Loading...
HomeMy WebLinkAboutNC0063720_Compliance Evaluation Inspection_20231031 (2)United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 2 u 3 I NC0063720 111 121 23/09/28 I17 18 L� ] 19 I s I 201 211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 73 � I 74 79 I I I I I I I80 70 I I 71 I LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 10:OOAM 23/09/28 19/01/01 Forest Ridge WWTP Forest Ridge Subdivision Exit Time/Date Permit Expiration Date Clemmons NC 27012 11:OOAM 23/09/28 23/12/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Samuel E. Pegram/ORC/704-489-9404/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Shannon V Becker,202 Mackenan Dr Cary NC 27511/President/919-653-5570/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Operations & Maintenar 0 Records/Reports Facility Site Review Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) DocuSigned by: fk4sbw 10/24/2023 Name s'W'84iFFAfffe(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Gary Hudson DWR/Division of Water Qua Iity/336-776-9694/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: ti T. 5,,�tr 10/31/2023 F EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO063720 I11 12I 23/09/28 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On September 15, 2023, Division of Water Resources staff Gary Hudson conducted a routine compliance inspection at the Forest Ridge WWTP. Sam Pegram was present during the inspection. A review of the October 2022, and April 2023 eDMR were compared to laboratory bench sheets. No discrepancies were noted. During the inspection, one violation was noted, as well as an area of concern. Violation: The flow meter was last calibrated on July 21, 2019. The flow meter was calibrated on October 3, 2023. Area of Concern: The wastewater treatment plant consists of two identical package plants sitting side by side, in parallel operation. About 8 months prior to the date of the inspection, the #2 plant floated out of the ground and had to be taken offline. However, the #1 plant appeared to be handling the flow from the subdivision. The following treatment components and documents were inspected: Permit: The permit became effective on January 1, 2019, and expires on December 31, 2023. A permit renewal application was received on June 15,2023. Preliminary Treatment: Preliminary treatment consists of a bar screen. Primary Treatment: This facility does not have primary treatment. Secondary Treatment: Secondary treatment consists of an activated sludge basin (ASB), and a secondary clarifier. Both units were operating properly during the inspection. Final Effluent: A tablet chlorinator with 3 tablet tubes is used for disinfection, and a tablet de -chlorinator with 3 tablet tubes is used for de -chlorination. Sludge Digestion: Sludge digestion consists of one aerobic digester. Except for the flow meter not being calibrated, the inspection of the facility was satisfactory. If you have any questions regarding the inspection or this report, please contact Gary Hudson or me at (336) 776-9800 or by email at gary.hudson@deq.nc.gov or lon.snider@deq.nc.gov. Page# Permit: NCO063720 Inspection Date: 09/28/2023 Owner -Facility: Forest Ridge WWTP Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ■ ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The grade 2 WWTP appeared clean and well maintained. Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ■ ❑ ❑ ❑ application? Is the facility as described in the permit? ■ ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ■ ❑ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑ Comment: The permit became effective on January 1, 2019, and expires on December 31, 2023. A permit renewal application was received on June 15,2023. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? ■ ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ■ ❑ ❑ ❑ Dates, times and location of sampling ■ Name of individual performing the sampling ■ Results of analysis and calibration ■ Dates of analysis ■ Name of person performing analyses ■ Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ■ ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ ■ ❑ operator on each shift? Is the ORC visitation log available and current? ■ ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ■ ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility ■ ❑ ❑ ❑ classification? Page# 3 Permit: NC0063720 Inspection Date: 09/28/2023 Record Keeping Is a copy of the current NPDES permit available on site? Owner -Facility: Forest Ridge WWTP Inspection Type: Compliance Evaluation Facility has copy of previous year's Annual Report on file for review? Comment: Mr. Pegram keeps good records onsite. Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Page#