BYPASS Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 ( - 6.00 4.00 - 4.00 2.00 2.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 11 PRE-DA 2 Hydrograph type = SCS Runoff Peak discharge = 15.61 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 35,788 cuft Drainage area = 2.100 ac Curve number = 69.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 9.80 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE-DA 2 Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Hyd. No. 12 POST DA-2 BYASS Hydrograph type = SCS Runoff Peak discharge = 0.433 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 992 cuft Drainage area = 0.220 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA-2 BYASS Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 63 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 66.0418 12.6000 0.8880 2 78.1105 13.0000 0.8840 3 0.0000 0.0000 0.0000 5 15.7627 1.1000 0.4497 10 77.0629 12.4000 0.8025 25 66.5822 10.9000 0.7370 50 61.1768 10.0000 0.6945 100 56.6743 9.2000 0.6559 File name:Coats NC.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.17 4.14 3.47 2.99 2.64 2.36 2.14 1.96 1.81 1.68 1.57 1.47 2 6.07 4.89 4.11 3.55 3.13 2.81 2.55 2.34 2.16 2.00 1.87 1.76 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.99 5.34 4.52 4.00 3.64 3.36 3.14 2.96 2.81 2.69 2.58 2.48 10 7.79 6.36 5.41 4.73 4.21 3.81 3.48 3.21 2.99 2.79 2.63 2.48 25 8.67 7.09 6.05 5.31 4.76 4.32 3.97 3.68 3.43 3.22 3.04 2.88 50 9.33 7.64 6.54 5.76 5.18 4.72 4.35 4.04 3.78 3.56 3.37 3.20 100 9.95 8.16 7.01 6.20 5.59 5.11 4.72 4.40 4.13 3.90 3.70 3.52 Tc=time in minutes.Values may exceed 60. tboada\Underfoot Engineering,Inc\The Boot-Documents\Software Support\Hydraflow\SCS Precip Data\Coats NC.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.01 3.65 0.00 4.65 5.44 6.55 7.45 8.39 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents C22008-Hydraflow.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday, 11 /29/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, PRE DA-1A 4 TR-55 Tc Worksheet 5 Hydrograph No. 2, SCS Runoff, POST DA-1A 6 Hydrograph No. 3, Reservoir, DA-1A W/ DETENTION 7 Pond Report - SCM 1 8 Hydrograph No. 4, SCS Runoff, POST DA-1A BYPASS. 9 Hydrograph No. 6, SCS Runoff, PRE DA-1B 10 TR-55 Tc Worksheet 11 Hydrograph No. 7, SCS Runoff, POST DA-1B 12 Hydrograph No. 8, Reservoir, DA-1B W/ DETENTION 13 Pond Report - SCM 2 14 Hydrograph No. 9, SCS Runoff, POST DA-1B BYPASS 15 Hydrograph No. 11, SCS Runoff, PRE-DA 2 16 TR-55 Tc Worksheet 17 Hydrograph No. 12, SCS Runoff, POST DA-2 BYASS 18 2 - Year Summary Report 19 Hydrograph Reports 20 Hydrograph No. 1, SCS Runoff, PRE DA-1A 20 Hydrograph No. 2, SCS Runoff, POST DA-1A 21 Hydrograph No. 3, Reservoir, DA-1A W/ DETENTION 22 Hydrograph No. 4, SCS Runoff, POST DA-1A BYPASS. 23 Hydrograph No. 6, SCS Runoff, PRE DA-1B 24 Hydrograph No. 7, SCS Runoff, POST DA-1B 25 Hydrograph No. 8, Reservoir, DA-1 B W/ DETENTION 26 Hydrograph No. 9, SCS Runoff, POST DA-1B BYPASS 27 Hydrograph No. 11, SCS Runoff, PRE-DA 2 28 Hydrograph No. 12, SCS Runoff, POST DA-2 BYASS 29 10 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, SCS Runoff, PRE DA-1A 31 Hydrograph No. 2, SCS Runoff, POST DA-1A 32 Hydrograph No. 3, Reservoir, DA-1A W/ DETENTION 33 Hydrograph No. 4, SCS Runoff, POST DA-1A BYPASS. 34 Hydrograph No. 6, SCS Runoff, PRE DA-1B 35 Hydrograph No. 7, SCS Runoff, POST DA-1B 36 Hydrograph No. 8, Reservoir, DA-1 B W/ DETENTION 37 Hydrograph No. 9, SCS Runoff, POST DA-1B BYPASS 38 Contents continued... C22008-Hydraflow.gpw Hydrograph No. 11, SCS Runoff, PRE-DA 2 39 Hydrograph No. 12, SCS Runoff, POST DA-2 BYASS 40 25 - Year Summary Report 41 Hydrograph Reports 42 Hydrograph No. 1, SCS Runoff, PRE DA-1A 42 Hydrograph No. 2, SCS Runoff, POST DA-1A. 43 Hydrograph No. 3, Reservoir, DA-1A W/ DETENTION 44 Hydrograph No. 4, SCS Runoff, POST DA-1A BYPASS. 45 Hydrograph No. 6, SCS Runoff, PRE DA-1B 46 Hydrograph No. 7, SCS Runoff, POST DA-1 B 47 Hydrograph No. 8, Reservoir, DA-1 B W/ DETENTION 48 Hydrograph No. 9, SCS Runoff, POST DA-1 B BYPASS 49 Hydrograph No. 11, SCS Runoff, PRE-DA 2 50 Hydrograph No. 12, SCS Runoff, POST DA-2 BYASS 51 100 - Year Summary Report 52 Hydrograph Reports 53 Hydrograph No. 1, SCS Runoff, PRE DA-1A 53 Hydrograph No. 2, SCS Runoff, POST DA-1A. 54 Hydrograph No. 3, Reservoir, DA-1A W/ DETENTION 55 Hydrograph No. 4, SCS Runoff, POST DA-1A BYPASS. 56 Hydrograph No. 6, SCS Runoff, PRE DA-1B 57 Hydrograph No. 7, SCS Runoff, POST DA-1B 58 Hydrograph No. 8, Reservoir, DA-1 B W/ DETENTION 59 Hydrograph No. 9, SCS Runoff, POST DA-1 B BYPASS 60 Hydrograph No. 11, SCS Runoff, PRE-DA 2 61 Hydrograph No. 12, SCS Runoff, POST DA-2 BYASS 62 IDF Report 63 I APPENDIX F: INLET CALCULATIONS I P ......... 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com Flow(Total Flow(Total Downstream Upstream Inlet Upstream Inlet Upstream Pipe Diameter Capacity(Full Total Pipe Flow Total System Invert Invert Elevation(Rim) Elevation Structure Gutter Depth Gutter Spread Upstream Node Material Pipe Length(ft) Slope(fUft) Inlet` Inlet Type Bypass Target Intercepted) Bypassed) Node C Area(acres) Intensity*(in/h) (in) Flow)(fP/s) (ft'/s Flow fP/s)( (Upstream)(ft)ft) (Downstream)Downstream)(ft)ft) (ft) (Invert)(ft) Height(ft) (ft'/s) (ft'/s) (in) (ft)i 348 346 0.55 0.23 7.79 15 Class III RCP 126.60 6.55 0.99 0.99 0.010 235.20 233.90 348 242.44 235.20 7.20 Drop-Grate-NCDOT 840.15 - - I - - - 347 346 0.55 0.23 7.79 15 Class Ill RCP 27.40 6.76 0.99 0.84 0.011 234.20 233.90 347 241.15 234.20 7.00 Combo-NCDOT 840.03 345 0.48 0.03 1.30 3.50 346 344 0.61 0.33 7.62 15 Class III RCP 217.00 6.50 1.53 2.96 0.010 232.20 230.00 346 240.92 232.20 8.70 Combo-NCDOT 840.03 344 0.71 0.10 1.60 4.50 345 344 0.61 0.34 7.79 15 Class Ill RCP 26.10 6.93 1.62 1.31 0.012 228.30 228.00 345 235.04 228.30 6.70 Combo-NCDOT 840.03 343 0.75 0.11 1.60 4.60 344 342 0.58 0.44 7.40 18 Class III RCP 241.80 8.27 1.89 5.66 0.006 227.20 225.70 344 234.99 227.20 7.80 Combo-NCDOT 840.03 342 0.93 0.20 1.70 5.20 343 342 0.61 0.45 7.79 15 Class Ill RCP 26.00 6.94 2.14 1.66 0.012 226.00 225.70 343 229.66 226.00 3.70 Combo-NCDOT 840.03 340 0.94 0.28 2.00 6.20 342 341 0.59 0.51 7.15 24 Class III RCP 43.10 18.87 2.15 8.71 0.007 224.70 224.40 342 229.66 224.70 5.00 Combo-NCDOT 840.03 i 340 1.05 0.36 2.10 6.60 341 336 0.60 0.49 7.11 24 Class Ill RCP 26.00 19.84 2.09 10.05 0.008 223.20 223.00 341 230.05 223.20 6.80 Combo-NCDOT 840.03 340 0.92 0.27 1.90 6.10 340 339 0.81 0.06 7.79 15 Class III RCP 26.00 5.66 0.38 1.99 0.008 224.50 224.30 _ 340 226.98 224.50 2.50 Combo-NCDOT 840.03 0 0.87 0.23 1.90 5.90 339 336 0.65 0.35 7.76 15 Class Ill RCP 208.00 4.70 1.76 3.26 0.005 224.10 223.00 339 226.96 224.10 2.90 Combo-NCDOT 840.03 0 0.76 0.17 1.80 5.50 338 337 0.61 0.41 7.79 15 Class III RCP 59.20 6.50 1.95 1.96 0.010 226.10 225.50 338 229.72 226.10 3.60 Combo-NCDOT 840.03 0 1.01 0.00 3.40 4.00 337 336 0.95 0.05 7.72 15 Class Ill RCP 41.40 7.10 0.37 2.32 0.012 225.30 224.80 337 229.45 225.30 4.10 Combo-NCDOT 840.03 0 0.19 0.00 1.50 1.00 336 331 0.73 0.10 7.09 24 Class III RCP 116.50 16.23 0.52 15.59 0.005 222.10 221.50 336 230.09 222.10 8.00 Combo-NCDOT 840.03 339 0.29 0.01 1.20 3.10 335 334 0.49 0.07 7.79 15 Class Ill RCP 151.50 6.64 0.27 0.27 0.011 229.00 227.40 335 232.99 229.00 4.00 Drop-Grate-NCDOT 840.15 - - - - - 334 333 0.56 0.44 7.49 15 Class III RCP 140.40 6.68 1.85 2.12 0.011 227.20 225.70 334 230.99 227.20 3.80 Drop-Grate-NCDOT 840.15 - - - - - 333 332 0.59 0.39 7.34 15 Class Ill RCP 30.90 7.35 1.69 3.78 0.013 225.50 225.10 333 228.70 225.50 3.20 Drop-Grate-NCDOT 840.15 - - - - - 332 331 0.60 0.07 7.32 15 Class III RCP 26.00 6.94 0.31 4.07 0.012 222.90 222.60 332 231.14 222.90 8.20 Combo-NCDOT 