HomeMy WebLinkAboutSW3230608_Stormwater Report_20231014 Stormwater Management Plan Stormwater Report for Stoneglen Subdivision W. Peeler Street Rowan County, NC Prepared for: PresPro 6549 Morehead Rd, Harrisburg, NC 28075 Prepared by: Gavel & Dorn Engineering, PLLC 6730 Freedom Drive Charlotte, NC 28214 \\ V b f, \�,` CAR We swat* sS •,*•;,;:!.S. :' 5 E 7 036 7 ' ";• 44.0 /o Table of Contents • Narrative • USGS maps • Precipitation Data • Soils Data o Watershed Soil Data • Pre-Development Hydrologic Data(Map, Tc, and CN) o Built Upon Area Summary • Post-Development Hydrologic Data o Maps, Tc and CN o Built Upon Area Summary o 1-Inch Storm Simple Method Calculations o Water Quality Storage Table • Storm Drain and SCM Construction Plans • HydroCad Hydrology Results • Storm Drainage System Design o Storm Drain Pipe Capacity Calculations o Inlet Spread Calculations o Rip Rap Apron Calculations o Buoyancy Calculation • Seasonal High Water Table Information o Calculation Narrative o Graphic Narrative Stormwater Narrative Stoneglen is a proposed 31-lot single family subdivision located on a 12.4-acre parcel off W. Peeler St. in Granite Quarry,NC. The project is a high-density project and the storm water runoff that is generated by the development will be treated as required by NCDEQ including treating the runoff from the first one inch of rainfall for 85% TSS removal. The project will be required to comply with Town of Granite Quarry requirements to detain the post-development 1-year and 10-year storm event runoff rates to less than pre-development runoff rates. In addition, the SCM will be designed to have minimum 6 inches of freeboard during the 50-year storm event. The piped storm drainage system has been designed to convey the runoff from the 10 yr. storm event while ensuring that the hydraulic grade line is minimum 6"below the top of storm structures while accounting for the tailwater of the proposed sand filter SCM. Stormwater improvements include a piped stormwater collection system and an on-site detention and water quality SCM consisting of a combination dry pond and sand filter. Sizing of the SCM has been completed per the NCDEQ Stormwater Design Manual. The predevelopment conditions for the site included on-site and off-site drainage that drain in a westerly direction across the site. The pre-development drainage area for this site is 23.32 acres including 10.92 acres of off-site drainage. Post development, 11.52 acres of runoff will be captured in two clear water diversion ditches and routed around the site and bypass the SCM. Of the remaining 11.8 acres, 11.52 acres that includes all new impervious will be routed to the proposed SCM. A 0.28-acre basin of on-site drainage comprised of the pond embankment and nearby grassed areas, which has no impervious, will surface drain off-site. The post-development discharge point for all stormwater runoff is the same as the predevelopment discharge point. Drainage Basins Pre-Development The predevelopment conditions for the site included on-site and off-site drainage that drain in a westerly direction across the site. The pre-development drainage area for this site is 23.32 acres including 12.92 acres of off-site drainage. The point of analysis for this project is located at the southwest side of the parcel. The pre-development model consists of three drainage basins, one for the on-site drainage and two off-site drainage basins. These drainage basins are bound by topography onsite and the site boundary. The pre-development cover condition for the subject parcel will be modeled as 100%wooded. There is no existing built upon area(BUA) located within the project boundary. This will ensure a conservative pre-development flow rate, and volume. The off- site drainage areas consist of 1-acre residential parcels. Note that the off-site drainage is partially diverted around the site by existing clean water ditches. Time of Concentration ("Tc") for each basin has been calculated. Tc path for off-site flow ends at the property line of the parcel. Post-Development The post-development model consists of four drainage basins. 11.52 acres of on-site drainage, which includes all impervious, will be directed to the new SCM. A 0.28-acre basin of on-site drainage comprised of the pond embankment and nearby grassed areas, which has no impervious, will surface drain to the point of analysis. The two off-site basins will be directed around the site via existing clean water ditches and additional piped storm drainage systems. The same point of analysis is used for pre-development and post-development. Tc path for off-site flow is unchanged from pre-development. All on-site "Tc"paths for on-site flow are assumed to be 5 minutes in the post-development. Cover conditions for the entire on-site parcel were modeled as 1/4-acre residential districts as per Soil Conservation Service TR-55 method. The at-grade sand filter SCM has been sized to treat the runoff volume from the 1-inch storm. Runoff volume has been determined using the Simple Method. Size and storage volume for the sand filter has been designed as per the NC DEQ Stormwater Design Manual. Built upon areas for the project include: 1) BUA as detailed in the construction plans including road, sidewalk, curb & gutter, etc. 2) In addition, allowances for built upon areas for each parcel (Houses, driveways, hardscape etc.) were calculated as detailed in the report. Maximum built upon area for each parcel was calculated as 3,600 SF. No BUA will be allowed on the SCM lot, Lot 5. Calculation Methodology and Assumptions • Rainfall Data is taken from NOAA Atlas 14. • HydroCAD 10.00-22, is used to produce the pre-development and post-development runoff hydrographs. • Soil Data is from the NRCS web soil survey. Soil types for each subbasin are calculated and composite curve number created from this data. The site is completely composed of"HSG C" soils. • A composite SCS curve number was calculated for the pre-development condition and the proposed post-development drainage area based on cover conditions and existing soils. • Time of Concentration is calculated based on the SCS (NRCS) TR-55 methodology. In the pre-development all overland flow occurs in 100'.In the post-development condition all developed areas are assumed to have times of concentration of 5 minutes. • Storm drainage pipe capacity calculations have been completed utilizing Hydraflow Hydrographs Extension for Autodeck Civil 3D (2021). The calculated tailwater for the 10-year storm(as per HydroCAD model)has been utilized as the tailwater condition for pipes draining to the SCM. • Inlet gutter spread calculations have been completed utilizing Hydraulic Toolbox 5.2. Results Summary Predevelopment Peak Flow Storm Event 100- 1-Year 10-Year Year Drainage Areas (cfs) (cfs) (cfs) Off-Site (Subbasin 1) 2.92 8.25 13.62 Off-Site (Subbasin 2) 5.06 13.31 21.3 On-Site (Subbasin 3) 4.92 17.9 32.02 Total Peak Runoff 12.84 39.09 66.44 Post-Development Peak Flow Storm Event 100- 1-Year 10-Year Year Drainage Areas (cfs) (cfs) (cfs) Off-Site (Subbasin 1) 3.04 10.06 14.09 Off-Site (Subbasin 2) 5.5 15.81 22.93 On-Site 2 (Bypass) 0.3 0.86 1.37 On-Site 1 (Subbasin 7) Unattenuated Flow 15.4 35.11 52.07 Attenutated Flow 3.83 15.79 29.48 Total Runoff 10.87 37.78 65.73 Post Development Increase(cfs) -1.97 -1.31 -0.71 The proposed stormwater management plan for the Stoneglen Subdivision meets the design criteria as required by the Town of Granite Quarry and the NC DEQ. As required by the Town of Granite Quarry, the post-construction runoff is less than the pre- construction runoff for the 1-year and 10-year storm event. In addition, minimum 6-inches of freeboard is maintained during the 50-year storm event. (Freeboard=0.88') As per NC DEQ requirements the sand filter is sized to store and treat the water quality runoff volume for the 1-inch rain event. If the development is built as proposed within this report, all applicable design criteria will be met. However, modifications to the proposed development that change assumptions made in this report will invalidate this report. USGS Maps NC Surface Water Classifications ;46gt MP 4.41 r RP and Rd a ale es efp NIB Discharge Point of —\ Property April 25, 2023 1:4,852 0 0.05 0.1 0.2 mu 0 0.07 0.15 0.3 km Rowan County, State of North Carolina DOT. Ean, HERE. Garman. INCREMENT P. USGS. METINASA. EPA.USDA,NCDENR•Division of Water Resources ( Lege^d )( Layers )( Prnt 00 00 Surface Water Classifications: Stream Index: 12-115-{2) Stream Name: Crane Creek Description: From Dam at Happys Lake to High Rock Lake,Yadkin River Classification: C Date of Class.: August 31, 1974 What does this Class. mean? View > River Basin: Yadkin Pee-Dee Precipitation Data 4/18/2018 Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 0P Location name: Granite Quarry, North Carolina, • Vc - USA* none Latitude:35.6079°, Longitude: -80.4552° Elevation:780.84 ft** 1.^"t.0c source:ESRI Maps 'N.• *,sr **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 4.66 5.51 6.42 7.06 7.76 8.23 8.65 9.00 9.36 9.60 5-min (4.28-5.05) (5.08-5.99) (5.90-6.98) (6.47-7.64) (7.09-8.40) (7.49-8.92) (7.81-9.36) (8.09-9.76) (8.34-10.2) (8.48-10.5) 3.72 4.40 5.14 5.64 6.18 6.55 6.87 7.13 7.40 7.56 10-min (3.43-4.04) (4.06-4.79) (4.73-5.59) (5.18-6.11) (5.65-6.70) (5.96-7.10) (6.21-7.44) (6.41-7.73) (6.60-8.05) (6.68-8.24) 15-min 3.10 3.69 4.34 4.76 5.22 5.53 5.79 6.00 6.22 6.32 (2.86-3.36) (3.40-4.01) (3.99-4.71) (4.36-5.16) (4.77-5.66) (5.03-5.99) (5.23-6.27) (5.39-6.51) (5.54-6.76) (5.59-6.89) - 2.12 2.55 3.08 3.45 3.87 4.17 4.43 4.67 4.94 5.12 30-min (1.96-2.30) (2.35-2.77) (2.83-3.35) (3.16-3.74) (3.54-4.19) (3.79-4.51) (4.01-4.80) (4.20-5.07) (4.41-5.38) (4.53-5.58) 60-min 1.32 1.60 1.97 2.24 2.58 2.82 3.05 3.27 3.55 3.74 (1.22-1.44) (1.48-1.74) (1.82-2.15) (2.06-2.43) (2.35-2.79) (2.57-3.06) (2.76-3.31) (2.94-3.55) (3.16-3.86) (3.31-4.07) 2-hr 0.764 0.925 1.15 1.32 1.53 1.69 1.85 2.00 2.20 2.34 (0.702-0.833) (0.850-1.01) (1.05-1.25) (1.20-1.43) (1.39-1.67) (1.53-1.84) (1.66-2.01) (1.78-2.18) (1.94-2.40) (2.04-2.56) 3-hr 0.542 0.654 0.818 0.940 1.10 1.23 1.35 1 1.47 1.64 1.76 (0.498-0.592) (0.602-0.715) (0.750-0.892) (0.859-1.02) (1.00-1.20) (1.11-1.33) (1.21-1.46) 1 (1.31-1.60) (1.44-1.78) (1.53-1.92) 6-hr 0.329 0.396 0.495 0.571 0.673 0.753 0.832 0.913 1.02 1.11 (0.303-0.360) (0.365-0.434) (0.455-0.541) (0.523-0.622) (0.611-0.731) (0.679-0.816) (0.746-0.903) (0.810-0.990) (0.894-1.11) (0.954-1.20) 12-hr 0.193 0.232 0.291 0.338 0.401 0.452 0.503 0.557 0.630 0.686 (0.178-0.210) (0.214-0.254) (0.268-0.318) (0.310-0.368) (0.365-0.436) (0.407-0.489) (0.450-0.544) (0.492-0.601) (0.547-0.679) (0.587-0.740) 24-hr 0.115 0.139 0.175 0.203 0.240 0.270 0.301 0.332 0.375 0.409 (0.108-0.124) (0.130-0.150) (0.163-0.188) (0.189-0.217) (0.223-0.258) (0.251-0.290) (0.278-0.323) (0.306-0.357) (0.344-0.403) (0.374-0.440) 2-day 0.067 0.081 0.100 0.116 0.137 0.153 0.170 0.187 0.211 I 0.229 (0.063-0.072) (0.076-0.086) (0.094-0.108) (0.108-0.124) (0.127-0.146) (0.142-0.164) (0.158-0.182) (0.173-0.200) (0.194-0.225)1(0.210-0.245) 3-day 0.048 0.057 0.071 0.081 0.096 0.108 0.119 0.131 0.147 0.160 (0.045-0.051) (0.054-0.061) (0.066-0.076) (0.076-0.087) (0.089-0.102) (0.100-0.115) (0.110-0.127) (0.121-0.140) (0.136-0.158) (0.147-0.172) 4-day 0.038 0.045 0.056 0.064 r 0.076 l 0.085 r 0.094 0.103 0.116 I 0.126 (0.036-0.040) (0.043-0.048) (0.052-0.060) (0.060-0.068)i(0.070-0.081) (0.079-0.090) (0.087-0.100) (0.095-0.110) (0.107-0.124) (0.115-0.135) 7-day 0.025 0.030 0.036 0.041 0.048 0.054 0.059 0.065 0.073 0.079 (0.024-0.026) (0.028-0.032) (0.034-0.038) (0.039-0.044) (0.045-0.051) (0.050-0.057) (0.055-0.063) (0.061-0.069) (0.068-0.078) (0.073-0.085) 10-day 0.020 0.024 0.028 0.032 ' 0.037 0.041 0.045 0.049 0.054 0.059 (0.019-0.021) (0.022-0.025) (0.027-0.030) (0.030-0.034)1(0.035-0.039) (0.039-0.043) (0.042-0.048) (0.046-0.052) (0.051-0.058) (0.054-0.062) 20-day 0.013 0.016 0.019 0.021 0.024 I 0.026 I 0.029 0.031 0.034 0.037 (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.022) (0.023-0.0252i(0.025-0.028)1(0.027-0.030) (0.029-0.033) (0.032-0.036) (0.034-0.039) 30-day 0.011 0.013 0.015 0.017 0.019 0.020 0.022 0.024 0.026 0.027 (0.011-0.012) (0.012-0.014) (0.014-0.016) (0.016-0.017) (0.018-0.020) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) 45-day 0.009 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.020 0.021 (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.016-0.017) (0.017-0.018) (0.018-0.019) (0.019-0.021) (0.020-0.022) 60-day 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 (0.008-0.009) (0.009-0.010) (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.013-0.015) (0.014-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.018) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top hops://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6079&Ion=-80.4552&data=intensity&units=english&series=pds 1/4 4/18/2018 Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 0P Location name: Granite Quarry, North Carolina, • Vc - USA* none Latitude:35.6079°, Longitude: -80.4552° Elevation:780.84 ft** 110 1.^"t.0c source:ESRI Maps 'N.• *,ee **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 0.388 0.459 0.535 0.588 0.647 0.686 0.721 0.750 0.780 0.800 5-min (0.357-0.421) (0.423-0.499) (0.492-0.582) (0.539-0.637) (0.591-0.700) (0.624-0.743) (0.651-0.780) (0.674-0.813) (0.695-0.848) (0.707-0.872) 0.620 0.733 0.857 0.940 1.03 1.09 1.15 1.19 1.23 1.26 10-min (0.571-0.673) (0.677-0.798) (0.788-0.931) (0.863-1.02) (0.942-1.12) (0.993-1.18) (1.03-1.24) (1.07-1.29) (1.10-1.34) (1.11-1.37) 15-min 0.775 0.922 1.08 1.19 1.31 1.38 1.45 1.50 1.55 1.58 (0.714-0.841) (0.851-1.00) (0.997-1.18) (1.09-1.29) (1.19-1.42) (1.26-1.50) (1.31-1.57) (1.35-1.63) (1.38-1.69) (1.40-1.72) - 1.06 1.27 1.54 1.72 1.94 2.08 2.22 2.33 2.47 2.56 30-min (0.978-1.15) (1.18-1.39) (1.42-1.67) (1.58-1.87) (1.77-2.10) (1.89-2.26) (2.00-2.40) (2.10-2.53) I (2.20-2.69) (2.26-2.79) 60-min 1.32 1.60 1.97 2.24 2.58 2.82 3.05 3.27 3.55 3.74 (1.22-1.44) (1.48-1.74) (1.82-2.15) (2.06-2.43) (2.35-2.79) (2.57-3.06) (2.76-3.31) (2.94-3.55) (3.16-3.86) (3.31-4.07) 2-hr 1.53 1.85 2.30 1 2.63 3.06 r 3.38 3.70 4.00 4.39 4.68 (1.41-1.67) (1.70-2.02) (2.11-2.51) (2.41-2.87) (2.79-3.33) I (3.06-3.68) (3.32-4.02) (3.57-4.36) (3.87-4.79) (4.09-5.11) 3-hr 1.63 1.97 2.46 2.82 3.31 3.69 4.05 4.42 4.91 5.28 (1.50-1.78) (1.81-2.15) (2.25-2.68) (2.58-3.07) (3.01-3.60) (3.33-4.00) (3.64-4.40) (3.94-4.80) (4.31-5.34) (4.59-5.75) 1.97 2.37 2.96 3.42 4.03 4.51 4.99 5.47 6.12 6.61 6-hr (1.81-2.15) (2.19-2.60) (2.72-3.24) (3.13-3.73) (3.66-4.38) (4.07-4.89) (4.47-5.41) (4.85-5.93) (5.35-6.64) (5.71-7.19) 12-hr 2.33 2.80 3.51 4.07 4.84 5.44 6.07 6.71 7.59 8.27 (2.14-2.54) (2.58-3.07) (3.23-3.83) (3.73-4.44) (4.39-5.25) (4.90-5.89) (5.42-6.56) (5.92-7.24) (6.59-8.18) (7.08-8.92) 24-hr 2.77 3.34 4.19 4.86 5.77 6.49 7.22 7.98 9.00 9.81 (2.58-2.97) (3.12-3.59) (3.92-4.51) (4.53-5.22) (5.36-6.19) (6.02-6.96) (6.68-7.74) (7.35-8.56) (8.26-9.67) (8.97-10.5) 2-day 3.22 3.88 4.82 5.57 6.57 7.36 8.17 8.99 10.1 11.0 (3.01-3.44) (3.63-4.15) (4.51-5.16) (5.19-5.95) (6.11-7.02) (6.84-7.87) (7.56-8.72) (8.30-9.62) (9.29-10.8) (10.1-11.8) 3-day 3.42 4.11 5.09 5.87 6.91 7.74 8.58 9.44 10.6 11.5 (3.21-3.66) (3.86-4.40) (4.77-5.44) (5.48-6.26) (6.44-7.38) (7.19-8.26) (7.95-9.17) (8.72-10.1) (9.77-11.4) (10.6-12.4) 4-day 3.63 4.35 5.37 6.17 7.26 8.12 9.00 9.90 11.1 12.1 (3.41-3.87) (4.09-4.64) (5.03-5.72) (5.77-6.57) (6.76-7.74) (7.55-8.66) (8.34-9.61) (9.15-10.6) (10.2-11.9) (11.1-12.9) 7-day 4.18 4.99 6.07 6.93 8.10 9.03 9.97 10.9 12.3 13.3 (3.95-4.45) (4.71-5.31) (5.72-6.45) (6.52-7.36) (7.60-8.60) (8.45-9.59) (9.31-10.6) (10.2-11.6) (11.3-13.1) (12.3-14.2) 10-day 4.77 5.68 6.82 7.71 8.91 9.85 10.8 11.8 13.1 14.1 (4.53-5.05) (5.38-6.01) (6.45-7.21) (7.29-8.15) (8.40-9.42) (9.27-10.4) (10.1-11.4) (11.0-12.5) (12.2-13.8) (13.1-14.9) 20-day 6.42 7.58 8.95 10.0 11.5 12.6 13.8 14.9 16.5 17.7 (6.11-6.74) (7.21-7.96) (8.50-9.39) (9.52-10.5) (10.9-12.0) (11.9-13.3) (13.0-14.5) (14.0-15.7) (15.4-17.4) (16.5-18.7) 30-day 7.94 9.34 10.8 12.0 13.5 14.7 15.9 17.0 18.6 19.7 (7.58-8.31) (8.91-9.76) (10.3-11.3) (11.4-12.6) (12.9-14.2) (14.0-15.4) (15.0-16.6) (16.1-17.9) (17.5-19.5) (18.5-20.8) 45-day 9.99 11.7 13.4 14.6 16.3 17.5 18.8 19.9 21.5 22.7 (9.59-10.4) (11.2-12.2) (12.8-13.9) (14.0-15.2) (15.6-17.0) (16.7-18.3) (17.9-19.6) (19.0-20.8) (20.4-22.5) (21.4-23.7) 60-day 11.9 13.9 15.7 17.0 18.8 20.1 21.4 22.6 24.2 25.4 (11.5-12.4) (13.4-14.4) (15.1-16.3) (16.4-17.7) (18.0-19.5) (19.3-20.9) (20.5-22.3) (21.6-23.6) (23.1-25.3) (24.2-26.6) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top hops://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6079&Ion=-80.4552&data=depth&units=english&series=pds 1/4 Soils Data • Watershed Soil Data 3 Soil Map—Rowan County, North Carolina (Stoneglen) F NN NN W W 549060 549120 549180 549240 549300 549360 549420 549480 549540 549600 35°36'34"N _ ` % - , 35°36'34"N 8 ' 1 , N. 0 111‘k.'' 1/11,, IC:Illiii°' ;i e ..,), , )1•• , 1 . i VaB ' 1- ------_Byrd Rd_ 1 r ,L1 PM-4 44 / .1( f \ 40004 1 N. IP, f, a X • * l i -� •• 1 ' VaB _• - ‘ ,i4 1 - m Xoo� iraap may T10n b - Do J ate�G�o,2 -2(gaOQo 4 1 ' r 35°36'23"N 4' 35°36'23"N 549060 549120 549180 5a4240 549300 549360 549420 549480 549540 549300 to 3 3 N Map Scale:1:2,550 if printed on A landscape(11"x 8.5")sheet. N Meters E3 m N 0 35 70 140 210 Feet 0 100 200 m 400 600 Map projection:Web Mercator Coer coordinates:WG584 Edge tics:UTM Zone 17N WG584 USDA Natural Resources Web Soil Survey 4/7/2023 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Rowan County, North Carolina (Stoneglen) MAP LEGEND MAP INFORMATION Area of Interest(AOI) Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soils very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet Spot Enlargement of maps beyond the scale of mapping can cause .�� Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other line placement.The maps do not show the small areas of p Soil Map Unit Points contrasting soils that could have been shown at a more detailed Special Line Features Special Point Features scale. L.) Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map cs Borrow Pit measurements. Transportation X Clay Spot Rails Source of Map: Natural Resources Conservation Service 0 Closed Depression Web Soil Survey URL: ti Interstate Highways Coordinate System: Web Mercator(EPSG:3857) X Gravel Pit US Routes Maps from the Web Soil Survey are based on the Web Mercator ,. Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 0 Landfill Local Roads Albers equal-area conic projection,should be used if more Lava Flow accurate calculations of distance or area are required. Background 46 Marsh or swamp Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. iRk Mine or Quarry Soil Survey Area: Rowan County,North Carolina O Miscellaneous Water Survey Area Data: Version 20,Sep 12,2022 Q Perennial Water Soil map units are labeled(as space allows)for map scales v Rock Outcrop 1:50,000 or larger. Saline Spot Date(s)aerial images were photographed: Mar 13,2022—May 9,2022 Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor • Sinkhole shifting of map unit boundaries may be evident. 