HomeMy WebLinkAboutSW6230606_Stormwater Report_20231009 BENHA V EN EMERG ENC Y S ER VICES 13 13151 NC HWY 27 W BROADWAY, NC 27505 STORMWATER CALCULATION FOURTH REVISION: 09 OCTOBER 2023 THIRD REVISION: 31 AUGUST 2023 SECOND REVISION: 27 JUNE 2023 FIRST REVISION: 20 DECEMBER 2022 DATE: 11 NOVEMBER 2022 j11`14S51i11(�1'•1^+I N��11111tr1Frrr.Jfr`rr Es SEAL i 24438 i r,J� p• P 1 ``10/9/23 'I f t'•rrrfprru a i!!i n Iriuri o E=— EE i N - B 600 GERMANTOWN ROAD RALEIGH NC 27607 TELEPHONE 919 851 1980 FAX 919 851 1982 Drainage Area Run-off Summary Benhaven Emergency Services 13 project description This is a project to develop a 12,200 SF Emergency Service. The project is located at 13151 NC HWY 27 W, Broadway, NC 27505 on a lot of parcel size 2.49 ac. The site lies within the jurisdiction of Harnett County with the zoning district of RA-20R. The property is part of Falcon Crest Development. The project lies in FEMA Floodplain Zone X, area of minimal flood hazard per FIRM Panel# 3710958600J dated Oct 3, 2006. Neither USGS 7.5-minute quadrangle map (Olivia Quadrangle NC 7.5-Minute Series) nor Soil Survey of Harnett County, North Carolina(Sheet 9 of 14)by USDA Soil Conservation Service has jurisdictional features to the property. Also, S&EC (Soil & Environmental Consultants, PA) of 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 believes that there are no jurisdictional features on property per site visit conducted on 07/01/2022. The property lies in the Cape Fear River basin. The project lies outside of a water supply watershed. As part of the development, approximately 2.15-Acres of area will be disturbed with 0.73 acres of additional impervious (proposed building, parking spaces and sidewalk)will be added to the existing development. The total disturbed area includes the 1.57 acres of development area draining towards the Southwest side of the property along with 0.58 acres of area along Dunrovin Ln, where the improvement does not increase the runoff. Thus, for the calculation purpose only 1.57-acre area as on Annex A are considered. Drainage area The site has a high spot near NE corner of the property. Most of the existing water naturally flows towards the SW corner of the property. Two 1' deep and 3:1 side slope, trapezoidal swales were proposed to collect the runoff for the treatment before releasing near the SW corner of the property. A bioretention cell will serve the purpose of a Stormwater Control Measure(SCM), by treating the runoff from the developed area (the detail of the drainage area could be seen on Drainage Area Map, attached to this report). The area is graded in such a way that the pre and post development drainage area remain the same (1.57 acres)for a point