Loading...
HomeMy WebLinkAboutNC0060526_NOV-2023-LV-0694_20231113Manuel, Vanessa From: Daniel Sears <dsears@envirolinkinc.com> Sent: Monday, November 13, 2023 9:47 AM To: Manuel, Vanessa Cc: Andrew White; William Lamm; wl p.techsu p port; Fowler, Kevin G Subject: [External] Pope Industrial NOV response Attachments: NOV Response for August 2023 Violation.pdf Follow Up Flag: Fallow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mrs. Manuel, Please find attached the response forthe NOV-2023-LV-0694, corresponding to the August 2023 monitoring Period. If any questions or comments, please let me know. Respectfully, Daniel Sears Environmental Compliance Coordinator 4700 Homewood Court Suite 108 Raleigh, NC 27609 Office:252-235-4900 Direct: 984-365-9155 www.envirolinkinc.com g I \\ II(()I I\f' CARE, CHAUCAIER, 11MUNCE & PROFESSIONALISM ffc,oCP�D52-tp t COMMERCIAL REALTORS November 10, 2023 Mrs. Vanessa Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Subject: Notice of Violation and Assessment of Civil Penalty Tracking Number: NOV-2023-LV-0694 Permit No. NCO060526 Pope Industrial Park WWTP Wake County Mrs. Manuel, Thank you for allowing the Pope Industrial Park the opportunity to respond to this Notice of Violation issued October 9, 2023; received on November 01, 2023, for the BOD Daily Maximum exceedance and Monthly average exceedance which occurred during the August 2023 monitoring period. The BOD daily exceedance reported on August 16, 2023, with a value of 18.6 mg/L, was a result of what we believe to be suppressed dissolved oxygen in the aeration basin due to a peak effluent water temperature resulting in less efficient removal of the ROD. This is illustrated below in the chart showing the highest recorded temperature for the sampling month was on the day the sample was collected. On August 22, 2023, we were notified of the elevated BOD value and the operator increased the amount of air to the system in an attempt to increase the dissolved oxygen concentrations in the plant. The remainder of the samples collected for the month were compliant, however, the monthly average resulted to 5.84 mg/I, equivalent to a 16.8 % exceedance of the limit established on the permit. As can see on the following chart, the value that caused both violations in this period does not reflect the normal performance of the facility, and the remaining samples pulled from the system were compliant. It is evident through the trendline below that the treatment facility operates below the 5 mg/L line routinely. P. O. BOX 97215 RALEIGH, NORTH CAROLINA 2762,1 919.6463500 Pope Industrial BOD performance 3s .. _ .. 30 26 626.1 26.7 271 28.1 27.9 27 27.7 .... 23.7. 24.8 24 23.4 23 24 229 21.7 .,.. 23 _._.. 25.1 26.6 ... .. ...... . . .. __ .. _. _ _: _ 10 18.6 ..._. _. .. _..;... .. _ .i 19 ..._.. .. ...__..._ ___ ]s 3.R 4.2 94 - 6 i. ... 1,9. ..1.A ai4..:1 .6 19 31 2 47 33 31 1.9I- ..... ............. .. ................ . _ 0 03/06/1 23/06/2023 13/07/2023 02/08/2023 22/08/2023 11/09/2023 OV10/2023 21/10/2023 10/11/2023 � Boo (rI - a Temp (T) .•••.•••• Linear (Boo (mg/L)) During a recent inspection of the facility, some systems of the plant were identified to be in need of repair. Currently, we are waiting for quotes and financial approval to move forward with these identified items. As described above, the values that caused the violations of this facility are not representative of the actual performance of the system. It is our request that the Division take into consideration the actions taken by the permittee when deciding whether further enforcement actions are warranted. Sincerely, o'4 '�4 g�T Albert E Finley, Pope Industrial Park II Ltd Partnership CC: Andrew White, Envirolink, Inc. William Lamm, Pope Industrial W WTP ORC