3) Slide or Slip oa Sodic Spot i\ Natural Resources Web Soil Survey 4/7/2023 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Rowan County, North Carolina Stoneglen Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI EnB Enon fine sandy loam,2 to 8 4.7 45.8% percent slopes SeB Sedgefield fine sandy loam, 1 4.0 39.3% to 6 percent slopes VaB Vance sandy loam,2 to 8 1.5 15.0% percent slopes Totals for Area of Interest 10.2 100.0% USDA Natural Resources Web Soil Survey 4/7/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 Pre-Development Hydrologic Data (Map,Tc,and CN) U I \ \ \ \ \\\ \\\ \4\\\ /\ \ \T,\ / //i 1 1 ^l \v v/v \\ \ \\\ v ` v 7 / P [ / / :: II / \ / \ 6 :Ng— /, ;�\ \11 \ \\ \ \\ \ \ ------ ii a -Oz o6 LLN\ \\\ \ pV 8 \ \ A \ a A ° \\ \ \\ \ \ \ — — GRAPHIC SCALES HORIZONTAL \ \ \ \ \$\ \\\\ ,' \ \ \ \ \ / Tc PATH#7 �80 / \\' /� 8Oq6 0 0 \\ o \\ \ \ \ \ \ \\ \ \\ \\O \ t �\ GM" 1 88 _ � I ' L / \ I inch _' \ \ ' I I �� 0 \ \ \ \ \\ \ \ SingeTFc2ig]R tlN. a \ _ — g° 80 ` tc<%b 2 \ _\ 0 \ ,O/ \ \ \ \ \ \\ \\ \ Av '56 nne \ �/ \ ' X.PERIMETE 8°° I I I / / 2 /y \ � \'9g �/ Z / 2 \ \ \\ dS \— \_\ \ � ' > \ I / / / OLLJ _ _ I l �__ Tc=27.2 MIN. I/ /�/ EX.PERIMETER BERM ` EX.PERIMETER BERM AREA.6.79 Resident. �J_ CO \ \ / I ) / �\\�\�� _= ^, \ ' ya¢/F\ \ \ ENDS \ \SA 0I egHSG Si��iderel-1 I \ fI fr /Ct O W BERMENDSTER \ \\ 9°-4)4 \ \ CN=7e/C=0.50 \/ / / 0_ OZ �D/'� Q1 VJ J�� \ \ \\\ \ �\ '89 \ \ \ \\ \/ /I \ r/ w > Z H- — 1 l 1T Tc PATH#3 l \ '8,S \ \ \ /\\ \ ` \ (/ < /ri W 9 2 \ \ —\ \—,/ V ` T/ SEGMENT 3�r� ..f.... ..L I \ \. ) \ \\ `\/ \ \ \ / ) w N \ `-,.\ 3',: ) \ \ \ \ , I 0 \ H col— LIJ \ \ Tc=23A MIN. // LJ_ \ `` ` \ \ AREA=11.8 AC\ / • , \ \ " (( / / f I (1/ / /\ 0 \')'4% ii / / !Il w \ \ \ HSG'C \ \ \ I 1 \\\ I NEW CLEAN LE NWATER / ( `/ /� \ \ I 1 / / / ` \\ CN=70/C=0.25 \ \ \ \ I / / I I \ ` I FD RECTOOUN DSOE \ \ \ LL I ` \ \ \ \\ \ / \ �\ \ 1/ \\ \ \ l' \ \ \ \ \ \ \ \ \ ‘ \ \ 1 \ 1V / / / T I I y r_ �, - �( 9 / / �/ \ ti \ ) ( H / \ \ 1 1 , • / --v I , , ) �1 \ J \ / `T. \v % \ / ////// _ \/ \i► / / A v ,< VA Vv / ) / / I y / j/ / y-1 \N / \ ( 7\ \� \ / / Vim / / '° � 1 / ��� / �/ // s � V V \\v \\� \ \ \ A v \ uw / AV \ , , � \Av i Apprvd. a v CARQ,, Date: U POINT OF ANALYSIS AY-e°•F Es......... 9/1 5/2023 FOR DETENTION :9 =CALCULATIONS = SEAL `_ Chkd. 368 SMM F '.NCIN .r '1 �� Drwn: �� � 9/15/2023 Scale: KAW 1 1"=60' Project No.: Sheet: C-6 • v v V v v v v v / - a \ \ \ \\ \\ \V \ \ V A �\ \\ � \ \\ /A \ \\ \ \ �� \V PEGGY D 6�9800D,PG 538 TEE / / // �/ I \ v A \ \ V v v v V � / v v v / I I / \ ✓ \ \ \\ \ \ v \ \ \ v V A v vAv \ \ vim _ / / 1 � / // / 1 1 \ \ V A \ \ \ \ \ v/ \ v v I // / / l \, � ;� o \ \ \ \\ \\ \\ V A\ \\ \\ \ \ \\ \�A \v V vvv — �� i :1( / /\ \ �� E �d• \ \ \ \ \ \ \ \ \ \ \ V AVv '�s v i \ w ��� \ \ \ \ \ \ \ \ \ \ \v v vv A �� �� 1 A \ \ V A \ \ \ v A \ v v v A i V v qc �� 2 V A V V V A V N PEGGY J. WOOD, TRUSTEE 7 N A .2$ <o 6 \ \ \ \ \ \ \ \ \ / V A D.B. 980 PG. 538 \ 1 V _ _ — '\ \\ \ \ \ \ A\ \\ \\ \\ \ A\ \ /� \ \V A \�� �\\ \\ AV A\ --- \\ \ �O° �I � � \ \ \ \� GRAPHIC SCALES C7 4. \ \ \ \ \ \ V A \ V \ V \ g00_ \ CHRISTOPHER B. LANKFORD_ 1 inch—40 ft. \ \ \ \ V A A \ \ \ \ \ V A \ \� y y V D.B. 1058 PG. 7� rc \ \\ \ \ \ \ \\ \\/\ \ \ \� \\ \ \\\ \'LNEITYP.IRTV\ \ \\LESLEY W. ENSLEY �795 \ ±iii ---- N _ \ \ \ \ \ \ \ / \ \ -_,________\\ u \ \ D.B. 649 PG. 175 _ _ — \ \ \ -' V \ \ \ \ \ V A A\ `� \ V A\ \ \ - - \ \ \ / Z s V / \ \ \ \ V A — A \ / / \ \ \ \ v V A \� \\ V — _ — r — — V A Know what's below. / 1 \ A \ V A A V A \ _ _ — — V / \ 1 \ V Call before you dig // \ \ vvv A RIGHT.) V A AAA \V A\\\ \\ ��� y \ \\ v7es_ / � \----- \ �\ \ — � � � V / \ \ v \\� A A\ �\*\ A\V A \ \ � � - - - -�—v vv — / '-', V A \ Z \ V A \ \ V \ \ PEGGY J. WOOD, TRUSTEE \ / / v \ VA JOE L. FUNDERBURK .��N CARo \ , I ' \ \ \ \\ \ \ \ _ _/ \ \ ` — \ 1072 PG. 245 O o f ESSip•=.e2 s 0 11 v _ M ►A A vA \ \ \ D.B. sso Pc. 5s i v V D.B. ,� ti•.� Z < s I M� rN ^ \ \ \ \ \`\ \\ \ \ \ \ \ \ \ \ 368 L < 0 s I 8° � v , - - - - Al — v v U \ s \ \ \ \ Na,„,,,,,,,,,�\�\ �\�\ �_ _ - - - - - - - - � \ I \ \ \` \ sae „'„ "'� _ � Z \ s\ 0 \ \ \ \ \ \\ \ � \\\ � _--- ��\ \ \ \ \ \\ \\\ \ �9s \ FINAL PLANS — FOR PERMITTING PURPOSES O m \ _ - - m V \ \ N \ \\� \ � � \_ \ \ \ \ \ \ Z DO NOT USE FOR CONSTRUCTION Cl) D s. / EX.SSMH \ \ \ \ \_ — 1 Z \ \ \ \785 \ \ \ \ \\ \ vJ v J Z \\ \ R M=775 45 >>S \ \ \ \ \ \\ I I \` � \\ \\ 9O\ \\\ \ \ \ \/ \ \ \ W Z 0 \_ ��+ INV.IN=787.88 (YL W \ 1>S_ �^ EX.INV.OUT=767.41 ,� \ I I \ \ \ \ \ \ \ \ \ 0 Ct _ \ \ \ \ \ \ \ \ LL `^ \ I v �V A / — � � / / / I 1 � v \ A A \ \ V A \\ \ V A \ �D�( Z Z_ \ \ \ \ EX.SIDEWALK(7vP.) \ / / / / 1 I \ I I \ \ \ \ \ \ \ \ \ � \ \ V� ROGER D. GARDNER ��1 \ \\ V / / �/ / / / �I I I I \ \kn 1 I \ \ \ \ \ D.B. 917 PG. 8186 \ w I- vJ \ / \ l \ I I I \I II )I cn X vv vv v / AV I I r / / ) I \ I I / \ \ I I �� z w \\ \\ \ E/.EDGE OF / \ \\ l I I\ 1 ( / \/ \ ) \I I I I \/ \\ \ f // / / \ PAVEMENT(TVP.) \ \ \ \ / i \ \ ''‘ \ \ \ \ ' ( I \ \ \ 1 / / / \ /\ / / A V A \ , / / / 1 \ / I ��\ \\ 1 I I \V A V A\ / / STONEGLENN, INC. / I I I 1 / ^� A \ / / / / V A \ \ I D.B. 818 PG. 320/ / l V I I I / / / \ \\\\ NOTE:ORIGINAL EXISTING CONDITIONS WERE 100% A A / / V A\\ I A I I I II / \\\ V \ WOODED WITH NO EXISTING BUILT UPON AREA (BUA). . \ I I I \\ \ \\ I I \ S \ \ I i ( /\ I ^ ('' \ \ >>s 1 THE SITE HAS CURRENTLY BEEN CLEARED AND \ \ I ` \ \ \ `\ I I $ \ V / / / / A V \ GRUBBED. NO OTHER PROPOSED IMPROVEMENTS \ I \ \ VA \ A I I 1 A / 1 / \ ) ) 7 I HAVE BEEN MADE TO THE SITE. V \ \ \ \ / \ \ / 1 � // / / / / I I I I I I I I I II \ \\�� \ I I � / \ I / / / Iv I I I / I I I I I 1 I \ \ \ \ II \ 1 / I \ / I I i I I I \ 1 1 1 y / hI \ _ AI \ 1 / / IV/ / v v A \ / / \ \ I v \ v / / / / IV \ A g / / // vvv \ ��ti / V A V I I I V I \ \ \\ \ I l I l l V \ / / / \ I A / / / / I I A VA \\A \\ DTB.N715EPG. 600 1 , I // / / / / / V— \ ( r / /1 ) / / / 1 1 1 V A V A VA\ \ Vv vv v o /�// / / \ AAti' N00 I \ / / / A \ \ V Apprvd. 1 / l l _ _ 7 / ,j ' � \ \VA A V / / / \ V A V A VA V A \ TBD _ / yj / VvvV / II \ \ A ( \ , VDate: 06/22/2023 ////I / / y/ / /�/ /\ / A A A V A \ A / \ \ \ / \ Chkd: I \ i / / / / / vvv vv v V A ( \ 1 / _I I / I I SJM a I I I / / - \ /� i \ V A VA V A V Al�� V ' V A\ \ \ I / V I \/ I I \ Drwn: KAW Scale: w N. \ � \ \ \ _ _ ( \ \ _ 1 I / v/ i // r ss — — v v vv v ) / ( _ _ _ 1 =40 / /��// / � \ \� \\ \ \\� \ \ I \ —� \ Project No.: / / ) / / i /7 /� _ _ vv ss� v vvv v v v v A \ I v - - _ V A v TBD / // / / / / /// /�� / / / \ v v v \\ \V A A V A \ \��� A V A A V )° \ WILLIAM F. BRINKLEY • \ A\ — \ A\ \ Sheet: / / \ V A 1'. \\ \\ \\ 8 V A T.M. 404 PAR. 68 V \ \ A \ C-8 I I i / / / / / i / III 1 , i v N - - vv _ \ \ \ \ v v v v v \ PRE DEVELOPMENT TC 20230425 Stoneglen Sand Filter test Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 9/18/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 1: Off Site 1 Runoff = 2.92 cfs @ 12.41 hrs, Volume= 0.340 af, Depth= 0.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C _ 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 540 0.0185 2.19 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 29.7 1,380 Total Subcatchment 1: Off Site 1 Hydrograph ❑Runoff 3— 2.92 cfs Y/ Granite auarry IDF 24-hr S1 1-yr / Rainfall=2.77" Runoff Area=4.730 ac / Runoff Volume=0.340 af 2— / Runoff Depth=0.86" w _ / Flow Length=1,380' • _ / Tc=29.7 min LL• - / CN=76 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) PRE DEVELOPMENT TC 20230425 Stoneglen Sand Filter test Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 9/18/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 2: Off Site 2 Runoff = 5.06 cfs @ 12.37 hrs, Volume= 0.548 af, Depth= 0.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C _ 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.6 790 0.0310 2.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.2 1,890 Total Subcatchment 2: Off Site 2 Hydrograph / ❑Runoff 5.06 cfs 5 ' Granite Quarry IDF 24-hr S1 1-yr / Rainfall=2.77" / Runoff Area=6.790 ac 4 / Runoff Volume=0.548 af 1/ Runoff Depth=0.97" / Flow Length=1,890' / 3 1lc=27.2 min LL / CN=78 2 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) PRE DEVELOPMENT 20230425 Stoneglen Sand Filter test Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 9/18/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 3: Existing - on Site Runoff = 4.92 cfs @ 12.35 hrs, Volume= 0.580 af, Depth= 0.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description 11.800 70 Woods, Good, HSG C 11.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.9 100 0.0400 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.4 915 0.0220 2.39 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 23.4 1,255 Total Subcatchment 3: Existing - on Site Hydrograph 0 Runoff 4.92 cfs 5 ' I Granite Quarry IDF 24-hr S1 1-yr Ra'nfall .7T" / Runoff Area=1 t800-ac - 4 Runoff Volume=0.580 of Runoff Sep h=0.5?" 3-i / low Lengt =1,255' _ // lac=23.4 min LT- - / CN=70 2 1-/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Post-Development Hydrologic Data • Map,Tc and CN • Built Upon Area Summary • 1-inch Storm Simple Method Calculations • Water Quality Storage Table V d 1 v v �v ` \\ \ / (v [ / / yVI' ;1 I \ \\ \\ \\\ \\\ \ .'' ,mS \ \I / / Av a -OZ o 6 LLN\ \ \\ \ / 6V OOLC O \ \\ \ \ \\9° \ \ IT' / f 1 7 7 ( i / \ T' 810— \ > 4,/ 1 \\\ \\ \1.\\ \ m\ \ a/g \ ` \ \ V A \ \ y VA\ \ � v v / vv �8p � - - � A A \ sc \ \ \\ \ \ \ \\ \ \ \ _,C �806 -��/ \ GRAPHIC SCALES S \ \ \ \ \ \ / / / — / ) 0 20 40 \ \ \ \ 9p\ / 805_ \ \ \ \ , \ \ �c PATH _ (\ ' \ \ \ \ \ \\\\ ' \ \ \ \ \ \ �� SEGMENT 1 \' \ 8�_ \ 1 inch=90 h. \ \ \ \ \\ VA \\ \ \ - - �� A v _ BDz� QPjti� Q \ \ OR Site DA-1 GI/ S / (\ \ \ \ \ \ \ \/ \ \\ \\ \ Tc=27.8 MIN. \ .Cr i`ry\ —\\ _ �m11 \ 8D7 \ S�GtT 1 I / / ` G \ AREA=4.73 AC. /�Z �= 8 \ I / 2 \ \\\ \ Aw \\/ \\ Single Family Residentl- \ i�' \\� Po\ �\/ \ / — Average Lot Size 1 Acre ~4i0\ HSG='C' \y J89\ / , I / / /w/ \ \ \ \ \\��X 1 c5' \\\CN=78/C=0.5 \ I \ '9j '9/ / ��/ \ \ \ / O LJ� \ \ 1 EX.PERIMETER/NDS \\\\ \\\\\\ - J96 / \ /\ O aj ' `J w x4/ — \ / X.PERIMETER BERM h Off Sile DA-2 '^Or' < \ \ / ) Q // 30S_ Tc\\L\ -� \ T9 a¢/F\ \ `. \\ \ \ AREA 26.70IAC. \ I fI ( `� 0 D L.1 C \ as \SEGMENTS\ �� \ \ Single Family Residential-I 1\ \ / / z r^ \ �� ��S �\/O \ \ ` \ Average Lot Size l-Acre \ co 0 \ \ m /O / 1 \ \,.. \,8y l/J \ �_ ______/ " �/ �' / I! 1 \ •><�_�4111 ,1411 7� \ \ \ \ \ . I.SD \ \ / I�'/� 7 a JS\ _\ I \ \1 ;J '� \ \ X.PERIMETER ENDS�/ 1 1 \ \ / f I(/ ///LLLJYW�yl\J// _I Lt WJ LLJ V // r� ��� \‘c ( 1/ — f _ _ I 1 I / \ \ \ \ \ \ V \ f C� z p \ \ `�I SUB-BASIN#3 \ I ` 1 I I 0 1 \ \ \ �'tt� 44�_ ($D' EGLE (TO SAND FILTER) / p I/ \ t N /// / ) I J I Q \ l `'T � PV 1) Tc=13.2 MIN. 1 I\ \ ` / l /0 / / / �_— 9 REA=1Y.52 AC. _ _ _ I --,i ‘ in \ \/ \mC'n / / \ 1 \ \\ / 0 I B Avere9e HSG C•il4`:e1 / / ,,,v \ \ /\ _ c / C� H\ )1 82 tq$' ... N. /\ \`\ I / EW CLEAN WATER \ / I / DITCH/PERIMETER 1 O \ \ I / TO / \ SK ` \ I I I / ` \ \ ` (11 \ DRECT OFF-SIBERM TO BE TE \ 0- 1 � "c�_�DE I� O I\\ r-y i \ \ ) I FLOW AROUND SITE \ \ \ / / 24r� SDE_ .SDE y-1 1 ) / (\ 1 8�6 /) 1) \ \ V / /f- :,1 /( / /I m �� )1-- 1 1 I - ,9z-, , \ ;fin 1 ' si, it ' 1 / , pi ^ \,,/ \. \\L \ , D I \ \a � n / 7JN/ \ I\ / \ /1 / 7' ---------— L--: "-•-• — „.,, ,;c, ,,•, i _ / \ 0/ / A—Al'' SD "�7 1 0 i' i .. \ \ ' I D SDE a0\OS// \\ \ \\) ) \ \ \ \ N -`�a?�Y'<8'Zr]EridrL+Ke 4%;B�ittSPfi�'. )\ E z' \ / \ \ 42 Ei //� �• l \ , E , r� \ \ W / sod - —i i II — _ \ I \ I /-`/ I/ \ DE ' $ 308 / cii -30S� 30S j 30,a- 710S L 305 \ \ \ / N 3 \/ PROP.SAND D,J 9 \ \ �� // //\ //�/\ / FILTER/DRV _\ J \\\ Jo\ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ / O /1e DETENTION SCM \ K / I I 1 / / /// / hi /I I I I / DISCHARGE POINT \ \ ss\ \\ \ \ \ \ \\\ \\\ DISCHARGE ODAOFF SITE BVIPASS \\ \ \ I \ \\ \\ \\ \\ \ ___,/ a rVd Q J / OF OFF SITE BVPASS Q ON-SITE BYPASS Date tj Tc=SHIN. ,,, 9/15/2023 1 AREA=0.28AC. �N.iC �O</ Chkd. CN=74 =0,,._F ESS/o•,,2 " 9 - SMM SEAL 368 . Drwn: M F%vcIN i','a KAW �A bll'1. ii .'7 Scale: n 1 =60 10/11/2023 Project No.: Sheet: C-7 POST DEVELOPMENT TC 20230425 Stoneglen Sand Filter test Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 9/18/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 5: Off Site 1 Runoff = 3.04 cfs @ 12.38 hrs, Volume= 0.340 af, Depth= 0.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" NOTE: FOR HYDROFLOW STORM Area (ac) CN Description SEWERS, TC SEGMENT 4 (PIPED FLOW) * 4.730 76 1 acre lots, 20% imp, HSG C IS NOT APPLICABLE. 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 628 0.0080 5.32 9.40 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 27.6 1,468 Total Subcatchment 5: Off Site 1 Hydrograph ❑Runoff 3.04 cfs I� �Granite6uarry IDF 24-h�S1 14r Rainfall=2.7r" - / Runoff Area=4.730 ac / Runoff Volume=0.340 of Runoff Dep h=Q.86" 2 / Flow Lengt�=1,468' - Tc=27.6 min LL _ / CN=76 I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) POST DEVELOPMENT TC 20230425 Stoneglen Sand Filter test Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 9/18/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 6: Off Site 2 Runoff = 5.50 cfs @ 12.30 hrs, Volume= 0.548 af, Depth= 0.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" NOTE: FOR HYDROFLOW STORM Area (ac) CN Description SEWERS, TC SEGMENT 4 (PIPED FLOW) * 6.790 78 1 acre lots, 20% imp, HSG C IS NOT APPLICABLE. 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 409 0.1830 25.43 44.94 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 22.9 1,509 Total Subcatchment 6: Off Site 2 Hydrograph ■Runoff 5.50 cfs I I� 11 I L - r/ Gr'anite aualrryl IDF 24-h�S'� 1-'r 6-/ I / I Rainfall=2.77" / Runoff Area=6.790 ac / Runoff VolumeA48-af - 4 // Runoff Dep h=Q.9T" N / Flow Lengti=1,509' 31 / 7 I Tc=22.9 min LT- _ / CN=78 I // I I I 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) POST DEVELOPMENT TC 20230425 Stoneglen Sand Filter test Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 9/18/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 7: On Site Runoff = 15.40 cfs @ 12.15 hrs, Volume= 1.152 af, Depth= 1.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 11.520 82 11.520 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 100 0.0400 0.16 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 134 0.0100 7.20 22.62 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 1.2 524 0.0188 7.22 8.86 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 13.2 998 Total Subcatchment 7: On Site Hydrograph 17!— — 1— I —t t � H t � H ■Runoff 16VI_ 15.40 cfs � � 15 / 4GrnilteualrryT6� -h � r= 14_ Rnf =g .. 13/ Runoff Area=11.520ac_ 12V / _2ur ofil/_dl urne ,.1152_afiiV N10 ` fenth98 - 0 8/ -F / — / I-1 1 mpn 4 i 2 6/ 5. 1 1 _L L1 _1 _ 4V 3/r 17 TIC 2/ I — 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42�� 44�� 416 48 Time (hours) Maximum Built Upon Area Calculations Calculations were completed to determine the maximum amount of built upon area(BUA)allowed per lot. This maximum built upon area will be included as a deed restriction on each lot as required by NC DEQ. Methodology for completing the maximum built upon area calculation was as follows: 1. Determine the runoff curve number(CN) for the site per Soil Conservation Service TR-55 methodology. Cover conditions for the on-site parcel draining to the SCM were modeled based on the calculated built upon areas of the residential development.Note that the HOA will have deed restrictions on each parcel limiting the amount of allowed BUA. That maximum BUA was utilized in the calculations. 2. The site is completely composed of "HSG C" soils. As per SCS TR-55, the CN for impervious areas is 98. The CN for grassed areas is 74. A weighted average for impervious areas (Roads,buildings, sidewalk, etc.) and grassed area was calculated to be 81.9. 3. The maximum allowed built upon area (BUA) for each of the 31 parcels is 3600 SF. This BUA will include building footprints, driveways, hardscape etc. 4. The amount of `known' BUA for roads, sidewalks, curb and gutter as per the design drawings is 1.25 acres. Percent Built Upon Area Calculations Project Area: 12.4 acres Pre-Development Pre-Development Built Upon Area: 0 SF Pre-Development BUA%: 0% Post Development Known BUA (as per Construction plans i.e. Roads, sidewalks, C&G): 54333 SF Allowable BUA (3600 SF allowed for each lot to include buildings, Driveways, hardscape, etc. Does not include LOT 5 for the SCM) 111,600 SF Total Post Development BUA: 165,933 SF Post Development BUA for Project Area: 30.72% SCM Drainage Area 11.52 acres (501,811 SF) Total Post Development BUA: 165,963 SF Post Development BUA for SCM Drainage Area: 33.07% Note: All post development BUA drains to proposed SCM. 1-Inch Storm Simple Method Calculation Stoneglen Subdivision Water Quality Volume Calculation Post Developed Basin Data Drainage Area = 11.520 ac Impervious% = 33.07 % Impervious acres = 3.81 ac Simple Method for Runoff Volume Simple Method for Runoff Volume Rv= 0.05+0.009(I) = 0.348 Design Storm Depth 1.000 inches Design Volume 14536 CF 75% Design Volume 10902 CF Water Quality Storage Table Stoneglen Subdivision Water Quality Storage Table Sediment Chamber Area Sand Filter Volume Sediment Chamber Volume Elevation Total Area (SF) Total Volume(CF) Sand Filter Area (SF) (SF) CF) (CF) 767.2 6302 0 4743 1559 0 0 768 10507 6724 4743 5764 3794 2930 768.42 11986 11876 4743 7243 5786 6090 769 14029 18992 4743 9286 8537 10455 770 16036 34024 4743 11293 13280 20744 771 18121 51103 4743 13378 18023 33080 772 20286 70306 4743 15543 22766 47540 772.25 20829 75445 4743 16086 23952 51493 Storm Drain and SCM Construction Plans ___ ___ _L___,.6s _., _...... , \, I .. • • i/i ' \ / l ` \° \\C / 0 20 40 `1 0) TOP OF PIPE(SS).768.41 I o ` \..., / LOT 23 \ ` { '�" LL 0 N EX.SSMHikk4 \ \ \) \ / \ / /\ PAD ELEV.787.5/ \ '\ \ I 1 inch= 40 ft. Q co co O U LOWER PROP.W.M.UNDER / PROP.MH 1A INSTALL PROP.18"STORM \ \ l I� r > INSTALL PROP.15"STORM \ S I DRAINAGE PIPE ABOVE PROP. r Fp I M w� DRAINAGE PIPE ABOVE PROP. `� CO U PROP.S.D.-SEE WATER I �j PROP.SAN.SEWER Ep 8"SAN.SEWER PIPE \ \ ) - 8"SAN.SEWER PIPE N /E9 '^� DISTRIBUTION PLAN y qq ���, 77$ BOTTOMOFPIPE(SD)=770.18 MANHOLE(TVA.)-SEE p / \ F / BOTTOM OF PIPE(SD)=]]9.73 `/\ / \\ \ \ \ ' JB 101 TOP OF PIPE(SS)=769.07 15 SANITARY SEWER PLAN 't TOP OF PIPE(SS)=7]].00 \ �' I •^ .. MIN.18"SEPARATION WM UNDER STORM \ I S5 5$ 5$- E 775 PROP.MH 2A L`SEE WATER DISTRIBUTION PLAN _ PROIP.MH 3A I I \ \ \ L. - SS- r 55 ,_:__SS_IL SS SS 55 1, SS�il I� 55 .u• 55 = 55-+- 55 ,�- 1 04 n I I LOT 22 l \ \ \ \ r -_ _ I I PAD ELEV.788.0 \ \ \ \ \ a 3 DCB S CBB �NEGLEN '•IVE C88 C87A PROP.SAN.SEWER / \ \ \ w ���= 775 `j > 91 PUBLIW/ jj N W� j8 \ j8\ j \ MAIN •(TYP.)