near the outlet of the bioretention. This point is considered as Point Of Analysis (POA)for the purpose of runoff calculations. Further, all the impervious surface within the subject parcel is collected and treated to the SCM. The SCM itself has a drainage area of 1.45 acres. Below is the detail of the drainage area considered for the calculation of the pre- development condition and post-development condition. Pre-Development: Ex. Impervious area(to remain) = 0.04 acres Ex. Undeveloped area to be modified) = 1.53 acres Total drainage area = 1.57 Acres Post-Development: New additional Impervious area = 0.73 acres Ex. Impervious area(to remain) = 0.04 acres Lawn with slope less than 5% = 0.26 acres Lawn with slope more than 5% = 0.42 acres Sub-total area to the SCM = 1.45 acres Bypass area (not collected to SCM) = 0.12 acres Total drainage area = 1.57 Acres Bioretention Cell A 2,850 SF Bioretention cell with IWS is proposed as a Stormwater Control Measure (SCM). The bioretention cell is designed with 2.5' of media depth. PVC underdrain pipes will be placed at the bottom of the cell and are connected to a 2'x2' concrete riser. The riser will eventually discharge the collected water at the outlet pad via a 15" RCP pipe. The proposed bioretention cell without IWS can achieve various pollutant removal. It can reduce 40%total nitrogen, 45% of total phosphorus and 85% of suspended solids. A riser with a 15" RCP outlet is proposed to discharge the outflow near the SW corner of the property. SHWT is identified at 43inch below surface during the storm water soil evaluation carried out by "Soil & Environmental Consultants, PA" of 8412 Falls of Neuse Road, Suite 104, Raleigh,NC 27615 (see included report), with a report titled "Detailed storm water soils evaluation for Benhaven, 13151 NC Hwy 27, Broadway, NC.". Existing ground elevation at the test location is 278', thus the existing SHWT is estimated at 274.42 fmsl, which is more than 2' below proposed bottom of bioretention cell (276.67'). Peak Runoff The rational method is adopted to calculate the peak runoff and runoff volume. The peak runoff calculation for 1-yr, 2-yr, 10-yr and 100-yr storms are presented under this heading. Pre-development runoff at POA is compared to the post-development runoff at the same location. The results of the calculations are presented here. The details of the runoff calculations are annexed to the Hydraflow modelling report. All the time of concentrations calculated were below 5 min. So, for the calculation purpose all the time of concentrations for surface runoff were considered as 5-min. Below is the sample calculation for time of concentration using Kirchoff's method. Time of Concentration The Kirpich