840.03 330 0.17 0.00 1.00 2.10 331 329 0.64 0.17 6.99 30 Class Ill RCP 96.50 29.52 0.76 19.90 0.005 220.80 220.30 331 229.88 220.80 9.10 Combo-NCDOT 840.03 329 0.41 0.03 1.40 3.70 330 329 0.65 0.13 7.79 15 Class III RCP 26.50 6.87 0.66 0.59 0.011 221.90 221.60 330 228.35 221.90 6.40 Combo-NCDOT 840.03 323 0.33 0.01 1.30 3.30 329 322 0.61 0.21 6.91 30 Class Ill RCP 73.10 30.34 0.89 21.00 0.005 220.10 219.70 329 228.80 220.10 8.70 Combo-NCDOT 840.03 322 0.49 0.05 1.50 4.20 328 326 0.57 0.35 7.79 15 Class III RCP 127.00 6.54 1.55 1.57 0.010 226.80 225.50 328 231.50 226.80 4.70 Drop-Grate-NCDOT 840.15 - - - - - 327 326 0.62 0.52 7.79 15 Class Ill RCP 26.00 6.94 2.51 1.61 0.012 224.30 224.00 327 230.88 224.30 6.60 Combo-NCDOT 840.03 325 0.99 0.31 2.00 6.30 326 324 0.62 0.52 7.64 15 Class III RCP 191.30 6.61 2.46 4.70 0.010 223.80 221.80 _ 326 230.88 223.80 7.10 Combo-NCDOT 840.03 324 0.99 0.31 2.00 6.30 325 324 0.61 0.36 7.79 15 Class Ill RCP 26.00 6.94 1.71 1.66 0.012 223.60 223.30 325 227.97 223.60 4.40 Combo-NCDOT 840.03 323 0.93 0.27 1.90 6.10 324 323 0.63 0.39 7.47 18 Class III RCP 44.50 8.63 1.84 7.87 0.007 221.30 221.00 324 227.97 221.30 6.70 Combo-NCDOT 840.03 323 0.99 0.31 2.00 6.40 323 322 0.76 0.10 7.43 24 Class Ill RCP 26.00 19.84 0.56 9.47 0.008 220.20 220.00 323 227.16 220.20 7.00 Combo-NCDOT 840.03 320 0.75 0.15 1.80 5.30 322 319 0.58 0.15 6.86 36 Class III RCP 103.90 50.68 0.60 30.23 0.006 218.90 218.30 322 227.15 218.90 8.30 Combo-NCDOT 840.03 319 0.38 0.02 1.30 3.60 321 320 0.48 0.83 7.79 15 Class Ill RCP 73.80 6.73 3.10 1.88 0.011 222.70 221.90 321 226.71 222.70 4.00 Drop-Grate-NCDOT 840.15 - - - - - 320 319 0.49 0.17 7.71 15 Class III RCP 31.10 5.18 0.64 3.06 0.006 221.70 221.50 320 226.27 221.70 4.60 Combo-NCDOT 840.03 309 0.45 0.04 1.40 4.00 319 302 0.55 0.21 6.78 36 Class Ill RCP 166.50 49.03 0.78 33.35 0.005 218.20 217.30 319 225.51 218.20 7.30 Combo-NCDOT 840.03 302 0.45 0.04 1.40 3.90 318 317 0.58 0.17 7.79 15 Class III RCP 26.00 5.66 0.77 0.66 0.008 223.70 223.50 318 227.53 223.70 3.80 Combo-NCDOT 840.03 315 0.38 0.02 1.30 3.60 317 315 0.61 0.21 7.75 15 Class Ill RCP 48.10 5.10 0.99 1.46 0.006 223.30 223.00 317 227.56 223.30 4.30 Combo-NCDOT 840.03 315 0.47 0.04 1.50 4.10 316 315 0.69 0.22 7.79 15 Class III RCP 26.00 5.66 1.18 0.92 0.008 223.20 223.00 316 226.52 223.20 3.30 Combo-NCDOT 840.03 311 0.54 0.07 1.60 4.50 315 314 0.72 0.13 7.68 15 Class Ill RCP 56.10 5.45 0.72 3.18 0.007 222.80 222.40 315 226.51 222.80 3.70 Combo-NCDOT 840.03 314 0.41 0.03 1.40 3.80 314 312 0.53 0.08 7.61 15 Class III RCP 60.30 5.26 0.32 3.64 0.007 222.20 221.80 314 225.73 222.20 3.50 Combo-NCDOT 840.03 312 0.20 0.00 1.10 2.40 313 312 0.55 0.46 7.79 15 Class Ill RCP 67.60 6.57 1.97 1.99 0.010 222.50 221.80 313 226.60 222.50 4.10 Drop-Grate-NCDOT 840.15 - - - - - 312 310 0.58 0.06 7.55 15 Class III RCP 60.90 5.23 0.26 5.83 0.007 221.60 221.20 _ 312 224.91 221.60 3.30 Combo-NCDOT 840.03 310 0.14 0.00 0.90 1.90 311 310 0.56 0.35 7.79 15 Class Ill RCP 26.00 5.67 1.53 1.26 0.008 221.40 221.20 311 223.93 221.40 2.50 Combo-NCDOT 840.03 309 0.72 0.14 1.70 5.30 310 309 0.49 0.11 7.48 18 Class III RCP 47.50 8.34 0.40 7.38 0.006 220.70 220.40 310 223.93 220.70 3.20 Combo-NCDOT 840.03 309 0.22 0.00 1.10 2.50 309 302 0.64 0.43 7.43 24 Class Ill RCP 26.00 19.84 2.05 10.67 0.008 219.70 219.50 309 223.19 219.70 3.50 Combo-NCDOT 840.03 0 1.35 0.00 3.80 5.30 308 307 0.65 0.18 7.79 15 Class III RCP 26.60 5.60 0.91 0.76 0.008 221.90 221.70 308 226.13 221.90 4.20 Combo-NCDOT 840.03 305 0.44 0.03 1.40 4.00 307 306 0.57 0.26 7.75 15 Class Ill RCP 85.20 5.42 1.15 1.65 0.007 221.50 220.90 307 226.05 221.50 4.50 Combo-NCDOT 840.03 306 0.53 0.06 1.50 4.40 306 304 0.63 0.19 7.63 15 Class III RCP 47.20 5.15 0.91 2.54 0.006 220.70 220.40 306 224.86 220.70 4.20 Combo-NCDOT 840.03 304 0.50 0.05 1.50 4.30 305 304 0.54 0.25 7.79 15 Class Ill RCP 26.10 5.65 1.05 0.94 0.008 220.60 220.40 305 224.17 220.60 3.60 Combo-NCDOT 840.03 309 0.52 0.06 1.50 4.40 304 303 0.55 0.14 7.57 15 Class III RCP 47.40 5.14 0.58 4.14 0.006 220.20 219.90 304 224.14 220.20 3.90 Combo-NCDOT 840.03 303 0.35 0.01 1.30 3.40 303 302 0.55 0.14 7.52 15 Class Ill RCP 60.60 5.25 0.58 4.73 0.007 219.70 219.30 303 223.53 219.70 3.80 Combo-NCDOT 840.03 302 0.32 0.01 1.30 3.20 302 301 0.58 0.55 6.67 36 Class III RCP 215.50 47.65 2.13 48.97 0.005 217.20 216.10 _ 302 223.22 217.20 6.00 Combo-NCDOT 840.03 0 1.33 0.00 3.70 5.20 301 300 (N/A) (N/A) 6.52 36 Class III RCP 179.60 49.77 (N/A) 47.89 0.006 216.00 215.00 301 221.71 216.00 5.70 Manhole-4'RC - - - - - 244 243 0.60 0.17 7.79 15 Class III RCP 26.00 6.94 0.79 0.68 0.012 235.40 235.10 244 242.39 235.40 7.00 Combo-NCDOT 840.03 0 0.39 0.02 1.40 3.70 243 242 0.59 0.17 7.75 15 Class Ill RCP 121.50 6.93 0.78 1.34 0.012 234.90 233.50 243 242.39 234.90 7.50 Combo-NCDOT 840.03 0 0.38 0.02 1.40 3.60 242 241 0.57 0.01 7.61 15 Class III RCP 43.10 6.95 0.04 1.36 0.012 233.30 232.80 242 243.65 233.30 10.30 Combo-NCDOT 840.03 234 0.02 0.00 0.50 1.00 241 240 0.60 0.22 7.56 15 Class Ill RCP 26.00 6.94 1.00 2.15 0.012 232.60 232.30 241 243.39 232.60 10.80 Combo-NCDOT 840.03 234 0.48 0.05 1.50 4.20 240 234 0.63 0.14 7.53 15 Class III RCP 43.10 6.95 0.66 2.73 0.012 232.10 231.60 240 243.38 232.10 11.30 Combo-NCDOT 840.03 234 0.34 0.01 1.30 3.40 239 238 0.66 0.44 7.79 15 Class Ill RCP 126.70 6.54 2.26 2.28 0.010 241.00 239.70 239 244.37 241.00 3.40 Combo-NCDOT 840.03 0 1.17 0.00 3.60 4.60 238 236 0.73 0.02 7.65 15 Class III RCP 122.20 6.66 0.11 2.35 0.011 238.00 236.70 238 246.02 238.00 8.00 Combo-NCDOT 840.03 236 0.06 0.00 0.60 1.30 237 236 0.58 0.39 7.79 15 Class Ill RCP 26.00 6.94 1.76 1.27 0.012 237.00 236.70 237 243.57 237.00 6.60 Combo-NCDOT 840.03 235 0.77 0.15 1.70 5.10 236 235 0.71 0.08 7.53 15 Class III RCP 43.10 6.95 0.43 3.95 0.012 235.00 234.50 236 243.56 235.00 8.60 Combo-NCDOT 840.03 235 0.23 0.00 1.10 2.40 235 234 0.77 0.10 7.49 18 Class Ill RCP 26.00 11.28 0.58 4.87 0.012 232.00 231.70 235 241.90 232.00 9.90 Combo-NCDOT 840.03 233 0.45 0.01 1.20 2.80 234 232 0.72 0.11 7.47 18 Class III RCP 94.90 10.78 0.59 8.35 0.011 230.50 229.50 234 241.89 230.50 11.40 Combo-NCDOT 840.03 232 0.38 0.00 1.10 2.50 233 232 0.59 0.23 7.79 15 Class Ill RCP 26.10 6.93 1.06 1.04 0.012 229.80 229.50 233 237.63 229.80 7.80 Combo-NCDOT 840.03 230 0.54 0.02 1.20 3.20 232 229 0.55 0.27 7.39 24 Class III RCP 118.10 22.80 1.10 10.26 0.010 225.30 224.10 _ 232 237.63 225.30 12.30 Combo-NCDOT 840.03 229 0.58 0.02 1.30 3.30 231 230 0.51 0.58 7.79 15 Class Ill RCP 123.70 6.62 2.30 2.32 0.011 229.20 227.90 231 232.98 229.20 3.80 Drop-Grate-NCDOT 840.15 - - - - - 230 229 0.60 0.24 7.66 15 Class III RCP 29.10 6.56 1.10 3.36 0.010 225.70 225.40 230 232.65 225.70 6.90 Combo-NCDOT 840.03 220 0.57 0.02 1.30 3.30 229 228 0.63 0.15 7.31 24 Class Ill RCP 43.10 24.35 0.69 14.13 0.012 223.90 223.40 229 231.99 223.90 8.10 Combo-NCDOT 840.03 222 0.40 0.00 1.10 2.60 228 223 0.64 0.09 7.28 24 Class III RCP 26.00 24.30 0.42 14.95 0.012 221.20 220.90 228 230.26 221.20 9.10 Combo-NCDOT 840.03 222 0.44 0.04 1.40 4.00 227 226 0.54 0.32 7.79 15 Class Ill RCP 127.00 6.53 1.35 1.36 0.010 227.20 225.90 227 231.49 227.20 4.30 Drop-Grate-NCDOT 840.15 - - - - - 226 224 0.60 0.47 7.63 15 Class III RCP 26.00 6.94 2.15 2.76 0.012 224.20 223.90 226 230.98 224.20 6.80 Combo-NCDOT 840.03 228 0.89 0.25 1.90 6.00 225 224 0.59 0.32 7.79 15 Class Ill RCP 127.00 6.53 1.47 1.48 0.010 226.70 225.40 225 232.03 226.70 5.30 Drop-Grate-NCDOT 840.15 - - - - - 224 223 0.60 0.48 7.61 15 Class III RCP 45.20 6.79 2.19 5.66 0.011 223.70 223.20 224 230.98 223.70 7.30 Combo-NCDOT 840.03 223 0.91 0.26 1.90 6.00 223 222 0.53 0.06 7.26 24 Class Ill RCP 48.70 22.91 0.23 21.08 0.010 220.70 220.20 223 230.26 