Loading...
HomeMy WebLinkAboutNCC233472_ESC Approval Submitted_20231128 ROY COOPER s ' Governor ELIZABETH BISER `14 Secretary 'yM WILLIAM E.TOBY VINSON,JR. Interim Director NORTH CAROLINA Environmental Quality November 6, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Jackie Investments Inc Attention: Daniela J Garcia Sandoval, Owner/Manager 4916 Tigers Den Road Randleman,NC 27317 RE: Project Name: Lion's Warehouse Acres Approved: 1.5 Project ID: RANDO-2024-022 County: Randolph City: Randleman Address: Central Piedmont Ct River Basin: Cape Fear Stream Classification: C Submitted By: Summey Engineering Associates, PLLC Date Received by LQS: November 1, 2023 Plan Type: New Dear Ms. Garcia Sandoval: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: North CarolinaDepartment of Environmental tal neslMi RDoad Energy,Mineral,andLand h Carolina Winston-Salem Regional Office�450 West Hanes Mill Road,Suite 300 I Winston-Salem,North 27105 cal 336-776-9800 Letter of Approval with Modifications Jackie Investments Inc November 6, 2023 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Lion's Warehouse Project ID: RANDO-2024-022 County: Randolph Plan Reviewed By: Lisa Edwards, PE Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Diversions should be placed above the sediment basin or the sediment basin/trap should be reconfigured so that sediment-laden water enters the sediment basin/trap at the end opposite the outlet to allow for flow through three baffles/maximum water path/sediment settling. Please revise your plans. [G.S. 113A-57(3)] 2. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 4B .0120] 3. Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 5. The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan ..1 tv W •- tcu O .1:I : 0 4 o .5 0 O' 0 .4., .4 E-I p ago co iai . W4 0 /. O . au V au a U •�, I t 4) CD• C .1e( : en 4) $: 6 g CI " "" m i:1 2 8 04 ici — ,,,,, 4.1 = . v 44 i: •,- 'd co v rC CD r„ CI ( •o 4 ,,:, 6 in . .. -,-. ,0 0 1 - t 7-4 D cl -y = A M I w,, c.,, .9 ..- „.,- er 8 ,„,,..- •,'Ysiltr----.;.._:__-_. '.' ‘„ 1. 1 r___ ms : • g I! ° • 3 6 = piTo . • l'•- -N•._-1... - . : 8.: 4) 6C 5 V94 i:.7'" t Z C ,,:s . ie,!'•110 ., `i1V' *a U y (>J Z [ cu 12 cu� O .a 0 m J •o - 8‘ Cb) 6 4t..., . = •,:$ 1.5 . a� .. ix: . O ., b0 H v '•' 1 U ©too 0 li W Ca a C T a Cas g •1....) cel Cu) •� • O ~ •� RI I �" bA ;.I.. y b et L�a a oc 61 o PO : ctUctU -� A 4[ e a