-SEE r \ \ K -- 1S- j6. 9 O A 3 $4 '18S \` SANITARY SEWER PLAN ' �\ D_ EX.6"PVC W.M. /,, I ' S \ • \ WIk�, \ 4 ��� �� / , PROP.WATER �� I /^ METER TYP. SO / �, 77 PROP.B"W.M.-SEE WATER ii / • - 6 SS \ \ \ \ '' \ \ . 775 �' / 6 \ rp +"q � \ \ c`'a. \ LOT 21 \ ` \ 47 /' \ • ,P DISTRIBUTION PLAN A I / I/ L00E -_ \ NEW SWRLATUNDER SD \ `. `r W 'CB9-WATER LOTS I+I O rP0 BOTTOM 15"SD 4776.5 �, DISTRIBUTION PLAN ` I PAD ELEV:]75.0' \ I 10_. \TOP SWR LAT 4774.0 \ \ s \ "1' PROP.MH 4A -405\ \ \ \ ' , PROP.BUILDING LOT 9 \ LOT 15 �Po \ '� / L4 OT 13A \ \� DEFL=T PROP.W.M.U � R ( ) pAD ELEV.779.0 I p PAD TVA.� PROP.4' ,- PAD ELEV:783.0 ,n N /-. \� �4. .A. .__,' \-� \ \ \ m 1 PAD ELEV.775.5' f7 PROP.24"STORM DRAING- j \ ,1 \ \ �`� I/,SpS' S° �, PIPE ITH MIN.18"SEP•-•TIO LATERAL(TVA.) \ I I 1 ) GRD .773.5 -- jS \ \ \ / / \ I �81 \.- \ ' \ \ J BOTfO - °.''SD) Q �. "H ) Im TOP OF PIPE=767.6(W.M.) ` \ �j � \ \ 782 LOT 16 � 1 \ /�\ S� \ \8� \O\� \\ \ \ ' -f--776 PROP.MH 16 ;, / SDE�_SDE- 11111 •1 L'L\R \ \\ \ PAD ELEV.786.0 / I 1 Y \ \ \ m DI 14A •I� \ I INSTALL W.M.OVER PROP.15" I 787 C LOT 20 • \ \ - I I I l -• SDE SDE m • ., NEW SWR LAT UNDER SD \ 1A. STORM DRAINAGE PIPE WITH `, ItI g� J r )) may, PAD ELEV.=787.5 `\ �S BOTTOM 15"SD t]74.7 MIN.18"SEE.RATION / PROP.MH SA �' S I I TOP SWR LAT 4773.7 I ' a��l 1 \\ • \ O n / '� 9 \ J ,}, L:76fi.0 / . `c ' ' - I ° �I I LOT 14 BOTTOM OF PIPE= 5(W.M.) �7$6 / / lI \ TOP OF PIPE=]800 SD 1 r, \ z Z LOT 2 LOT 10 FJI:, 1- PAD ELEV.---781.0 f ( ) ``" DCB 13 \ ' LOT 7 ^ PAD ELEV.779.0 W \ I I • ,� �' \ I m I PAD ELEV.776.SV it I I e 1 PAD ELEV.=775.0 1II `tIdy \ \I� II dj4�5�� Y INSTALL PROP.8"SAN. I\ \ \\\ \ O"''' T \ S � SEWER PIPE ABOVE PROP.15" \ /\ _o ` JlLOT 17 ° / STORM DRAINAGE PIPE U JC` ' I I L I I \ y0 \ \PAD ELEV.787.5 'i BOTTOM OF PIPE(SS)_]82.65 \ _ \ 1 S \ TOP OF PIPE(SO)=760.52 \ / COI PROP.20'STORM CB 10 G PROP.2"W.M.-SEE WATER \ 1 \ ) \ O / 776_ Any m III DRAINAGE EASEMENT 1- I '_11) ' DISTRIBUTION PLAN 11yy \ /\ \� \ \ \ H > W i 2� PROP.2"W.M./• -SEE WATER '" T�Iy I '.D / `\ ` / °� / JB 102A m ]\ DISTRIBUTION PLAN 1 I I I \�` \ \ NEW SWR LAT OVER SD I �' \ ` / \ \ ( PAD ELEVLOT,787.5 \ \ O/ ((� �1 ' c' I LOT 6 I I\ \ - \ 1 �� / / nOITOP15"SDt7726 PAD ELEV.=775.0I BOTTOM SWR LAT f]]3.6J /�/ IV .J PAD ELOEV=778.0 11. ws `f' , LOT13 / LOT 18 / \ \ / / \ Ly z zfii J / \ PAD ELEV.=787.5 \ 305 \ \I LOT3 ' \ DEFLECT PROP.W.M.UNDER oNall INSTALL NEW SWR LAT OVE PAD ELEV 780.0 '.� / ( I �- �1 ) /�'PAD ELEV.7]5.5 tl PROP.15"STORM DRAINAGE '^ I ^ '\ PROP.MH 1C I' 4 TOP 24"STORM 4772.25 /\ 1' ' ` ` ` \ 787 u� L r. OT 200 \ V J PIPE WITH MIN.18"SEPARATION i 1 I CB 11 \ O / \ w J BOTTOM SWR LAT 3773.25 J.I j$j t 0 ��f / 1 ' /W GRD EL.773.5 SDE SDF r,,E SDE �. 79 /�/ f I m J O,11N BOTTOM OF PIPE=769.75(SD) 774_ DI 15A III I -°T-�� 780 J m" 7$S - �,. N. �95 L.I� TOP OF PIPE=7685(W.M.) / , `�I \ Q� n / �F -� \ \ C� m 775 /V �- 772 - �e ' T_oi11A \ ° §DE OT 11B ,/ / 3as �� \ STRUCTURE TABLE a Q UI C I j _PROP.MH 2B FES 15 76 ' I \ gP > \ / sE \ c, _1 jS ' / j I dw IRp' _ - \ STRUCTURE NAME: RIM INV.IN(DIA.) INV.OUT Z '�� '�^ DCB 17 ^^O 'w 4. 5 I '� 1� 5►J� �DE \ o\ O Et \ J CB 6 775.42' 771.92' m I '0 ^i •l ill' \ LOT 12 80 3a C W �• FES 12A I '\^ L ! F \ \ _• }'P- I OCB 12 \ ^ PAD ELEV.781.0 - II I \ \ ( J /� �'/^1 FES 6 i y 5- F �•..1 \- \ i f SDE \ \ CB 7A 784.74' 779.88' 1$' 779.88' u J V J \.:es �. '\ \ \ \ / ,, �FEB 201� / N. _ - - \ / / N. A15 Ah `G'' W _9" �r2 t ,� A 14 780 l I \ CB 8 781.40' 777.88'(15') 777.88' Z ',ISO 1 „ F ..-, \,r \ \ \ o I LOTa 773 ,� s ' " 770 _ 72 ____\ \,�s \ 8 \ �'8s N. \ _ \ CB 780.3T 776.91'(15') 776.91' N '^ PAD ELEV.=775.0 ,�:,� (� 768 _ 7 \ \ \ yy \ \ �\ \ \ _ _ \\ \ II I •- •� \ \ \ SITE THIS AREA TO DOFF \ CB 10 77S.S0 774.2 771.59 I v� 769�770 ��■ T � \ \ N. ›� Q AR DRAIN \ CB 11 778.40 769.62 \ \ \ \ \ \C. 4'(15") ' v, / � � \ \ \ \ 1 �cRADE \ \ 770.81'(15') ° FES 18 _ 0 \ \ \ \ \ .� \ c N. \ - \ \ 770.12'(24') o I oT 1e 769 - 772 ���V A \\ \ �� \ \ \ V A \ (� ) ` \ \ \ DCB 2 774.67, 770.35'(181) 769.85' I (\_74�W�\� _ 770_ JI'4�.,;F DSAND ETENTION SCMV \N. \ \ \ \ �'S \ N. N N N \ \ ) i ,:_.-_ .1),. ''' ._SDE r - SEE DETAIL SHEETS \ N. �j \\ \\ \ \ \\ N \ N \ PIPE TABLE 770.59' 15" FES 103 SEE RIP TABLEP TH THISON SHEET \ \ \ o \ \ C. C. N. 770.33'(15") / US STRUCTURE DS STRUCTURE DIAMETER LENGTH SLOPE MATERIAL DCB3 773.92' 769.58' m JB 102 FOR DIMENSIONS \ \ \ \ \ \ \ \ \ \ \ \ N. \ \ 769.58'(24") SDE SDE SDE / - - �s \\ N. N. \ N. DI 15A FES 15 24" 33.39' 0.51% CLASS III RCP(O-RING WATERTIGHT JOINT) RIP RAP APRON(TYP.) S DCB 4 773.92' 769.46'(24") 769.46' / mSEE TABLE THIS SHEET \ \ \ \ N. N 1�° FOR DIMENSIONS \ \ \ \ \ \ \ \ \ N. \ DI 14 DI 15A 24" 133.53' 0.50% CLASS III RCP(O-RING WATERTIGHT JOINT) ^mg - _ \ \ \ \ DCB 12 776.37' 768.84'(24") 768.84' / \ T 1 \ \ \ \ N. N. \ DI 14A DI 14 24" 135.25' 0.50% CLASS III RCP(0-RING WATERTIGHT JOINT) DCB 13 786.00' 778.65'(15") 778.40' NOTES: STRUCTURE KEY DCB 4 DI 14A 24" 67.82' 0.50% CLASS III RCP(0-RING WATERTIGHT JOINT) DCB 17 773.05' 769.61' Vl DCB 3 DCB 4 24" 23.43' 0.50% CLASS III RCP(0-RING WATERTIGHT JOINT) 1. ALL WORK TO BE DONE IN ACCORDANCE CB CATCH BASIN DI1 774.10' 770.46'(15") 770.46' W NOTES: AND LENGTH WIDTH AND DEPTH OF APRON - aMarEaRm.cno„ - WITH TOWN OF GRANITE QUARRY, DI DROP INLET (0-RING ) DI 3A DCB3 15" 18.83' 6.21% CLASS III RCP WATERTIGHT JOINT DI 3A 773.75' 771.50' M 1. CLASS O BE OR MEDIAN THE ENN RIPRAP SALISBURY-ROWAN UTILITIES, NCDEQ DCB DOUBLE CATCH BASIN o DCB 2 DCB 3 24" 54.27' 0.50% CLASS III RCP(0-RING WATERTIGHT JOINT) 0 2. REFER TO off CHARLOTTE�ME�c oLSNBURc STORM WATER DESIGN MANUAL FOR I�I STANDARD SPECIFICATIONS AND PROJECT FES FLARED END SECTION DI 11A 777.50' 770.97'(18") 770.72' U 3. ROFPF HFE SHOULD EXTEND RTPATBO E SIDES OFF oEr APRON AND AROUND Top END rZ;, SPECIFICATIONS. WHEN SPECIFICATIONS ARE OT OPEN THROAT CATCH BASIN DI 1 DCB 2 18" 20.43' 0.54% CLASS III RCP(O-RING WATERTIGHT JOINT) DI 14 773.50' 768.44'(24") 768.44' ° 2:1 ANDERT A HEIGHT NOT LESS THAN Two THIRDS THE PIPE"DIAMETER OR IN CONFLICT, THE STRICTER SHALL BE HELD. < HEIGHT. o tat :`16 OT lA DI 15" 103.82' 0.50% HDPE DI 14A 773.50' 769.12'(24") 769.12' I- 4. SURRACSHALL THE NO OVERFLOW T"THEE"AREAFTO"HE APRONTOR THE 1 2. ALL RIM ELEVATIONS PROVIDED FOR CATCH ci SHALL BE DUNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE EO CB 6 DCB 2 15" 67.23' 1.98% CLASS III RCP LU ME GRA E(PLUS„)wNH HE SURFACE of T„E RECEDNG Cx NNE(. Va _ • BASINS IN THE STRUCTURE TABLE ARE DI 15A 773.00' 767.77'(24") 767.37' d c. APRON SHALL HAVE A CUTOFF OR TOE WALL Ar THE DOWNSTREAM END. • 11 - �,. GIVEN AT THE TOP OF CURB. DC817 FES 16 18" 26.83' 9.00% CLASS III RCP(O-RING WATERTIGHT101NT) a s „E WIDTH of THERECEDING END of CTHEHANNEL APRON BE EQUAL To THE BOTTOM as S r I FES 12A 768.40'(24") to WIDTH OF THE RECEDING CHANNEL MAXIMUM TAPER TO RECEDNG CHANNEL 5:1 - _ ;Are •t L�l 6 N- v. ••�'�•' '%��' DCB 12 FE512A 24" 38.64' 1.14% CLASS III RCP(O-RING WATERTIGHT JOINT) \ ALL SUBORADE FOR STRUCTURE TO BE COMPACTED TO 95%OR GREATER. AA 1: :t♦mite 3. ALL RIM ELEVATIONS PROVIDED FOR OPEN �1.r.:. FES 15 767.20'(24") Ig 7. THE PLACING OF ALL ETHER LOOSEOR COMPACTED IN THE RECEDING THROAT CATCH BASINS IN THE STRUCTURE o CHANNEL SHALL NOT BE ALLOWED. 1' ow of ma. CB 11 DCB 12 24" 78.29' 1.00% CLASS III RCP(O-RING WATERTIGHT JOINT) a. THE HORIZONTAL ALIGNMENT OF THE PROD TABLE ARE GIVEN AT THE BOTTOM OF THE FES 16 767.20'(18") NO BE PERMITTED.ES JLAN OPENING. CB 10 CB 11 15" 56.65' 1.91% CLASS III RCP a g 9. FILTER FABRICSHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO \ FES 18 E '(18STurseARE4COON Erv0 of APRon ro RECIEVTNc cHArvNEL '(18ABIL CB7A CB8 15" 15074' 133% CLASS III RCP '(24") Date: w Plpe Flow Length Worm Stone Thickness a '- (I�NEEDEoi101° - �M1M. DI 11A CB 11 24" 29.59' 2.03% CLASS III RCP(0-RING WATERTIGHT JOINT) JB 101 776.45' 770.9T(18") 770.9T 9/15/2023 ours et me r Ws) (fq (ft) Class D50 ELEVATION ° FES 1zA oaza°e 19sz 1s zO Class a^ 1S^ `,o 'I�AR' DCB 13 OT 11B 18" 145.91' 1.00% CLASS III RCP JB 102 776.98' 767.61'(18") 767.61' Chkd: o FES 15 a° 4.4 6 a° o� SJM FES 16 15" 2.24 10 12 Class 4^ 106 NATRAL CROE c=OF°LF ESSiO ems';- OT 11B DI 11A 18" 192.58' 3.10% HDPE J8102A 775.60' 769.11'(18") 769.11' d FES 18 15 3.55 10 12 Class 4' 10' FES 103 18 899 lO 12 Class 8' 18" _ •• 9° _ Drwn: FES 201 20 1365 16 18 Class 8^ 18'' �� �•-. SEAL �° = OT 13A DCB 13 15" 160.11' 0.78% CLASS III RCP OT lA 774.50' 770.98' K A W w SCM 30 1535 16 19 Class 8" 18" • �\ &W. 368 • _ F\/'1VV �1 ,z! '.. T°'"E.'' MM. - OT 100 JB 101 18" 110.10' 0.74% CLASS III RCP OT 7B 784.00' 780.50' ° 350(see fig 6.06 awe'NC SEDIMENT AND EROSION CONTROL MANUAL i FNGIN� / Scale: n_ 1 m /"�'^ ,R r!P' OT 7B CB 7A 15" 123.85' 0.50% CLASS III RCP OT 11B 783.50' 776.94'(18") 776.94' 1 =40 •r(m ejzi0 .��� USER PLS.FABRIC tik4 illo"�li�i 11,0 PPE w ER u"`A SECTION B-@ JB 102 FES 103 18" 148.32' 0.75% HDPE OT 13A 786.50' 779.91' Project No.: 10/11/2023 / JB 101 JB 102A 18" 248.51' 0.75% CLASS III RCP OT 19 772.00' 769.27' RIPRAP APRON DETAIL Know what's below. OT 19 FES 18 18" 53.46' 0.51% HDPE OT 100 775.00' 771 78' Sheet: / Call before you dig C_3 OT 200 FES 201 24" 408.75' 1.10% HDPE OT 200 788.00' 785.00' DRY DETENTION POND CONSTRUCTION SPECIFICATIONS BERM SOIL AND COMPACTION SPECIFICATIONS $. 1. ALL FILL MATERIALS TO BE USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM / •o JB 702A r ��� BORROW AREAS APPROVED BY THE ON-SITE GEOTECHNICAL ENGINEER.THE FILL MATERIAL y _ I GENERAL NOTES o SHALL BE FREE FROM ROOTS,STUMPS,WOOD,STONES GREATER THAN 6",AND FROZEN OR /O T/ \ 0 1."I�S I �' I w tel J I. PRIOR TO CONSTRUCTION,THE ON-SITE GEOTECHNICAL ENGINEER SHALL VERIFY THE OTHER OBJECTIONABLE MATERIAL.THE FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS JO I I SUITABILITY OF THE PROPOSED BORROW AREA/FILL FOR USE IN THE DAM EMBANKMENT/ FILL WITHIN THE DAM EMBANKMENT AND KEY TRENCH:ML AND CL. - / ilf II ' I x3•r� ; ill \ \ KEY TRENCH/IN-SITU SOIL$UITABLITY FOR EMBANKMENT. 2. FILL PLACEMENT SHALL NOT EXCEED A MAXIMUM 8"LIFT.EACH LIFT SHALL BE CONTINUOUSaIlli.' / /( / PROP.CURB& I I I 2. THE ON-SITE GEOTECHNICAL ENGINEER SHALL INSPECT THE KEY TRENCH EXCAVATION PRIORFOR THE ENTIRE LENGTH OF EMBANKMENT.BEFORE PLACEMENT OF FILL FOR THE BERM a GUTTER(TYP.) / I J TO PLACEMENT OF ANV BACKFILL WITHIN THE KEV TRENCH.IF THE CONTRACTOR SECTION,ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLYIrk 4 ( CONSTRUCTS AND COVERS UP THE KEY TRENCH PRIOR TO INSPECTION,THEN THE KEVSC 0)$ I LOT 14I ) I PREPARED FOR FILL PLACEMENT. ? O`\ Y ��#\/, LOT6� 1 TRENCH SHALL SE UNCOVERED AND TESTED AT THE CONTRACTOR'S EXPENSE. 3. ALL FILL SOILS USED IN THE EMBANKMENT/KEY TRENCH CONSTRUCTION SHALL BE • QCNO co\ '/ q` / - ` PROP.20'DRAINAGE l \ GRAPHIC SCALES 3. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING v N O J / ws-PROP.SAND FILTER(4732 SF)PER / m EASEMENT(TVP.) ( COMPACTED TO AT LEAST 95%OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY G E O d DETAIL THIS SHEET ELEV.=767.20 HORIZONTAL PLAN/SCHEDULE.PLEASE NOTE THAT NO TREES/SHRUBS OF ANY TYPE MAY BE PLANTED )ASTM-698).THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN-I TO '5p O U �77$ \ \ QI /II111 CB 10 ON THE PROPOSED DAM EMBANKMENT. • G y Z OcT,Z 020 40 +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT.COMPACTION TESTS SHALL BEW N.J• • �\ I \ 4. THE CONTRACTOR SHALL SCHEDULE A FINAL AS-BUILT INSPECTION AND AS-BUILT SURVEY $ / PERFORMED BY THE ON-SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY \ oy N LOT 11 I \ WITH THE ENGINEER.AN AS-BUILT INSPECTION SHOULD BE SCHEDULED A MINIMUM OF 60 THAT THE PROPER COMPACTION LEVEL HAS BEEN REACHED.THE FILL SHOULD BE �+ LL O / ^� - \ \ - 1 inch= 40 ft. DAYS BEFORE A PERMIT TO IMPOUND(OR A CERTIFICATE OF OCCUPANCY)IS REQUIRED.ANY COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR.IN ORDER TO PREVENT DAMAGE TO A M {p U PUBLIC ROAD V \ COMMENTS OR DEFICIENCIES IN THE DAM CONSTRUCTION MUST BE CORRECTED TO THE THE PIPE NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE UNTIL MINIMUM COVER IS n /I'/ / / RNJ \ CLEANOUT(TYP.) DI i5A"' 1/ / / SATISFACTION OF THE ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. ESTABLISHED ALONG THE PIPE. O U l�I / /I 1,/ 4. A KEY TRENCH SHALL BE PROVIDED BENEATH ALL FILL AREAS OF THE BERM.THE TRENCH Y y CONSTRUCTION PREPARATION SHALL EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE OR 2 FT BELOW THE 36"0 / T/ "IQ5 -�y� \ DCB 17 �10 7® / 11 ' I ' LT13 1. PRIOR TO PLACEMENT OF THE NEW FILL,THE AREAS ON WHICH FILL IS TO BE PLACED SHALL OUTLET BARREL AND SHALL HAVE A MINIMUM BOTTOM WIDTH OF 5 FEET.THE KEY TRENCH -03 C. / Tgi • BE CLEARED AND STRIPPED OF TOPSOIL,TREES,ROOTS,VEGETATION,AND OTHER SIDESLOPES SHALL BE A MINIMUM OF 1:1(H:V).THE KEV TRENCH SHALL BE COMPACTED TO m/� , OBJECTIONABLE MATERIAL.THE AREAS ON WHICH FILL IS TO BE PLACED SHALL BE SCARIFIED. THE SAME SPECIFICATION LISTED IN ITEM 3 ABOVE.DEPENDING UPON ON SITE SOIL AIL D111A o 2. ANV REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING(SEEDING)ON THE DAM CONDITIONS ENCOUNTERED DURING EXCAVATION THE ON SITE GEOTECHNICAL ENGINEER/ I/ CU , - SOE EMBANKMENT ONCE FINAL GRADES(AS SHOWN ON THE GRADING PLAN)HAVE BEEN MAY VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY.THE A / - \�1U - F (', AE _ I - TABLISHED WITH COMPACTED FILL 3. TSHE CONTRACTOR SHALL FURNISH,INSTALL,OPERATE,AND MAINTAIN ANV PUMPING UTUREON-SITEASEBUITH UICAL BMITTALS EER SHALL RETAIN DOCUMENTATION OFANY VARIATION FOR / _ '.i 1" ° J\ �. / EQUIPMENT,ETC.NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE DRY 5. UPON REQUEST,THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH REPORTS TO VERIFY N 4 Jb� � \ DETENTION POND.IT IS ANTICIPATED THAT PUMPING WILL BE NECESSARY IN THE THAT THE DAM EMBANKMENT MEETS THE SPECIFIED COMPACTION REQUIREMENTS. �®} OT 1]A� / - \ FES 12A "OCe 12 EXCAVATION AREAS I.E.( -KEY TRENCH).DURING PLACEMENT OF FILL WITHIN THE KEY COMPACTION REPORTS WILL BE NEEDED DURING THE AS-BUILT CERTIFICATION PROCESS FOR '^ "FE518- / 769 769 I \ ,17 ® TRENCH(OR OTHER AREAS AS NECESSARY),THE CONTRACTOR SHALL KEEP THE WATER LEVEL THIS STORMWATER FACILITY.THEREFORE,IT IS THE CONTRACTOR'S RESPONSIBILITY TO o JB 102 I SOE /\ i , \ BELOW THE BOTTOM OF THE EXCAVATION.THE MANNER IN WHICH THE WATER IS REMOVED ENSURE COMPACTION TESTS ARE PROPERLY PERFORMED DURING CONSTRUCTION. �' _ Sp'E ° / / / „ TOP OF DAM=772.25' \ \ / SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDESLOPES ARE STABLE. _ PROP.RIP RAP SPILLWAY PIPE SUBGRADE SUPPORT AND BEDDING SPECIFICATIONS J I I I SOE ��FS 103� 770 APRON(TYP) 's OUTLET STRUCTURE MATERIAL SPECIFICATIONS FILL IN THE AREA OF THE SPILLWAY PIPE AND ADJACENT AREAS SHOULD BE BROUGHT UP TO J / / D�` �� +r r r 4' \ \ \ \ \ �� \ 1. THE RCP OUTLET BARREL SHALL BE CLASS III RCP,MODIFIED BELL AND SPIGOT,MEETING THE A POINT OF 2'TO 3'OR MORE ABOVE THE TOP OF CROWN ELEVATION OF THE PIPE IN J ii,, ,N \ REQUIREMENTS OF ASTM C76-LATEST.THE PIPE SHALL HAVE CONFINED 0-RING RUBBER ADVANCE OF SPILLWAY CONSTRUCTION SO THAT THE SPILLWAY PIPE CAN BE INSTALLED IN A / //��� / / iINV.=7fi4.61 \ \ 1j0 \�\ \ \ GASKET JOINTS MEETING ASTM C-443-LATEST.THE PIPE JOINTS SHALL BE TYPE R-4. TRENCH CONDITION.ONCE THE FILL IS AT AN ELEVATION 2'-3'ABOVE THE TOP OF CROWN, / / % / / OUTLET STROUCTURE \ N PROP RIP RAP EINE RO(TYPERT\ N . o\ \ 2. THE STRUCTURAL DESIGN FOR THE RISER BOX WITH EXTENDED BASE SHALL BE BY OTHERS. THE PIPE TRENCH SHOULD THEN BE EXCAVATED FOR INSTALLATION. Z / / / / / / TOP OF BOX=771.50 RIP RAP APRON \ FOREBAV BERM(TYPJ \ PRIOR TO ORDERING THE STRUCTURE,THE CONTRACTOR SHALL PROVIDE THE ENGINEER 2. IF SEEPAGE OR FLOW OCCURS IN OR ALONG THE PIPE ALIGNMENTS,GROUNDWATER CONTROL/ / PROPERTY LINE I T65� 3fi'X18"WEIR ELEV.=766.45 18'LX19'W,CLASS B \ \ \ \ WITH SHOP DRAWINGS,SEALED BY AN P.E.REGISTERED IN NORTH CAROLINA,FOR REVIEW. WILL eE NECESSARY.THIS COULD INVOLVE PUMPING(OR STREAM DIVERSION,ETC.) / / / // // I // / / / / INV.OUT=]fi4.]5 \ STONE,SEE DTL \ \\ \ \ \ \\\\ \ \\ \ \ \ \ \ 3. THE RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WITH STEPS 16"ON CENTER.STEPS DEPENDING ON THE TOPOGRAPHY.SINCE IT IS NECESSARY TO WORK IN A"DRY"CONDITION, Q J - SHEET C3 SHALL BE PROVIDED ON THE INNER WALL OF THE RISER BOX.STEPS SHALL BE IN THIS SITUATION MAY REQUIRE USE OF LEAN CONCRETE BACKFILL,FLOWABLE FILL,ETC.TO 7 /L'1L PROP.NCDOT PRE-CAST ACCORDANCE WITH NCDOT STD.840.66. ESTABLISH SUBGRADE CONDITIONS SUITABLE FOR SOIL TYPE BACKFILL PLACEMENT. L_ 28.6 LF OF 30" HEADWALL PER STD.838.80 4. THE ANTI-FLOTATION BLOCK SHALL BE PRECAST AS THE EXTENDED BASE OF THE RISER BOX 3. PRIOR TO INSTALLATION,SUBGRADE CONDITIONS ALONG THE SPILLWAY PIPE SHOULD BE J Z RCP @ 0.50% DURING FABRICATION.THE PRECAST BASE SHALL BE INCLUDED AS PART OF THE SHOP EVALUATED BY THE ON-SITE GEOTECHNICAL ENGINEER TO ASSESS WHETHER SUITABLE PRIMARY SAND FILTER/DRY DETENTION SCM DRAWINGS THAT WILL BE SUBMITTED TO THE ENGINEER FOR REVIEW(SEE ITEM 2 ABOVE).IN BEARING CONDITIONS EXIST AT THE SUBGRADE LEVEL.SHOULD SOFT OR OTHERWISE 0z f) SCALE:1"=40' LIEU OF A PRE-CAST BASE,THE CONTRACTOR MAY OPT TO CAST-IN-PLACE THE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG THE PIPE ALIGNMENT,THESE MATERIALS Et ANTI-FLOTATION BLOCK IN THE FIELD.HOWEVER,PRIOR TO CONSTRUCTING THE SHOULD BE UNDERCUT AS DIRECTED BY THE GEOTECHNICAL ENGINEER.THE UNDERCUT 0 M CAST-IN-PLACE BASE,THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER MATERIALS SHALL BE REPLACED WITH ADEQUATELY COMPACTED STRUCTURAL FILL,LEAN W FOR REVIEW DENOTING THE FOLLOWING: CONCRETE OR FLOWABLE FILL AS DIRECTED BY THE ON-SITE GEOTECHNICAL ENGINEER. /1 E5 A. MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT 4. FILL MATERIAL ADJACENT TO THE 0-RING OUTLET BARREL SHALL MEET THE SPECIFICATIONS (-J 7 B. THE CONNECTION MECHANISM TO JOIN THE ANTI-FLOTATION BLOCK WITH THE RISER LISTED IN ITEMS 1 THROUGH 3 IN THE SECTION TITLED"BERM SOIL&COMPACTION I 5 O SECTION SPECIFICATIONS."THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO THE COMPACTION 5. THE RISER BOX JOINT DESIGN SHALL CONFORM TO ASTM C-478.THE JOINTS SHALL BE EFFORTS ALONG THE PIPE TO ENSURE THAT ALL SPACES UNDER AND ADJACENT TO THE PIPE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO ASTM-990.THE CONTRACTOR ARE FILLED WITH PROPERLY COMPACTED MATERIAL. n I- 0 SHALL PARGE JOINTS ON BOTH THE INSIDE AND OUTSIDE WITH NON-SHRINK GROUT. L._ Z CO 6. IF THE ANTI-FLOTATION BLOCK IS PRECAST AS PART OF THE RISER BASE SECTION,THE TESTING OF THE EMBANKMENT 0 11I ENTIRE PRECAST RISER BOX STRUCTURE SHALL HAVE A SHIPPING WEIGHT SHOWN ON THE D LLI SHOP DRAWINGS.THE STRUCTURE WEIGHT SHALL BE THE SHIPPING WEIGHT AND SHALL BE 1. TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE CL Z CO I- DETERMINED BY SUBTRACTING THE WEIGHT OF THE FACTORY BLOCKOUTS FROM THE GROSS RECOMMENDED LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION.THEREFORE, ALL UPSTREAM DRAINAGE AREAS MUST BE STRUCTURE WEIGHT.THIS INFORMATION SHALL BE SHOWN ON THE SHOP DRAWINGS ONE DENSITY TEST SHALL BE PERFORMED FOR EVERY 2,500 SQUARE FEET OF AREA FOR EVERY CO ` " w W rZ STABILIZED PRIOR TO CONSTRUCTION OF ALL SUBMITTED TO THE ENGINEER FOR REVIEW.IF THE CONTRACTOR OPTS TO CAST-IN-PLACE LIFT OF FILL. Q THE ANTI-FLOTATION BLOCK,THE CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE 2. TESTING WILL BE REQUIRED ALONG THE 0-RING OUTLET BARREL AT A FREQUENCY OF ONE SAND FILTER FILTRATION CONTROLS AND FILTER W RISER STRUCTURE IS EQUAL TO THE MINIMUM LISTED ABOVE. TEST PER 25 LF OF PIPE PER VERTICAL FOOT OF FILL. MEDIA. 