HomeMy WebLinkAboutNCC233312_Site Plan or Location Map_20231107 % - CONSTRUCTION SCHEDULE �� �� \/ 1.Obtain MI necessary permits and plan approvals Erosion and Sediment Control(E&SC)permit and a Certificate of Coverage yp ° �p��°� / -�^� (COG)must be obtawN before dry land disnrbmg e " .A copy of the'''SC permit.the COC and a hard copy of the Pr•"' S (J ` plan most be kept on site,preferably m a permits box,and accessible doting amnion. ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY y Ry 7 �poAo / 2.lo o gravel concoction entrances first,men But fences,reinfoeei silt fence NCGS 113A-54.1'IS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR o "c µOP outlets and wanes. COMPLETED AS AN EXCEL SPREADSHEET. 'b n Y,,,e, moo- �- 3,Finish cleatingand rubbing any necessary areas on the lots as they are started, AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED R _ Cj, „ 4.Begin lot grading endexcevmiom activities EROSION AND vvzz ° 6 • - Q \i ---1 SBegworcwtivme with house construction activities. SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A b rt2 sit / OJ- 47 I 6.Finish all rough grading and house construction. NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY 9 ].Install driveways,walks end patios. o ` Y. paio INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE P 'b to _/ B.Begin foe grading Otto(areas APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, ' °' \ / \ Zi / 9.Fina'grasmng.muwM1ing and.....in of lot.In moat cases mis willwwlve the installation oesma on melot.Theafit fence will DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE / remain m place until me lot is sodded or grassing is stabilised and takes hold.te PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION . SITE T✓ Ill r ) \ (`�i 1 ID.The contractor shall conduct self-inspections afore erosion and aetlimrntatlw control measures and complete the follawivg CONTROL PLAN.' f A mbimoc.goinspenion form mundonmeoF,mlxangres ° k (f nrps://xww.deq.ne.gov/about/divisrmns/energy-mimernl-end-land-asmurces/stOttawa(er/setOttawa(er-pr°gnMnpdes-cmnsnucmmn-vrmgram. 0 9� RO 'Iw0 III / 53 4 /^� Twelve mon.of complete inspection[shall be kept on site and available for inspe.on at all times.It u recommended pA T° \ 75 (?� / \ coPYMkept in aPetmitsbox, ef:G.5.113A-54.1 mraugM1 GS.113A-5]Sections lSA NCAC 04A.0101 iM1rough lSA /) NC C04E rmi IOOW NPDES for ConatrmctionA- g� rr'o / Ilsl inapec r arw. control meeamea ammbep r u I monde every seven aalenear aaya and SODDING 'b ." / 'n'zan f e.e f Want roan.nor neWW revs nlrb a immee aLelvm ma mtarm meaaarea as O Rix III L. r de fined A111:SC shall b - 'Was specified in Ns.consruc- de'I mis plan A rain gauge sbsll be installed ° 0� ROc'�/sNc J �4� / / /• %/ / I at We Prolcu sitc'or monitoring. �� LAY SOO IN P STAGGERED ABpR III 12.Inspection and anal acceptnce letters When Me pmlect is comlete,M1e permineea sM1all wmm�DEMLR m close outme F&SC ■ Plan.After OEMLIS informs me pennrnee of the project close out,via inspection report,the perminee shall visit 00 54''. 49• L/ "seq.nc.govNC(:01't°wbmitnneleco-onicNoticeofterminanon(o-NOT).ASIOOammelgenerelpemitfeewi11TochargW M���'�I�� / \ 1 \nn Ire e-1:01'M1ua been fillW orL exos nxo Taaarms metes. w tf Toro I .(��tie'\ / \ 5� \ , ." ' �l i. EL1 ,tOr ' os2 djdll. 