Equation was used to analyze the time of concentration. A sample calculation for the time of concentration from most remote point to POA is presented below. Kirpich Equation Tc = L( 3 0.385 128 L=330 ft H=11 ft Tc = 3303/11 0.385 128 Tc= 2.52 min (5-min used) Since, all the calculated time of concentrations were below 5 min, the minimum time of concentration of 5 min is used for all drainage area. Runoff Coefficients Following runoff coefficients were used for the calculations. Proposed Coefficient(C-Values) Undistrurbed ground with grass cover(slope approx. 5%) =0.30 Improved lawn(slope less than 5%) =0.25 Improved lawn in slope (slope more than 5%) =0.35 Impervious roof =0.95 Impervious driveway, parking space and sidewalk =0.95 1-yr Peak Runoff I- (1 yr) =4.48 in/hr(Tc-5min.) Pre dev.: 0.32 (C-Value)x 4.48 x 1.57 ac = 2.24 cfs Post dev. SCM outflow: 0.65 (C-Value)x 4.48 x 1.45 ac = 0.06 cfs Bypass Area: 0.35 (C-Value)x 4.48 x 0.12 ac = 0.19 cfs Total (for POA) = 0.22 cfs Post-Development-Combined post development peak flow accounts for difference in Time of Concentrations from sub-basin run-off and SCM. See routing (Hydraflow report) for details. 2-yr Peak Runoff I- (2 yr) = 5.76 in/hr(Tc-5min.) Pre dev.: 0.32 (C-Value)x 5.76 x 1.57 ac = 2.87 cfs Post dev. SCM outflow: 0.65 (C-Value)x 5.76 x 1.45 ac = 0.07 cfs Bypass Area: 0.30 (C-Value)x 5.76 x 0.12 ac = 0.24 cfs Total (for POA) = 0.28 cfs Post-Development-Combined post development peak flow accounts for difference in time of Concentrations from sub-basin run-off and SCM See routing (Hydraflow report) for details. 10-yr Peak Runoff I- (10 yr) =7.22 in/hr(Tc-5min.) Pre dev.: 0.32 (C-Value)x 7.22 x 1.57 ac = 3.60 cfs Post dev. SCM outflow: 0.65 (C-Value)x 7.22 x 1.45 ac = 0.07 cfs Bypass Area: 0.30 (C-Value)x 7.22 x 0.12 ac = 0.30 cfs Total (for POA) = 0.35 cfs Post-Development—Combined post development peak flow accounts for difference in Time of Concentrations from sub-basin run-off and SCM. See routing (Hydraflow report) for details. 100-yr Peak Runoff I- (100 yr) = 9.72 in/hr(Tc-5min.) Pre dev.: 0.32 (C-Value)x 9.72 x 1.57 ac = 4.85 cfs Post dev. SCM outflow: 0.65 (C-Value)x 9.72 x 1.45 ac = 0.08 cfs Bypass Area: 0.30 (C-Value)x 9.72 x 0.12 ac = 0.41 cfs Total (for POA) = 0.48 cfs Post-Development—Combined post development peak flow accounts for difference in Time of Concentrations from sub-basin run-off and SCM. See routing (Hydraflow report) for details. Result The results of the runoff calculations are summarized on table below. Runoff in cfs Return Period Pre-Dev. Post-Dev. 1yr 2.24 0.22 2yr 2.87 0.28 10yr 3.60 0.35 100yr 4.85 0.48 Thus, the post development runoff for lyr, 2yr, l0yr and 100yr is less than the