3. TEST OF THE DEGREE(%)OF COMPACTION OF THE PLACED FILL IN THE DAM SHALL BE 8. ALL POURED CONCRETE SHALL BE MINIMUM 3000 PSI(28 DAY)UNLESS OTHERWISE NOTED. Q 9. GEOTEXTILE FABRIC FOR THE OUTLET BARREL JOINTS SHALL BE MIRAFI 1 BON OR ENGINEER PERFORMED AS A PART OF THE PERMITTEE'S NORMAL QUALITY CONTROL PROGRAM FOR THE APPROVED EQUAL(NON-WOVEN FABRIC) CONSTRUCTION OF THE DAM.TESTS SHALL BE CONDUCTED CONCURRENT WITH THE 0 INSTALLATION OF COMPACTED FILL AND THE CONTRACTOR SHALL COORDINATE THE PROP.TOP OF DAM CONSTRUCTION OF THE DAM SO THAT TESTING CAN BE COMPLETED.SHOULD THE RESULTS 0 Z \ PROP.NCDOT PRE-CAST ELEV.772.25 TRASH RACK `J LLLJNILLL HEADWALL PER STD.838.80 OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OUTLET CONTROL STRUCTURE OBTAINED;THE PORTIONS OF THE DAM REPRESENTED BY SUCH TESTS SHALL BE REWORKED O W TOP OF BOX=771.50 OR REBUILT.ALL PORTIONS OF THE DAM SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE LLI 1_ 24"X18"WEIR ELEV=768.45 OF COMPACTION. .A J 10' INV.IN=764.80 V, INV.OUT=764.75 CLEANOUT,CAPPED - z 3I r TOP OF BERM 789.0 Z 1 1- (// SOLID PIPE I..L i= 3.1 / - TOP OF STONE AT - - r SAND FILTER67.2 - r PROP.GRADES PER PLAN p / ELEV. j// f 0 u �--� 0 Z u, 16' J 28.6 LF OF 30"RCP g0.50% ( '4. • ,l COMPACTED FILL ►,?UU6U,,v �INV=764.61 f� `\\C Cl) 7INV=764.75- `PERFORATED PIPE IN�765.6 AT ALL END PROP.RIP RAP APRON SAND FILTER'MIN.1% CLEANOUTS W/CLASS B RIP RAP BEGIN NON-PERFORATED EXISTING GRADE 30-INCH RCP PIPE WNJATERTIGHT PIPES'FROM OUTSIDE OF TRASH RACK SHALL BE JOINTS PROP.6'PERFORATED PIPE H 1.0% RISER. HOT DIPPED GALVANIZED INV=764.8 ELEV.764.85 1 L4X4a1 4 GROUTED WATERTIGHT CONNECTION AT RISER RIDGE-0 REBAR PRIMARY SPILLWAY PROFILE SCALE:1"=5' RACK-04 RERAN TRASH RACK(SEES AI A ANTI-VORTEX PLATE CO DETAILSHEE THITS MIN 20 GA Z W M TOP OF OPEN STRUCTURE=ni.s0 I • M O PROP.18k36'WEIR UNDERDRAIN C-) NOTES: COLLECTION POST-CONSTRUCTION NS 1, twzogm,mtu.. SYSTEM CONTROLS THE TOP OF THE SAND FILTER MESA EASEMENT MUST BE PROTECTED.INSTALL FILTER Q L,c CLEAN°. f(PCCE) FABRIC WITH A 2"LAYER OF WASHED I-x RIP-RAP vcCE aE f2 STONE ON TOP. MAINTENANCE ACCESS EASEMENT'EMT APRON oPROP.3D"RCP BOTTOM OF LW OW WEIR ELEV 76845 Z wuNT xnu nN a AaR stt xy T T T F FlLTER FABRIC d o PR FETOR ro nsT..MTon PRETREATMENT PLAN VIEW SECTION VIEW A-A N - J. SEDIMENTATION O i LL CHAMBER \ (FOREBAY) O OUTFLOW 18"MIN. 12"MIN. NOTE m FILTER UNDERDRAIN non A6rni inE `SURFACE F CLE4NE0 WASHED 2 "� •corvcRETE• L FULL WELD ALL SIDES OF ALL CONNECTIDNS 0 w PROP.17 SAND INV.our �647s Ca„NEm6nE. `°PX6 RPE.MnT SOE P A 1 1�l 1 P«E SAND 2, CONNECT TRASH RACK TO CONCRETE BOX VITH - rc WATER THHT SML MOST EE PROM6Eo INC.N TMw COW NL R6 `J 'REDHEAD' TYPE CONCRETE BOLTS. 0 OVERFLOW HD AS SPILLWAY NEEDED 11 r \ y Apprvd. 12.5' ISMINIEll 6"PERFORATED TRASH RACK DETAIL PIPE UNDERDRAIN 0filar',ANSMIIMMI INV.OUT=7fi3.25 PLAN VIEW ALL SYSTEM EMBANKMENT TYPICAL SECTION N SEE INSET SLOPES Dote: E SIN.II.THICK CONCRETE BASE a PERFORATED FOR OPTION 3:1 MAX W BELOW GM RCP. STANDPIPE RED PIPE ND FINAL PLANS-FOR PERMITTING PURPOSES 03 22 2023 RIP-RAP oRERFLOW NOTES: DO NOT USE FOR CONSTRUCTION BERM EN ° 2, BERM SPND SPILLWAY I.1 CO ON DT MINIMUM SLOPE. PERFORATED TUPSTREAMEUNEAR END WITH PVC CAP. �hkd: WO,° r�i"wAsxm . py� FILTER NEEDED CETER.SAND POPATCLLLESTSHALLLBEELCRAZESS ESAN 2R THE VG 440(MIN). SMM aOUTLET CONTROL STRUCTURE DETAIL _ -_ wov, ..i�.XI`1..►- ° BED 2 NSMETER. MM LOTT EDT°ED SHHALLP Ro DEE2A M OPEN Aeu OF 12 So, �//t�/t�SCALE:N.T.S /- _y� ` _ e _. fi:�i``i:`Si- TALL DRAINAGE AREAS TO A SAND FILTER FACIUTY ARE o BE ArAGLZER PRIOR TO NDTAUAERN of SOlO IN/LF.CONFIGURATIONPURPOSES ONLY.EXACT CONFIGURATION PER 111 Cq '<, DFWn: f\/1V V rc h INFLOW ` - < 0R0. ,� PERFORATED PIPE PER NOTES THIS SHEET S EXCEPT WHERE PLAN INSTALLED SLOTTED PIPE SHALL BE IS ALL FILTER ORAN ALLY CALL FOR SOLID _,O�°°°tSS16.716-,_ Scale: ru U OR RP ROIMM 0. `` oTFLow PPE _ • r° -E- S..'..- �t SEAL .t FF_40' 'p UNDERDRAIN 368 1 INSET 1 CONTROL E PROFILE VIEW cLEANour COLLECTION MEASURES - \^ i IiiP-714 \eliOr Project No.: a NOT TO SCALE , °`°'°°'v' lD/ SURFACE SAND FILTER SURFACE SAND FILTER SECTION ��®��;'�I�,°"���� Know what's below. Sheet: eJ J 10/11/2023 Call before you dig C_4 V d v v v Vvv \\\ v\\\ \ \ � � ` v / / / \ \ / / j, ;� \ \ ( cicliiq -Oozot O \ ( /'vim n°� ' y / ,.B O O LLi-Z2 C O \ \ \\ \ of \ \ \\ / / I ` -810- / m\ V \\\\\ � � / \ v _ / v A \\ J L -�- \ GRAPHIC SCALES \ \ \ �� \ \ \ \ l \ �806 - / HORIZONTAL \ \ \ \ \\\\ ' \\ \ \ OM SIte DA-ib \ \ �806_ °\ oT too / 1 inch=80[G \\ o \ \ \ \ \ \ , \ \ Tc25.6 MIN. \ ' 8aq I / AREA=4.]]AC \\ \ \Single Family Residential \ \ \\ \ \ Average Lot Size 1-Acre \ 807� � , 1 / \ \\ \ \\ \ \/ \ \\ \\ \ \ \ \\ ` \ �' ��EX.PERIMETER BERM \ \( I I I / / / 2 \ \\ \ \ \ \\\ \ \/ \\� I�� J9 9g'Tc PATH=22.6 MIN. Y / / � \ \ \ \ \A \\\ ` \ 1 _ �� _ vJ 8, � �- \ \ oZ a Tc PATH=25.8 MIN. 5 �� IX PERIMETER BERM ENDS \\ \ �� \ I.I.J _� / ,/� _�� \ \ / EX.PERIMETER BERM\ / \ \\ \ \ 1 \ \ I 0 LL D Q •_ CO OT A \ 1\ _ `_J� 0 \ jit,iff, TFSMIN \\!•_i. _ 789 \ I \ L \ \- ' AREA-0.63 AC. 7OT 78 ' \ \ \ \ \ Et UJ2C=O.fi 68Tc=5MIN. I\\ JJ� ' ',1•� I J ' AREA=1.45AC. EX.PERIMETER ENDS\ \ 1 1 \ C\ 1 8j C=0.5 \ ^\ \ -\ O fi7 AC. o DCB 2 I� 86 \ OH-S%e DA-2 to \ L.L '^ \ 8$ OT 6 1 j v� \ \ ` "�/ �\ �, AREA 038 AC.10011041, : \ Tc 22.6 MIN. \ \ )) I Q AREA 676Ac\ Wi_e� _ 1\ \ � � TFSMINir �^ \ \ C-0.5 \ _ C0.8 \ / � ��� . /� \\ \ Single Family Residential- \ O \ \ ��, -�� i� 1 AveragelLotSize0.6acre \ 1 , ILi j ,� \ AREA 0.36 A I \\/\ ��//�� DI 3A �) -�'\'B ���� C=0.6 CB 8 v 11 \ Tm=5MIN. \_�n9 _'/ �_ -�'_- Tc=5 MIN / AREA=0.25 AC. � �4�~ �� -� / / \ Z C=0.6 / I DC64 �t � . AREA=0.32 AC / / C=0.6 I..i� Tc=5MIN 1111*-----.41011111,11-W, / / / / 1\ m / �• I AREA=0.28 AC. � CB]A C=0.6Tc=5MIN. /\ \ �• / lliC I -` AREA=0.49 AC. /1 / N/CLEAt/ATER / r `J1 / Tc=S MIN ,� DI4110 /�$� '� C=0fi OT 13A 1 NEWCLE CLEAN WATER \ 6\ Tc-5 MIN 1 / BERMTOBE I AREA=0.28 AC. 5�41' \ / 7 / , Tc5MIN -�a1ry�-- \ ARAC. / CONSTRUCTED TO1TAC=06AG . (/ �, .� ®` C-O.fi DLOW AROUND SITE DI 14A Am 1s \� . �, \ FLOW AROUND SITE1I AREA=088Ac.� 0 4,6 \ ;�II I o ) ,.'� ` I \°6 /\ \ ) / � 0 64 ,_a ' I tl' ) CBI ` I 1 \ o\ OC812 ) CB0AREA=0.21 AC. , 1 m,_�-mV III Tc c:0" Tc=5 MIN , C=O.fi T. 1 / / o 4 AREA=0.49 AC. / AREA=0. �'I � � ^` m I I \ �1 \ 9 /t/ oce n I/ I/ CI / Tc=5 MIN. I /.��� ) ate/ ^ 3p5 ; \i. \ \\ AREA=0.84 AC.` pl5ADCB13I �° / j75 C=0.8 �\ It AREA=033AC. , I AREA On73 AC.\ SDE ` \ / s c-a I ce11 �itt � ��� c ae r/ ,�.-. `I§$ AREA=OA7INAC. ' �1/4Iilk \I4 O F71 C-0.6OT11B .♦/ 11 OT 17A � '\1 4�, �-� TF 5MINf \\ To-5 MIN. •.i Y / I AREA 0.91A � \ AREA=0.53 AC. ` A z5 Z$t"I� 69 / �m C=O.fi • .# . . ... 9 \ V* , )1�� TDIS MIN. f t C-0.8 30S Rip /-\ \ \\ _ „,,,,,.,,. .....v. AREA=0.73 AC. IIsbe \ , :,,. __,.... ,o o �,1sDe 769 , ...... ... 76•- �J 1,\ 1 •E \ \ �+ 770 m �'�. ,° �a.-.�� �� , _�� fla ;.// ^o _JJO s 6D�(\ `. \ \ /\ \N CARD i I \ // // ((( \ NEW DRY N \''O\ \\ \ o\ \ \ \ \ \ \ \ \ \ \ \ =fie'°FESS%�`9%- 7.,9 DETENTION/SAND = SEAL = Ay J I // DSCHARGE POINT FILTER \\ DISCHARGE POINT \ \ \ \ \ - 368 / / I /// / //I I I / OF DA 1)F SITE BYPASS \ \ \\ \ \ \ \ \ \\\ DA 2FF SITE BVPASS \\ \ 1 \\ \ , a 9/15/2023 Date 9/15/2023 o Chkd: 0 SMM Drwn: '`^`A' Scale: KA V V 1"=60' Project No.: Sheet: C-5 HydroCad Hydrology Results 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Soflnvare Solutions LLC Page 6 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=0.86" Flow Length=1,380' Tc=29.7 min CN=76 Runoff=2.92 cfs 0.340 af Subcatchment2: Off Site 2 ipre-development ;.;s% Impervious Runoff Depth=0.97" Flow Length=1,890' Tc=27.2 min , N=78 Runoff=5.06 cfs 0.548 af Subcatchment3: Existing-on Site Runoff Area=11.800 ac 0.00% Imp- ious Runoff Depth=0.59" Flow Length=1,255' Tc=23.4 min CN=70 -unoff=4.92 cfs 0.580 af Reach 4: confluence Inflo 12.84 cfs 1.469 af Outflow=12.84 cfs 1.469 af Subcatchment5: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=0.86" Flow Length=1,468' Tc=27.6 min CN=76 Runoff=3.04 cfs 0.340 af Subcatchment6: Off Site 2 Runoff Area=6.790 ac 20.00% Impervious Runoff Depth=0.97" Flow Length=1,509' Tc=22.9 min CN=78 Runoff=5.50 cfs 0.548 af Subcatchment7: On Site +post-development 0.00% Impervious Runoff Depth=1.20" Flow Length=998' Tc=13.2 min =82 Runoff=15.40 cfs 1.152 af Pond 8: Sand Filter Peak Elev=769.25' Storage=22,68, f Inflow=15.40 cfs 1.152 af Outflow=3.83 cfs 1.135 af Reach 9: confluence In •w=10.87 cfs 2.041 af Out . =10.87 cfs 2.041 af Subcatchment 10: Onsite Bypass Runoff Area=0.280 ac 0.00% Impervious Runoff Depth=0.77" Tc=5.0 min CN=74 Runoff=0.30 cfs 0.018 af Total Runoff Area = 46.640 ac Runoff Volume = 3.527 af Average Runoff Depth = 0.91" 90.12% Pervious = 42.032 ac 9.88% Impervious = 4.608 ac 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1: Off Site 1 Runoff = 2.92 cfs @ 12.41 hrs, Volume= 0.340 af, Depth= 0.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 540 0.0185 2.19 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 29.7 1,380 Total Subcatchment 1: Off Site 1 ` Hydrograph / 0 Runoff 2.92 cfs 3 Granite aualrry IDF 24-1-1V•Si 1-f r Rainfall=2.77" Runoff Area=4.730 ac Runoff Volurie4.340 of 2 Runoff Eepth=0.86" Flow Length=1,380' 1 c=29.7, m i n LL 91=76 1-/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2: Off Site 2 Runoff = 5.06 cfs @ 12.37 hrs, Volume= 0.548 af, Depth= 0.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.6 790 0.0310 2.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.2 1,890 Total Subcatchment 2: Off Site 2 �1 Hydrograph ■Runoff 5.06 cfs � I L 6 / ' Granite-6uarry1 ID/ F 24-ht S� r Rainfall=2.77" / RunoffArea=6.790 ac 4-i / I Runoff Volurie=0.548 af Runoff [ep h=0.9T" 3 % Flow Length=1,890' - / 1 c= 7.2 min u_ / i I 91=78 2 i/ 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3: Existing - on Site Runoff = 4.92 cfs @ 12.35 hrs, Volume= 0.580 af, Depth= 0.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description 11.800 70 Woods, Good, HSG C 11.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.9 100 0.0400 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.4 915 0.0220 2.39 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 23.4 1,255 Total Subcatchment 3: Existing - on Site Hydrograph 0 Runoff 4.92 cfs 5 ' I Granite Quarry IDF 24-hr S1 1-yr Ra'nfall .7T" / Runoff Area=1 t800-ac - 4 / I Runoff Volume=0.580 of Runoff Sep h=0.5?" • 3-i / low Lengt =1,255' • _ // lac=23.4 min LT- - H _ * CN=70 2- 1-/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Reach 4: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth = 0.76" for 1-yr event Inflow = 12.84 cfs @ 12.37 hrs, Volume= 1.469 af Outflow = 12.84 cfs @ 12.37 hrs, Volume= 1.469 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 4: confluence Hydrograph � I- + H -h 17 Rd rf 0 Inflow 14= I 12.84 cfs .. 13� _ ikfi iv 3-O _c ❑Outflow 111/ ' - 10Y ' 9Y 8/ 3 7J 6-- 5 -zzZZ _ / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 5: Off Site 1 Runoff = 3.04 cfs @ 12.38 hrs, Volume= 0.340 af, Depth= 0.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 628 0.0080 5.32 9.40 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 27.6 1,468 Total Subcatchment 5: Off Site 1 Hydrograph 0 Runoff 3.04 cfs I� � 3Y Granite6uarry IDF 24I -hiL S1 14r V RaInfell=2.7r" jRunoff Area=4.730 ac / Runoff Volume=0.340 6f Runoff Dep h=Q.8r 2 / Flow Length=1,468' - Tc=27.6 min LL _ / CN=76 I I 1- 0 f//ffrS/f(//ff//(f// 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 6: Off Site 2 Runoff = 5.50 cfs @ 12.30 hrs, Volume= 0.548 af, Depth= 0.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 409 0.1830 25.43 44.94 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 22.9 1,509 Total Subcatchment 6: Off Site 2 Hydrograph •Runoff 5.50 cfs I I� 11 I L - Gr'anite aualrryl IDF 24-h�S'� 1-rr 6-/ I / I Rainfall=2.77" / Runoff Area=6.790 ac / Runoff VolumeA48-af 4- '1/ Runoff Dep h=Q.9T" N / Flow Lengti=1,509' 3/ / 7 I Tc=22.9 min LT- _ / CN=78 / 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 7: On Site Runoff = 15.40 cfs @ 12.15 hrs, Volume= 1.152 af, Depth= 1.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description * 11.520 82 11.520 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 100 0.0400 0.16 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 134 0.0100 7.20 22.62 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 1.2 524 0.0188 7.22 8.86 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 13.2 998 Total Subcatchment 7: On Site Hydrograph 17 ■Runoff 16 15.40 cfs ' 15_ Grniteualrry�T�F 1 -h '� r 14/I / I _ RaA nfa4=g.77" 13/ _ Runoff Area=11.520 ac 12/ P / i2urof'ILc�Iurne=,.115�p6f .7/11° — // f en =I99r8' / -f — / 1c=1-3.2 m i n 0 8 ' / CN2_ 5= I ILII 1 I7 Y 1 717 2-' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 14 Summary for Pond 8: Sand Filter Inflow Area = 11.520 ac, 0.00% Impervious, Inflow Depth = 1.20" for 1-yr event Inflow = 15.40 cfs @ 12.15 hrs, Volume= 1.152 of Outflow = 3.83 cfs @ 12.69 hrs, Volume= 1.135 af, Atten= 75%, Lag= 32.5 min Primary = 3.83 cfs @ 12.69 hrs, Volume= 1.135 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 769.25' @ 12.69 hrs Surf.Area= 14,511 sf Storage= 22,684 cf Plug-Flow detention time= 314.1 min calculated for 1.134 of(98% of inflow) Center-of-Mass det. time= 306.6 min ( 1,151.9 - 845.3 ) Volume Invert Avail.Storage Storage Description #1 767.20' 75,114 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 767.20 6,302 0 0 768.00 10,507 6,724 6,724 769.00 14,029 12,268 18,992 770.00 15,987 15,008 34,000 771.00 18,001 16,994 50,994 772.00 20,072 19,037 70,030 772.25 20,599 5,084 75,114 Device Routing Invert Outlet Devices #1 Primary 764.75' 30.0" Round Culvert L= 30.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 764.75' / 764.60' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 768.45' 18.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 #3 Device 1 771.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Primary 767.20' Sand Filter Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.280 0.400 0.520 0.640 0.770 0.890 Primary OutFlow Max=3.82 cfs @ 12.69 hrs HW=769.25' (Free Discharge) -1=Culvert (Passes 3.41 cfs of 42.58 cfs potential flow) 12=Orifice/Grate (Orifice Controls 3.41 cfs @ 2.86 fps) 3=Orifice/Grate ( Controls 0.00 cfs) -4=Sand Filter (Custom Controls 0.41 cfs) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 15 Pond 8: Sand Filter Hydrograph 1 F1 I t I 1 - 1rt j1i fi 1 -1 T 1 17� 0 Inflow 15.40 cfs ❑Primary 16_ _ _ _ - H Iitfio v krle = 1 .520 15V 14� 7— 14 ]- I A H 4 Oe tc Eiev=769?251 13/ 7— I J 1- I � I t d agi= 684 c 127 111/ I I 1 / _ T To- 10� t' 9/ /— / T 8/ /— / _ LL 7_ 1 T I 5/ /— — 3.83 cfs I4T 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 16 Summary for Reach 9: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth > 1.05" for 1-yr event Inflow = 10.87 cfs @ 12.38 hrs, Volume= 2.041 af Outflow = 10.87 cfs @ 12.38 hrs, Volume= 2.041 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 9: confluence Hydrograph —L I— I —F L I t 1-1 —t h , L IH 0 Inflow 12Y i 11 f1 R7 rf ,l A ❑outflow 10.87 cfs - Inn AI"Pa=23 330--ac 11L i — — 8 / / I� " /6 L iL_ LLILL o - 3 6' / 'L _ ' i i ' I I ' I I ' 5- / - 2 '/ 0 ,,, 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 10: Onsite Bypass Runoff = 0.30 cfs @ 12.04 hrs, Volume= 0.018 af, Depth= 0.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 1-yr Rainfall=2.77" Area (ac) CN Description 0.280 74 >75% Grass cover, Good, HSG C 0.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10: Onsite Bypass Hydrograph 0.32 0.30 cfs JJ 0 Runoff 0.3 7 7 T rarl 17 4Le tivarry II 2 � 17-1- 0.28 0.26 1 - I I 1Ra f, '' i- Run of-AreIa=0 28110 lac 0.24 - -Pill r10N V llurie0-O�181af 0.22 0.2 I L L L I I I 17ep 1 15 0.18 / ��C c 0.16 1 01=1 "'Q 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 18 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: Off Site 1 D ^^ff Area=4.730 ac 20.00% Impervious Runoff Depth=2.42" pre-development p = 380' Tc=29.7 min CN=76 Runoff=8.25 cfs 0.954 af Subcatchment2: Off Site 2 Runoff Area=6. '0 ac 20.00% Impervious Runoff Depth=2.59" Flow Length=1,890' Tc= 2 min CN=78 Runoff=13.31 cfs 1.467 af Subcatchment3: Existing-on Site Runoff Area=11.800 ac 0.64% Impervious Runoff Depth=1.93" Flow Length=1,255' Tc=23.4 min =70 Runoff=17.90 cfs 1.901 af Reach 4: confluence Inflow=39.09 cfs 4.322 af Outflow=39.09 cfs 4.322 af Subcatchment5: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=2.42" Flow Length=1,468' Tc=27.6 min CN=76 Runoff=8.57 cfs 0.954 af Subcatchment6: Off Site 2 Runoff Area=6.790 ac 20.00% Impervious Runoff Depth=2.59" Flow Length=1,509' Tc=22.9 min CN=78 Runoff=14.39 cfs 1.467 af Subcatchment7: On Site Run,post-development-�)% Impervious Runoff Depth=2.95" Flow Ler _ ...... C -82 Runoff=35.11 cfs 2.836 af Pond 8: Sand Filter Peak Elev=770.60' Storage=44,261 c Inflow=35.11 cfs 2.836 af O low=15.79 cfs 2.816 af Reach 9: confluence Inflo 37.78 cfs 5.290 af Outflow=37.78 cfs 5.290 af Subcatchment 10: Onsite Bypass Runoff Area=0.280 ac 0.00% Impervious Runoff Depth=2.25" Tc=5.0 min CN=74 Runoff=0.86 cfs 0.053 af Total Runoff Area = 46.640 ac Runoff Volume = 9.632 af Average Runoff Depth = 2.48" 90.12% Pervious = 42.032 ac 9.88% Impervious = 4.608 ac 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 1: Off Site 1 Runoff = 8.25 cfs @ 12.39 hrs, Volume= 0.954 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 540 0.0185 2.19 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 29.7 1,380 Total Subcatchment 1: Off Site 1 Hydrograph g ■Runoff 8.25 cfs — - $�� ' rani army IDF 241hr 51 '10,r- Rainfall=4.86" Runoff Area=4.730 ac H- off Vdlur e 954-af - 6J, -RurRLfno f 90h=F.T Flow Lengt =1,380' 3 _ I I I L H _L I _ Tc= 9./ min LL a1 91=76 11/ z1 i 0411r//��//��// ���ll�/1 /���7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 2: Off Site 2 Runoff = 13.31 cfs @ 12.35 hrs, Volume= 1.467 af, Depth= 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.6 790 0.0310 2.