220.70 9.60 Combo-NCDOT 840.03 222 0.37 0.02 1.30 3.50 222 219 0.68 0.13 7.23 24 Class III RCP 117.10 22.90 0.64 21.98 0.010 217.20 216.00 222 228.14 217.20 10.90 Combo-NCDOT 840.03 219 0.41 0.00 1.10 2.60 221 220 0.53 0.25 7.79 15 Class Ill RCP 137.10 6.53 1.03 1.04 0.010 221.50 220.10 221 224.21 221.50 2.70 Drop-Grate-NCDOT 840.15 - - - - - 220 219 0.58 0.44 7.61 15 Class III RCP 26.60 6.86 1.94 2.60 0.011 217.10 216.80 220 223.70 217.10 6.60 Combo-NCDOT 840.03 218 0.92 0.13 1.50 4.40 219 217 0.59 0.26 7.16 30 Class Ill RCP 103.70 33.70 1.10 25.27 0.007 215.10 214.40 219 223.73 215.10 8.60 Combo-NCDOT 840.03 217 0.59 0.03 1.30 3.40 Flow(Total Flow(Total Downstream Upstream Inlet Upstream Inlet Upstream Pipe Diameter Capacity(Full Total Pipe Flow Total System Invert Invert Elevation(Rim) Elevation Structure Gutter Depth Gutter Spread Upstream Node Material Pipe Length(ft) Slope(ft/ Inlet` Inlet Type Bypass Target Intercepted) Bypassed) Node C Area(acres) Intensity*(in/h) (in) Flow)(ft'/s) (ft'/s Flow fP/s)( (Upstream)(ft) (Downstream)Downstream)(ft) (ft) (Invert)(ft) Height(ft) (ft'/s) (ft'/s) (in) (ft) 218 217 0.60 0.24 7.79 15 Class III RCP 26.00 6.94 1.12 1.22 0.012 218.00 217.70 218 221.99 218.00 4.00 Combo-NCDOT 840.03 212 0.62 0.10 1.60 _ 4.80 217 216 0.63 0.21 7.09 30 Class Ill RCP 43.10 34.20 0.94 27.02 0.007 214.20 213.90 217 222.03 214.20 7.80 Combo-NCDOT 840.03 212 0.51 0.05 1.50 4.30 216 210 0.95 0.00 7.06 30 Class Ill RCP 26.00 35.97 0.01 26.92 0.008 213.70 213.50 216 222.14 213.70 8.40 Combo-NCDOT 840.03 212 0.00 0.00 0.30 0.50 215 214 0.50 0.21 7.79 15 Class Ill RCP 21.80 6.18 0.82 0.82 0.009 216.90 216.70 215 220.55 216.90 3.60 Drop-Grate-NCDOT 840.15 - - - - - 214 213 0.60 0.08 7.76 15 Class Ill RCP 26.00 5.67 0.37 1.54 0.008 216.50 216.30 214 218.94 216.50 2.40 Combo-NCDOT 840.03 0 0.26 0.00 1.20 2.80 213 211 0.57 0.12 7.72 15 Class Ill RCP 93.40 4.73 0.53 2.23 0.005 216.10 215.60 213 218.94 216.10 2.80 Combo-NCDOT 840.03 0 0.34 0.01 1.30 3.40 212 211 0.67 0.17 7.79 15 Class Ill RCP 26.40 6.88 0.89 1.21 0.011 215.90 215.60 212 220.26 215.90 4.40 Combo-NCDOT 840.03 214 0.54 0.07 1.60 4.50 211 210 0.60 0.27 7.60 15 Class Ill RCP 141.50 4.86 1.23 4.32 0.006 215.40 214.60 211 220.37 215.40 5.00 Combo-NCDOT 840.03 213 0.57 0.08 1.60 4.60 210 207 0.95 0.00 7.04 30 Class Ill RCP 148.40 30.11 0.01 30.87 0.005 213.20 212.40 _ 210 222.14 213.20 8.90 Combo-NCDOT 840.03 211 0.00 0.00 0.30 0.50 209 208 0.57 0.14 7.79 15 Class Ill RCP 127.00 6.54 0.62 0.63 0.010 215.50 214.20 209 221.15 215.50 5.60 Drop-Grate-NCDOT 840.15 - - - - - 208 207 0.60 0.26 7.59 15 Class Ill RCP 26.00 6.94 1.18 1.56 0.012 214.00 213.70 208 219.46 214.00 5.50 Combo-NCDOT 840.03 202 0.57 0.06 1.50 4.10 207 201 0.60 0.27 6.93 30 Class Ill RCP 101.00 31.61 1.12 32.69 0.006 212.20 211.60 207 219.46 212.20 7.30 Combo-NCDOT 840.03 201 0.59 0.06 1.50 4.20 206 205 0.56 0.44 7.79 15 Class Ill RCP 127.00 6.54 1.92 1.93 0.010 216.30 215.00 206 220.99 216.30 4.70 Drop-Grate-NCDOT 840.15 - - - - - 205 204 0.62 0.51 7.65 15 Class Ill RCP 26.00 6.94 2.42 3.63 0.012 214.80 214.50 205 219.98 214.80 5.20 Combo-NCDOT 840.03 202 1.07 0.21 1.70 4.90 204 201 0.58 0.24 7.62 15 Class Ill RCP 131.00 6.68 1.06 4.54 0.011 214.30 212.90 _ 204 219.98 214.30 5.70 Combo-NCDOT 840.03 201 0.54 0.02 1.20 3.20 203 202 0.55 0.23 7.79 15 Class Ill RCP 127.00 6.54 0.99 0.99 0.010 214.80 213.50 203 220.01 214.80 5.20 Drop-Grate-NCDOT 840.15 - - - - - 202 201 0.61 0.49 7.62 15 Class Ill RCP 26.00 6.94 2.28 4.22 0.012 213.20 212.90 202 217.88 213.20 4.70 Combo-NCDOT 840.03 0 1.47 0.00 3.90 5.70 201 200 0.69 0.24 6.86 30 Class Ill RCP 66.50 31.80 1.14 41.75 0.006 211.40 211.00 201 217.88 211.40 6.50 Combo-NCDOT 840.03 0 0.75 0.00 3.20 2.80 118 117 0.62 0.24 7.79 15 Class Ill RCP 26.00 6.94 1.16 0.97 0.012 220.80 220.50 118 226.37 220.80 5.60 Combo-NCDOT 840.03 116 0.56 0.04 1.40 3.70 117 115 0.62 0.21 7.76 15 Class Ill RCP 150.10 7.27 1.01 1.83 0.013 220.30 218.40 117 226.37 220.30 6.10 Combo-NCDOT 840.03 115 0.50 0.02 1.30 3.40 116 115 0.59 0.00 7.79 15 Class Ill RCP 26.00 6.94 0.00 0.21 0.012 218.70 218.40 116 221.65 218.70 3.00 Combo-NCDOT 840.03 1 110 0.04 0.00 0.50 1.00 115 114 0.57 0.21 7.60 15 Class Ill RCP 56.00 6.69 0.91 2.89 0.011 218.20 217.60 115 221.62 218.20 3.40 Combo-NCDOT 840.03 110 0.49 0.02 1.30 3.40 114 113 0.57 0.08 7.54 15 Class Ill RCP 74.50 6.69 0.34 3.20 0.011 217.40 216.60 114 221.19 217.40 3.80 Combo-NCDOT 840.03 113 0.18 0.00 1.00 2.30 113 109 0.57 0.12 7.47 15 Class Ill RCP 101.00 5.75 0.51 3.70 0.008 216.40 215.60 113 220.11 216.40 3.70 Combo-NCDOT 840.03 109 0.28 0.00 0.80 1.60 112 111 0.57 0.17 7.79 15 Class Ill RCP 76.00 5.24 0.75 0.76 0.007 217.10 216.60 112 221.68 217.10 4.60 Drop-Grate-NCDOT 840.15 - - - - - 111 110 0.50 0.27 7.66 15 Class Ill RCP 46.50 5.19 1.03 1.79 0.006 216.40 216.10 111 219.78 216.40 3.40 Drop-Grate-NCDOT 840.15 - - - - - 110 109 0.72 0.00 7.60 15 Class Ill RCP 34.40 6.03 0.01 1.95 0.009 215.90 215.60 110 218.94 215.90 3.00 Combo-NCDOT 840.03 108 0.02 0.00 0.50 1.00 109 107 0.57 0.25 7.37 18 Class Ill RCP 85.90 8.01 1.05 6.37 0.006 215.10 214.60 109 218.60 215.10 3.50 Combo-NCDOT 840.03 107 0.52 0.06 1.50 4.40 108 107 0.65 0.51 7.79 18 Class Ill RCP 26.00 9.21 2.58 3.23 0.008 214.50 214.30 _ 108 217.31 214.50 2.80 Combo-NCDOT 840.03 0 1.47 0.00 3.90 5.70 107 106 0.60 0.29 7.28 24 Class Ill RCP 27.90 19.16 1.27 11.02 0.007 213.60 213.40 107 217.31 213.60 3.70 Combo-NCDOT 840.03 0 0.82 0.00 3.20 3.10 106 102 0.58 0.23 7.25 24 Class Ill RCP 78.50 18.06 0.97 11.75 0.006 213.20 212.70 106 217.92 213.20 4.70 Combo-NCDOT 840.03 107 0.48 0.06 1.60 4.60 105 104 0.62 0.31 7.79 15 Class Ill RCP 39.80 5.61 1.50 1.23 0.008 215.10 214.80 105 223.67 215.10 8.60 Combo-NCDOT 840.03 108 0.72 0.05 1.40 3.70 104 103 0.60 0.42 7.73 15 Class Ill RCP 49.60 5.02 1.95 2.72 0.006 214.60 214.30 104 222.31 214.60 7.70 Combo-NCDOT 840.03 103 0.90 0.11 1.50 4.30 _ 103 102 0.60 0.12 7.67 15 Class Ill RCP 65.60 5.64 0.55 3.60 0.008 214.10 213.60 103 220.02 214.10 5.90 Combo-NCDOT 840.03 102 0.40 0.00 1.10 2.50 102 101 0.54 0.30 7.19 24 Class Ill RCP 155.10 16.25 1.16 15.98 0.005 212.50 211.70 102 218.66 212.50 6.20 Combo-NCDOT 840.03 108 0.58 0.08 1.60 4.60 _ 101 100 N/A N/A 7.05 24 Class III RCP 91.80 16.70 N/A 15.67 0.005 211.50 211.00 101 217.23 211.50 5.70 Manhole-4'RC - - - - - M M - - MI IM M M M IM Notes: 'Entire length of pipe is o-ring gasketed w/joints double-wrapped in non-woven filter fabric.Upstream structure shall be constructed with watertight gaskets,and pipes fitted into structure with watertight gaskets. Gutter spread computations shown in this table are based on the 4in/hr storm. Gutter spread bypass targets are only shown for on-grade structures which bypass to on-site targets.Structures in a sag do not have bypass targets. Pipe sizing is based on 10-year storm intensities showin herein. Intensities shown are based on a time of concentration(Tc)of 5 minutes. Total System Flow is calculated based on flow intercepted at structure.Bypassed flow captured from upstream structures is included and pipe sizes are calculated accordingly. Rim Elevations: NCDOT 840.03 rim elev is @ edge of pavement,middle of frame.Back of curb elev is rim elev+0.42' NCDOT 840.15 rim elev is @ top of grate JB-Manhole rim elev is @ top of cover I I underfoot ENGINEERING Riprap Outlet Protection Design Project: Lauder Parcel Location: Coats,NC Project Number: C22008 Date: Nov-29-2023 Designed: JT Checked: - Outlet ID: STM 100 Pipe diameter= 24 inches Pipe slope= 0.54 % Roughness Coef.= 0.013 Full Flow Capacity= 18.29 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 5.82 ft/sec Figure 8.06.b.1 25 ������=�������� 'one �-----_- ---------' 20 •6 "m•NO SUM------ u ----iirea=2-"-�r� 15 --- e!!!