pre- development runoff. Supporting documents and calculations are annexed as below Annex A: Drainage Area Maps Annex B: Pre & Post-development Hydraflow Modeling and Report Annex C: Drainage Swale Design Annex D: Bioretention Cell Design Annex E: SCM Operation & Maintenance Manual Annex A: Drainage Area Map FM FM PRE-DEVELOPMENT EX. IMPERVIOUS M - I \ EX. IMPERVIOUS AREA: 0.04 AC AREA: 0.04 AC 1 .53 AC � - - - r � � � \ II \ � \ TOTALNAREALOPED AREA: 1 .57 AC LEGEND EX. IMPERVIOUS 290 \ STORM MANHOLE - 29, EX. UNDEVELOPED AREA: 1 .53 AC \ \ 288 - \ \ 287 -286 \ \ I 1 / \-285- � � � � \ I tiP - - - -284 - \ - -283 - -282- \ I � 1 - 281- - - -26°_ BENHAVEN EMERGENCY SERVICES 13 13151 NC HWY 27 W _ - - 279- PRE-DEVELOPMENT BROADWAY, NC 27505 1"=30'@11X17 - \ BOBS TT DESIGN BUILD,INC. 600 GERMANTOWN ROAD RALEIGH,NC 27607 PH.(919)651-1960 (999)661-9962 VDRAINAGE AREA ��'�� NAIL desi bbitt� � WWW aoBBITT COM 0 15 30 60 Firm Lic#D-0191 POINT OF ANALYSIS i i 1 4 COPYRIGHT C 2022 BOBBITT DESIGN BUILD,INC.ALL RIGHTS RESERVED. �a��c�'S ``�. ♦wee' �� ..�eeoeeoeo� ��..v♦♦eeoeoeeoo D.�•owoeeoeo♦�te♦eee�e0♦♦♦e�•�•�•e�� . •- •N . �♦♦eeee• wvee�oeossee� - ��e��eii�`�1��eoee♦oe♦eeU♦teeeet!►♦e°ee+� • . . - . . /�►.o��e♦,oeesoee♦♦e,►e♦eee♦ee.��ye:!ee♦a.e�`� /��♦°eee°e°a°e°<�e°e°•°:G+♦Ae��e°♦°O°♦°•°�� � // � e,►eie��°♦�A♦'►+e.�ie�e•:e�<woe+Qe�eGe � � //, /// ��� -♦♦♦eeeeo. :.o• .eeaiv ♦e♦e+�>eeeoe•,eoeo♦ s//��/�w����������� ♦�e�e w��ee++w�♦♦♦♦eeew°+e°°eei°♦°♦e •� • • � �_, // /��`�//�/' eeeee`►2eeei•'OGA��+°+e+♦°e♦����°♦°e°e�°♦. , - //��,/////��������� �:oo+♦+e`o°♦�i'�o°esvpe�,poe�°°i°+°o°oee-, / �ii 'eeoeeeeoe♦eoou7.�eos ���jmaom, ;eeeeee♦epso"ee,►eaeiee+♦C�,r►�i°♦jump-p- eeee '� �j c sue? .. leeee♦?eeeee♦►��e♦eee - /��I�� ��ea�♦.ee°Uw0 �►°♦7 i119 I°�te°e°eN01 ♦eee°O�s+°�_ ..� °e°e°e°e°e°e°e°e°e°e°e°� • //I- �. '►j+�+�e♦°�°�°a�♦°ee����°e°�C►���e♦°�'►�°�►A°<oee°�♦►��°o��►�♦�ie�e-e���°�°� ♦eeeee♦oee♦e� //� � .rAee�eAe�Ga.� , ee1+Jeoee�♦e.�•.�•.r�oee♦♦►eee ����.�-�.�-����♦ / ' �.���e°e°.fie►,�♦iei i♦�����►S°e�0le°e°e°♦°��O�� e��♦fie°♦°e°e°♦°♦°e°��♦°e°e°ee 1 .. �/ / ..`♦-�►fie°?°A°e�lla WON°�°e°�°♦°e��� ►��i �weC♦°�°e°�°e°e°�°�°e°e°e°�°♦°fie%♦�e��A�' +-.e°e°eeee�°��G� .�ieeGe�e°♦°e°♦°♦°e��R°♦°e��1;♦°e�e�e°e°e°e°a°♦°e°e°♦°e°e°♦°e°e°e°♦°e°♦°e�.,.U♦��e�=. /���� • •• ° °'����''"°�°e`�°°°e°o°°°o°♦°°°♦°°°♦°e°eo►ooee�'�oe♦eeeeo♦e♦°ee°e°♦♦o♦°♦eeeeeeeo°♦°eeee♦°oe°e♦eeee♦♦°oo�` •. ++t� ��♦ee°e°Q♦eC�!°o�L�T�t��/�T�Tl♦°e°e°e�e�♦°e°♦e°°e°ee+e+°+♦+e+e+°+e+a+e+a+e+♦+e+e+°+°+��'�+e+♦+°+e� !i°i ,e . OOOOe°ie0o**11s♦1♦'Oe°i°e'i,►°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i°i�oi°i°i°i°s:; °iei+i°i°i°i°i°i'0♦•i!