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.2 1,890 Total Subcatchment 2: Off Site 2 Hydrograph ■Runoff 14" 13.31 cfs - 13 ' j ' r nit�iar�ry I1DF 241hrb1 12= Ranfall=14.86" 11_ Runoff Area=6.790 ac 10= I —i2uriofliVdlurie=T4167 af 9./ 1121.fno f ep h=2 �� Flow Lengt�=1,890'- 8_ / c=$7.2 min - 5/ 4 -/ 3-/ 2-/ 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 3: Existing - on Site Runoff = 17.90 cfs @ 12.30 hrs, Volume= 1.901 af, Depth= 1.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description 11.800 70 Woods, Good, HSG C 11.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.9 100 0.0400 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.4 915 0.0220 2.39 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 23.4 1,255 Total Subcatchment 3: Existing - on Site /� Hydrograph 20- - •Runoff 19 17.90 cfs 18/1 I I � 6rarrit Qiar'ry IbF12 hr 110-rr 15=, Runoff Area=11.800 ac 14 /17 I / L L -L L emu+ of'-Vdlue t010-1-laf- /12 /1 TRu-norf 9ep1tr=i1.9 " 11=✓ _ Flow Lengt1,255'_ 3 10 —[ I I 1 1c=3•4 m n- o 9LT- � — — — — 0 6V1- 1 L I— — - I � ' ' — 4�� 1 � � I — � � � 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 22 Summary for Reach 4: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth = 2.22" for 10-yr event Inflow = 39.09 cfs @ 12.33 hrs, Volume= 4.322 af Outflow = 39.09 cfs @ 12.33 hrs, Volume= 4.322 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 4: confluence /' Hydrograph / 1— 1 1 1 -k 1 1 4 I- 1 4 1- 1 -F ❑Inflow / —I 'lA f1Q rf ll I ❑Outflow 42 - 39.09 cfs i iio XI"e= I Ti c 40 3W / I I 364 — - 32 — — 34� 30 � ,r d � 28V / — 26=� - - 24i l -2- 22=/ Z 20: z' LL 18- /I- I 1 - 16- i— 14� + 12 // — — — 107 ' 7 — T 8 0 2 4 6 8 10 12 14 16 18 20 0- '"4"/"."1.'"''"".: 1 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 5: Off Site 1 Runoff = 8.57 cfs @ 12.36 hrs, Volume= 0.954 af, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 628 0.0080 5.32 9.40 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 27.6 1,468 Total Subcatchment 5: Off Site 1 Hydrograph - - ■Runoff 9- 8.57 cfs --I __ -- ra�ni#� QUarty I�I]F 24.hr 5� '10r 8- Ranyl=j4.T 1 — — Runoff Area=4i730 ac Runoff Volurie0.9154 6f _ 6- I Runoff pep h1.4�" ' —Flow Length1,468' - 6_ Tc= 7.$ min LL 4� / �,1=76 2_ 1- 0/1 , , , �� ,,,,;,,,,,,,,,,,,,2 ,,.2 .2(: 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 6: Off Site 2 Runoff = 14.39 cfs @ 12.28 hrs, Volume= 1.467 af, Depth= 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 409 0.1830 25.43 44.94 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 22.9 1,509 Total Subcatchment 6: Off Site 2 Hydrograph 16 ■Runoff 15_ 14.39 cfs 1� - 14/ artery Ibf 2� '1r 51 r 13 — / Rarfa= 6" 12/ / Runoff Area=6.790 ac Vcjlur�ne=1.4i67 of 10� / RLfnor-f_ep h-�2 " s�_ _ ✓ Flow Lengt=1,509' 81/ L J i — j lac= •9 rrOn LL 7--z" CNV=78 6y fi 4_ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 7: On Site Runoff = 35.11 cfs @ 12.14 hrs, Volume= 2.836 af, Depth= 2.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description * 11.520 82 11.520 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 100 0.0400 0.16 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 134 0.0100 7.20 22.62 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 1.2 524 0.0188 7.22 8.86 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 13.2 998 Total Subcatchment 7: On Site Hydrograph 38� — — 1— ■Runoff 35.11 cfs - 34 — — I —6r nit c,�wJ aa�ry IDF 24hrL 51 '1a yr 32V — r R of =f4A " 30,ZR-unof -Area=1t520-ac- 28 -2u-nofi lurie 8136 of 26= — R no epTi= : " 22 — — / {{-f�1owlength 98' 20V 4 I I I =�3.2 min - 0 LL 184/ ✓ 16_ I 12 / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD software Solutions LLC Page 26 Summary for Pond 8: Sand Filter Inflow Area = 11.520 ac, 0.00% Impervious, Inflow Depth = 2.95" for 10-yr event Inflow = 35.11 cfs @ 12.14 hrs, Volume= 2.836 af Outflow = 15.79 cfs @ 12.47 hrs, Volume= 2.816 af, Atten= 55%, Lag= 19.6 min Primary = 15.79 cfs @ 12.47 hrs, Volume= 2.816 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 770.60' @ 12.47 hrs Surf.Area= 17,203 sf Storage= 44,261 cf Plug-Flow detention time= 163.8 min calculated for 2.816 af(99% of inflow) Center-of-Mass det. time= 159.5 min ( 983.3 - 823.8 ) Volume Invert Avail.Storage Storage Description #1 767.20' 75,114 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 767.20 6,302 0 0 768.00 10,507 6,724 6,724 769.00 14,029 12,268 18,992 770.00 15,987 15,008 34,000 771.00 18,001 16,994 50,994 772.00 20,072 19,037 70,030 772.25 20,599 5,084 75,114 Device Routing Invert Outlet Devices #1 Primary 764.75' 30.0" Round Culvert L= 30.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 764.75' / 764.60' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 768.45' 18.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 #3 Device 1 771.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Primary 767.20' Sand Filter Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.280 0.400 0.520 0.640 0.770 0.890 Primary OutFlow Max=15.77 cfs @ 12.47 hrs HW=770.60' (Free Discharge) -1=Culvert (Passes 15.20 cfs of 50.70 cfs potential flow) 12=Orifice/Grate (Orifice Controls 15.20 cfs @ 4.71 fps) 3=Orifice/Grate ( Controls 0.00 cfs) -4=Sand Filter (Custom Controls 0.57 cfs) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 27 Pond 8: Sand Filter Hydrograph 1 H H I-1 H - I4 i41 - - 1 _ ��� . 0 Inflow 361 - 1 4 1— 3 1 1 CfS I 1 + 4 i ffi 4 i e— .1 .5 � Primary 34 32i/ ' 1 H 1— 1 —F 1 1 H H Oeitkl E1ev 770I01r 284/ z— 1 I— 1 —i 1 1 fi H ttodg i441 61tci 26V 24V r11 1 1 T rt Irt 1 fi l 1 rt 1 N 22= i 16- 20V / IJ Fri 1 I H 4 IJ I -r 1 1 1 0 184 15.79 cfs 1 1 1 LL 16V / 14V 12= 1j i 1 _ I4 IJ I _[ 10v 8v ,� 1 j _14 _ 14 ]_ 14 _I - 1 6=/ 4LFAF'2 0 ,;,,.�,.,(,,, 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 28 Summary for Reach 9: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth > 2.72" for 10-yr event Inflow = 37.78 cfs @ 12.34 hrs, Volume= 5.290 af Outflow = 37.78 cfs @ 12.34 hrs, Volume= 5.290 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 9: confluence Hydrograph 0 Inflow 40 37 78 cfs f + ❑Outflow l 38 / / ' ► IIW1 � .JLCi 34=/ 32 30= z— I —h I— I fi t /— 281- I I I I 1 J 1 1- w 24V 5 22 , 1 1 -k 1 1 4 I- 1 4 � 1 -F -k 1 W 0 20 12 � — 184/ z— I_ 1 61 r � �III/ 44/ 0- or - rr/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 10: Onsite Bypass Runoff = 0.86 cfs @ 12.03 hrs, Volume= 0.053 af, Depth= 2.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 10-yr Rainfall=4.86" Area (ac) CN Description 0.280 74 >75% Grass cover, Good, HSG C 0.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10: Onsite Bypass Hydrograph 0.95 0 Runoff 0.9 0.86 cfs I 1 J o.s5=� % 1 Graniteau�rry Ili 24 hr S1110iyr 0.8- t I R f 11= gam" 0.75�— Rand#A00e 0.65-i/ RqC1of' Iu O t!53 of —Runoff Dept ih--2.2-5" a 0.55±1 t t fft 'c�5.b m n 5� ` t —i t 1 1 t CN 4 c 0.4.45�_ LL 5� I I / H H l I H 0.3 0.3-V_ 1— —I 0.2 —1 -H 1 1 1 0.15= 0.1/1 0.05= 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Paae 30 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=3.81" Flow Length=1,380' Tc=29.7 min CN=76 Runoff=12.06 cfs 1.500 af Subcatchment2: Off Site 2 Runoff Area=6.790 ac 20.00% Impervious Runoff Depth=4.01" Flow Length=1,890' Tc=27.2 min CN=78 Runoff=19.01 cfs 2.272 af Subcatchment3: Existing-on Site Runoff Area=11.800 ac 0.00% Impervious Runoff Depth=3.20" Flow Length=1,255' Tc=23.4 min CN=70 Runoff=27.87 cfs 3.146 af Reach 4: confluence Inflow=58.50 cfs 6.918 af Outflow=58.50 cfs 6.918 af Subcatchment5: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=3.81" Flow Length=1,468' Tc=27.6 min CN=76 Runoff=12.50 cfs 1.500 of Subcatchment6: Off Site 2 Runoff Area=6.790 ac 20.00% Impervious Runoff Depth=4.01" Flow Length=1,509' Tc=22.9 min CN=78 Runoff=20.48 cfs 2.272 af Subcatchment7: On Site Runoff Area=11.520 ac 0.00% Impervious Runoff Depth=4.44" Flow Length=998' Tc=13.2 min CN=82 Runoff=47.37 cfs 4.263 af Pond 8: Sand Filter Peak Elev=771.37' ftorage=58ols cf Inflow=47.37 cfs 4.263 af Outflow=24.67 cfs 4.242 af Reach 9: confluence Inflow=57.09 cfs 8.098 af Outflow=57.09 cfs 8.098 af Subcatchment 10: Onsite Bypass Runoff Area=0.280 ac 0.00% Impervious Runoff Depth=3.60" Tc=5.0 min CN=74 Runoff=1.23 cfs 0.084 af Total Runoff Area = 46.640 ac Runoff Volume = 15.037 af Average Runoff Depth = 3.87" 90.12% Pervious = 42.032 ac 9.88% Impervious = 4.608 ac 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 1: Off Site 1 Runoff = 12.06 cfs @ 12.38 hrs, Volume= 1.500 af, Depth= 3.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 540 0.0185 2.19 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 29.7 1,380 Total Subcatchment 1: Off Site 1 Hydrograph ■Runoff 137 12.06 cfs II-- 127 % I r nit carry I1DF 24.hrb1 '5 fr 11 / I I Rainfall=p.4p" Runoff Area=4.730 ac 9Y 1 1— —I2uriofli�tdr i lue -.510D-af I —12n p "- —Flow Leal gt 1,3S0'- _4 LL 6- CN=76 57/ 47 I I I I I 121416 18 2 l( 0 2 4 6 8 10 0 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 2: Off Site 2 Runoff = 19.01 cfs @ 12.34 hrs, Volume= 2.272 af, Depth= 4.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.6 790 0.0310 2.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.2 1,890 Total Subcatchment 2: Off Site 2 Hydrograph 21, ■Runoff 20 V 19.01 cfs — I-- 19VC 1 7 7 ra-ite Quarry 119E 24rtt hr 51 64r- 18V I nfLitopA .. 17= 161 - Runoff Area=6J90ac_ 151 -2uinofi l urne 2173--oaf- 14V 13V I RLno _ep =4.01" 121 -Flow Lengt 1,890'- 11� fi fi I I 1c_ • min 7_ // 6V I _1 _H L 1 LI 1 1 3_ 2= 12/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 3: Existing - on Site Runoff = 27.87 cfs @ 12.30 hrs, Volume= 3.146 af, Depth= 3.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description 11.800 70 Woods, Good, HSG C 11.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.9 100 0.0400 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.4 915 0.0220 2.39 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 23.4 1,255 Total Subcatchment 3: Existing - on Site �t Hydrograph / I - Runoff 30- 27.87 cfs 28/ _Granit�S,l!darry IDF 24Jhr 51 26/1Ra!nf =p.0" 24: Runoff Area=1t800_ac_ 22 —Runoff Volume=3.1466of 20/ unlf f Dep 3 " 18= _Flow Lengt =1,255'- p 3 16 / A 1$c=23.4 min - LL 14- - CN=70- 12/ 10 8/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 34 Summary for Reach 4: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth = 3.56" for 50-yr event Inflow = 58.50 cfs @ 12.32 hrs, Volume= 6.918 af Outflow = 58.50 cfs @ 12.32 hrs, Volume= 6.918 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 4: confluence Hydrograph / 1 r fi t I rt 1 11 rr I ❑Inflow 65- / I c cn rf ❑Outflow so� 58.50 cfs I_I i i ifio iv iiJe— 313_toLaC 55;-/ , I - / 1 + I-I I— I 1— I H 4 —1 50 -' 45;-/ / - 40:/ 4— I-I 4 I- 14 # I - 4 I-1 0 35_ T I 14 1 14 14 I 0 30- LL 25- 0 20- 7 / I 15 "Iiir 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 5: Off Site 1 Runoff = 12.50 cfs @ 12.35 hrs, Volume= 1.500 af, Depth= 3.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 628 0.0080 5.32 9.40 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 27.6 1,468 Total Subcatchment 5: Off Site 1 / Hydrograph 14J ■Runoff 137 12.50 cfs 12--/ —[ 6ralnite aarry l6F 24-1hr�'1 5 r RaCnfatl= -p.._ Runoff Area=4730-ac- 10- / t J 12unof'alolume l.510D-raf- 9-/ Runoff Dep =�3.811" w 8: Flow Length 1,468 / lac= 7.$ min LL 6 C,N-76 4-/ = ice ' 1-' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 6: Off Site 2 Runoff = 20.48 cfs @ 12.28 hrs, Volume= 2.272 af, Depth= 4.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 409 0.1830 25.43 44.94 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 22.9 1,509 Total Subcatchment 6: Off Site 2 Hydrograph 22= — ■Runoff 20.48 cfs I � - II-- 21 rt 20� _6rniteS iaar'ry IIQF 2 r 51 '5 r- - 19 18VC -i 1f!"=P 4T- 17-/- - _ Runoff Area=6.790 ac_ 16 V- -2utnofi I w e 2173--af- 15 14� — - Runor-f ep iL i" w 13 — —Flow Lengt 1,509'- 12 11= Tc=Z2.9 min LL 10_ — �i 5 — 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 7: On Site Runoff = 47.37 cfs @ 12.14 hrs, Volume= 4.263 af, Depth= 4.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description * 11.520 82 11.520 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 100 0.0400 0.16 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 134 0.0100 7.20 22.62 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 1.2 524 0.0188 7.22 8.86 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 13.2 998 Total Subcatchment 7: On Site Hydrograph -/ — ■Runoff 50_ 47.37 cfs -6rair to arty 83F 2 r 50-f r 45= / - Ranfa4=8.49" 40-" / Runoff Area=11.520 ac -Runoff#olume2163 of 35 / R not _ep =�L.4�4" 1 30� / low Length=998' 0 25_ / Tc=13.2 min- LL 20--/ F C12— 15- 10Y 5--/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 38 Summary for Pond 8: Sand Filter Inflow Area = 11.520 ac, 0.00% Impervious, Inflow Depth = 4.44" for 50-yr event Inflow = 47.37 cfs @ 12.14 hrs, Volume= 4.263 af Outflow = 24.67 cfs @ 12.41 hrs, Volume= 4.242 af, Atten= 48%, Lag= 16.3 min Primary = 24.67 cfs @ 12.41 hrs, Volume= 4.242 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 771.37' @ 12.41 hrs Surf.Area= 18,765 sf Storage= 58,015 cf Plug-Flow detention time= 126.0 min calculated for 4.237 af(99% of inflow) Center-of-Mass det. time= 124.2 min ( 940.3 - 816.1 ) Volume Invert Avail.Storage Storage Description #1 767.20' 75,114 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 767.20 6,302 0 0 768.00 10,507 6,724 6,724 769.00 14,029 12,268 18,992 770.00 15,987 15,008 34,000 771.00 18,001 16,994 50,994 772.00 20,072 19,037 70,030 772.25 20,599 5,084 75,114 Device Routing Invert Outlet Devices #1 Primary 764.75' 30.0" Round Culvert L= 30.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 764.75' / 764.60' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean FInv\ Area= 4.91 sf #2 Device 1 768.45' 18.0" W x 36.0" H Ve Freeboard during IO #3 Device 1 771.50' 48.0" x 48.0" Horiz. rif 50-year storm = Limited to weir flow at Io j0 88' #4 Primary 767.20' Sand Filter Head (feet) 0.00 1. 0 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0 280 0.400 0.520 0.640 0.770 0.890 Primate OutFlow Max=24.65 cfs @ 12.41 hrs HW=771.37' (Free Discharge) I -1=Culvert (I-asses L3. 39 cts of b4./5 cts potential tlow) 12=Orifice/Grate (Orifice Controls 23.99 cfs @ 5.48 fps) 3=Orifice/Grate ( Controls 0.00 cfs) -4=Sand Filter (Custom Controls 0.66 cfs) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 39 Pond 8: Sand Filter Hydrograph I 1 1 1 1 1 1 1 0 Inflow 47.37 cfs ❑Primary 50_ / 4- I Mr li flow 1 e- - I5i0 & 45� , 4 ]— I / ' fieicl Eie1:,371~ 40 1 ttc4age=58,015—c1 35 2 / / a 301/ o - 1 24.67 cfs 0 251 i 20- 15-" / 1 1 I 10- 1 1 1 51-/ / / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 40 Summary for Reach 9: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth > 4.17" for 50-yr event Inflow = 57.09 cfs @ 12.32 hrs, Volume= 8.098 af Outflow = 57.09 cfs @ 12.32 hrs, Volume= 8.098 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 9: confluence Hydrograph �,7 f1Q rf ❑Inflow El Outflow 60- ,— 7 - 57.09 cfs — 4 Ifio4w ►r�e�a 557 — I r — I 7 7 45� 40-' o 35 a 30- 25- 20- 15_ / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 10: Onsite Bypass Runoff = 1.23 cfs @ 12.03 hrs, Volume= 0.084 af, Depth= 3.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Area (ac) CN Description 0.280 74 >75% Grass cover, Good, HSG C 0.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10: Onsite Bypass Hydrograph 0 Runoff 1.23 cfs Granite Quarry IDF 24-hr S1 50-yr Rainfall=6.49" Runoff Area=0.280 ac 1- Runoff Volume=0.084 af Runoff Depth=3.60" - - Tc=5.0 min CN=74 o ✓ 0 it 0/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD - - - - •- -- Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=4.45" Flow Length=1,380' Tc=29.7 min CN=76 Runoff=13.62 cfs 1.756 af Subcatchment2: Off Site 2 Runoff Area=6.790 ac 20.00% Impervious Runoff Depth=4.67" Flow Length=1,890' Tc=27.2 min CN=78 Runoff=21.30 cfs 2.645 af Subcatchment3: Existing-on Site Runoff Area=11.800 ac 0.00% Impervious Runoff Depth=3.80" Flow Length=1.255' Tc=23.4 min CN=70 Runoff=32.02 cfs 3.739 af Reach 4: confluence Inflow=66.44 cfs 8.139 af Outflow=66.44 cfs 8.139 af Subcatchment5: Off Site 1 Runoff Area=4.730 ac 20.00% Impervious Runoff Depth=4.45" Flow Length=1,468' Tc=27.6 min CN=76 Runoff=14.09 cfs 1.756 af Subcatchment6: Off Site 2 Runoff Area=6.790 ac 20.00% Impervious Runoff Depth=4.67" Flow Length=1,509' Tc=22.9 min CN=78 Runoff=22.93 cfs 2.645 af Subcatchment7: On Site Runoff Area=11.520 ac 0.00% Impervious Runoff Depth=5.12" Flow Length=998' Tc=13.2 min CN=82 Runoff=52.07 cfs 4.918 af Pond 8: Sand Filter Peak Elev=771.61' Storage=62,652 cf Inflow=52.07 cfs 4.918 af Outflow=29.48 cfs 4.897 af Reach 9: confluence Inflow=65.73 cfs 9.396 af Outflow=65.73 cfs 9.396 af Subcatchment 10: Onsite Bypass Runoff Area=0.280 ac 0.00% Impervious Runoff Depth=4.23" Tc=5.0 min CN=74 Runoff=1.37 cfs 0.099 af Total Runoff Area = 46.640 ac Runoff Volume = 17.557 af Average Runoff Depth = 4.52" 90.12% Pervious = 42.032 ac 9.88% Impervious = 4.608 ac 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 1: Off Site 1 Runoff = 13.62 cfs @ 12.37 hrs, Volume= 1.756 af, Depth= 4.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 540 0.0185 2.19 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 29.7 1,380 Total Subcatchment 1: Off Site 1 Hydrograph 15 ■Runoff 14 13.62 cfs G i u DF 24-hr yr- 13= / I - - Rainf if 7 "- 12- / Runoff Area 4.730_ac- 11 Runoff_Volurne 1.756_ef_ Runoff Depth=4.45" 9/ I // I lover Ling =�,3�E 0' 8_ Tc=29. min C�N46 o 4- 3- I 1-' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 2: Off Site 2 Runoff = 21.30 cfs @ 12.34 hrs, Volume= 2.645 af, Depth= 4.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.6 790 0.0310 2.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.2 1,890 Total Subcatchment 2: Off Site 2 Hydrograph 23_. ■Runoff 2= J JJ JJ I 21.3jcfs 221 �Gr�iteua�ry IDf 2 r i 10iyr- 20_ mf 117.2p" 18= / 19_�I Runoff A ea=6.790 ac_ - 17 -- RU-nof-VoIutne=2.645-af- 16= Runoff Depth=4:67" 13�14= / TC=27 -rnin 12v1 511� I � � � N18_ LL 10 I I 9� 8V 74/1 o-mil i /i......... 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30��/ 32// 34��/ 36l�/ 38�/ 40// 42��/ 44 4'6 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 3: Existing - on Site Runoff = 32.02 cfs @ 12.29 hrs, Volume= 3.739 af, Depth= 3.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description 11.800 70 Woods, Good, HSG C 11.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.9 100 0.0400 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.4 915 0.0220 2.39 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 23.4 1,255 Total Subcatchment 3: Existing - on Site Hydrograph =/ t Runoff 34= 32.02 cfs JJ l J 32/ I r/ - Granite ua y IDF 24 hr S110DJyr_ 30= _ _ .. I Resin 7 28/ / H unoff Area= 1. 