99..1..)603 O� \ wrHTHeamr «) ■■ � /� APPEARANCE OF GOOD SOD WEEKS.SFr-niE No q e 57 � \ VICINITY. MAP � WjCI � i maaarmIf I^�N.T.S. - I 7 f� ��II�f`IIIVVl' I� ma� / l y DATE: PAGE: ft•sy 63 -,7: �� � 'C, casmru.x .maraomu.T HMIN .{ FENCE I> �i , i1 ��� + 45 it T1 �'r� � C,a�o <G4 0l. 4 / 2 ��VaNO' / DATE: PAGE: TaP OFSLTE e�/ // / _yE MusT es.AT teas -- - • 4T' THE ASHEDS NE J ^o STEEL FENCE POST % / / 3 J'C 43 y "A" •'B" 'C "D" 'E" "F" "G" ••H•• WIRE FENCE Z 77/ HARDWARE CLOTH OT100 VIEW NauR „,,,„../7."- % /r Fv,y „, OS1 4 1 I I G �' 1 FILTER 0arorvE •I CLOTH IN TRENCH �66 /%/ �� / / my� ¢4. `♦�` 42 ml /�\_ R Na R 1 ou 1 .•nous 1 1 �G ��usE,,,,N• :11 NOUS NOuSE ON NTOSOOGId FILTER oa�E - __ // / /may /II \\ ftw L_.I J `-Ra �., LRo AY `24 NOTES: •- •••1 1,Hardware cloth and 2�I should overly he silt fence at least 12 �i / / J / l \ / \ _ Ro AY AY -ROADWAY;3.. grave y J I / CONSTRUCTION % I1r Ro••Av Ro A .....: o°�°. ':' I 2.Stoma outlets should be placed on low elevation areas of silt fence /% % A°0 34 r 41 LIMITS / \ `CURB INLETLEo0E or CUae Notes: \\\`\ and based on field conditions. / I/ / - \ 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland URY MAINTENANCE % / ',.a \ \ / / i1 \ LEGEND boundary and/or around protectetl trees,providing:adios of at least 1.25 feet for each BURY WIRE FENCE AND or 1.Per NOG-01,Inspect outlet at lest once a week and after each l inch orinch of trunk diameter. HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. / O �" / 2 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on 2.Freshen stone when sediment accumulation exceeds 6Inches. ' 40 ^' A1 / N p schematiGtliagrem antl field atljustetl,if necessary,for placement at low points.If lots are 3.Keep mesh free of debris to provide adequate flow. / �_ / 35 �c�,tr ��j / \, 24 /' \ contiguous antl have tli(ferent)antl owners or builtlers,each lot shoultl have intllvidual Silt 4.Remove sediment when half of stone outlet is covered. _ �� "s>- �f / 25 I. Lot Plan j/ \ ILT FENCE Fences. ..\NC-Envirpinleil ul.lyey SECTION VIEW 5.Replace stone as needed to facilitate de-watering a SS�S G�'J / \ Lot Plan "p" / S ILT FENCE OUTLET ® 3.Install required Silt Fence within 10 feet of property line to ensure there is no conflict with J ?yF gyp. �S / / \\ ��E�� I / \ CONSTRUCTION ENTRANCe septic system.It Is the responsibility of the builder to ensure the Installation of sediment L______ SILT FENCE OUTLET - -� / ',� �e.t' / tP / 190 u D LET = control measures does na impact the septic system and repair area(s). V'b 0 �., / 39 //A;\ ••. ,• \ 4.At least one Construction Entrance/Exit is to be Installed per lot. 36 ♦/ Lot Plan // \ F� l 7.'r / 5.Waste bins and other areas dedicated for managing building material waste shall be at /� (/ t� ♦ "G'. �/ \ •r 23 least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that \ // ,\ \ •b� Lot Plan \ no other alternative exists.If this separation cannot be achieved,these areas must be / 1 contained behind Silt Fence. O •' ccErp \ // // G / 6,Inlets downstream of disturbances should be protected;streets should be swept when m r / 1 0 sediment from the construction actrvi is present. �1' l�y� \ / ( /�•r•O4-' -' \ ..\NC-Environmen tel.peg ].Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are 9 37 M' '✓•P(' / CONSTRUCTION��+,.y. G'F ,/,bye /x \ C+�,'cjp •. 6 provided on additional sheets.Erosion and sediment control details are not drawn M scale. 