%•�-0♦°e0�o°� ,►°0♦°e°e°o°♦°O♦O°♦O°Oe°o°e°e°oee°o�,�e°00♦°0000°♦00°o°o0°e°e°o°Oe°o°e0°,,°o°♦°♦p°�; '// Ike°e°a°a°e°e°♦�►°e��i�°e°e°♦°e°��e°♦� 1°°e°e�♦�e�♦�♦�o�♦�o�e �e �♦�♦��%e�e�����♦��Q�e�e�° 1t�e��'����w����e��e�e♦°ems /I�/I/ .e���0°e°a°e°e°♦°e°i��i�°e°♦°e°e°e°fie°O� 1�e°eeeeee♦♦♦♦eeee♦eeeee♦♦e►A.Ir.�l�>��i♦-. .J�OJ♦eel eee •- /Fill" / ♦��ee�°♦°e°��eei`�e�e°♦°e�♦%�♦�e�e�e�e�♦�e�♦�►O°�� �C�eO��e�e�e�e�e�♦�♦�e�e�e�e�e�e�e�e�e�e���e�e�e�e�eOA�Q�e�i�►•�t�e�e1�'♦+�°�°�°�°�°�°��'�teee°��> �/►��+je�e�e�♦�♦���e�♦♦e�e��,��♦��°eeeee°eee♦eeeeOteee� I�ee°`eeee♦eeee°♦eeeeee°e♦♦eeee°♦°eeeee►eeee°e♦eeeee♦,t��+°01��',►°eCa+e°e°e°e°e°e°e°e°�+fie°e°e°e°� A �/ /►i°i°i°i°i°i°i►i°i°i°i�:e°i°iei°i°i°i°i°i°i°ieo°i°e. ....•►i°i°i°i`e°'°OOOOi°i°i°i°i°i°i°i°i°'►!•►°o°o°o°i'i'i?4i�e���eo°i�i�i°i°i°i°i°i°i°i°i!Oi°i°i°i �/I°�°e°e°e°e°e°♦���°e°e��♦°OO°��e�e� ♦i°A°♦°�°v°OJ'A°�°�°e°♦°�°♦°�°♦�1♦�°���°♦°e°�°e°♦°e°�° ►�°♦°°�°�°�°♦°�°♦°e°e°�°�°♦°�°e°♦°�°�°♦°e°e�A°e°����e°(, � �w�/►°e°♦°e°e°♦°Do°♦�ie0°♦°e°e��ree♦ee�eoeeeese�+eeeeeeeee♦°Uoeeeee♦n;eee♦eeeee♦eeeeeeeeeeee gee I►�� i/.......♦,..............o.A..ee:. >...........e.eeeeo♦►......................•....�. • , ��� /��h//��C0°♦�e0°♦�o0`e�vo��e,�Ce.O°.♦e.e0'° �ieO°o_ioo°e°o�i♦♦°e°�ie♦* ��N, ii/ / �� i �N °e°�oe♦e°►�iOoe°o��iec°°e°�i♦�e°e°�i♦0e°e�ie♦e°op�i♦♦°op�iee°e°�ioo�°♦°es♦�eo;s0�ie�°°e�eo0��� ' i'►°�i�;�e°o�io♦°o�iee♦°�ioo°o�iee°e�i eeooeee♦ee•e•-o o•�,♦♦eoee�e_e♦•o ee♦oe�e+:♦i�°e:oiie°.i�e°i.i•°ii�°°�oi•°�i,��:ea+p}„o►�eiG+oi_+n� ,. , - • chi°i°i°i° • +♦+♦+eQp+�+�°pOi // %�L�',�e°e°e°e°♦°e°��♦°e°e°e°e°e°♦°eee°e°e`O�:°.°,�:.e0� C1 v♦ems,♦eeeeee♦eee wee.oee♦ ijte♦eeee eeeeeeee�°eeee♦e°e°��s♦�°ef Ie PAP�I��y���IV�/I��IIt�I���'�I���IIII�I�I�►����I e,•I��,�►III'��'II��I,jI�/,�h�e►1��I���e�����►��e♦�►,�e+�°e�►►�I�eee���e/►e♦�°e♦�eoi�eeee°�+►+o�e°♦�oee+eoe�►e♦♦+ee�•°�e♦+e°e.ODoe+o°°►eoe°e�♦�e°e.♦�°e.i�e++°e°♦°eO►esee°�s�+e°e���ee♦♦e•��e♦�eee°e�°�°♦►►°��oes♦♦++°�+e��e♦♦e°`�eoe+e:k♦`►�e♦ee+°°°eecoe♦°°�eee♦e°e"Te�oeeee+°°°eeoee°�°oee+°ee°♦o�eoac°ep°°♦°a ee♦e�es�o♦ee♦°°°°♦°eey�°°!eo♦+e°♦°°♦�♦�e�.°°°eeeepe°�♦oe+ee°eOe°�♦�Q°°Oee►eeeep��►°♦°°e♦°°�e♦ee�ee►eee°O�♦♦eee°e�°o♦ee��♦eee0°oeoe♦°e�°°�o♦oe°�eeeeepe�eoee°eeo°�o0♦o�°♦♦ee�°�e♦e°ee���0oe�e°°�e°�♦oee°e�°��e♦ee�°♦♦♦e�e�eee'e►°�o�o�e♦�eeee♦pe���♦eeee0°��.e��♦�ee♦pee°���e�e►°��oOeoi►°e♦�e♦�°°o♦•►���oe♦oiG�►ee�♦�.e°�eei'°�♦eeeei♦e°�eeeee•�l°°e♦�r�♦��eieo♦°>i�eee�e�e°�ee��♦O%e�i♦�Qe,°±°��.!�`s��eoe;or.�♦'e���O°°eseep 4r+e ee77+,�e,;'°'Se,�..e°.♦1�e°'o�s.neewe.see�-♦eeOe'�oee�!ei'e��i°p�►ee;weD°o�e1•eee°�'l►°e�e���►�e♦e�+°ee,°o��♦ei♦e•�♦�°�°ee��°°oeei♦°e0ee�♦♦°�°e�o♦♦eeep°♦�°ep�°�e0eeee!eeaee�°p�♦♦oeoe=°a°°p�e0eeie°�e°°oe♦e°i♦e��°°♦♦�♦°ie♦e�e°�°p�o°♦e♦0��°°o�eeioe►<ee°ee°e�e�ioo.♦e°ee°e�°oee°e�e °♦�♦°ieeee°ep�°°�0°ie.pe♦°�o1°�0°i0o♦e°e°°�♦°eeee�eIi�eo'°:��@�ei�!w°e?i�°°i�°e'!°j°OOp°'♦'t1l��'.-;.