09 c- 26 - ✓ - T -F Runof-Voiiirne=3.p9Haf- 24- / Runoff Depth=3:80" N 22/ / — H- H 1 4 I— 1 —I l#Io L�,gih=i65'— 21s/1 / T —L �c=23.4-rrin — LL 16/ // 0= 14/ — I I � 11 1 12/ 10/r — 1 T 71 T T IT T 1 - 6 / I 4/1 L 2= 0ti�44f�����������1/,,,;,,,,;, ,, ,, , , , � 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 46 Summary for Reach 4: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth = 4.19" for 100-yr event Inflow = 66.44 cfs @ 12.32 hrs, Volume= 8.139 af Outflow = 66.44 cfs @ 12.32 hrs, Volume= 8.139 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 4: confluence Hydrograph ❑Inflow IRA dd rf I ❑Outflow 70V 66.44 cfs �T l� Iano_w /AI" =z3310 c 65V I I I _L 1_ I _1 601/ 55v r / 50/ i 45V a � 40� c 35V 307" 25V ,r ALIAL 20?� 15 2 I fi l I 10- A�/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 5: Off Site 1 Runoff = 14.09 cfs @ 12.35 hrs, Volume= 1.756 af, Depth= 4.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description * 4.730 76 1 acre lots, 20% imp, HSG C 3.784 80.00% Pervious Area 0.946 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 1.3 260 0.0460 3.45 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 480 0.0230 2.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 628 0.0080 5.32 9.40 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 27.6 1,468 Total Subcatchment 5: Off Site 1 Hydrograph / 1 ■Runoff 15= 14.09 cfs IJ JJ 14/ Gr ite ua ry IDF 24-hr S1 100iyr 13/ _ / R inf II 7.2�2" 12= / Runoff Area=4.730 ac 11/ I I / ROno ff Vlolurne=1.756 af 10/ v��n pth=4�5"- / gam= 8' 8/ �� Lin / LL 7J 5Y � I- � I 3/ I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 6: Off Site 2 Runoff = 22.93 cfs @ 12.27 hrs, Volume= 2.645 af, Depth= 4.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description * 6.790 78 1 acre lots, 20% imp, HSG C 5.432 80.00% Pervious Area 1.358 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.0 100 0.0200 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 2.5 410 0.0290 2.74 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 6.1 590 0.0100 1.61 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 409 0.1830 25.43 44.94 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 22.9 1,509 Total Subcatchment 6: Off Site 2 Hydrograph 25 l J- _ ■Runoff 224 2 22.9 cfs 23 - Granite @ua>�ry DF 24hr 51 • I:K yr 21 20 t -4 - ;9 C _ —Runoff Area=fi.790 ac 18 -4 1= I/ — 1 -4 Wolff Vlolurne 2.1H.S of 17 _ _ Runoff-Depth=&67" 16 15 0I I-4ngr�- ,sd9' 13 — I / fi —Tc=22. min 012 0 $ LL11 I/ I 4 I - I I I— I 10 I— o /// ,,; 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment 7: On Site Runoff = 52.07 cfs @ 12.14 hrs, Volume= 4.918 af, Depth= 5.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description * 11.520 82 11.520 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 100 0.0400 0.16 Sheet Flow, Grass: Dense n= 0.240 P2= 3.34" 1.1 240 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.3 134 0.0100 7.20 22.62 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 1.2 524 0.0188 7.22 8.86 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 13.2 998 Total Subcatchment 7: On Site Hydrograph -/ — — — — ■Runoff 55- 52.07 cfs ite�uatry �DF 24hr 5fi • 00-yr- 50--/ 45 Runoff Area=11.620 ac 40--/ / 7 ROinoff Volurne4.118]af- Runoff Depth=5.12"_ 35" Flow Lenlgth968' w _ 30: 1 Tc3. __--mLLin N=82- LL 25Y 203 15_� 10- 5-0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Pond 8: Sand Filter Inflow Area = 11.520 ac, 0.00% Impervious, Inflow Depth = 5.12" for 100-yr event Inflow = 52.07 cfs @ 12.14 hrs, Volume= 4.918 af Outflow = 29.48 cfs @ 12.38 hrs, Volume= 4.897 af, Atten= 43%, Lag= 14.4 min Primary = 29.48 cfs @ 12.38 hrs, Volume= 4.897 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 771.61' @ 12.38 hrs Surf.Area= 19,269 sf Storage= 62,652 cf Plug-Flow detention time= 116.1 min calculated for 4.891 af(99% of inflow) Center-of-Mass det. time= 114.7 min ( 928.1 - 813.4 ) Volume Invert Avail.Storage Storage Description #1 767.20' 75,114 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 767.20 6,302 0 0 768.00 10,507 6,724 6,724 769.00 14,029 12,268 18,992 770.00 15,987 15,008 34,000 771.00 18,001 16,994 50,994 772.00 20,072 19,037 70,030 772.25 20,599 5,084 75,114 Device Routing Invert Outlet Devices #1 Primary 764.75' 30.0" Round Culvert L= 30.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 764.75' / 764.60' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 4.91 sf #2 Device 1 768.45' 18.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 #3 Device 1 771.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Primary 767.20' Sand Filter Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.280 0.400 0.520 0.640 0.770 0.890 < .Freeboard during p Primary OutFlow Max=29.32 cfs @ 12.38 hr HW=771.61' ((Free Disch 1=Culvert (Passes 28.63 cfs of 55.98 cfs LCIILIdI HOW) 100-yr = 0.64' 12=Orifice/Grate (Orifice Controls 26.73 cfs @ 5.94 fps) 3=Orifice/Grate (Weir Controls 1.89 cfs @ 1.08 fps) -4=Sand Filter (Custom Controls 0.69 cfs) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 51 Pond 8: Sand Filter Hydrograph / — I _ 0 Inflow �/ 152.07 cfs I ❑Primary 55 A 4 I i ioiN itrle�a ='I 115iCi a6 501/ / I— fi fi Oe I E1efi 7711 11' 45:-/ zStdr &=62,61521 cif 40-/ i 351/ , 1 1 1 1 1 1 1 1 1 3 301/ , I 29.4s cfs I I 4 4 41 4 1 1 4 1 o LL 25� T rt 4 I —[ I I I JIl / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 52 Summary for Reach 9: confluence Inflow Area = 23.320 ac, 9.88% Impervious, Inflow Depth > 4.84" for 100-yr event Inflow = 65.73 cfs @ 12.34 hrs, Volume= 9.396 af Outflow = 65.73 cfs @ 12.34 hrs, Volume= 9.396 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach 9: confluence Hydrograph L I _1 H I-I I ❑Inflow I RR 7'1 rf r,l I ❑Outflow 65.73 cfs 654 V 604 1 4 1 - 1 1 55/ / 50/ 45 -/ + I-I 4 I- I 1 H 46 40� c 35- 30V z-- fi l I � 1 —L t1 —F 25/ f / 20/ // 1—I H 1— I H H H 154 � � I I —L 10 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 20231011 Stoneglen Sand Filter REV Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Prepared by HP Inc. Printed 10/12/2023 HydroCAD® 10.00-26 s/n 10469 ©2020 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment 10: Onsite Bypass Runoff = 1.37 cfs @ 12.03 hrs, Volume= 0.099 af, Depth= 4.23" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Area (ac) CN Description 0.280 74 >75% Grass cover, Good, HSG C 0.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10: Onsite Bypass Hydrograph / 0 Runoff 1.37 cfs Granite Quarry IDF 24-hr S1 100-yr Rainfall=7.22" Runoff Area=0.280 ac Runoff Volume=0.099 of 1- / Runoff Depth=4.23" Tc=5.0 min / CN=74 o y_ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Storm Drainage System Design • Storm Drain Pipe Capacity Calculations • Inlet Spread Calculations • Rip Rap Apron Calculations • Buoyancy Calculation Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan OT 100 Note: 'Rim' elevations noted in Hydraflow are as 27 follows: JB 101 OT 1A Catch basin - Back of Curb El. 26 19 Open Throat Catch Basin - Throat El. 18 ��� Drop inlet: Top of Grate 25 JB 102A DI 3A 27 0 21 g 1®CB JB 102 DCB 5 CB 6 DI 14A 24 \4 OT 19 DCB 17 28 22I D114 Outfall • /tt58tfall 13 5 CB 8 12 Outfall DI 15A CB 9 OT 7B 4 6 Outfall 1 2 3 CB 10 DCB 12 8 CB 11 CB 7A DI 11A 9 Outfall OT 1 10 DCB 13 11 OT 13A 23 OT 200 Project File: Stoneglen HydroFlow w off site.stm Number of lines:28 Date: 9/18/2023 Storm Sewers v2021 00 Storm Sewer Inventory Report Pagel Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) 1(ac) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 1 End 38.640 52.138 Comb 0.00 I 0.61 0.60 5.0 768.40 1.14 768.84 24 Cir 0.013 1.18 776.37 FES 12A-DCB12 2 1 78.000 -48.485 Comb 0.00 0.11 0.60 5.0 768.84 1.00 769.62 24 Cir 0.013 1.50 778.40 DCB 12-CB11 3 2 56.650 -38.432 Comb 0.00 0.36 0.60 5.0 770.81 1.91 771.89 15 Cir 0.013 0.50 778.80 CB 11-CB 10 4 3 133.339 0.000 Comb 0.00 0.21 0.60 5.0 774.24 2.00 776.91 15 Cir 0.013 0.50 780.37 CB 10-CB 9 5 4 58.732 8.905 Comb 0.00 0.32 0.60 5.0 776.91 1.65 777.88 15 Cir 0.013 1.49 781.40 CB 9-CB 8 6 5 150.740 81.756 Comb 0.00 0.49 0.60 5.0 777.88 1.33 779.88 15 Cir 0.013 1.50 784.74 CB 8-CB 7A 7 6 123.850 -90.143 DrCrb 0.00 1.45 0.50 11.7 779.88 0.50 780.50 15 Cir 0.013 1.00 784.00 CB 7A -OT 7B 8 2 29.590 88.909 DrGrt 0.00 0.73 0.60 5.0 770.12 2.03 770.72 18 Cir 0.013 0.98 777.50 CB 11-DI 11A 9 8 192.580 -36.931 DrCrb 0.00 0.91 0.60 5.0 770.97 3.10 776.94 15 Cir 0.013 1.15 783.50 DI 11A-OT 11B 10 9 145.946 -46.323 Comb 0.00 0.73 0.60 5.0 776.94 1.00 778.40 15 Cir 0.013 0.50 786.00 OT 11B-DCB13 11 10 160.110 14.616 DrCrb 0.00 0.31 0.60 5.0 778.65 0.79 779.91 15 Cir 0.013 1.00 786.50 DCB 13-01 13A 12 End 33.386 -32.996 DrGrt 0.00 0.33 0.60 5.0 767.20 0.51 767.37 24 Cir 0.013 0.50 773.00 FES 15-DI 15A 13 12 134.000 -0.088 DrGrt 0.00 0.47 0.60 5.0 767.77 0.50 768.44 24 Cir 0.013 1.50 773.50 DI 15A-DI 14 14 13 135.000 -89.881 DrGrt 0.00 0.16 0.60 5.0 768.44 0.50 769.12 24 Cir 0.013 1.50 773.50 0114-0114A 15 14 67.820 87.903 Comb 0.00 0.28 0.60 5.0 769.12 0.50 769.46 24 Cir 0.013 1.50 773.92 DI 14A-DCB 4 16 15 23.430 -86.423 Comb 0.00 0.28 0.60 5.0 769.46 0.51 769.58 24 Cir 0.013 2.10 773.92 DCB 4-DCB 3 17 16 54.000 80.396 Comb 0.00 0.38 0.60 5.0 769.58 0.50 769.85 24 Cir 0.013 1.50 774.67 DCB 3-DCB 2 18 17 20.430 -14.385 DrGrt 0.00 0.27 0.60 5.0 770.35 0.54 770.46 18 Cir 0.013 0.78 774.10 DCB 2-DI 1 19 18 103.820 27.642 DrCrb 0.00 0.63 0.60 5.0 770.46 0.50 770.98 15 Cir 0.013 1.00 774.50 DI 1-OT 1A 20 16 18.830 8.724 DrGrt 0.00 0.25 0.60 5.0 770.33 6.21 771.50 15 Cir 0.013 1.00 773.75 DCB 3-DI 3A 21 17 67.248 98.775 Comb 0.00 0.36 0.60 5.0 770.59 1.98 771.92 15 Cir 0.013 1.00 775.42 DCB 2-CB 6 22 End 26.830 -85.288 Comb 0.00 0.84 0.60 5.0 767.20 8.76 769.55 15 Cir 0.013 1.00 773.05 FES 16-DCB 17 23 End 409.000 46.039 DrCrb 0.00 6.78 0.50 22.6 780.50 1.10 785.00 24 Cir 0.013 1.00 788.00 FES 201 - OT 200 Project File: Stoneglen HydroFlow w off site.stm Number of lines 28 Date: 9/18/2023 Storm Sewers v2021 00 Storm Sewer Inventory Report Page2 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 24 End 148.320 -121.340 MH 0.00 0.00 0.00 0.0 766.50 0.75 767.61 18 Cir 0.013 1.00 776.98 FES 103-JB 102 25 24 200.050 98.828 MH 0.00 0.00 0.00 0.0 767.61 0.75 769.11 18 Cir 0.013 0.15 775.60 JB 102-JB 102A 26 25 248.510 1.099 MH 0.00 0.00 0.00 0.0 769.11 0.75 770.97 18 Cir 0.013 0.46 775.45 JB 102A-JB 101 27 26 110.100 -23.861 DrCrb 0.00 4.77 0.50 25.6 770.97 0.74 771.78 18 Cir 0.013 1.00 775.00 JB 101 -OT100 28 End 53.500 -135.490 DrCrb 0.00 0.53 0.60 5.0 769.00 0.50 769.27 15 Cir 0.013 1.00 772.00 FES18-OT 19 Project File: Stoneglen HydroFlow w off site.stm Number of lines 28 Date: 9/18/2023 Storm Sewers v2021.00 Storm Sewer Summary Report Pagel Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 FES 12A-DCB12 19.52 24 Cir 38.640 768.40 768.84 1.139 770.56 770.84 n/a 771.71 i End Combination 2 DCB 12-CB11 17.53 24 Cir 78.000 768.84 769.62 1.000 771.71* 772.17* n/a 772.19 i 1 Combination 3 CB 11-CB 10 8.44 15 Cir 56.650 770.81 771.89 1.906 772.19 773.14 n/a 774.60 i 2 Combination 4 CB 10-CB 9 7.26 15 Cir 133.339 774.24 776.91 2.002 775.08 777.99 n/a 779.13 i 3 Combination 5 CB 9-CB 8 6.58 15 Cir 58.732 776.91 777.88 1.652 779.13* 779.74* n/a 779.85 i 4 Combination 6 CB 8-CB 7A 5.54 15 Cir 150.740 777.88 779.88 1.327 779.85 780.87 n/a 781.52 i 5 Combination 7 CB 7A -OT 7B 3.94 15 Cir 123.850 779.88 780.50 0.501 781.52* 781.98* 0.16 782.14 6 DropCurb 8 CB 11-DI 11A 11.34 18 Cir 29.590 770.12 770.72 2.028 772.19* 772.54* n/a 773.35 i 2 DropGrate 9 DMA-OT 11B 8.25 15 Cir 192.580 770.97 776.94 3.100 773.35 778.07 n/a 779.56 i 8 DropCurb 10 OT 11B-DCB13 4.40 15 Cir 145.946 776.94 778.40 1.000 779.56* 780.23* 0.10 780.33 9 Combination 11 DCB 13-01 13A 1.31 15 Cir 160.110 778.65 779.91 0.787 780.33 780.48 n/a 780.54 i 10 DropCurb 12 FES 15-DI 15A 14.43 24 Cir 33.386 767.20 767.37 0.509 770.56* 770.70* 0.16 770.86 End DropGrate 13 DI 15A-DI 14 13.03 24 Cir 134.000 767.77 768.44 0.500 770.86* 771.30* 0.40 771.71 12 DropGrate 14 0114-0114A 11.04 24 Cir 135.000 768.44 769.12 0.504 771.71* 772.03* 0.29 772.32 13 DropGrate 15 DI 14A-DCB 4 10.36 24 Cir 67.820 769.12 769.46 0.501 772.32* 772.46* 0.25 772.71 14 Combination 16 DCB 4-DCB 3 9.18 24 Cir 23.430 769.46 769.58 0.512 772.71* 772.75* 0.28 773.03 15 Combination 17 DCB 3-DCB 2 6.94 24 Cir 54.000 769.58 769.85 0.500 773.03* 773.08* 0.11 773.19 16 Combination 18 DCB 2-DI 1 3.81 18 Cir 20.430 770.35 770.46 0.539 773.19* 773.22* 0.06 773.28 17 DropGrate 19 DI 1-OT 1A 2.67 15 Cir 103.820 770.46 770.98 0.501 773.28* 773.45* 0.07 773.53 18 DropCurb 20 DCB 3-DI 3A 1.06 15 Cir 18.830 770.33 771.50 6.213 773.03* 773.03* 0.01 773.05 16 DropGrate 21 DCB 2-CB 6 1.52 15 Cir 67.248 770.59 771.92 1.978 773.19* 773.23* 0.02 773.26 17 Combination 22 FES 16-DCB 17 3.55 15 Cir 26.830 767.20 769.55 8.759 770.56 770.61 n/a 770.69 i End Combination 23 FES 201 - OT 200 13.65 24 Cir 409.000 780.50 785.00 1.100 781.83 786.33 n/a 787.12 i End DropCurb 24 FES 103-JB 102 8.99 18 Cir 148.320 766.50 767.61 0.748 767.66 768.87 n/a 769.64 i End Manhole Project File: Stoneglen HydroFlow w off site.stm Number of lines:28 Run Date: 9/18/2023 NOTES: Return period= 10 Yrs. ; *Surcharged(HGL above crown). ; i-Inlet control. Storm Sewers v2021.00 Storm Sewer Summary Report Page2 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 25 JB 102-JB 102A 8.99 18 Cir 200.050 767.61 769.11 0.750 769.64* 771.10* n/a 771.14 i 24 Manhole 26 JB 102A-JB 101 8.99 18 Cir 248.510 769.11 770.97 0.748 771.14* 772.96* n/a 773.00 i 25 Manhole 27 JB 101 -OT100 8.99 18 Cir 110.100 770.97 771.78 0.736 773.00* 773.81* n/a 773.81 i 26 DropCurb 28 FES18-OT 19 2.24 15 Cir 53.500 769.00 769.27 0.505 770.56* 770.62* 0.05 770.68 End DropCurb Project File: Stoneglen HydroFlow w off site.stm Number of lines:28 Run Date: 9/18/2023 NOTES: Return period= 10 Yrs. ;*Surcharged(HGL above crown). ; i-Inlet control. Storm Sewers v2021.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 38.640 0.61 6.23 0.60 0.37 3.59 5.0 11.7 5.4 19.52 24.14 6.21 24 1.14 768.40 768.84 770.56 770.84 769.20 776.37 FES 12A-DCB12 2 1 78.000 0.11 5.62 0.60 0.07 3.23 5.0 11.7 5.4 17.53 22.62 5.58 24 1.00 768.84 769.62 771.71 772.17 776.37 778.40 DCB 12-CB11 3 2 56.650 0.36 2.83 0.60 0.22 1.55 5.0 11.7 5.4 8.44 8.92 6.88 15 1.91 770.81 771.89 772.19 773.14 778.40 778.80 CB 11-CB 10 4 3 133.339 0.21 2.47 0.60 0.13 1.34 5.0 11.7 5.4 7.26 9.14 7.36 15 2.00 774.24 776.91 775.08 777.99 778.80 780.37 CB 10-CB 9 5 4 58.732 0.32 2.26 0.60 0.19 1.21 5.0 11.7 5.4 6.58 8.30 5.36 15 1.65 776.91 777.88 779.13 779.74 780.37 781.40 CB 9-CB 8 6 5 150.740 0.49 1.94 0.60 0.29 1.02 5.0 11.7 5.4 5.54 7.44 4.90 15 1.33 777.88 779.88 779.85 780.87 781.40 784.74 CB 8-CB 7A 7 6 123.850 1.45 1.45 0.50 0.73 0.73 11.7 11.7 5.4 3.94 4.57 3.21 15 0.50 779.88 780.50 781.52 781.98 784.74 784.00 CB 7A -OT 7B 8 2 29.590 0.73 2.68 0.60 0.44 1.61 5.0 5.0 7.1 11.34 14.95 6.42 18 2.03 770.12 770.72 772.19 772.54 778.40 777.50 CB 11-DI 11A 9 8 192.580 0.91 1.95 0.60 0.55 1.17 5.0 5.0 7.1 8.25 11.37 6.91 15 3.10 770.97 776.94 773.35 778.07 777.50 783.50 DI 11A-OT 11B 10 9 145.946 0.73 1.04 0.60 0.44 0.62 5.0 5.0 7.1 4.40 6.46 3.59 15 1.00 776.94 778.40 779.56 780.23 783.50 786.00 OT 11B-DCB13 11 10 160.110 0.31 0.31 0.60 0.19 0.19 5.0 5.0 7.1 1.31 5.73 1.74 15 0.79 778.65 779.91 780.33 780.48 786.00 786.50 DCB 13-01 13A 12 End 33.386 0.33 3.41 0.60 0.20 2.05 5.0 5.0 7.1 14.43 16.14 4.59 24 0.51 767.20 767.37 770.56 770.70 767.60 773.00 FES 15-DI 15A 13 12 134.000 0.47 3.08 0.60 0.28 1.85 5.0 5.0 7.1 13.03 15.99 4.15 24 0.50 767.77 768.44 770.86 771.30 773.00 773.50 DI 15A-DI 14 14 13 135.000 0.16 2.61 0.60 0.10 1.57 5.0 5.0 7.1 11.04 16.05 3.51 24 0.50 768.44 769.12 771.71 772.03 773.50 773.50 DI 14-01 14A 15 14 67.820 0.28 2.45 0.60 0.17 1.47 5.0 5.0 7.1 10.36 16.02 3.30 24 0.50 769.12 769.46 772.32 772.46 773.50 773.92 DI 14A-DCB 4 16 15 23.430 0.28 2.17 0.60 0.17 1.30 5.0 5.0 7.1 9.18 16.19 2.92 24 0.51 769.46 769.58 772.71 772.75 773.92 773.92 DCB 4-DCB 3 17 16 54.000 0.38 1.64 0.60 0.23 0.98 5.0 5.0 7.1 6.94 15.99 2.21 24 0.50 769.58 769.85 773.03 773.08 773.92 774.67 DCB 3-DCB 2 18 17 20.430 0.27 0.90 0.60 0.16 0.54 5.0 5.0 7.1 3.81 7.71 2.15 18 0.54 770.35 770.46 773.19 773.22 774.67 774.10 DCB 2-DI 1 19 18 103.820 0.63 0.63 0.60 0.38 0.38 5.0 5.0 7.1 2.67 4.57 2.17 15 0.50 770.46 770.98 773.28 773.45 774.10 774.50 DI 1-0T 1 A 20 16 18.830 0.25 0.25 0.60 0.15 0.15 5.0 5.0 7.1 1.06 16.10 0.86 15 6.21 770.33 771.50 773.03 773.03 773.92 773.75 DCB 3-DI 3A 21 17 67.248 0.36 0.36 0.60 0.22 0.22 5.0 5.0 7.1 1.52 9.08 1.24 15 1.98 770.59 771.92 773.19 773.23 774.67 775.42 DCB 2-CB 6 22 End 26.830 0.84 0.84 0.60 0.50 0.50 5.0 5.0 7.1 3.55 19.11 3.05 15 8.76 767.20 769.55 770.56 770.61 768.62 773.05 FES 16-DCB 17 Project File: Stoneglen HydroFlow w off site.stm Number of lines:28 Run Date: 9/18/2023 NOTES:Intensity=72.63/(Inlet time+12.70)"0.81; Return period=Yrs. 10 ; Pipe travel time suppressed. ; c=cir e=ellip b=box Storm Sewers v2021.00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 23 End 409.000 6.78 6.78 0.50 3.39 3.39 22.6 22.6 4.0 13.65 23.72 6.15 24 1.10 780.50 785.00 781.83 786.33 780.50 788.00 FES 201 - OT 20 24 End 148.320 0.00 4.77 0.00 0.00 2.39 0.0 25.6 3.8 8.99 9.08 5.89 18 0.75 766.50 767.61 767.66 768.87 768.90 776.98 FES 103-JB 102 25 24 200.050 0.00 4.77 0.00 0.00 2.39 0.0 25.6 3.8 8.99 9.09 5.09 18 0.75 767.61 769.11 769.64 771.10 776.98 775.60 JB 102-JB 102A 26 25 248.510 0.00 4.77 0.00 0.00 2.39 0.0 25.6 3.8 8.99 9.08 5.09 18 0.75 769.11 770.97 771.14 772.96 775.60 775.45 JB 102A-JB 101 27 26 110.100 4.77 4.77 0.50 2.39 2.39 25.6 25.6 3.8 8.99 9.01 5.09 18 0.74 770.97 771.78 773.00 773.81 775.45 775.00 JB 101 -OT100 28 End 53.500 0.53 0.53 0.60 0.32 0.32 5.0 5.0 7.1 2.24 4.59 1.83 15 0.50 769.00 769.27 770.56 770.62 0.00 772.00 FES18-OT 19 Project File: Stoneglen HydroFlow w off site.stm Number of lines:28 Run Date: 9/18/2023 NOTES:Intensity=72.63/(Inlet time+12.70)"0.81; Return period=Yrs. 10 ; Pipe travel time suppressed. ; c=cir e=ellip b=box Storm Sewers v2021.00 Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm as N co 7 7 7 C 7 C 7 C 7 E 7 E E C E C E C J C J C • C J O — J O- O— J o O— O— O— O co.O�OW �(OW SOON M6)6) �CO 00 N CO �O Elev. (ft) o w `�° co• comm `° '��� •M ��� o �mm °r°�� co N M r`cm co N_ +O -6 W O WWW WWW WWW M WWW M WWW in WWW cc, El cciE > ca .1= » as E > > as .E cu E » cu E > > coE » coE5 -) O s c, E ES co ESE a ESE co ESE o EE E co EE E co E E 798.00 798.00 791.00 791.00 784.00 - - 784.00 / / OLf-15" cou.50%. .A-15" @ . 777.00 777.00 3 770.00 — 58.732Lf-15"a1.65 to 770.00 — CR RCM I-lc"61 q1°/ — /t3.000Lt-z4"(Q 1.UU% 38,640Lf-24"@ 1.44% 763.00 763.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm 0 5 O c J O c J Q E J Q E J 0 0 W 6)0 ( r00 , CO Co CO — OWcd N 06) Elev. (ft) o '_ r, N r r`r- N CO r` r` co + W -- + W-- + W-- +CO W-- + L.T. O W W O W W N W W M W W co W ca E > > as E > ; as E > > cc E > > cc E > Q E cc Fe c c c E c E co E c E co E E 800.00 800.00 793.00 — • 793.00 786.00 —786.00 ._-----.