_mr.m__ •-•����� _ NNE 10 - �------ ---� e 4 leIIIIILIIrIIIM.etPl==M.W11H.. Z" 3 0 - 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Is grade of apron 10%or more: N Y/N Zone used= 2 _ Length= 12.0 ft. Outlet pipe diameter= 24 in. Width at Outlet= 6.0 ft. Outlet flowrate= 18.3 cfs Width at end of Pad= 19.9 ft. Outlet velocity= 5.82 ft/sec Stone diameter= 8 in. Material= Class B Thickness= 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual I I underfoot ENGINEERING Riprap Outlet Protection Design Project: Lauder Parcel Location: Coats,NC Project Number: C22008 Date: Nov-29-2023 Designed: JT Checked: MAR Outlet ID: STM 200 Pipe diameter= 30 inches Pipe slope= 0.6 % Roughness Coef.= 0.013 Full Flow Capacity= 34.95 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 7.12 ft/sec Figure 8.06.b.1 25 �������_���������� Zone ��������_•_-_-------� 20 �� =====Mmiii��� •6�� �� ne-. 1��------ u —\�-- ----i■—•=2—"—..111.g 15 I ;= ==— M --■.■■r e!!!_mr.m__ � �■ 10 -f==== .....--- Emmil e 5 MMIMIMMItiniligrill ---liiiii Zion --,, ---'_ ---_--- II 3 ------= ------ - GIO— 0 — 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Is grade of apron 10%or more: N Y/N Zone used= 2 _ Length= 15.0 ft. Outlet pipe diameter= 30 in. Width at Outlet= 7.5 ft. Outlet flowrate= 34.9 cfs Width at end of Pad= 24.8 ft. Outlet velocity= 7.12 ft/sec Stone diameter= 8 in. Material= Class B Thickness= 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual I I underfoot ENGINEERING Riprap Outlet Protection Design Project: Lauder Parcel Location: Coats,NC Project Number: C22008 Date: Nov-29-2023 Designed: JT Checked: MAR Outlet ID: STM 300 Pipe diameter= 36 inches Pipe slope= 0.56 % Roughness Coef.= 0.013 Full Flow Capacity= 54.90 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 7.77 ft/sec Figure 8.06.b.1 25 iiiiiii_iiiiiiiiii Zone iiiiii—�i------- _ ii_____•_.� _ 20 —i -------��ii •6ii �� ne_, 1�i------ iiii ���iM' MINI—M i\�ii ii--��—irk °' 15 i==i—ii---iii iii--- �i ii i ---"--2—i ■.■■�■ e 5 iiiiii NM ��i 10 INI -`iiiiii iii� -i1�T-iiiiii -riff,e 4 `_ S.MIL]ESaiii- ,=====ffirmw�Zii--l!,--=Ei! i—= Mdm �j---- -� 0 - 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Is grade of apron 10%or more: N Y/N Zone used= 2 _ Length= 18.0 ft. Outlet pipe diameter= 36 in. Width at Outlet= 9.0 ft. Outlet flowrate= 54.9 cfs Width at end of Pad= 29.8 ft. Outlet velocity= 7.77 ft/sec Stone diameter= 8 in. Material= Class B Thickness= 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual I I underfoot ENGINEERING Riprap Outlet Protection Design Project: Lauder Parcel Location: Coats,NC Project Number: C22008 Date: Nov-29-2023 Designed: JT Checked: MAR Outlet ID: STM 400 Pipe diameter= 18 inches Pipe slope= 1.12 % Roughness Coef.= 0.013 Full Flow Capacity= 12.23 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 6.92 ft/sec Figure 8.06.b.1 25 one` 20 Zone 6- —"NM w 15 0 10 \��� 7 e5 re 4 6.9-ftfset Ane 1 Zan 3 MMMMM 0 - 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Is grade of apron 10%or more: N Y/N Zone used= 2 _ Length= 9.0 ft. Outlet pipe diameter= 18 in. Width at Outlet= 4.5 ft. Outlet flowrate= 12.2 cfs Width at end of Pad= 14.9 ft. Outlet velocity= 6.92 ft/sec Stone diameter= 8 in. Material= Class B Thickness= 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual I I underfoot ENGINEERING Riprap Outlet Protection Design Project: Lauder Parcel Location: Coats,NC Project Number: C22008 Date: Nov-29-2023 Designed: JT Checked: MAR Outlet ID: STM 500 Pipe diameter= 18 inches Pipe slope= 1.5 % Roughness Coef.= 0.013 Full Flow Capacity= 14.15 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 8.01 ft/sec Figure 8.06.b.1 25 one` 20 Zone 6 15 o 10 Zane 5 • 8.0 ft/bw _______ re 4 Zone 1 1�---■■■ MMMMM mm ---�_Gm� Za 3 0 - - 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Is grade of apron 10%or more: N Y/N Zone used= 2 _ Length= 9.0 ft. Outlet pipe diameter= 18 in. Width at Outlet= 4.5 ft. Outlet flowrate= 14.2 cfs Width at end of Pad= 14.9 ft. Outlet velocity= 8.01 ft/sec Stone diameter= 8 in. Material= Class B Thickness= 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual I I underfoot ENGINEERING Riprap Outlet Protection Design Project: Lauder Parcel Location: Coats,NC Project Number: C22008 Date: Nov-29-2023 Designed: JT Checked: MAR Outlet ID: STM 600 Pipe diameter= 24 inches Pipe slope= 0.92 % Roughness Coef.= 0.013 Full Flow Capacity= 23.87 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 7.60 ft/sec Figure 8.06.b.1 25 done 20 Zone-6 10 Aaae 5 o /.6 ft/sec re 4 Aloe 1 -- 1�---.■■-Aa 3 MMMMM 0 - - 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Is grade of apron 10%or more: N Y/N Zone used= 2 _ Length= 12.0 ft. Outlet pipe diameter= 24 in. Width at Outlet= 6.0 ft. Outlet flowrate= 23.9 cfs Width at end of Pad= 19.9 ft. Outlet velocity= 7.60 ft/sec Stone diameter= 8 in. Material= Class B Thickness= 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Special study required Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual Profile Report Profile: 105 to 102 105 to 102 - Coats - 10yr Label:105 224 Type:Catch Basin ID:327 223.5 223 Label:104 .e:Catch Basin 222.5 D.344 I I I I I I I 222 221.5 221 Label:103 220.5 l.e:Catch Basin r...., 220 :• 43 4--I ``- 219.5 Labe:102 C 219 Type:Catch Basin ID:342 O 218.5 I . 218 CO 11111 > 217.5 CD Label:105-104 217 Type:-Cur dolt Label:104-103 w ID:282 216.5 Type:Conduit ID:287 Label:103-102 216liptC303. it 215.5 215 214.5 _______10. 214 213.5 213 212.5 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95100 091 q 19 20 29 30 39 40 45150155160 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 108 to 107 108 to 107 - Coats - 10yr 217.7 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r �■ 217.6 ETTl.517■■■■■■■■■■.111.■■■■■■■.71Tri i1 i 21T�,ape iii iiliir����I■■■■■■■■���e ,*1 ANrill AM �Zlsin 217.3 1122"-11 M�I■■■■■■■■■■■■■■■■■■l� --- ' 217. ■■■■ ■■■■■■■■■■■■■■■■■■■■� ■■� 217.2 ■■� �■■■■■■■■■■■■■■■■■■■■� ■■� 2 17 ■■■■ ■■■■ 216.9 ■■. 216.8 M. .■■■■■■■■■■■■■■■■■■■■. ■■� 216.7 ■■� ■■■■■■■■■■■■■■■■■■■■� ■■� 216.6 M. .■■■■■■■■■■■■■■■■■■■■. ■■� 216.5 M. .■■■■■■■■■■■■■■■■■■■■. ■■� 216.4 N■■� ■■■■■■11_mieranumm■■■■■o N■■m 216.3 ■■■■ M■■■■■■INIIIMI NI ' �l■■■■■■N ■■■■ 216.2 ■■■■ ■■■■■■■■Igiiii iiii`i■■■■■■■ ■■■■ 216.1 ■■■■ ■■■■■■■■■IL'FLEA■■■■■■■■■ ■■■■ 216 ��■�����==:��■��■■■■■� ■■� 215.9 M. MUM���-- ���� ■■� O 215.8 ■■� �■■■■■■■■l�l■ 1111111 � �■ � _-- 215.7 ■■� ■■■■■■■■■■■■■■■■■■■�� ■■� �--+ 215.6 M. ■■■■■■■■■■■■■■■■■■■■� ■■� > 215.4 _ _ ���■.� ■■� 215.3 ■■■■ ■_■_■_■■■■■■■■■■��■����� I��� W 215.2 �����■■■■■■■■■■■■� iid�� 21251.51 ■l1■1Inn��- ��■������� ■■� 214.9 M. ■■■■■■■■■��■�����-_ '■■� 214.8 ■■� ■■■■■■■■■■■■■■■■■■■�� ■■■■ 214.7 M. ■■■■■■■■■■■■■■■■■■■■` •==• 214.6 ■■■■ ��■■■■■■■■■■■■■■■■■■■� ■■� 214.5 -��������■■■■■■■■� ■■� 214.3 ■■■■■■■■■■■■■�������� MUM - 214.2 ■■■■■■■■■■■■■■■■■■■■■■■■l ni N■■E 214.1 ■■■■■■■■■■■■■■■■■■■■■■■■■. ■■� 214 ■■■■■■■■■■■■■■■■■■■■■■■■■� ■■� 213.9 ■■■■■■■■■■■■■■■■■■■■■■■■■. ■■� 213.8 ■■■■■■■■■■■■■■■■■■■■■■■■■. .■1111 213.7 ■■■■■■■■■■■■■■■■■■■■■■■■■. ■■� 213.6 ■■■■■■■■■■■ ■■■■■■■■■■■. ■■■■ -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 1314 1516 171819 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 112 to 109 ll2to 09 - Coats - 1 0yr 222.6 222.4 Label: I iz 2 222Type: Cat 1 Basin 22 221.8 ID: 3 4 221.6 221.4 221.2 221 220.8 220.6 220.4 Label: 111 220.2 220 219.8 219.6 219.4 a e: 2-111 • aL-bel 109 219.2 0 219 Type: Conduit I • '-• _ Basin 218.8 ID. 293 —1 31 218.6 Label: 111-110 218.4 218.2 Type: Conduit 0 218 ID. 308 Label: 110-109 uJ 217.8 Type: C•nduil 217.6 217.4 217.2 — 217 - — 216.8 216.6 216.4 216.2 216 - - 215.8 215.6 215.4 215.2 215 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 116 to 115 116 to 115 - Coats - 10yr 222.1 I 221.9 Lame 116 bel: 11 0e.22 Catch Basin _ .