�ee°°e�1�ee`'�e��Oe►�►�o�.j'�iee�eOi+:l 0e�'e°ii�♦♦e:����ee0o°�pvi�eD�°���o♦e�`'oe!�ee°.�'Op���oeDoe°.oe�pee►+iee°;°�e•o°�i♦li�se°•i0e'°s��e°eo���_ec.►°♦�°�i°s�i�o���►°e�ip1�Q�eeew°•oo�°�♦!%'♦°�v�e!•°e ee♦°♦�°e��%feC��♦�e�te�°e�.!e���!•eoee°��e�e�!•G♦e°�I� ♦ ee �eWe♦e4p�pww� e e ♦♦e♦ eppe°oopW � oe eN, Irl IN PAP I o♦e e +0000000 `�:+op.o+go♦0 IlMINOpo °♦e !fffeff'o f, of*i°f*i ♦�ee�°eC� �♦oeeFe�0w` 3N ° eeeeOe•oe♦l =, ! S��ee�.♦�•►♦�eeee°i�°`�eo�eite°i♦e�°e♦e�%t0eee: ♦�°G�pie°es��ee�0%ieOe♦e�e°.°°°°et�i�♦♦�e♦oeee��r e °°°e:e►�eieeeo ♦�;. ♦°ee� e° °ii+ ♦ ieei! e Ie'° ♦° ♦ee�i♦ WIQCl_i ee ♦ i.�Oepe►� ♦°°♦ �-�°+. ee.o ♦ e �e� �e+ieo�e►e♦°�ej1 ♦ eO�eCeo�t ��OE!�M'��►WON e �0° eG '♦ e°e�ee�� 1w O"'ONOWp °° ,e•e.e♦` ,,° ° eieece♦�e>eeee♦ie Ch+E. °i�.�esie;Qts°►eQ°;`�♦O►♦.toe♦e�1 .jowG_eE,, .�0!e♦Aa, � ♦=♦°e��e eee+%+7vse+eo����eweee�.�:�e►���.pwe.•.�►����.ee+���-.e�ee+e���e.Qe�e�e�p ee.e♦+_.°♦��.e.ee+°���.veeo♦e+�.�����eeee+D�+e�pG♦•�ei. e+���ieo♦eewe°°���eiieeee+°����eiee♦+°�i��ieeeeG+°e°o��die♦��.+ �►cam- /.�OEr�♦`:•♦�°eeee♦gee ie►°e!O�♦�eG♦ee7et a♦♦e♦♦eeeeee♦tee �I,��PAII������I.►���r,1'I,���.�����;����ore°e►♦°°y�iee°♦°°���♦�e0�°ee��e�l♦�e�e►°eek►♦i°e�°e°ee°e;,°ee°�♦e°♦�°e♦e°°e♦°ee♦°e°es°eeee°♦_°ee�i°e::oo MEMO+ aeoe♦°e♦�e�►♦e��_S°e��♦e°e♦°oe♦ee.°e'ie°♦eee°e°eepeee°eeo°eeee♦°"��SH, °o°e.eee�oe�i;�!e►�°e�►eee'�°oeeee�'°oe':eeee°ee 0��-e��4O�!°♦°A�►e�♦♦ee•.e°�j�e��,�e.e.♦�e�♦eepeee.°♦•�ee�e�e.ee�e�e�♦�i�e�wee�:°ee�e..°ee.e�e°♦•v�e�°e:�Qe!°♦e��♦te�°°e�eewe�•e°eee♦�te�i�°�►°•.�i�°♦,+°!-.�eo�.oe:°s-�see•�'e♦eee i-ee�°eiie♦i�eD°eee♦ec+�ee°♦�1e��o�e♦e°�e°e=ee�e�.°oee►eeeet,/°•♦iee,eoeoet!°eee°se`ees°ee°e�♦oeee°°e♦:eevpCe♦see°eei♦of°�pee�♦'epeee°°"+i►.e♦°e�sO�.O�e•♦A°e:°s�iepoeee♦.►��ea°e►�ee+oes0efj�eee+se+°e°°.eeeeeoe�•e°°`reoteeD°9ee ec+eeee°see°�oee+ee°p♦e°'eee�•e°t.°'<ioGe�°oee�A�Dp♦'e�'eiop�pe,�:.e°�oeE°.00°�.+°•e09 e♦�°°e4ieO!�°0♦ee<�°°♦.♦eee-/°°`eeeero�°♦e�e.����►ee0°•/eee °?/♦e.io/�'ee��•e�!�Iee/°• e/_♦��♦��es - ��/,�������i � /�/•�IsI.I�����1•��1/.���Ii i��,�1�������1i�I��s1���►I�.s���I�IAy��'��I'�oI'��♦��1p��o�'p��o��e•h1��♦��I•�%♦���i°♦�:°ie°°�ii�!�°°°iii♦e°s�ei�.ee:�ii���°ii°°��ie°�io°♦i°iiiii°'!i0t°M-•o°.°��m-o°��•iee/e'°�p=i°e°°�/°ciee0°°�°i°e'°°�°�i eee��°'eiee:°`�-°aOi♦°°°�♦ii•i°°°�ee-ieei°°°°°♦oiii•e°��°o0vi♦�°ee♦♦�/eie:/�°eoe♦i°°/°°ee�ei♦!/°eooOei♦�°°♦ei/♦°ie/°e°ei/♦i°°�°♦ei/�i♦°°♦oiei♦°/°°♦i?i°°ee�!i°/��o�°►�/.°r�e�°►e�°�/ie��p°O'/>°�we•�'/!.e0 ee"�°<•//eii°i/♦io/I°+�_�ie�/.°eeee.//°°�/ei° /ev°!/ee/°���e-,paI//�/,�����i:/�♦'�/�•°//�/�/�//��/► / �fir e♦e♦I♦ o+�I I� °OWN s°iii 0p ♦eaoo♦♦oii0e,ow,—o O o�°��F DOMI•/ON,� �� o�t�:N101744 ° �MEM� I // / /s �� III� �I����i���i� • • >%i�/�� s - � OESION COIL Annex B : Pre & Post-dev. Hydraflow Modeling Report Hydraflow Table of Contents Stormwater_Ben Have n_v4.gpw Hydraflow Hydrographs Extension for Autodeskg Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, Rational, PreDev........................................................................................ 