----_.. 779.00 — — '^"' 2 i _ 14i9.110Lf i 5' w u.t —779.00 Q0% 3 Aplo 772.00 1�2 5�� 772.00 • 20.590Lf-18"@ 2.03% 765.00 765.00 0 50 100 150 200 250 300 350 400 450 500 550 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm N co v U) CO N. eo rn —03 5 c 5 c 5 c 5 c 5 c 5 c 5 c 5 c O C J O C J O C J O C J 0 C J OE J OE J O = J 0 O O O ' OI�I� ' 07 V ' OCV CV ' NCO CO ' NCO CO ' NLoLo ' 00 Co ' OCo O W N co• co co�MI� co •��V ao � O OVV co OU)U) co co.co co CO 7V•V• co �6) Elev. (ft) o w CO rcoco • hcco .cooco o hc�om or Nmm rn rmm v Nco� m N. N- +O -p W O W W W W W W coW W W M W W W M W LT;W W LT;W W W W W LT; a E > co E » co E > > co E > > co E > > co E > co E > co .1 >> tii O c co E c E co E c E co E c E co E c E co E ES co E c E co E c E co ES 784.00 784.00 780.00 - 780.00 776.00 / I f 776.00 U i EMT_ 772.00 — 772.00 _.._.._.._ o/ �� 103.820Lf 15" 0.50% 768.00 0.50 Y, 135. — 70 43(v f-1 R"Q 0 5 t% 768.00 �� 134.�nnl_f-24"L 54.000Lf-24"(a,,0.50% 23.43ULT-24"L U.b7% 07.820L1-24" £LD 0.50% 33.386Lf-24"C 0.51% 764.00 764.00 0 50 100 150 200 250 300 350 400 450 500 550 600 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm N 7 7 OE . 0 N co M LO O a) LC)co O M 6)O ccoo M • Elev. (ft) g 00 owww o Ww m E >: m E >: c7iEcc SEE 783.00 783.00 780.00 ' 780.00 777.00 777.00 774.00 774.00 771.00 1 „ @ 6.21% 771.00 18 g30Ii 768.00 768.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm N 7 C 7 o E J 0 rLr)O ' N N co co V a) O r 6)O N Elev. (ft) g . r- N.-• owww o Ww m E ,: m E 783.00 783.00 780.00 . 780.00 777.00 777.00 / 774.00 — —774.00 771.00 5 (-15"@ 1 92% • • 771.00 768.00 768.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm cia N N O N o o ' oLo o o -• oc• jai Elev. (ft) g w N r` o -ow o L.T. co 0 E co ES 784.00 784.00 780.00 780.00 776.00 776.00 772.00 772.00 768.00 ap i-�6" — • G�"�s" 768.00 764.00 764.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm fa co N 5' aw E O p O O � �• O 0 . O O O co Elev. (ft) g w 00 o r` o -ow •. Ww asE > ra E cooE u) EE 802.00 —802.00 797.00 797.00 792.00 792.00 • 787.00 —787.00 _ IV'@ 1.10°° 782.00 782.00 777.00 I 777.00 0 50 100 150 200 250 300 350 400 450 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm LU co cc - N N N N O C E O E E O E E O E E O O O O J O J O J Lo N-N-- J O co O coOO �!)• N O�� N co—� co' �00 W Q� O I� CO CO N-IN- co ^Cn 0) co 0 0 6) Lr),- Elev. (ft) OO w m N-co CO CO co N-CO CO CON o r s +O -p w ,- www co www In wwW I. L.T. coo E co EEE co EEE co ESE co EE 788.00 788.00 783.00 - - 783.00 • 778.00 • 778.00 ---\ 773.00 - - 773.00 ._._.___.. ---/ 0.7 rI :.510Lf 18 C� 768.00 ^ % 768.00 210.0.1 - Yo 14�320Lf- _ 110.100Lf-18"@ 0.74/o 763.00 763.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Stoneglen HydroFlow w off site.stm co co N p Lcq E J O r CD •O O ON O r• 6) L • 6) o -ow + ww mEj co E > 782.00 782.00 779.00 - • 779.00 776.00 776.00 773.00 773.00 770.00 770.00 53.500Lt-lb"(co u.5u% • ' 767.00 767.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Inlet Spread Calculations _C m m 0 00 Lo o o m 01 Z rn 00 lfD o Ln CO m a CO CO - Ln Q1 O- c-I rl ci N c-I rl N N N N 0 t co m N. O O Ol O O co Ol ~L co LIl O m Lfl l0 Co N LIl Lfl co N. o_ Lfl Ln 7 LD 7 LP N 00 Ln Lfl LD 00 co f6 co 04 CIA 0A 04 0A C C Ca Ca CO CO Ca CU CO f0 (6 f0 (6 f0 (6 C U U U V U o (n t/) (n L/1 (n L/1 0 0 0 O LL N c-I Lfl Cr) m lD LL N CDCDNI O O O O O O N U O O O O O O 0_ CO 0 LL 00 Ol Lfl rl N �--1 Lfl n n N N LL Ol CO Cr n 00 L!1 n lD lD rl O N C O• .0 4(770 > O U L.L 1.71. co N O N Lfl l0 L l Lfl n n N NI— LL r1 O Lc) Ol O L.n n l0 LO rl O • U a�J U r-1 rl O O O �--I rl ci O O rl N O O co H -o N C C O O LL — tr)OU O N O 0 co 00 0 0 0 NO ? O O O O O O U Vl Ll _O CON OLn co N CO N lD lD Ol O (n LL c-1 O O O O O c-1 c-1 O Otaa O N 3 C O N O 'L Q QN CU LU LU LU LU LU LU LU LU LU LU LU L O O O O O O O O O O O O if; 0 O 0 0.1 C — f6 _ T u = Q m 00 00 00 m N m c-I m l0 N NiN m co N Q t6 Q � C Cr O N m rn n a co rn 2 ° c r r1 m u m co °O U U m m U U U U oO U U — U U U co a 0 U Double Curb in Sag DCB2 Gutter - — Inlet Longitudinal Slope of Road: 0.010 (ft/ft) Inlet Location (Inlet in sag Cross-slope of Pavement: 0.020 (ft/ft) Percent Clogging: 50.000 (%) Ri Define Cross-slope of Gutter f 0.040 (ft/ft) Inlet Types Manning's Roughness: 0.015 I Equal-length combo 2 000 ( Grate Types Gutter Width: ft) I P - 1.7/8 Enter one of the following- Design Flow: 1.120 (cfs) Grate Width: f 2.000 (ft) r Width of Spread: 16.884 Grate Length: 6.000 (ft) ' (ftJ Compute unknown] Length of Inlet: 6.000 (ft) Curb Opening Height:(6.000 (in) Gutter Depression 0.480 (in) Local Depression: 11.5O0 (n) Area of Flow: 0.514 (ft"2) Eo(Gutter Flow to Total Flow): 0.663 Depth at Curb: 2.132 (in) Compute Inlet Data Parameter Value Lire: Perimeter 10.000 ft Effective Perimeter 5.000 ft Area 14.550 ft"2 Effective Area 7.275 ft"2 Depth at center of grate 0177 ft Computed Width of Spread at Sag 8.866 ft Flow type Weir Flow Efficiency 1 000 ALIA Double Curb in Sag DCB3 X Gutter- Inlet Longitudinal Slope of Road 0.010 (ft/ft) Inlet Location IInlet in sag Cross-slope of Pavement: 0.020 (ftlft) Percent Clogging: 50.000 (�) Define Cross-slope of Gutter 0.040 (fttft) Inlet Types M anning's Roughness: 0.015 I Equal-length combo r2,000 ( ) Grate Types Gutter Width: ft (P- 1-7/8 Enter one of the following: Design Flow: 0.670 Grate width: 2.000 (ft) ids) Width of Spread: 5.498 (ft) Grate Length: 6.000 (ft) Compute unknown I Length of Inlet: 6.000 (ft) Curb Opening Height: 6.000 (in) Gutter Depression: 0.480 (in) 1 500 Local Depression: (in) Area of Flow: 0.342 (f(2) Eo(Gutter Flow to Total Flow): 0.769 Depth at Curb: 11.800 (in) Compute Inlet Data 1 Parameter Value Unit Perimeter 10.000 ft Effective Perimeter 5.000 ft Area 14.550 ft"2 Effective Area 7.275 1(2 Depth at center of grate 0.126 ft Computed Width of Spread at Sag 6.294 ft Flow type Weir Flow Efficiency 1.000 Double Curb in Sag DCB4 X - Gutter -Inlet Longitudinal Slope of Road 0.010 (ft/ft) Inlet Location I Inlet in sag Lvi Cross-slope of Pavement: 0.020 (ft/ft) Percent Clogging: 50.000 (z) T Define Cross-slope of Gutter 0.040 (ft/ft) Inlet Types Manning's Roughness: 0.015 [Equal-length combo Grate Types Gutter Width: 2.000 (ft) I P• 1.7/8 Enter one of the following: Design Flow: 0.670 (cmGrate Width: 2.000 (ft) Width of Spread: 5.498 Grate Length: I6.0O0 (it) Compute unknown I Length of Inlet: 6.000 (ft) Curb Opening Height:I6.0O0 (in) Gutter Depression 0.480 (in) Local Depression: I1.5O0 (in) Area of Flow: 0.342 (ft-2) Eo(Gutter Flow to Total Flow): 0.769 Depth at Curb: 11.800 (in) Compute Inlet Data 1 Parameter Value I I nit Perimeter 10.000 ft Effective Perimeter 5.000 ft Area 14.550 ft"2 Effective Area 7.275 ft"2 Depth at center of grate 0.126 ft Computed Width of Spread at Sag 6.294 ft Flow type Weir Flow Efficiency 1 000 Curb 'net slope CB6 X Gutter Inlet Longitudinal Slope of Road: (ft/ft) Inlet Location 0.021 Inlet on grade Cross-slope of Pavement 0.021 (ft/ft) Percent,_io gg,ng. 0.000 I I Define Cross-slope of Gutter 0.040 (ft/ft) Inlet Types Manning's Roughness: 0.015 Equal-length combo -� 2.000 ( ) Grate Types Gutter Width: ft P 1-7/8 Enter one of the following- Design Flow: 1.060 (ca) Grate Width: 2.000 (It) !" Width of Spread: 5.600 (h) Grate Length. 3.000 (ft) Compute unknown) Length of Inlet: 3.000 (ft) Curb Opening l-I- 1 1.00C ,1i1 Gutter Depression: 0.461 (in) Local Depression: 1.500 (n) Area of Flow: 0.365 (f(2) Eo(Gutter Flow to Total Flowk 0.756 Depth at Curb: 1.859 (in) Compute Inlet Data Parameter Value Units Eo' 0.756 Intercepted Flow 0.854 cfs Bypass Flow 0.206 cfs Approach Velocity 2.908 fps Splash-over Velocity 9.970 fps Efficiency 0.806 Curb Inlet at 2,1' slope CB7A X Gutter Inlet Longitudinal Slope of Road 0.021 (ft/ft) Inlet Location !Inlet on grade Cross-slope of Pavement: 0.021 (ft/ft) Percent Liogging: 0.000 Define Cross-slope of Gutter 0.040 (ft/ft] Inlet Types Manning's Roughness: 0.015 IEqual-length combo Grate Types Gutter Width: 2.00i (I)) I P.1.7/8 Enter one of the following: r Design Flow: 1.180 (its) Grate Width: 2,000 (ft) �' Width of Spread: 5.871 Grate Length: 3.000 (ft) Compute unknown I Length of Inlet: 3.0 (ft) ,rb l i� ;i rng Hero' 0 000 Irnl Gutter Depression: 0.461 (in) Local Depression: 1.500 (in) Area of Flow: 0.397 (f(2) Eo(Gutter Flow to Total Flow): 0.734 Depth at Curb: 1.926 (in) Compute Inlet Data J Parameter Value Unit:. Eo' 0.734 Intercepted Flow 0.928 cfs Bypass Flow 0.252 cfs Approach Velocity 2.974 fps Splash-over Velocity 9.970 fps Efficiency 0.786 Curb Inlet at 2.13 slope CB8 • --Gutter - Inlet Longitudinal Slope of Road 0.021 ( ) Inlet Location IInlet on grade Cross-slope of Pavement: 0.021 (ft/ft) PercentCloggria 0.000 I Define Cross-slope of Gutter 0.040 (Rlft) Inlet Types Manning's Roughness: 0.015 IEqual-length combo 2 000 ( ) Grate Types Gutter Width: ft I P 1.7/8 Enter one of the following- Design Flow: 1.020 ids) Grate Width: 2.0 ((ft) Width of Spread:�' 5.505 Grate Length: 3.000 (ft) ( )ft Length of Inlet: 3.000 (ft) Compute unknown I r .rk,Opernng Height 0.000 Gutter Depression: 0.461 (n) Local Depression: 1.500 (n) Area of Flow: 0.354 (It 2) Eo(Gutter Flow to Total Flowk 0.764 Depth at Curb: 1.835 (in) Compute Inlet Data I Parariieter alu• I_Irot Eo' 0.764 Intercepted Flow 0.829 cfs Bypass Flow 0.191 cfs Approach Velocity 2.::5 fps Splash-over Velocity 9.970 'fps Efficiency 0.812 Curb Inlet at 1.0 slope CB9 X - Gutter Inlet Longitudinal Slope of Road: 0.010 O r Inlet Location 'Inlet on grade A Cross-slope of Pavement 0.020 (ft/ft) Percent Uogging. 0.080 I%=1 (i Define Cross-slope of Gutter 0.040 (ft/ft) Inlet Types Manning's Roughness: 0.015 IEqual-length combo Gutter Width: 2•000 (ft) Grate Types I P-1.7/8 jj Enter one of the following: r Design Flow: 0.500 (cfs) Grate Width: 2.000 (It) Grate Length. 3.000 (ft) r Width of Spread: 4.803 (ft) Compute unknown I Length of Inlet 3.000 (It) Curb Opening Height 0.000 ;,,,; Gutter Depression: 0.480 (in) Local Depression: 1.500 (n) Area of Flow: 0.271 (k"2) Eo(Gutter Flow to Total Flow): 0.829 Depth at Curb: 1.633 [n) Compute Inlet Data I Eo' 0.829 Intercepted Flow 0.445 cfs Bypass Flow 0.055 cfs Approach Velocity 1.847 fps Splash-over Velocity 9.970 fps Efficiency 0.890 Curb Inlet at 1,0 slope CB10 • Gutter Inlet Longitudinal Slope of Road: 0.010 (ft/ft) Inlet Location Inlet on grade Cross-slope of Pavement: 0.020 (ft/ft) 0.000 I'•I Define Cross-slope of Gutter 0.040 (ft/ft) Inlet Types Manning's Roughness: 0.015 'Equal-length combo 2 000 Grate Types Gutter Width: (ft) 'P 1.7/8 Enter one of the following: Design Flow: 0.920 Grate Width: 2.000 (ft) (cfsJ Width of Spread: 6.326 (it) Grate Length: I3.000 (h) Compute unknown I Length of Inlet: 3.0 (ft) Gutter Depression 10.480 (in) Local Depression: 11.500 (in) Area of Flow: 0.440 (ft"2) Eo(Gutter Flow to Total Flow): 0.703 Depth at Curb: 1.998 (in) Compute Inlet Data J Parameter Value Units. Eo' 0.703 Intercepted Flow 0.731 cfs Bypass Flow 0.189 cfs Approach Velocity 2.090 fps Splash-over Velocity 9.970 fps Efficiency 0.794 fur, net at 1.0 slope CB11 X Gutter Inlet Longitudinal Slope of Road 0.010 (ft/ft) Inlet Location (Inlet on grade Cross-slope of Pavement: 0.020 (ft/ft) Percent Clogging: 0.000 (t) Define Cross-slope of Gutter 0.040 (Rift) Inlet Types Manning's Roughness: 0.015 IEqual-length combo r 2 000 Grate Types Gutter Width: I — (ft) I-1.7/8 Enter one of the following Design Flow: 0.450 (cfs) Grate Width: 2000 (ft) Grate Length: 3.000 (ft) C Width of Spread: 4.567 (It) Compute unknown I Length of Inlet: 3.000 (ft) Curb Opening Height 0.000 Iir Gutter Depression: 0.480 (n) Local Depression: 1.500 (n) Area of Flow: 0.249 (ft-2) Eo(Gutter Flow to Total Flow): 0.849 Depth at Curb: 1.576 (in) Compute Inlet Data l Parameter Value IJnit: Eo' 0.849 Intercepted Flow 0.407 cfs Bypass Flow 0.043 cfs Approach Velocity 1.810 fps Splash-over Velocity 9.970 fps Efficiency 0.904 Double Curb in Sag DCB12 X I - Gutter Inlet Longitudinal Slope of Road 0.010 (hit) Inlet Location Inlet in sag Cross-slope of Pavement: 0.020 (ft/ft) Percent Clogging: I50.000 (%) I Define Cross-slope of Gutter 0.040 milt) Inlet Types Manning's Roughness: 0.015 (Equal-length combo Gutter Width: 2 000 (h) Grate Types IP-1.7/8 �l Enter one of the following: r Design Flow: 1.510 (cfs) Grate Width: 2.000 (ft) C Width of Spread: 7.803 (It) Grate Length: I6.000 (ft) Length of Inlet: I6.000 (ft) Compute unknown I Curb Opening Height:16.000 (in) Gutter Depression 0.480 (in) Local Depression: 11.500 (n) Area of Flow: 0.649 (ft"2) Eo(Gutter Flow to Total Flow): 0.604 Depth at Curb: 2.353 (in) Compute Inlet Data Parameter 'dab.re Units Perimeter 10.000 ft Effective Perimeter 5.000 ft Area 14.550 ft"2 Effective Area 7.275 ft"2 Depth at center of grate 0.216 ft Computed Width of Spread at Sag 10.820 ft Flow type Weir Flow Efficiency 1 000 Double Curb in Sag DCB1 , Gutter 1 --Inlet Longitudinal Slope of Road 0.010 (ft/ft) Inlet Location IInlet in sag • Cross-slope of Pavement: 0.020 (ft/ft) Petcent Cbgging 50.000 (i) R Define Cross-slope of Gutter 0 040 (Rim Inlet Types Marrings Roughness_ 0.015 (Equal-length combo Gutter Width 2.000 ((t) Grate Types IP • 1.7/8 J Enter one of the following a Design Flow: 1.750 (cfs) Grate Width: 2.000 (ft) (- Width of Spread 8.292 (it) Grate Length. 6.000 (ft) Compute unknown 1 Length of Inlet: 6.000 (ft) Curb Opening Height. 6.000 (n) Gutty Depression 0.480 (n) Local Depression: 1.500 (n) Area of Flow: 0.728 (ft"2) Eo(Gutter Flow to Total Flow) 0.576 Depth at Curb: 2.470 (in) Compute Inlet Data l Parar-letr_• Value I_Irut• Perimeter 10.000 ft Effective Perimeter 5.000 ft Area 14,550 ft"-2 Effective Area 7 275 1(2 Depth at center of grate 0 239 ft Computed Width of Spread at Sag 11.938 It Flow type Weir Flow Efficiency 1 000 Double Curb in Sag DCB17 X Gutter — — - Inlet Longitudinal Slope of Road 0.010 (fit) Inlet Location Cross-slope of Pavement 0.020 (ft/ft) I Inlet in sag J I Percent Clogging: 50.000 (%) 1-47 Define Cross-slope of Gutter 0.040 ( ) I Inlet Types Manning's Roughness 0.015 I Equal-length combo 2 000 ( Grate Types �) Gutter Width I P-1.7I8 J Enter one of the following: aDesign Flow: 2 020 (�s) Grate Width: 2•000 (ft) C' Width of Spread 8.793 (ft) Grate Length: 6.000 (ft) Compute unknown I Length of Inlet 6.Ooo (ft) t Curb Opening Height 6.000 (n) Gutter Depression 0.480 fin) Local Depression: 1.500 (n) Area of Flow: 0.813 (ItA2) Eo(Gutter Flow to Total Flowk 0.550 Depth at Curb: 2.590 (in) l Compute Inlet Data I F ararserer ,'alue I_Int-- Perimeter 10.000 ft Effective Perimeter 5.000 ft Area 14.550 ft"2 Effective Area 7.275 ft"2 Depth at center of grate 0.263 ft Computed Width of Spread at Sag 13.136 ft Flow type Weir Flow Rip Rap Apron Calculations Rip Rap Apron Summary Pipe Stone Thickness Outlet Diameter Flow (cfs) Length (ft) Width (ft) Class D50 FES 12A 24" 19.52 18 20 Class B 8" 18" FES 15 24" 14.43 15 17 Class A 8" 18" FES 16 15" 3.55 10 12 Class A 4" 9" FES 18 15" 2.24 10 12 Class A 4" 9" FES 103 18" 8.99 10 12 Class A 8" 18" FES 201 24" 13.65 16 18 Class B 8" 18" SCM 30" 15.35 16 19 Class B 8" 18" Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 FES 12A Circular Highlighted Diameter (ft) = 2.00 Depth (ft) = 1.37 Q (cfs) = 19.52 Area (sqft) = 2.29 Invert Elev (ft) = 768.40 Velocity (ft/s) = 8.51 Slope (%) = 1.14 Wetted Perim (ft) = 3.90 N-Value = 0.013 Crit Depth, Yc (ft) = 1.59 Top Width (ft) = 1.86 Calculations EGL (ft) = 2.50 Compute by: Known Q Known Q (cfs) = 19.52 Elev (ft) Section Depth (ft) 771.00 2.60 770.50 2.10 770.00 1.60 769.50 1.10 769.00 0.60 768.50 0.10 768.00 -0.40 767.50 -0.90 0 1 2 3 4 Reach (ft) Appendices FES 12A Discharge (10-yr) = 19.52 cfs d = 16.44" Design d50 = 0.6' (Class B Rip Rap) La = 18' W= 20' 3 o lit i l,: ,Y. I lj' I -11.. Outlet W = Do + La 90. l'iii imH I '' 111 I, • mum 1 pipe ;11111uu111 diameter (Do) 1 iiiiiiri�i= I . ly La _� nnuunn • n„llul� 80 { f- . - umum *AMP; �ulluu �f,!�rn�ul� T ilwa___ < 0.5Do 4. ._ I-_ '-- 1u1 111 1 ' „friSli n r4 11 � Air, i111 is-� _ i ISIOII I I■ - � _tO 411.11i11. .ai - - . %ii;lll►I,m ' Sul • .6 AIP,r.o. I •i•■pp 60 osk 111 I /,III!IPI 11 1 1111111 eC\ _ - 11111110 r yd,�rI /71PA 5 11111■ / II rlli 111111i i J� 51 1 11EMEI — 6 •// rnillauuum� •�C� ',� / Illrlllllllllllllll1 ,� I '_% .a ►1i II, 111111111111111 - _ LIIIIEE! - 1 .�o a,rr lwruiHtmu uuu■ � - /.� �1111111111111111 1111111R.i 40 . a• 1111111111111 IU!;/I 4 �1 J /%ri'�1111111m DA.,,III�I �1111111 .dldlll111 _ I,�11-0111- �k , ' %' . �� �uu1111 �nulnnu7l �n ■ �� �1111111111111 111111'1I111r1�1 Y._. _— N�� H - l / 1 /Ii 1111111 UIIP:;dllll![I. N i -�`0 I !:iIJIIIS111.:m1 NNHNI 1� ..� I i11�liIlUiArIII _ i 20 _ NNl■N il__I_ r 1111111511:;u1111;1■r �■� 'di:i09l i� 1 I rdiilium�;nP meld .�!/�' I _ mind, 11! ti1";r 3 .I ,I P' :: Iiii u IiJ I I eY e11 10 . l _SSA IN ; - li :et !! r 1,--Mil II _I %�'i ififi lllli,: w / i r71111!111i11:11;ll�i N 0 �. N IN. I �!� �II;IIIII,IIli11!ll! 2 -_-=N:== _. � �Ig�" N [ 1111A1SIRl1�, rt/ /..IIII;dlygo], 11: NH��ii H ' I/� �:LJR I;IIIIi11i1111111111W ill 1111U -- --- MI' u V= ' 1' rp e"/,i/ /I IIId111111111111111111� '� - }f 1,1_ ln,' , ''11,, -J.ii�iimllllluunuunnuuIU rums - - ; -1jl�.'r. _ , ,r r . NN ` _ 111mm01 I 1 1 111111111■ 1 D I- — �u� — 1 I 1 1 m n� , n. .,, 1 I III,11 "� ;.,r1110'., i V = 5 .ram I- 1 •I {I 1 1P„1 II. I I I ,I !1 III: 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 FES 15 Circular Highlighted Diameter (ft) = 2.00 Depth (ft) = 1.47 Q (cfs) = 14.43 Area (sqft) = 2.48 Invert Elev (ft) = 767.20 Velocity (ft/s) = 5.81 Slope (%) = 0.51 Wetted Perim (ft) = 4.13 N-Value = 0.013 Crit Depth, Yc (ft) = 1.37 Top Width (ft) = 1.76 Calculations EGL (ft) = 2.00 Compute by: Known Q Known Q (cfs) = 14.43 Elev (ft) Section Depth (ft) 770.00 2.80 769.50 2.30 769.00 1.80 768.50 1.30 768.00 0.80 767.50 0.30 767.00 -0.20 766.50 -0.70 0 1 2 3 4 Reach (ft) Appendices FES 15 Discharge (10-yr) = 14.43 cfs d = 17.64" Design d50 (min.) = 0.5' (Class B Rip Rap) La (min.)= 15' W(min.) = 17' 3 . ,:. I it I 1,': Outlet W = Do + La g0 •. on iin 1 I• ��� i, oumulu 1 pipe jinn�uul'1 miniu 1 i'• If 1 diameter (Do) 80 1. uuuln�t= I . lyi ' IIIIIll111111 • A„Itil'I La —'i f_ 11111111111 ., p!11i1►,1r uunlluu df,!arn�ul' T i l ii___ < 0.5Do -_ '-- 111111111 �.lrr!n lr r -i--- ---- - --- 1- noum '�:I�illl!Ilr �'I ��1 7C , Arnim,' ' 1 a\` -- I45111:11 fur a ��. . _ j- I ill.lil�l' �j �(� _� 1 •ri11i11i!11! .a 11■1 pt - -_� _ 1 5;iiiII.1,II . SUI o /alll!iI I rl ,1 ' III �\- tr 1 �_ EI _Ti_ pl• 7 11!1Pil •. . , IIII■ ec"c _- r-- y r Aiwa s uw■ '1i rim non■ J 5 I 6 •// roil/1111111111■ \(� _ U ,, / Ir11111111111111111 ` \ , '% Ld' I!11 1111111111111111111� \v` _ — -_- ,- I AAP,,,, xNO11'11111111111 uuu■ - _I; III1111111■11I111 1111111.r f M111111111111 1U!i/1 4 40 + 1 "ar �rMIIIMt�uuuullD .i.,,1111rI F /=� Mill ''.r11dll1rll __ I 4 7 - k s.