5 ^ / Oy Lot•tan ENTRANCE �\ E'+�"2/2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER DATE: PAGE: // j4� "a'j t•'°O I�fF`arTlvcn Slit sock/wattle \ ��Fy��O/ 8 •a4 \\ / / k �••\ L 22 n \ I DATE: PAGE: Silt Sock/Wattle 6 / �% \ rtow�_� �I �4II Porte bunted for J / of Plan // / �� \ N4I�� e � om equivalent protection J �11I .II... r- �M - may es.sus \ \ r!II II I.. - s. / 1, lA 2P \•'* ■ rolL ll. uniformly snTn tam r \ \ /2 :,c.; gV \\ Lot a /. / fl Stakes sz 'I set k s to the des.3. a length g .111 a°rnot aa m / /% 7 •/ .�(�1ayce-.fe SE,.. �\ ,H„" .� / {v SECTION SEGTIOM a:�I�a0olw GROUND STABILIZATION CONSTRUCTION % LotPl �e� r � / p\\. \� > / mfil fie a the LIMITS j 'F" /yE / \\ \� rdll 1 j s a e tea eat eee n laM disturbance,The turned. roe SITE AREA STABILIZATION / /� o•/ es rate an Lo Plan I 1 I . sock/welters) ent uoff from going arouM the and pslope DESCRIPTION TIME FRAME EXCEPTIONS i\ ,.., .1r1. \� \\ / `G� so a Oak in.x2 in.cross section should be driven PERIMETER DIKES, 7 DAYS NONE --'\ \ / �• �% /) '. .-...._. ..• tam IWII ...lbw SW&ESLOPESHES \� G,vo�' ' \\\ L1t9PIan \\•\ /, / k k smaximum interval of 4 feet or a maximum ac interval HIGH DUALITY 7 DAYS NONE y�J� 9 / CONSTRUCTION 11 1•••1 1 1 1 1 1 1 Trench'n a n OG, \\ �)\ LIMITS R Wood Mach or Com ground a Min. tee WATER ZONES O . •'. .. _ •1 1 1 . I 1 1 To 1/2 height of log at s. n - - M. (HOW) / \ \ 4. 18 \ ,r_r.w.. -_.v -vi k k UNTRENCNED INSTALLATION ENTRENCHED INSTALLATION. 9OL I • •- �. Lot Plan \' s Mn •• •••• m,.r tam mrem,..w.",..immaow,�a„rm�mw S. runoff*aro to hold it in plam doing want.. SLOPES STEEPER 7 DAYS IF SLOPES ARE f- ----__ I \ �'�a\ H' \\%Er'_ •I I. e- - saMETRCVEW THAN 3:1 / J' = 4- LENGTH i'll"ItAen:::Nlinii:"..g;r.ell'elitin:rx;:::'ri:tia:;:::::::::: LENGTTH ANDS ARE - �/ •\\ 17 \t•+„ I a / / n r" µ'ogPOS sac°N TIAL now RATES NOT STEEPER \ Lot Plan 6� /O� •- sTHAN 2:1, 14 • p\ ��H�l \ 1� 'Ld PMenm Deaa.m.m.,«ratzooT leaa,ml li0o�ml reoonm> hs^t DAYS ARE - was- / conaweuer: Men,tenance: Ppm mALLOWED /��� 1.Clear the entrance antl exit area of all vegetation,roots,and other objectionable 1,Per NCG-01 Inspect at least once a week antl after each 1 Inch or serest Pww� sdaoak/r�eufzi i rmi ivaFmi 10irid«° tr:.Po, SLOPES 3:1 OR 14 DAYS 7 DAYS FOR \ Ymaterial and property grader. greater ramfal¢make any regnbed repaire Immeaiatery. wm,xAe fwane .. coos mlf3ee ml (5N m1 FLATTER SLOPES GREATER J v 2.Place the gravel to the specific grade and dimensions shown onthe plans,and 2.Maintain the gravel pad in a condition m prevent mud or sediment �- \ smooth it. from leaving the consimetlon site.This may require periodic CONSTRUCTION g ny Water p or o p g with 2 inch stone.tams .,. in rmin Ilea"'mi 'min gaain '' THAN 50'IN j a.Prevlde erelna etc ca ter toeeedlmenl trap her sultable raft.. to aressin a"R or,„, (,ar• 10/, eMumamnea been ebana anew ex above one LIMITS 4.Use ixtilefabdca in order to improvestability of the foundation in locations 3.If /m/m) /m/m) Iymym) Iymym) /m/m) measure has been permanently stab... LENGTH �-- �- _� genes tyyemove all objectionable materials spilled.washed or subject to seepage or high water table. tracked onto public roadways. ALL OTHER AREAS 14 DAYS NONE(EXCEPT SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION WITH SLOPES FOR PERIMETERS I CONSTRUCTION ENTRANCE/EXIT FLATTER THAN 4:1 AND HQW ZONES) DATE: Wve Fence Filter Fabric PAGE: areal Post s'Max.shndam Strength fabric with sire fence e A sr Max.E.atrergt