- _ _ . .sin 221.7 ID: 338 D: 3 7 221.6 221.5 - - 221.4 LinumenemmemenummememiLabel: 221.3 - - 221.2 - - 221.1 221 220.9 - - 220.8 - - r� 220.7 - - 1 220.E `� 220.5 220.4 116-115 C 220.3ype: Conduit 0 220.2I D: 294 �-+ 220.1 CO 220 - - \ 219.9 - /^' 219.8 V! 219.7 W 219.6 - . 219.5 - . - 219.4 219.3 219.2 219.1 219 218.9 218.8 218.7 218.6 218.5 218.4 218.3 218.2 218.1 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 118 to 100 8 to 00 Coats _ 10yr Label:118 Label:117 227 Type.Catch 9 "atch Basin 226.5 _ID:340_]D7{ 22 225.5 ---------- 225 224.5 224 Label:117-115 223.5 • Label:118-1-7 Type:conduit 223 ape:-C-6ndrd ID:267 ub 17-15 222.5 - IB.266 Ty c^Ggt.. Be,h, Label:114 -------- 222 Ty,.Catui Do$ifl 2 21.5 Ty,. •_36 Label:113• 221 — = Lebo:115 111 •.e:Catch Basin 220.5 .' ase: ''lE,f zzo ID:zss ����� gal.= 1. 219.5 1pe:condyt ----- ID:296 La.e: - -`4.- =-- Lab-I'106 219 •— • Type: .n.u, •�• • (� 218 5 _ .- 7Tyoe:Catch Basin __ ��— Ls bet:109-.1 •Catch B. __ Lab 218 - Toe:Catch Basin 217.5 •' 3ID- 217 _ �_ .AID:315. LLI 216.5 •L:be1:107 Label: 06-102 216 �!��_ -^ ,IBr316 Type:•onduit Label'102-10] 215.5 ID:313 T.e:C nduit 215 =!1 ID:314 214.5 Type:Conduit • 214 3 0 213.5 — _ La el.100 213 3 ''lutfall 212.5 -------- DI 07 212 211.5 — • • • 211 -20 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 600 620 640 660 680 700 720 740 760 780 800 820 840 860 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 203 to 201 203 to 201 - Coats - 10yr Label: 203 Type: Catch Basin 220.2 D: 393 220 219.6 219.6 219.4 219.2 219 218.8 Label: 202 Label: 201 218.E 218.4 • (;atr.h RasiType• Catch Basin 218.2 218 I 1392 I 1 217.8 217.6 Label: 203-202 217.4 2,7.2 Type: Conduit �--' 217 ID: 304 216.8 216.6 216.4 0 216.2 216 �--+ 215.8 215.6 _abet: 202-201 \� 215.4 ^, 215.2 - W 215 214.8 ID: 317 w 214.6 214.4 - 214.2 214 213.8 213.6 213.4 213.2 213 212.8 212.6 212.4 212.2 212 211.8 211.6 211.4 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 206 to 201 206 to 201 _ Coats oyr 222.5 _abel: 206 222Type: Catc asin 221.5 ID: 6 NLeI: 205 Label: 204 221 • Catch Catch Basin 220.5 220 ID: 395 - 219.5 Labcl: 206-205 219 Type: Conduit Label: 201 218 5 ID: 298 T e: Catch Basin 218 IU�91 217.5 lel: 205-204 Label: 204-201 O 217 Type: CondL it T-ypa---onduit CO 216.5 ID: 305 ID: 306 216 215.5 LLI 215 214.5 214 213.5 213 212.5 212 211.5 _ 211 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 209 to 207 209 to 207 - Coats - 1 pyr Label: 209 Type: Catch Basin 221.199999999999 ID: 399 220.999999999999 220.799999999999 220.6 207 220.4 ��• m • - 220.2 ilffailialelMIN 220 e - - c :asi ype: atifiiBasin 219.6 219.6 I: 398 ID.4c 97 219.4 219.2 219 218.8 218.6 218.4 Label: 209-208 218.2 218 Type: Conduit a + 217.6 I D: 297 4- 217.6 ...../ 217.4 C 217.2 218 0 216.8 - 216.6 216.4 CD 216.2 _a-be : ii i N 21 216 Type: Conduit 5.8 215.6 - D: 309 w 215.4 215.2 215 214.8 214.6 214.4 214.2 214 213.8 213.6 213.4 213.2 213 212.8 212.6 212.4 212.2 212 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 212 to 211 212 to 211 - Coats - 10yr 221 220.8 Lab-. 11 220.6 Label.212 I ype: , basin 220Jype: Catch Basin —� . ID:402 220.2 220 219,8 219,6 219,4 219.2 219 218.8 218.6 218,4 0 218,2 CO 218 217,8 w 217,6 Label:212,211 Type:Condit 217.4 ID:30I 217.2 217 216.8 216.6 216.4 216.2 216 215.8 215.6 215.4 -2-1 0 1 2 3 4 5 6 7 8 9 1011 121314 1516 171819 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 215 to 210 215 to 21 0 Coats 1 0yr Label: 210 222599999999999 T •e: Catch Basin 22299999999999 222.1.199999999999 1:1 - 221.999999999999 221,79999999999 221.6 - 221.4 . 221.2 Ty.1 y3; t i.. iii 221 -- iI!LIS r.n�11.Cr, 220.8 D, - • 0 -- �1. . .� -_ 220.E 220.4 '-- WCIir _-- 2220 ^ - zz0 suaei ...al. 219.8 _ 1.11111 I. _ _ iiI 219.E 'V w-I - .i�lLY1N'f�l .III 219.a re_ I��.�e .?' 219 ! : e•._ -F-1T��j ilitiliMEMIl- `� 218.E 218. C 218.4 I , 0 218.2218 IllINCIN-= :-•• MI:In iMAIt •///}}}}���� 217.6 ==217.8 -. 0 W Y .. l V 217.4 -u -= D]Zj /\ 217.2 ^` 217 aJ 2,6.8 --Mm 216.E w '� - 216.4 2,6.2 = -216 , -- 215.8 -- - 215.6 -- 215.4 -- 215 215 -- 214.6 -- 214.4 - 214.2 -- 214 -- 214 -- 213.6 -- 213.4 -- 213.2 -- 213 213 -10 0 10 20 30 40 50 60 70 BO 90 100 1,0 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 218 to 217 218 to 217 - Coats - 10yr 222.6 222.4 Label:218 - el: 11 2 ype:Catch Basin ir - in atI zzz ID:408MI 221.8 221.6 221.4 221.2 221 220.8 220.6 220.4 220.2 220 219.8 Label:218-217 219.6 Type:Conduit ID:292 219.4 219.2 9 218.8 218.E . O 218.4 (13 218.2 a) 218 217.8 217.6 217.4 217.2 217 216.8 216.6 216.4 216.2 216 215.8 215.6 215.4 215.2 215 214.8 214.6 214.4 214.2 214 -2-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 221 to 219 221 to 219 - Coats - 10yr 225.399999999999 a 225.199999999999 Lbel: 221 224.9999994p999 224.7999999 9voe: ..i . 9 224.5999999999 Label. 221-220Basin 224.399999999999 ID: 'AA 1 - 224.199999999999 Type: Conduit 223.999999999999 4+0 I 409 223.799999999999 I U )/'7.., 223.6 : 2 P3 223.4 223.2 223 222.8 222.6 222.4 222.2 222 ,......\ 221.8 .i / 221.6 4- 221.4 `..../ 221.2 221 C 220.8 O 220.6 220.4 }. 220.220 21 CO 29.8 > 219.6 219.4 Label: 220-21 y CD 219.2 Type: Conduit 219 W 218.8 ID: 281 218.4 218.2 218 217.8 inommess 217.6 711111111111 217.4 217.2 217 216.8 216.6 216.4 216.2 216 215.8 215.6 215.4 215.2 215 -5 D 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 225 to 224 225to224 - Coats - lOyr Label: 225 Type: Catch Basin .6 232.4 ID: 41 Label: 224 232.2 232 231.8 • Catch Basin 231.6 231.4 231.2 I D, 414 231 230.8 230.6 230.4 230.2 230 Label: 225-224 229.8 229.E 229.4 Type: Conduit 229.2 229 ID: 232 228.8 228.6 O 228.4 228.2 228 227.8 227.6 ` 227.4 (� 227.2 W 228 226.8 226.6 226.4 226.2 226 225.8 225.6 225.4 225.2 225 224.8 224.6 224.4 224.2 224 223.8 223.6 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 B5 90 95 100 105 110 115 120 125 130 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 227 to 223 227 to 223 - Coats - 10yr - Time : 0 . 00 233 232.5 Label: 227 232ype: Catc -asin Label: 226 Label: 224 231.5 ID:4 231 ID:41• •l' '4 Label: 223 Ty.-: Catch Basin 230.5 II:413 230 Label: 227-226 229.5 Type: Conduit ID: 235 229 4-8 228.5 4- 228 C 227.5 O 227 4-0 226.5 Label: 226-224 Co 226 Type: Conduit Label: 224-223 ID:237 Type: Conduit a) 225.5 ID: 238 UJ 225 224.5 224 223.5 223 222.5 222 221.5I 221 220.5 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95100 09 10115120129 30139 401 45150155160169 7017518018519019T0205 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 231 to 229 231 to 229 - Coats - 10yr 234.199999999999 233.999999999999 L- •- . 23 r 233.799999999999 233.59999999T9pe: Ca ch Basin Labe : _ _ 233.39999999 9 233.199999999999 ID: . : Catch Basin 232.999999999999 % i' : 229 232.799999999999 i : A 232.6 - - --- ype: Catch Basin 232.4 232.2 Label:231-230 4 9 232 231.8 231.6 Type: Conduit 231.4 . - - I 231.2 231 230.8 230.6 230.4 230.2 `� 230 1 229.8 - 229.6 O 229.4 - 229.2 229 228.8 CO 228.6 228.4 W 228.8 t1 w 228 227.8 227.6 ype: on' W 227.4 ID: 231 227.2 227 226.8 P 226.6 226.4 226.2 226 225.8 001 225.6 225.4 225.2 mom 225 224.8 224.6 224.4 224.2 224 223.8 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 233 to 232 233 to232-Coats- 10yr Ty,C i'7e sp Tyra 1: Basin 2ss.s 235.5 234.5 234 2ss.s 0 232.5 231.5 Type',Cand,6 > Ib:226 N W zai 230.5 m ne.s -1 220 225.5 227.5 m / 220 225.5 Station(ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 237 to 236 237 to 236 - Coats - 10yr 243.999999999999 Label:237 .bel: 3' 24379999999999type: act ass1 ype :asin 243 6 �� -�Pi., • nil 243.4 243.2 243 242.8 242.6 242.4 242.2 242 241.8 241.6 241.4 241.2 241 240.8 240.6 240.4 240.2 240 239.8 Q 239.6 . CO 239.4 239.2 W 239 238.8 Label:237-236 238.6 Type:Conduit 238.4 ID:215 238.2 238 237.8 237.6 237.4 237.2 237 236.8 236.6 236.4 236.2 236 235.8 235.6 235.4 235.2 235 .2•1 0 1 2 3 4 5 6 7 8 9 1011 121314151617181920212223242526272829 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 239 to 200 239 to 200 Coats _ 10yr 248 247 -----Fe"" 246 245 244 ��'"Basin 242 ��° \ 241 'bal:298-238 240 ia z,z 239 _ 238 um, 237 -_________:• ryPPu z;%°o° 23 2351.