--- .r�1�■_111111'111 J Nuen..- ' t► IIIIII III Illllllilllll,►irk N. ,% I /�' AIr III111111111rAmim;11■1 Y. _i- -_-- _ ,. 1 „%' ow 11111111 u11P:e11111[I.• MN ,illam AP .41 1111E111.1111.1.1. - 20 1111tt1 IIIIMIN111111 111�1t� 1�5 j 1 ri I MI plillI• IIIMIlIIMIt1I,113 tom■■■ r _i�iO�I 7 lir El — — _ %U 5 dlll I 10 �it1� 1 r _I w '51 /.�''i';wr HUM at, —;� � MI V'. 1�"III?III! I! _ _Eall - --- • / i r lllll!dll/11ssllillli N 0 �_ I 1�P�IIIII�II:Ijjjj�! •r. 2 •cn _ / lr:^; .1111.: IIII■ MO MEN �: w �/yr;IIVi11r�1!III111111 III■ as Air' IlL %��111:1111iI1i11111IIIII III■ I V= i-i r /'111Rr1111111111111111111■ - - - — - }`` �11- 4!n, A�ry Ar . IIIIIIIIIII■1111111111111■ }-- i` �� 11111111111111111111111111■ _ uuuulu■1 lnmu ■ 0 - V_ ,,2°, 'a �j� uuU1111■111111nuun■ �� 1v /%-w mom pall 1 1 i iii�l rii 1 z3 _1o. d iJ -110"111P"-- 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 FES 16 Circular Highlighted Diameter (ft) = 1.25 Depth (ft) = 0.35 Q (cfs) = 3.550 Area (sqft) = 0.28 Invert Elev (ft) = 767.20 Velocity (ft/s) = 12.49 Slope (%) = 10.44 Wetted Perim (ft) = 1.40 N-Value = 0.013 Crit Depth, Yc (ft) = 0.76 Top Width (ft) = 1.13 Calculations EGL (ft) = 2.77 Compute by: Known Q Known Q (cfs) = 3.55 Elev (ft) Section 769.00 768.50 768.00 767.50 767.00 766.50 0 1 2 3 Reach (ft) Appendices FES 16 Discharge (10-yr) = 3.55 cfs d =4.2" Design d50 (min.) = 0.34' (Class A Rip Rap) La (min.) = 10' 3 o W (min.) = 12' I II I i,!: 1 l " 1 :II'. Outlet W = Do + La 90� `m m I III I. IIIII IIIII 1 pipe , ' - , j1I111111111�1 ., r nlulm 1� i', 11 diameter (Do) 80 I. iiiiii:I:,:Iii I :n%itii, La —'i I f_ ,. 11111111111 ,, !P!IliLlr 1 _ uun111111 4f,!i1WY,/ T ilwater < 0.5Do -_ '-- moon Nfrrnn' r ��1 7C IIII ,� �tl,l'�1!111iiiiiii ' ' r1 a\� I Iilrl,p f1r II (� __ - - L- j ..r;Iiii/C11� .a 11 P 60 I - '. _ _ : 'rir:lllr�r5lri '1 OHM OC;C /.itivi i1 11 .1 • 111111 �� tr 1 �, �� _Ti pl• 7 11!Iril •. . , IIII�II egg - r /11W1 , 111131 � ',1 roi, • nnlmll J 5 I 6 •// Aril II11111111111n • \(� �_ I ,, / IIIllllllllllllllll n �� _I 4025L F rII 1�111111111lUM11I�11 40 —hir iliiiiiimnimaiiiiiiimio � � u11mu1n111 lu!;/r1 1_ [,----1-: -- a.: �r/I�uuulnlm oA. gm 4 ig�� 111111111 101111P III k �, -,�� . uuu1ul 1 iliuinum _� -, -��� � nuu m liinuauu�►ir ,i i ��i �r nun nuuruu,u':;I�ri I _L I _ 4 - 1 r rigs 11111111 llm'iAl'lli[I; � ill Wpr'irr�IL 20 �NE �:11=� , 15 /-:/ I i� I MI p11 i NE 1111//lnAilript1III 3 ��1� 2 - • //ice — —Mil IIi111Va/1 I.i Yti / ►' %U51111 I io 'evil' e _I IA_ /.//' IW ..IlllO..n. laliSMIIIIIIIINI 0 M� Ail!!! _/ r lllll!dll/1C�Ilillli 11 2 N• �� 1 1 I/ ': Aibi II,dlill P %dill In IL.0., _1 '` _ LL —,,���',- �/.illiliilll/n;!; II.11 Q --� ii!' - lu.;..;�1.11,1dilli IIII111 ��= r ,:ur:l.....uuw ulmu MI� _ / �SL�R1r:111r,1/41n11111111111111 IZ V= ��'/ /'111:d111111111111111111m11 III. �MEM }` l,i_.ii!r, j .�r�tA �limnnnlnuumuuUun o-- If �i uuuuuuummu V- • .r IIIIIIII11 m miiiIimm ,� �1..r %� ullm1111111 nnl1 1 1 un1�1m■n 1 D -' - I l l I 1 111 nnu 11 k v-is r J . 'IU. ,.,. , 1 . , • 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 FES 18 Circular Highlighted Diameter (ft) = 1.25 Depth (ft) = 0.62 Q (cfs) = 2.240 Area (sqft) = 0.61 Invert Elev (ft) = 769.00 Velocity (ft/s) = 3.68 Slope (%) = 0.50 Wetted Perim (ft) = 1.96 N-Value = 0.013 Crit Depth, Yc (ft) = 0.60 Top Width (ft) = 1.25 Calculations EGL (ft) = 0.83 Compute by: Known Q Known Q (cfs) = 2.24 Elev (ft) Section 771.00 770.50 770.00 769.50 769.00 768.50 0 1 2 3 Reach (ft) Appendices FES 18 Discharge (10-yr) = 2.24 cfs d = 7.4" Design d50 (min.) = 0.34' (Class A Rip Rap) La (min.) = 10' 3 o W (min.) = 12' . ,:. i II I i' Outlet W = Do + La 90. 'iiimum I • Al pipe I. IIIII1 1 ' i mien.1 iiiiiirill i , 1111 IA„OIi'diameter (Do) La —� T ilwa___ < 0.5Do - -;.._ _ -_-_-`_ -. -_ -- Iuuu1 NPrPn'Ir i--- ---- - --- 1- 111111 ','iegi �' <�l 1 III * All'AI!111' 1 \� 1 -____—_,_ -_ ISlrl;lllll II a' _ __ _ _ •Ir,7151i:Ii l' ! o'(� _ !! I� _ '•rillil dI. , .a III ! 0\1\Y 60 1� — I _ ._ ''r IIIP•r:U'4 ''I w111• 1 i Cg ■ _ r ANI111n 5 '1 1II1II1IIII INu1 . ] ■ -- 11 UM, 11111111 cV„ 59 1 1 M■ _ ■ 6 •Ire rnulauuumll AA04,,, Iundum nm uuuu Iluun uu nv„ IIIIIIIIIIIIII lipai 4 40 --+- I1 1 —"ate "rs�luuulm DA.,, vl n ii�� Iumu el,uuru I . ■O. MI11111111 nius nine� �1 'it Inn1111 IIIIIII/NI sir, �n 11 1 �%1 1 i�r' IIIII IIIl11r1111 iKair _Y- n - 1. ;/' 1 AIWAi I111111 1111Pad111111[I! I i - "./0�•� _ M■r 4..A 1lll IP'i1 I■ I �� i� ��•.... 10.111 r',/�PJ I il__I_ •U r 111111MirilIt1 Iijir 20 111UIn - .1 m� I .}d.�:onam.r�r1 �� 1 I ■U �iaim1111rni11P MMI CI illIuI■r�JI� , ..//. 1 ,__ I iiii' l' 11!�'ti•' rr 3 �°I!' —!iii!iL ! $ /_� �r�A1,1� I/ si � � �I� _ —10 . ► r IMIuINII•Pi�!.��I r _ I N� '? %�''' '. IliPAPiin:HiII__________ IL Imo r•r riimi ism O 0 1 IIn I •. ��� • •1I11111/11i1I�1 I''•• 2I:�INN — — II —ii ��� �Illllil/ri1Gp�� IIIII � Irlul■I I _I a � ii"::;11511:11!:]IIIIIII �- 1u1u1■Im� � �I — I _1'. �: r".lialll'1I t!aum i Nutcrs iui.i.i� I III INNT NMI i __ 1 i� �� I: Isnamnnnlunl i�ri Ili { i—il /11111Sd11111111111111111111 MI�wi ___ �I : V Ir �J��/r �1111n11n�11III11nIIN11 ICI1E1:I�I■ .—,__...__ _ V c 20..�I•; �'�' I / .A111W1 111111111111111111111111111 1 0 1 1 1- . ,. ,,__ _ g I IIIII 1 1IIIIIIIIIII ;l�' ' -I 11 I k VI=15 - �.A,, /1'��=-�- — -- III II1!{I IIII�IIII IIII . II 1. ,i l i i i . . .. .._ i ; i • I -I I I I' I! I -1' 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 FES103 Circular Highlighted Diameter (ft) = 1.50 Depth (ft) = 1.22 Q (cfs) = 8.990 Area (sqft) = 1.54 Invert Elev (ft) = 766.50 Velocity (ft/s) = 5.84 Slope (%) = 0.75 Wetted Perim (ft) = 3.38 N-Value = 0.013 Crit Depth, Yc (ft) = 1.16 Top Width (ft) = 1.17 Calculations EGL (ft) = 1.75 Compute by: Known Q Known Q (cfs) = 8.99 Elev (ft) Section 769.00 2. 768.50 2. 768.00 1. 767.50 1. 767.00 O. 766.50 O. 766.00 -0 0 1 2 3 4 Reach (ft) Appendices FES 103 Discharge (10-yr) = 8.99 cfs d = 14.64" Design d50 (min.) = 0.40' (Class A Rip Rap) La (min.) = 10' 3 o W(min.) = 12' IIIr. I I,.: Outlet W = Do + La 90 • `on iin 1 I III :I." umuw I pipe I - , - ;IIlinium 1 0 1 diameter (Do) 1 iiiiiiiri�i=� I 1 80 • umuum •.n„I1U I L —1d 11111111111 P!Ir;L/ La 1 -l -I - , - n1111111111 rf!!d!11M►1 T ilwa___ < 0.5Do ,..- - --- I-_ '-- 111111111 �.frrnn' i-------- - --- 1_ IIIIIII 'IiiriII�Alr• t�l 1 IIII ,, ll'AIN11' \` 1 Amur'', di �� _ I • i71i I�I' °cA _ — rillllli►.11� .a II 't Pc c 60 _. '. - _ ',rill 111�I1 1U •1 :YI O /.itIi'iI I rl .l • 1111 tr � I�� _Ti a� r WIN! •. . , 11111 egg _ _- r-- y r i;ual s um■ Il rlli • 111111■ v� 1 1 ■ -— - 6 .AU r rnil1auuunlu V� 5q I ,, ',� vlrnuuunum \v` - `h-IIIIIIIIIA l!- 1 .�Q � iHWrunntt111111111111■ 41 111111111111111111 1111111Ri IIIIIIIIIIIIIII I !;/ 4 40 . +- 1 I , ii►5�����mmulm till.,w� uumu ei,uurl l -_ k- -- ; ,� 1 nuu m liivauu,►�i - -1-- � i �i�i � nun nuuruuiu'!al■ 1 N.li M --1-- _ - ,i Awi mum v111n:..ipiiE .• III --I-- - 4 a} ,,,,,,10- _- �—� I 4 neuCfn... 1 -1-- �- - 1 ...00.i1 in'1,uu i1Pr1/ muu =i __•_■ }d -.....00..0 'I 11ia1=P.Nriiilrio '1 20 mini mum �� 1. ..: . l 1 i Iniintrar ;n r mdw,, nuul r/�1� — , �-ri'!�' 1 — — nnun:ar u!�r,ti.,,; 3 mini mini 2 / ' f muter 1P °j 4'' IIIIIII wu■ — r %� ' ' — — — l'i 111' �V I n`f 1 Li 10 niiiii N/�. ► r Ine iuuiiu.�o/— u r _ I ',' %�/i';•lr�' airoffIl I '.' �S,iitllll— I'. %�•'�11?III! I' NMI IIIIIII �� 11111111 u = —_ OA - i. ./11 7.10111 min um i/ _� 4 r:11111!111r/11:11;111i • N 0 E IIIIIII u/� 1■ I'- �!� IIII!IIIIC11rilltil! 2 HOM Nom imm imom mI mu �� _ EMI— _ �� //-r;IIV;lIr�niniIIII III.Ix i .11 �IIIIIII 1 T -} v= „—i/ /'11II:d111111111111111111.1 i Nu — - l �,l_HIP . �.ii�iiswalimmi �rimnnnlnuumuuuu Ii � ll�� —,__ __ - 4- 2p `` r;r ;�� iiiiiiiiiiriiiiiiiiiiiiiiii ■um1 �- .r �-- PI - - _- - - �"'".: +,. ■uu/ IIIIIIII 1 1 un1tt111111 1 'a t v_15 - 0 �t'� II11 11111 nu i , k 1r11I i!!MHU1i11ii v = 5 .ran I. .. I .. . I I . 1 1 1 ®1N I1. I i I l 1 : 11: 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 FES 201 Circular Highlighted Diameter (ft) = 2.00 Depth (ft) = 1.09 Q (cfs) = 13.65 Area (sqft) = 1.76 Invert Elev (ft) = 780.50 Velocity (ft/s) = 7.76 Slope (%) = 1.10 Wetted Perim (ft) = 3.33 N-Value = 0.013 Crit Depth, Yc (ft) = 1.33 Top Width (ft) = 1.99 Calculations EGL (ft) = 2.03 Compute by: Known Q Known Q (cfs) = 13.65 Elev (ft) Section 783.00 2. 782.50 2. 782.00 1. v � 781.50 - 1. 781.00 O. 780.50 O. 780.00 -0 0 1 2 3 4 Reach (ft) Appendices FES 201 Discharge (10-yr) = 13.65 cfs d = 13.08" Design d50 = 0.6' (Class B Rip Rap) La = 16' W = 18' 3 . ,:. I it I I,': I l 1 i Ill Outlet W = Do + La 'mini 1 '• ��� pipe • 90 i um u1u IIIiniu I , If diameter (Do) 80 I I. . -'uuuliiu I . I,,i IIIIIIIIIIIII • A„lifll' La —� i f_ 11111111111 ., p;!11Sr,Ir uunlluu �f,!arnA, T ila___ < 0.5Do ,..- - --- --._ _. i-_ ' uu11I1 ,.lrrnlr r -i-------- - --- 6 1111111 '�aiiglill' �' �1 7C no , Arnim,' ' 1 a ;_. -- I Ii1wISp P II . A, j- I ill.lil�l' N t rs 60 I — •rdPSnIr;r517i '1 on. o /.itivin rl 4,0 '' 1111 �� tr 1 �, �� _Ti pl• r 11!IPi' •. . , IIII■ egg _- r-- y r i;ui s um■ � ',i roi, • non■ v 5 I 6 • roil1111111101■ \(c` _ ,� / IIIIII lllll lllll 111 0\t` - I -. - -I-— _Or� I!lipluwmunlnu� h A .� A,, 111111111111111111111111■ i unu1u11111uu 1nml.., 41 IIIIIIIIIIIIIII IU!;/1 --+ I 1 - — i=►!.#" I�uuuu1l . oA AVM 4 F uuulu Au,uuru 11111,11 111111111 I 1111111111 ..41111,1111Ivir N. EIIIII - .1 I �eV 111111111111r111LII 11111 �. I - 1. It�i mom 111P'e11/1I![I. 111 .1 1 ��' .0411.1011.41111r,' 11.741 20 ��■ o I 1.�5 .i:/. 1 /1 1 rniiliumn,1v luelrl immosiiimmil— �r 2 o' 'T %U'Scll• ...v ,..,, ' wiv°j�` ..„, r, :011 — 10 1111111111•1111nre/IIM -n� t� — 4'., , _ 1� 05111! I! =am= --- -- i`i/ - an.a11;111i1• i • r:11111!i11r/11:Iri11.i , N 0 ���I ' Ill 1- IIII;IIIII,IIIiI�!ll! 2 �� -__ Rar-47;* �ViII111i11,111ri: Q- Ell _ .Iuiii,...11.11... IIII■ r tl. �,suv,11r�1!luuw m■ — v= ' ��itl. i'Iur.,IIIIIlnnnnilms - - — } Tilt* .110A �.iy Ar. inullllu■uu11111111M ii Mill v_=2 'f', /.�I/�a iiiiiiiiiiw nnni o F . 111111 1 1 9111011g 1 ! u� I. - �5 /� ��!n 111 1 1 1 Mk n■ —" .�,v-10 d . v - 5 j� l i I' .'.l li- 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Sep 11 2023 SCM Circular Highlighted Diameter (ft) = 2.50 Depth (ft) = 1.30 Q (cfs) = 15.35 Area (sqft) = 2.59 Invert Elev (ft) = 764.50 Velocity (ft/s) = 5.92 Slope (%) = 0.50 Wetted Perim (ft) = 4.04 N-Value = 0.013 Crit Depth, Yc (ft) = 1.32 Top Width (ft) = 2.50 Calculations EGL (ft) = 1.85 Compute by: Known Q Known Q (cfs) = 15.35 Elev (ft) Section Depth (ft) 768.00 3.50 767.00 - 2.50 766.00 1.50 765.00 0.50 764.00 -0.50 763.00 -1.50 0 1 2 3 4 5 Reach (ft) Appendices SCM Apron Discharge (10-yr) = 15.35 cfs d = 15.6" Design d50 = 0.67' (Class B Rip Rap) La = 16' W= 19' 3 . ,:. 111 I I,': I l ; 1 .1I. Outlet W = Do + La 90� `m iin I ��� i, omnulu1 1 pipe jinn inn �, nmlul 1 i' If 1 diameter (De) 80 I I. . -'uuuln1l=� I . lyi ' IIIIIIIIIIIII • A„I�f1t''I La -14 I f_ 11111111111 , p;!11S/,Ir uunlluu 4f,!arnPul' T ilwa__ < 0.5Do ,..- - --- --._ _. i-_ ' uu11u1 i.11r1DWI \ -- 1 Ii111Sp 1 II ��. . _ j- I ill.lil�I' �j o(� 1 '.ri11il'!1I! .a II■1 P 60 I _ '. _ _ 1 -.61S11I1;15115 '1 •1111 o /.illl!in rl 1 ' 11■ �� Cr1 �, �� _Ti pl• r 11!1Pil •. . , IIIIo eg _- r-- , r anvil s uw■ � '1i roi, • non■ J 5 I 6 •// roil/1111111111N \(� _ - _. _ 1 , / 1111111111111111111 `n\� , '% .a �!Ii 111111111I11111 \v` - --- -- I IN-a M eiuliunnt11111 uu11■ . h 3 � ►r 1111111111n111111:111111.., 4, - a 111111111111111 {� 1111/1 4 J /%ri�llllllllllll tT .,,III lI F 111111111 �.dldlll111 III 4 - •.* 4W 1➢m1111 J'Alue111171 , 111111111 1111111NIIII 1 N. - r. 1 �� III111111111r1111N1!,11�11 �. 'I - 1. Aw a 11111111 1111P'e1111IIIII.• — +F- _ , is1 T� 'JJi01 - �—A[�■ 1 4.•AJUI;f1.:.1 1 111 .1 I-- ' 1 -��' �n l,uu1mw. I 1d -...; •� il_ 1 I1i1111,1::r11i1r,1■1 1 20 wommuil 1 1.5 -.lot. id 1 rniil1um',nlr 11eir,1 [ _ I - , //'M -- — 11111111:4 Ilr ti•"4r 3 — �r� 2 �II� 111';i,d111',.7, ,41 10 t�.i1111P 1 r I '1 /,%/i';.1.1' llllir!'11 1 = E•1 _---',_- 171__ IE- Nt,.' I - 1m1 i •,IIIIi.IShcli115ll, Ii N 0 : - 1' IIII;IIIII,IIIiI�!ll 2 i0i =M ,AIi� AViII111,111G11 is Q �'%i11111;i1/1':o/050 i % [�/�1SIn17dr�1!awuu u1■ _ i �:i�nl:dnsl►ilnnnul�m� 1 — — -} V= ' i/iL� A' il:1111n11111111111111E - _ - .`` III_.4in,' -Ji/�/.ilimnnnlnuumuuun or 4-. I`• Add • �% 11111111111111111111111111n -- y-'p , .4 j� l 11111111111n1111111111111■ o 11111111111111 1111111111� 'n �,1..._ %�� �� 1111111111011111111111 lil 1 l i iii liii 1 u„ 11 1 I 111II 15 �� I,v=10-d i1ir—.—_�,w• „ r IiiIIIM111■1111IINiII 1 l lli 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Buoyancy Calculation Riser Structure Buoyancy Calculations Project Name: Stoneglen Subdivision Project#: - Area of riser(outside) = 25 sq.ft. Max. elevation of water when riser is empty= 771.50 Elevation of weirs Bottom elevation of riser= 764.75 Max. height of groundwater= 6.75 ft. Volume of water displaced = 168.75 cu.ft. Weight of water= 62.4 lbs/cu.ft. Weight of water displaced = 10,530.00 lbs. Area of Concrete: Area of sides= 9 sq.ft. (8"Thick Assumed) Height= 6.75 ft. Volume of concrete= 60.75 cu.ft. Subtract weir opening= 2.25 cu.ft. (4 weirs) Subtract 30" pipe opening= 2.45 cu.ft. Total Volume of concrete in sides= 56.05 cu.ft. Bottom slab area = 25 sq.ft. Bottom slab thickness= 1.25 ft Volume of concrete= 31.25 cu.ft. Top slab area = 0 sq.ft. (subtract openings) Top slab thickness= 0 ft(Assumed) Volume of concrete= 0 cu.ft. Total volume of concrete = 87.3 cu.ft. Weight of reinforced concrete= 155 lbs/cu.ft. Total weight of concrete= 13,531.50 lbs Area of soil over concrete base = 0.00 sq.ft. Height of soil = 7.50 ft Total volume of soil = - cu.ft. Weight of rammed soil = 100 lbs/cu.ft. Total weight of soil = - lbs Total weight of concrete and soil = 13,531.50 Factor of Safety= 1.29 Seasonal High Water Table Information • Calculation Narrative • Graphic Seasonal High Water Table Summary The seasonal high-water table is required to be provided at the proposed SCM. As per the geotechnical report provided by Prespro, Test Hole 20 is located at the approximate location of the proposed riser structure. Per the geotechnical report, Test Hole 20 was excavated at this location. When completing the geotechnical exploration, test hole locations were horizontally located during the geotechnical exploration but not vertically located. Therefore, the elevation of Test Hole 20 is not known. In order to utilize the TH 20 results to approximate the SHWT, the existing grade elevation at the time of excavation of the test hole is required. As noted per TH 20 results,past development had placed approximately 9' of fill on top of existing grade. That fill material has now been removed. To determine the elevations of the soil layers noted in the report, G&D completed the following steps: • Approximated the pre-development existing ground surface, prior to 9' of fill placement. This was done using utilizing historical GIS data to determine the slope of the land prior to fill placement and then calculating the elevation at TH2O back from a known undisturbed survey point. Elevation at TH 20 assumed to be 765.55. • Converted the soil depths and ranges noted in the TH 20 results into elevations utilizing the calculated elevation from Step 1 (765.55). The existing ground surface,pre- development, was assumed to be at 108" depth noted as Residuum. • Assumed the depth of the water seepage (140" or 762.8') to be the SHWT. Note that soil information within the report was inconclusive as to SHWT. • As per the completed calculations,the SHWT was noted to be 1.95' below the 6-inch pipe invert at the riser. To comply with the 2' separation rule, 5 if of 6-inch pipe outside of the riser will be required to be solid. The 6-inch pipe will be at 1% slope. Therefore, all portions of the system that could drain the SHWT will be minimum 2' above the SHWT. APPROX LOCATION - TH-20 GRADE AT TIME OF TEST HOLE EXCAVATION.(FROM Z PRIOR DEVELOPMENT) J >- TEST HOLE 20 DATA H CC w DEPTH=0" 774.55 CL 0 DEPTH=2" 774.38 CC a PROP.TOP OF DAM X _ w DEPTH=28" 772.21 LOCATION OF SURVEY APPROX GRADE PRIOR / \ SHOT OF UNDISTURBED TO ANY DEVELOPMENT / / \ \ GRADE PRIOR TO ANY DISTURBANCE / ,--- DEVELOPMENT \ \ 44'@ 3.4% / \ DISTURBANCE 3'j \ TOP OF STONE AT / \ / \ SAND FILTER \ ELEV.767.2 / ASSUMED DEPTH OF \ / PRE-CONSTRUCTION GRADES _� •_ / DEPTH=108" 765.55 - - • / INVERT OF PERFORATED UNDERDRAIN 764.85 NATURAL GRADE - 764.05 �/ lS �/ L� �� �/ l� �� )C�/� O� O�/�S6 \-INV=764.61 DEPTH=140"V 762.8 DEPTH OF GROUNDWATER 762.8 DEPTH=150" 762.0 INV=764.75 \-- BEGIN NON-PERFORATED PROP.6"PERFORATED PIPE @ 1.0% PIPE 5'FROM OUTSIDE OF RISER. INV=764.8 ELEV.764.85 GROUTED WATERTIGHT DEPTH=zoo" 757.88 CONNECTION AT RISER TEST HOLE 20 PROFILE INFORMATION SCALE: 1"=5' M; 1 A. - - - - - - - 0 w r...w.w..r..r�-•rw. ... \ 0, 1 ` ...,-,--_ ,. _.- . ....... ....._..r------- -----_::4111111111 , \ rnr 1 ao ,�r rs tit tr r air a , got a r el �`, :/ ,L-A,-' - -, ... , ..,, 1 7 \., It. ATT. ;', 4\11). .. , a Jam' --._i '• _ - ! u jar . . .. . • 4......wrimp,=•."--- ..mgrit 44 •.•.- : ingore . , 411 Vil*Live e. TP-A ,1 TP-4 _ W t . I TP.A13 1,dab ri 11 r \ TP-12 1 4 a_ _ TP-1 • -1 _ ' • " 'N ? 1 6,• � �1 ' cot "'` v. .i . .„ i, _ __ _=_ •or o , . �—�� -- .fir_ '! #v - _ _ P 'A 1..... -.• , 0 SI: "i(ii TP-61 li.:0 6,0 ` / l' _„-_. _, . .4$0.j _-_ r•tir. Ar d, ..�. TP-1 1�47 ---�" Q Test Pit Location TEST PIT LOCATION PLAN DATE: 9-2-2021 CEST (with Conceptual Overlay) DRAWN BY: TKG PROJECT#:210583.000 45 Spring Street SW STONEGLEN SUBDIVISION DEVELOPMENT PO Box 268 NTS Concord,North Carolina,28026-0268 SCALE: Phone: 704)04)786-74544 Granite Quarry, North Carolina DRAWING NO.: 2 Fax:.corr,]Licens4 www.cesicgs.com License C-0263 CEST RECORD OF TEST PIT EXCAVATION PROJECT: Stoneglen Subdivision EXCAVATOR: Sany SY215C CLIENT: Prespro DATE: 8/31/21 CESI REPRESENTATIVE: T Gray CESI JOB NO: 210583.000 TEST PIT DEPTH (in.) DESCRIPTION NO. From To TP-19 0 3 Leaf litter, organic debris, topsoil, rootlets 3 43 FILL: Red, light brown, and yellowish-brown clayey SILT (ML)with little fine SAND (SM) 43 87 RESIDUUM: Pale brown, gray, and black fine sandy SILT (ML with little medium to coarse SAND (SM), large pocket of pale brown and gray silty ET elli 87 172 Slightly moist pale brown, gray, and black fine to medium sandy slightly elastic SILT (ML) Terminated at 172" TP-20 0 2 Grass, leaf litter, organic debris, topsoil, rootlets 2 28 FILL: yellowish-red, light brown, and red clayey SILT (ML) 28 108 FILL: Moist brown, gray, and light brown billy FAT CL ith pockets of OLD TOPSOIL with organic smell and organic fragments 108 150 RESIDUUM: Light brown, bluish-gray, and yellowish-brown silty 150 200 Damp to moist red, light brown, and yellow moderately plastic clayey SILT (ML) with pockets of wet gray IAT CLAY (CH) Terminated at 200", water seeping in on all sides 140" and below