hbdcwitoutmre fen Wire Fence Wire Bmckflll tren cthoroughly h '11 �e PAGE 1 of 2 and Compact R 1 z. All drat Erosion Control Notes �m� the areas shown shall be disturbed. N\ az1 \ TOTAL DISTURBED ACREAGE: 5.90 ACRES Steel Post Gene Plaataar ' 1} rowed areas shall be grassed and ���\S,�op� / �� LOT EROSION CONTROL PLAN Wire ties tr,d, mulched as soon as possible and maintained ` until pemanent cover s established. \ � I\I J \\\/// LOTS 17-27, 38 (Sc 39 t- ts�9 �nnt d GRACELAND Construction: + er Fabric �. � '- PHASE IIA 1.Construct the sediment banter of staWam strength or ex.strengthsynthetic Mere... °Ross SECTION VIEW -� FOR 2.Ensure that..may irnpauM �mesofwe�dimcienttocaumfnmftheststructure) grenW(Nigne,fem'° MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION BENJAMIN STOUT 3.Construct the niter...from a wines of water sufficient s MI Baum failure of the w ore.rrierto avoid joints.When joints are sewMy hate°the filter clot onlyat t upport past...et minimum overlap to the next post. ions. bottom by tendy rastenea»1Mifoma cent,ne thaaaofthe posaanalonea General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on an articular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates,measures will be a.n,aort Mre as wpvonmhrater mats o-eme.Fastn thew,reremmraemem,thendeM on theupamI I. P P 9 P any Y Y side of the ler. at reau urea rennin immediately, relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. REAL ESTATE SERVICES LLC a s maximum of e feet should be advert f M1uauPO nlenst Wire or ceaMiuwE,sparepoea poundea should have a minimum 60 tensile Supports ern 2.SM1ouldetneahbrer�c�ofal'seW mart fence mllePae.ter,decampoae. Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all securely8. the e�awIra8rooPstepochs does not eaulrearere mean support me.Beaarelr objectionable materials spilled,washed,or tracked onto public roadways. MCLAUCHLINTOWNSHIP HOKE COUNTY e.tBlnnle Alter fabric directly to post:.Were or plastic sip ties should have a minimum of 6000rllonsile set age volume sediment ronenet as recce:assure on Me Silt Fence-Sedimentfences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure = 7. v10Ta m y notes vide and v e proposed lineoftepostsand 3 ffra dlaaeauo aarema"CieuneermimtNtheiertceamong that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. SCALE:1rr �00' OCTOBER 2023 Exca the the bnriemoxi col 4i mRernoveSodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to dose,since this could inhibit adequate growth GRAPHIC SCALE .Place Inches of aWM along 0he bottom and aloe of the trench. and Ming theaea m geaeland stabillalaoea rrhe...ding 100 0 50 100 200 400 soil paced over the Merle.and romper.Thorough companion of the badmu is rrier 4 drainage area has been properly stabilise, and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 10.o.1.1 to silt rance omnt anacnnneoh performance. velan to c a. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = M ° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 'son Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) ..\NC-Er virq,m en talijpeg� SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the nett rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:10/5/2023 10:02 AM LAST PLOTTED:10/5/2023 10:11 AM PLOTTED BY.Dennis Gilbert FILENAME:C\CURRENT JOBS aBENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-24 GRACEvND-EC\PLANS\GRACELAND EC-LOTS 17-27.38&39.13W2