----------......,.... �I H234 1d" Label"'v"vv "' :::""Label 234.23? �i 233 : 232 C231 - ":el 228=229 Q 230 1 a , 228 229 *v Lobel 222 a'. �n Label 228.228 ID 227 — 226 ',o.33 . 225 �,.._______L"" W 224 gal”1", 223 4.:vos' Label 217 Labal.218 Label 210 222 Label 207 220 • TY LSZ a't Ca.Basln 207 219 '" 218 lo.za0 Label 2, 217 — 216 215 _ �a s," rma" 214 213 212 211 210 -50 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 244 to 234 244 to 234 - 10yr 244.5 Label:242 _ 244 - v•-. -.ch:- Label:241 Label:240 ID 4 tch Basin Type:C-ch•- 243.5 ID ' 1 -I _ 243 Label:244 Label:243 Type:Catch Basin Type: etch B in 242.5 ID:434 II.43 •bel:234 ype: -.h Basin 242 ID'424 241.5 241 240.5 240 }^, 239.5 239 238.5 - 0 238 - }, 237.5 Label:244-243 Label:243-242 Type:Conduit Type:Conduit CO 237 - ID:220 ID:213 236.5 -236 W 235.5 Label:242-241 235 TypID:214duit Label:241-240 234.5 Type.Cuiiduil Label:240-234 234 ID'217 Type:Conduit ID:218 233.5 233 232.5 232 231.5 231 230.5 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 305 to 304 305 to 304 - Coats - 10yr 224.E 224.5 ■llIIIEJ■■■■■■■■■■■■■■■■■■■■■I M■■■ „- . Gi�1 MIIIi■■■■M■lo ■ I■� UM■■■■■■■■Lf M 2224.3veN ELI■LFMP07._...MINNI._!u■Mii/1Tf i■4N7EIsin 224.2 QI ❑PIr:iiii■■■■■■■■■■lim, 41111111■[ MIME 224.1 ==mom ��■■■■■■■■■■■■■■■■11��� ----7 224 ■■■■ ■■■■■■■■■■■■■■■■■■■■■■ �■■■ 223.9 ■■■I ■■■■■■■■■■■■■■■■■■■■■■ •■■■ 223.8 ■■■I ■■■■■■■■■■■■■■■■■■■■■■ I■■■ 223.7 ■■■I ■■■■■■■■■■■■■■■■■■■■■■ M■■ 223.6 ■■■■ ■■■■■■■■■■■■■■■■■■■■■■ I■■■ I 223.5 ■■■I ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 223.4 ■■■I ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 223.3 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 223.2 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 223.1 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 223 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 222.8 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 222.7 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 222.6 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 222.5 ■■■■■■■■■■■■■■■■■■■■■■ ■■■ O 222.3 . ■ ■ ■■■■ ■■■■■■■■ ■■w■* ■■■■■■■ I■■■ I CO 222.2 ■■■■ ■■■■■■■IM 3■'lJ�:L'r:1■■■■■■■ I■■■ 222. ■■■� ■■■■■■■Ii�RZI[EGL�fa■■■■■■■ ■■■ 22 1 22 ■■■■ ■■■■■■■■■lliNINT:I■■■■■■■■■ I■■■ I ■■■� ■■■■■■■■■■r■r■■■■■■■■■ I■■■ i 221.8 ■■■I ������■�� I■■■■■■■■■■■ I■■■ W 221.8 ■■■� ■■■��������_ ���■�l1■■■ ■■■ 221.7 ■■■� ■■■■■■■■■■■■■■■�■����� I■■■ 221.E ■■■I ■■■■■■■■■■■■■■■■■■■■■■ �■■■ 221.45 ■■■I ■■■■■■■■■■■■■■■■■■■■■■ I■■■ 221.4 221.3 ■■■�■ ■■■■■■■■■■■■■■■■■■■■■■ I■P' I 221.2 ■■I ■■■■ ■ ■ ■■ ■■ ■■ I MINNIM■■■■■■■■■■ rA■■ 221.1 221 ■■■■ ■■■■■■■■■■■■■■■■■■■■■■ I■■■ 220. ■■■I ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 220.8 7 I■■I ■■■■■■■■■■■■■■■■■■■■■■ ■■■ 220. ■■■ ��■■_f■■■_■■■■■■■■■■■■■■■ ■■■ 220.6 ■■■■NI�M m- � ������■■■■■■■■■ 220.5 ■■■ 220.4 ■■■■■■■■■■■■■1 MMIInw � ���■ 1■■■ 220.3 ■■■■■■■■■■■■■■■■■■■■■■■■lni I■■■ 220.2 ■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■ 220.1 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i -2 -1 0 1 2 3 4 5 6 7 8 9 1011 12 13141516 171819 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 308 to 302 308 to 302 Coats 10yr Label:308 Label:307 226.599999999999 226.399999999999f��7�FC3I1'_ 226.199999999999 �� i - 225.999999999999 225.799999999999 225.E el:. a• 225.4 - .etch B. in 225.2 Ys . 225 I :35 - Label:304 224.8 - 224.6 - Type.Catch f .1 224.4 I,A:3 e - Label:303 224.2 - 224 Label:308-307 yp-. : h Basin Label:302 223.8 Label:307-306 223.6 Type:Conduit ID' 4�/ I'ThTA .tch Basin 223.4 ID:269 Type:Conduit IB.346 223.2 ID:270 223 222.8 PI:306-304 222.E .1:4• •Conduit 0 222..4 -� _ ID:274 Label:304-303 222 Type:Conduit Label:303-302 }, 221.8 - ID:277 CO 221.E ..� - Type:Conduit z21. 221.2 EIIIII. _ ` ID:283 0 221 `� Y! 220.8 w 220.E 220.4 - z2o.2 220 219.8 219.E 219.4 219.2 219 218.8 218.6 218.4 218.2 218 217.8 217.6 217.4 217.2 217 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 311 to 310 311 to 310 - Coats - 10yr 224.4 224.3 224.2 Label: 311 L. be!: 311 • 22y1pe• - - ' _ - - .- _ I ,3asin 224 r 5 II: 354 223.9 223.8 - - 223.7 - 223.6 223.5 223.4 223.3 - 223.2 -223.1 Label: 311-310 222s Type: Condu;t 222.8 - ID: 278. 222.7 O 222.6 �--i 222.5 222.4 - 222.3 - G) 222.2 V! 222.1 LLJ 222 221.9 11111111. 221.8 221.7 221.6 221.5 - 221.4 221.3 - 221.2 221.1 221 220.9 220.8 220.7 220.6 - -2 -1 0 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 313 to 312 313 to 312 - Coats - lOyr Label: 313 227Type: Catch Basin ID: 357 226.5 226 225.5 Label: 312 Ty : Catch Basin 225 : 356 Label: 3 3-3'12 224.5 Type: Conduit 224 ID: 263 223.5 223 222 .5 222 221 .5 -5 0 5 1015 20 25 30 35 40 45 50 55 60 65 70 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 316 to 315 316 to 315 - Coats - 10yr 226.8 ETIRF31�■■■■■■■■■■■■■■■■■■■■MRT' 7313 226. driVIMF !I■■■■■■1IRE�■■■■■■!'ENINI, Mil22 226.6 .li±li■■_r■M��-�����_!�■■_■■lL'ii�'`i MIS 226.5 ' in as������M■■■■■■■■Mll■�_Z���-�� Z]' 226.4 NMM■ ■■■■■■■■■■■■■■■■■■■IIlm. �'ao I 226.3 IEEE ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ ■ 226.2p■■ ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ ■ 226.1 ■■ ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ ■ 226MI ■■■■■■■■■■■■■■■■■■■■■■ IEEE I 225.9 EI ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 225.8 IEEE ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 225.7 IEEE ■■■■■■■■■■■■■■■■■■■■■■ IEEE I 225.6 I■■■ ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 225.4 IEEE ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I '• 225.3 IEEE ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 225.2 IEEE ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 225.1 IEEE ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 225 IEEE ■■■■■■■■■■■■■■■■■■■■■■ IEEE I 0 224.8 ■■■■ ■■■■■■■L' aElI��Ji]■■■■■■■ OMEN ■ CO 224.7 ME■ ■■■■■■■iERMIEVr CTINIM ■■■■ IEEE I > 224.6 MEI ■■■■■■■■■IIN M■■■■■■■■■ ■■■■ ■ a) 224.E M■■ ■■■■■■■■■MMMM■■■■■■■■■ IEEE I 224.4 224.4 M■■ _������M■■■■■■■■■■■■■■ IEEE ■ W 224.3INN. ����•M■�. ■■■■ I 224.2 IEEE ■■■■■■■■■■■■■■MlNN��Nn__ IEEE I 224.1 IEEE ■■■■■■■■■■■■■■■■■■■■■■ IMM■ I 224 ■■■ ■■■■■■■■■■■■■■■■■■■■■■ IEEE I 223.9 ■■■ ■■■■■■■■■■■■■■■■■■■■■■ ■■■■ I 223.8ll ����■M■■_■_■_■_■■_■■■■■■■■■ ■MNNENNENNENNENNENNEN •r I 223.7 ■mim■ ■.....�-_ .•��•UUU■ 'id■ I 223.6 --� � MOM` •m�� ■ 223.5 mmmm ���� ��--- 223.4 IEEE ■■�1����m.-- iIE1E1....••. .••. I 223.2 IMMI■..■ �■M■■■■■■■■■■■■■■■■■■■ IEEE I 223.2 -- ��23.1 ���,M■■■■■■■■ IEEE I 2 223 ■■■■■■■■■■■■MI■MM1�__- Mll M■ 222.9 ■■■■■■■■■■■■■■■■■■■■■■■ . ■■■■ I 222.8 ■■■■■■■■■■■■■■■■■■■■■■■■■■ ■... I -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 318 to 302 318 to 302 Coats 1 0yr 228.5 , 228 Labe:318 Label:317 227.5 ID 36 11.3. Label:315 227 Typ: Catc`n :3- 226.5 - Label:314 226 y.