January 6, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Union County
Attention: John Shutak,PE, CIP Program Manager
500 North Main Street, Suite 600
Monroe,North Carolina 28112
RE: Project Name: FY20 Short Water Line Extensions Project Ph. 2
Acres Approved: 5.75
Project ID: UNION-2021-005
County: Union, City: Indian Trail
Address: Various Streets
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Jake Berkshire, PE, W.K. Dickson& Co.,Inc.
Date Received by LQS: December 23, 2020
Plan Type: Revised
Dear Mr. Shutak:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) faun requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1,2019, a$100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept
on file at the job site:
North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
NOS"(I(ARC, NA
oepaAment at Envitonn ntal avaRry 704.663.1699
Letter of Approval with Modification
January 6, 2021
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days:
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Fouii, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
1
c: Inspection Department
ec: Jake Berkshire, PE
1
Letter of Approval with Modification
January 6, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: FY20 Short Water Line Extensions Project Ph. 2
Project ID: UNION-2021-005
County: Union I
1. An adequate measure (e.g. rock check dam, filter sock check dam, etc.) shall be provided
in ditch lines (downstream of work area) at the edge of the disturbed limits.
2. The stream crossing near STA 5+50 on Sheet C.10 references construction detail on Sheet
D.6. Adequate measures (e.g. filter socks, straw wattles, etc.) shall be provided along the
top of the stream banks,below the 10'silt fence offset. In addition,the bottom of the stream
shall be adequately stabilized per detail on Sheet D.5. Existing stream cobble could be •
utilized (if present) for the in-situ soil material.
1
r
0
pm, a 4-1
•— CA 7
_ 0
'�Y-i .60,
1110
.®
• c L)
• 0 •- .-
- .® c)
® o .®
cd
(......
.. (if
,tilt 7...s.
N $ q®j ^ . C ® 0 IL
SI V U ` q O // u1 (1.)
4� S
_ 4
III 1 .qrr• `-er ;' C� , �+ ,� MI
•"--1
4 ® , ' t
0 ® � , •�
O A 0
•_ •�+
Het .544 �, ,