Loading...
HomeMy WebLinkAboutSW6231109_Supplemental Info Review_20231127 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 11/27/2023 10:15:41 AM (Supplemental Submittal) Accept by Kaitlin Peck 11/27/2023 2:03:01 PM (Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 11/27/2023 10:15:43 AM =DEQ • Submittal from 11/27/2023 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW6231109 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Barker Laydown Yard Owner/Operator* Duke Energy Progress, LLC County: Cumberland Submitter Name:* Zachary Eulo Who is submitting this information? E-mail Address:* zeulo@dewberry.com Phone Number* 9194257610 Additional E-mail for dmahmoudi@Dewberry.com Submittal (Optional) Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Application Form File Upload Click the upload button,or drag and drop files to attach 1—Barker Laydown_Stormwater Application and 1.69MB Supplemental.pdf Only PDF files are accepted. File Type* BUA Allocations File Upload Click the upload button,or drag and drop files to attach 2—Barker Laydown_BUA Allocations.pdf 58.92KB Only PDF files are accepted. File Type* Construction Sequence File Upload Click the upload button,or drag and drop files to attach 3—Barker Laydown_Construction Sequence.pdf 66.61 KB Only PDF files are accepted. File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach 4—Barker Laydown_Stormwater Calcs.pdf 584.68KB Only PDF files are accepted. File Type* Lease Agreement File Upload Click the upload button,or drag and drop files to attach 5—Barker Laydown_Signed Lease_Red acted.pdf 2.33MB Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach 6—Barker Laydown_0-M-EZ-20201215-2.1--3- 217.77K6 (1).pdf Only PDF files are accepted. File Type* Photos/Pictures File Upload Click the upload button,or drag and drop files to attach 7—Barker Laydown_Existing Photos.pdf 20.71 MB Only PDF files are accepted. File Type* Plansheet-Cover Sheet File Upload Click the upload button,or drag and drop files to attach 8.1_Barker Laydown_Cover Sheet.pdf 2.8MB Only PDF files are accepted. File Type* Plansheet-Existing Conditions/Survey File Upload Click the upload button,or drag and drop files to attach 8.2_Barker Laydown_Existing Conditions Sheet.pdf 2.89MB Only PDF files are accepted. File Type* Plansheet-Proposed Conditions/Site Plan File Upload Click the upload button,or drag and drop files to attach 8.3_Barker Laydown_Site Plan Sheet.pdf 1.52MB Only PDF files are accepted. File Type* Plansheet-Existing Drainage Area File Upload Click the upload button,or drag and drop files to attach 8.4_Barker Laydown_Existing Drainage.pdf 789.58KB Only PDF files are accepted. File Type* Plansheet-Misc. Detail File Upload Click the upload button,or drag and drop files to attach 8.5_Barker Laydown_Misc Detail.pdf 7.66MB Only PDF files are accepted. File Type* Property Deed File Upload Click the upload button,or drag and drop files to attach 9_Barker Laydown_Deed_9079_0564_10.0.1.63.pdf 650.09KB Only PDF files are accepted. File Type* Response To Comments File Upload Click the upload button,or drag and drop files to attach 10_Barker Laydown_Comment Response.pdf 201.45KB Only PDF files are accepted. File Type* Signing Official Title&Position Information File Upload Click the upload button,or drag and drop files to attach 11_Barker Laydown_Signature Authority.pdf 48.61 KB Only PDF files are accepted. File Type* Soils/Geotechnical Report File Upload Click the upload button,or drag and drop files to attach 12_Barker Laydown_Soil Evaluation Report.pdf 3.18MB Only PDF files are accepted. File Type* Stormwater Narrative File Upload Click the upload button,or drag and drop files to attach 13_Barker Laydown_Stormwater Narrative.pdf 79.13KB Only PDF files are accepted. File Type* Stormwater Report File Upload Click the upload button,or drag and drop files to attach 14_Barker Laydown_NCDEQ Stormwater Report.pdf 13.48MB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach 15_Barker Laydown_SuppEZ-2020-Version-2.1.3 461.68KB 20201203-D E M L R-S W.pdf Only PDF files are accepted. File Type* USGS Topographic Site Map File Upload Click the upload button,or drag and drop files to attach 16_Barker Laydown_USGS Topo.pdf 331.69KB Only PDF files are accepted. File Type* Wetland Determination/Report File Upload Click the upload button,or drag and drop files to attach 17_Barker Laydown_Wetland Determination Enviro 2.15MB Memo.pdf Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: All attachments per the drop down have been uploaded,along with the entire stormwater report under number 14. Please note that Duke is looking to start construction early January ahead of material delivery in early February. I know this is a rushed schedule, but I am hoping based on the simplicity of the project,we can still meet this deadline. Please let me know if there is anything we can do to speed up the review period. * By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Zachary Eulo Signature: Zaafa �66;2!�, Date Submitted: 11/27/2023 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW6231109 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 11/27/2023