-. - tch Basin 1 43 Label:318-317 225.5 Typ :-C-ortdLabel:312 ait- Label:317-315 2 in 225 ID:257 Type:Conduit L 315=314 ID:258 Type:Conduit ,0---, 224.5 yp abel:310 a--' ID:265 Label:314-312 Type: h 224 Type:Conduit 3 Label:309 Label:302 223.5 IDummum .271 Label:312-310 _ -._at Basin Type:Ca ch Basin 0 223 ID:273 I. 347 IDA:46 Label:310-309 +-' Type:Conduit 222.5 ID:279• Label:309 302 222 Typ ID.2onduit N 221.5 W 221 220.5 r 220 219.5 219 218.5 218 217.5 217 — -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 321 to 319 321 to 319 - Coats - lOyr Label: 321 Type: Catch Basin 226799999999999 ID: 364 Label: 320 226.6 Type: Catch Basin 226.4 ID: 363 226.2 Label: 319 22626 225.8 Type: C ch Basin 225.6 I 62 225.4 225.2 225 I abe 321_3 0 224.8 Type: Conduit 224.E ID: 262 224.4 224.2 224 223.8 Label: 320-319 223.6 223.4 YPe• Conduit 223.2 ID: 268 223 222.6 O 222.E • 222.4 222.2 222 221.8 221.6 221.4 w 221.2 221 weft 220.8 220.6 220.4 220.2 220 219.8 219.6 219.4 219.2 219 218.8 218.6 218.4 218.2 218 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 325 to 324 325 to 324 - Coats - 10yr 228.4 225. i:]111111111111111111111:rl:i . 28 yPeli l�P��.�i■ii■■Ii.:!—.I■i �f i in 227.E 1■■11111111111111111111111..■1 I 227.E 1111 1111111111111111111111 1111 1 227.4 1111 1111111111111111111111 1111 I 2272 1111 1111111111111111111111 1111 I 227 1111 1111111111111111111111 1111 I 226.8 1111 1111111111111111111111 1111 I 226.E 1111 1111111111111111111111 1111 I 226.4 1111 1111111111111111111111 1111 I 2262 1111 1111111111111111111111 1111 I 226 1111 1111111111111111111111 1111 I 225.6 1111 1111111111111111111111 1111 I 225.E 1111 1111111111111111111111 1111 I 1111 1111111111111111111111 1111 1 225.4 1111 11111111 I11111111111111 225225.2 111111111111I 1 NI1111111111 I 0 224.8 1111 1111111111111111111111 1111 1 111111111n■i u1111111111 224E IIII 111111111111111111111 1111I224 :::r1 11■��1111111■11■■...____ 11111 2242242 ----••■�■'11111111111 223.6223.6 --" IIII 11111111■■■...____ 11111 2232 11111111111111111111i■.■.. 11111 11111111111111111111111111 WI 2222 22 8 11111111111111111111111111 I■:: I 2226 11111111111111111111111111 1111 I �.4 11111111111111111111111111 1 2222 11111111111111111111111111 I 222 11111111111111111111111111 I 221.8 11111111111111111111111111 I 221.E 11111111111111111111111111 I 221.4 11111111111111111111111111 I 11111111111111111111111111....2 -2-1 0 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 327 to 326 327 to 326 - Coats - 10yr 231.4 231.2 obcl:3 23type:Catch Basin Type: asin D:370 230.8 230.6 230.4 230.2 230 229.8 229.8 229.4 229.2 229 228.8 228.6 228.4 ��....\� 228.2 228 227.8 0 i 227.6 227.4 a) 227.2 W 227 226.8 226.6 226.4 226.2 226 _- -- - - Type:Conduit 225.8 ID:239 225.6 225.4 225.2 225 224.8 224.E 111111.1111m...- 224.4 224.2 224 223.8 -2-1 0 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 328 to 322 328 to 322 Coats - 1 pyr 233 Label:328 232 Type:Catch Basi Label:326 ID:371 e:Catch Basin 231 :3 230 Label:328-326 Type:Conduit 229 ID:234 Label:324 e:Catch Basin Label:323 Label:322 228 I .3 e:CatchiCatch Basin Label:326-324 •366 ID: 65 227 Type:Conduit o 226MIMMIIIIIIIammwossa-------___________ ID:240 oa 225 > 224 Label:324-323 Type:Conduit _Ebel:323-322 w 223 ID:256 Type:Conduit ID:259 222 221 220 219 218 -50 0 50 100 150 200 250 300 350 400 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 330 to 329 330 to 329 - Coats - 10yr Label:329 229 Type:Catch Bo in D 372 Lahol.330 228.5 Type:Catch Basin D:373 228 227.5 227 226.5 226 225.5 225 224.5 co N L� 224 Label:330-329 223.5 Type:Conduit ID:253 223 222.5 222 221.5 221 220.5 220 -2 0 2 4 6 8 1012 141618 20 22 24 26 28 30 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 335 to 331 335 to 331 - Coats - 1 pyr 234 Label:335 Type:Catch Basin 233 ID:377 232 • 35-334 Label:334 Label:332 Type:Con Type:Catch Basin Type:Catch Basin ID:229 :376 ID:375 Label:331 231 Type:Catch Basin 230 Label:334-333 • nduit Label:333 1�74 229 ID:604 Type:ICatc :60 4- asin c 228 _abet:333-332 0 Type:Conduit '+=. 227 ID:605 Co > 226 _0 Label:332-331 LLJ 225 Type:Conduit ID:241 224 223 .111111- 222 I 221 220 -50 0 50 100 150 200 250 300 350 400 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 338 to 336 338 to 336 - Coats - 10yr 231 - : 336 230.5 Label:338 Type: C, ch Basin Type: Catch Basin Label:3 D. 378 230 ID:380 T •e: Catcr Basin P 229.5 229 228.5 Label:338-337 228 Type_ ondiiit }^, ID:250 4 227.5 Label: 337-336 Type: Conduit 227 ID: 246 0 226.5 Co 226 N 225.5 W 225 224.5 224 223.5 223 222.5 222 -10 0 10 20 30 40 50 60 70 80 90 100 110 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 340 to 336 340 to 336 - Coats - pyr Label: 336 231 Type: Catch Basin 230.5 ID- 378 230 229.5 229 228.5 • .228 227.5 4 - Label: 339-336 0 22s 5 pe: Con it = Type: Conduit 11E73 226 ID: 261 ID: 247 225.5 — W 225 - 224.5 224 ✓ 223.5 223 222.5 222 - - -20 0 20 40 60 80 100 120 140 160 180 200 220 240 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 343 to 342 343 to 342 - Coats - 10yr 230.5 230 Label.343 Lab,, 4P Type:Catch Basin ype:�� h asin ID:385 84 229.5 229 228.5 228 Label:343-342 O 227.5 Type:2ondul (B 51 W 227 226.5 226 225.5 225 224.5 -2 0 2 4 6 8 10 1214 1618 20 22 24 26 28 30 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 345 to 344 345 to 344 - Coats - 10yr 235.5 Label:34 Labe 344 Type.Catch asin Type: h Basin 235 D:3a7, 86 234.5 234 233.5 233 232.5 232 9- 231.5 0 CO 231 N W 230.5 230 Label:3453d4 Type:Conduit ID:227 229.5 229 228.5 . 228 227.5 227 -2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 347 to 346 347 to 346 - Coats - 10yr 241.5 Labe:317 Type Catch§asin ID:389 Lab h 31asin 241 240.5 240 239.5 239 238.5 238 237.5 237 0 236.5 W 236 Label:347546 Type:Conduit ID:223 235.5 235 234.5 ormmenume 234 233.5 233 232.5 232 -2 0 2 4 6 8 1012 1416 18 20 22 24 26 28 30 Station (ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 Profile Report Profile: 348 to 300 348 to 300 - Coats - 10yr 244Label 342 242 D'3oo° ` 240Label 268.6 it I 238 o z;o 236 ;;—i ram. " 234 iilim ' 232 I�—ID I__ Label:342z,. L...e...au Lad.1:331 0 230 Type:ca.BiXPF?Te.eM:.Basin TYPe:CaIU Basin Label:329__, [,.. � 3 Label:322 .� 228 __ _le :il •37 -c kbBaam 224 �l 3,29 L. Ei I. can"uil I Label32.a) 226 22 220222 li-- �� 218 pl �� ��� 216 �� dozell 214 -200 0 200 400 600 800 1000 1200 1400 1600 1800 Station(ft) StormCAD C22008-StormCAD Model.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.04.53] 4/6/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 1 APPENDIX G: EROSION CONTROL CALCULATIONS millishi_,11. 111111117 1 149 Executive Circle, Suite C Cary, NC 27511 NCBELS # C-3847 1919.576.9733 underfoot Forward Thinking. Grounded Design. ENGINEERING www.underfootengineering.com Swale Summary PROPOSED PROJECT INFORMATION: Project: Lauder Parcel Location: Coats, NC Project Number: C22008 Date: 3/22/2023 Designed: HN Checked: MR Outlet ID: - Shear Bottom Side Area V10 Q10 Channel Channel Location (SF) C-Value Stress (fps) (cfs) Depth (ft) Width Slopes Slope(%) Lining Type (psf) (ft) (X:1) Swale 1 4.32 0.50 0.83 4.68 20.23 0.80 3 3 1.7 EroNetTM P300O Swale 2 5.13 0.50 0.66 4.22 21.64 0.90 3 3 1.2 EroNetTM P300O Swale 3 6.00 0.50 0.74 4.47 26.82 1.00 3 3 1.2 EroNetTM P300O Swale 4 4.32 0.50 2.59 8.30 35.86 0.80 3 3 5.2 EroNetTM P300O Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T H Channel Location: Swale 1 Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity (in/hr) 7.81 Drainage Area 4.70 ac Qio 18.35 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 18.35 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope (x:1) 3.0 Start Elevation 222.0 ft End Elevation 215.0 ft Length 423.5 ft Channel Slope,S 0.017 ft/ft Flow Depth, d 0.80 ft Selected Channel Lining: Selected Channel Lining EroNetTM P3000 Maximum Permissible Velocity{Vmax} (fps; 16 Permissible Shear Stress{tp} (psf) 8.00 Calculations: e 2.4 ft Side Slope Length, m 2.5 ft Top Width,T 7.8 ft Channel Area,A 4.32 sq ft Wetted Perimeter, Pw 8.06 ft Hydraulic Radius, Rh 0.54 ft Mannings"n" 0.027 Calculated Flow Rate, Qcaic 20.23 cfs Calculated Velocity, Vcaic 4.68 fps Calculated Shear Stress, tcaic 0.83 psf Q calc>_Q design? yes V calc <_V max? yes t calc <_tp? yes Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T H Channel Location: Swale 2 Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity (in/hr) 7.81 Drainage Area 4.55 ac Qio 17.77 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 17.77 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope (x:1) 3.0 Start Elevation 220.0 ft End Elevation 215.0 ft Length 423.5 ft Channel Slope,S 0.012 ft/ft Flow Depth, d 0.90 ft Selected Channel Lining: Selected Channel Lining EroNetTM P3000 Maximum Permissible Velocity{Vmax} (fps; 16 Permissible Shear Stress{tp} (psf) 8.00 Calculations: e 2.7 ft Side Slope Length, m 2.8 ft Top Width,T 8.4 ft Channel Area,A 5.13 sq ft Wetted Perimeter, Pw 8.69 ft Hydraulic Radius, Rh 0.59 ft Mannings"n" 0.027 Calculated Flow Rate, Qcaic 21.64 cfs Calculated Velocity, Vcaic 4.22 fps Calculated Shear Stress, .calc 0.66 psf Q calc>_Q design? yes V calc <_V max? yes t calc <t p? yes Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T H Channel Location: Swale 3 Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity (in/hr) 7.81 Drainage Area 5.60 ac Qio 21.87 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 21.87 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope (x:1) 3.0 Start Elevation 225.0 ft End Elevation 220.0 ft Length 423.5 ft Channel Slope,S 0.012 ft/ft Flow Depth, d 1.00 ft Selected Channel Lining: Selected Channel Lining EroNetTM P3000 Maximum Permissible Velocity{Vmax} (fps; 16 Permissible Shear Stress{tp} (psf) 8.00 Calculations: e 3.0 ft Side Slope Length, m 3.2 ft Top Width,T 9.0 ft Channel Area,A 6.00 sq ft Wetted Perimeter, Pw 9.32 ft Hydraulic Radius, Rh 0.64 ft Mannings"n" 0.027 Calculated Flow Rate, Qcaic 26.82 cfs Calculated Velocity, Vcaic 4.47 fps Calculated Shear Stress, tcaic 0.74 psf Q calc>_Q design? yes V calc <_V max? yes t calc <t p? yes Channel Design TRAPEZOIDAL/TRIANGULAR SHAPE T H Channel Location: Swale 4 Estimate 10-yr Peak Runoff: Rational C 0.50 Intensity (in/hr) 7.81 Drainage Area 7.30 ac Qio 28.51 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 28.51 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope (x:1) 3.0 Start Elevation 242.0 ft End Elevation 220.0 ft Length 423.5 ft Channel Slope,S 0.052 ft/ft Flow Depth, d 0.80 ft Selected Channel Lining: Selected Channel Lining EroNetTM P3000 Maximum Permissible Velocity{Vmax} (fps; 16 Permissible Shear Stress{tp} (psf) 8.00 Calculations: e 2.4 ft Side Slope Length, m 2.5 ft Top Width,T 7.8 ft Channel Area,A 4.32 sq ft Wetted Perimeter, Pw 8.06 ft Hydraulic Radius, Rh 0.54 ft Mannings"n" 0.027 Calculated Flow Rate, Qcaic 35.86 cfs Calculated Velocity, Vcaic 8.30 fps Calculated Shear Stress, tcaic 2.59 psf Q calc>_Q design? yes V calc <_V max? yes t calc <_tp? yes SKIMMER BASIN SUMMARY Drainage Q10 SKIMMER ORIFICE Basin Area BASIN DIMENSIONS VOLUME AREA WEIR (Ac.) (cfs) SIZE(in.) DIA.(in.) DEPTH LENGTH WIDTH PROP. REQ'D PROP. REQ'D PROP. (FT) (FT) (FT) (CF) (CF) (SF) (SF) (FT.) Skimmer Basin 1 13.02 50.84 5.00 See Plan 191,027 23,436 44,034 22,115 40.00 4.00 2.4 Skimmer Basin 2 19.88 77.63 5.00 See Plan 183,487 35,784 46,248 33,769 75.00 4.00 3.0 NOTES: -Intensity 7.81 IN/HR -Composite C 0.50 -REQUIRED SURFACE AREA BASED ON 435 SF*Q10 -REQUIRED VOLUME BASED ON 1800 CF/ACRE OF DRAINAGE AREA -EROSION CONTROL INSPECTOR CAN REQUIRE ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY. Ii underfoot `Low ENGINEERING SKIMMER SEDIMENT BASIN PROPOSED PROJECT INFORMATION: Project Name Lauder Parcel Location NC 27E, Coats, NC 27521 Project Number C22008 Date 4/14/2023 Designed By HN Verified By MR BASIN INFORMATION: Basin Name Skimmer Basin 1 Disturbed Area 13.02 Acres Rational C Value = 0.5 Undisturbed Area Acres Rational C Value = MINIMUM SURFACE AREA REQ (435 SF PER CFS Q10 PEAK INFLOW): Rainfall Intensity (10-Year storm) 7.81 in/hr Peak Flow to basin 50.84 cfs Surface Area Required 22115.4 sf Surface Area Provided 44034.0 sf MEETS REQ. REQUIRED SEDIMENT STORAGE: Rate of Volume 1800 cf/acre of disturbance Required Storage 23436 cf Provided Storage 191027.00 cf STORAGE PROVIDED MINIMUM SEDIMENT CLEANOUT VOLUME AND CLEANOUT ELEVATION: Sediment Cleanout Volume 11718 Incremental Accumulate Contour Area Volume Volume Elevation Contour (SF) (CF) (CF) (FT) 210 32602 0 0 0 _ 211 34776 33689 33689 1 212 37006 35891 69580 2 _ 213 39292 38149 107729 3 214 41635 40464 148193 4 215 44034 42835 191027 5 Temporary Pool Lower Elevation 210.0 Temporary Pool Upper Elevation 211 Temporary Pool Lower Volume 0 Temporary Pool Upper Volume 33,689 Cleanout Volume Elevation 210.35 SKIMMER SIZING FOR FAIRCLOTH SKIMMER® Skimmer Size Head on (in) Orifice (ft) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Selected Skimmer Size 4 in. Head On Orifice 0.333 ft. Required Volume 23436 CF Selected Orifice Radius 1.20 in. Selected Orfice Diameter 2.40 in. Desired Dewatering Time 3 days Actual Dewatering Time 3.05 days SPILLWAY DESIGN 10-Year Flow 50.84 cfs Spillway Length 40 ft. Emergency Spillway Elev. 213.40 ft. Top of Berm 215.00 ft. Freeboard 1 ft. Depth 0.6 ft. LENGTH TO WIDTH RATIO Length 265 ft. Width 110 ft. L/W ratio 2.41 GOOD SUMMARY TABLE Basin Side Slopes 3:1 Storage Depth 5 ft, Storage Required 23436 cf Storage Provided 191027 cf Surface Area Required 23436 sf Surface Area Provided 44034 sf Bottom of Basin Elevation 210 ft. Emergency Spillway Elevation 213.4 ft. Skimmer Main Crest Elevation 214 ft. Skimmer Size 4 in. Skimmer Orifice Diameter 2.4 in. Water Surface Elevation 214 ft. Freeboard 1 ft. Top of Berm 215 ft. Ii underfoot `Low ENGINEERING SKIMMER SEDIMENT BASIN PROPOSED PROJECT INFORMATION: Project Name Lauder Parcel Location NC 27E, Coats, NC 27521 Project Number C22008 Date 4/14/2023 Designed By HN Verified By MR BASIN INFORMATION: Basin Name Skimmer Basin 2 Disturbed Area 19.88 Acres Rational C Value = 0.5 Undisturbed Area Acres Rational C Value = MINIMUM SURFACE AREA REQ (435 SF PER CFS Q10 PEAK INFLOW): Rainfall Intensity (10-Year storm) 7.81 in/hr Peak Flow to basin 77.63 cfs Surface Area Required 33769.05 sf Surface Area Provided 46248 sf MEETS REQ. REQUIRED SEDIMENT STORAGE: Rate of Volume 1800 cf/acre of disturbance Required Storage 35784 cf Provided Storage 183487.00 cf STORAGE PROVIDED MINIMUM SEDIMENT CLEANOUT VOLUME AND CLEANOUT ELEVATION: Sediment Cleanout Volume 17892 Incremental Accumulate Contour Area Volume Volume Elevation Contour (SF) (CF) (CF) (FT) 215 6516 0 0 0 _ 216 35206 20861 20861 1 217 37882 36544 57405 2 _ 218 40614 39248 96653 3 219 43403 42009 138662 4 220 46248 44826 183487 5 Temporary Pool Lower Elevation 215.0 Temporary Pool Upper Elevation 216 Temporary Pool Lower Volume 0 Temporary Pool Upper Volume 20,861 Cleanout Volume Elevation 215.86 SKIMMER SIZING FOR FAIRCLOTH SKIMMER® Skimmer Size Head on (in) Orifice (ft) 1.5 0.125 2 0.167 2.5 0.208 3 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Selected Skimmer Size 4 in. Head On Orifice 0.333 ft. Required Volume 35784 CF Selected Orifice Radius 1.50 in. Selected Orfice Diameter 3.00 in. Desired Dewatering Time 3 days Actual Dewatering Time 2.98 days SPILLWAY DESIGN 10-Year Flow 77.63 cfs Spillway Length 75 ft. Emergency Spillway Elev. 218.50 ft. Top of Berm 220.00 ft. Freeboard 1 ft. Depth 0.5 ft. LENGTH TO WIDTH RATIO Length 412 ft. Width 120 ft. L/W ratio 3.43 GOOD SUMMARY TABLE Basin Side Slopes 3:1 Storage Depth 5 ft, Storage Required 35784 cf Storage Provided 183487 cf Surface Area Required 35784 sf Surface Area Provided 46248 sf Bottom of Basin Elevation 215 ft. Emergency Spillway Elevation 218.5 ft. Skimmer Main Crest Elevation 219 ft. Skimmer Size 4 in. Skimmer Orifice Diameter 3 in. Water Surface Elevation 219 ft. Freeboard 1 ft. Top of Berm 220 ft.