4 Hydrograph No. 2, Rational, Post.Dev..................................................................................... 5 Hydrograph No. 3, Rational, Post.Dev-Bypass........................................................................ 6 Hydrograph No. 4, Reservoir, Bioretention............................................................................... 7 Pond Report - BIORETENTION CELL................................................................................ 8 Hydrograph No. 5, Combine, PostDev_West (POA#2)............................................................ 9 2 - Year SummaryReport....................................................................................................................... 10 HydrographReports................................................................................................................. 11 Hydrograph No. 1, Rational, PreDev...................................................................................... 11 Hydrograph No. 2, Rational, Post.Dev................................................................................... 12 Hydrograph No. 3, Rational, Post.Dev-Bypass...................................................................... 13 Hydrograph No. 4, Reservoir, Bioretention............................................................................. 14 Hydrograph No. 5, Combine, PostDev_West (POA#2).......................................................... 15 10 - Year SummaryReport....................................................................................................................... 16 HydrographReports................................................................................................................. 17 Hydrograph No. 1, Rational, PreDev...................................................................................... 17 Hydrograph No. 2, Rational, Post.Dev................................................................................... 18 Hydrograph No. 3, Rational, Post.Dev-Bypass...................................................................... 19 Hydrograph No. 4, Reservoir, Bioretention............................................................................. 20 Hydrograph No. 5, Combine, PostDev_West (POA#2).......................................................... 21 100 - Year SummaryReport....................................................................................................................... 22 HydrographReports................................................................................................................. 23 Hydrograph No. 1, Rational, PreDev...................................................................................... 23 Hydrograph No. 2, Rational, Post.Dev................................................................................... 24 Hydrograph No. 3, Rational, Post.Dev-Bypass...................................................................... 25 Hydrograph No. 4, Reservoir, Bioretention............................................................................. 26 Hydrograph No. 5, Combine, PostDev_West (POA#2).......................................................... 27 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc.v2023 Legend 5 Hyd. Origin Description 1 Rational PreDev 2 Rational Post.Dev 3 Rational Post.Dev-Bypass 4 Reservoir Bioretention 5 Combine PostDev_West(POA#2) Project: Stormwater BenHaven_v4.gpw Wednesday, 08/30/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc.v2023 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational ------ 2.236 2.872 ------- ------- 3.602 ------- ------- 4.852 PreDev 2 Rational ------ 4.222 5.422 ------- ------- 6.801 ------- ------- 9.161 Post.Dev 3 Rational ------ 0.188 0.242 ------- ------- 0.303 ------- ------- 0.408 Post.Dev-Bypass 4 Reservoir 2 0.061 0.074 ------- ------- 0.076 ------- ------- 0.080 Bioretention 5 Combine 3,4 0.219 0.281 ------- ------- 0.353 ------- ------- 0.475 PostDev_West(POA#2) Proj. file: Stormwater BenHaven_v4.gpw Wednesday, 08/30/2023 1-yr Storm Runoff 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 2.236 1 5 671 ------ ------ ------ PreDev 2 Rational 4.222 1 5 1,267 ------ ------ ------ Post.Dev 3 Rational 0.188 1 5 56 ------ ------ ------ Post.Dev-Bypass 4 Reservoir 0.061 1 10 1,246 2 280.91 1,248 Bioretention 5 Combine 0.219 1 5 1,303 3, 4 ------ ------ Post Dev_West(POA#2) Stormwater BenHaven_v4.gpw Return Period: 1 Year Wednesday, 08/30/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 1 PreDev Hydrograph type = Rational Peak discharge = 2.236 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 671 cuft Drainage area = 1.560 ac Runoff coeff. = 0.32* Intensity = 4.480 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.520 x 0.30)+(0.040 x 0.95)]/1.560 PreDev Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 Oz 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 2 Post.Dev Hydrograph type = Rational Peak discharge = 4.222 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,267 cuft Drainage area = 1.450 ac Runoff coeff. = 0.65* Intensity = 4.480 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.770 x 0.95)+(0.420 x 0.35)+(0.260 x 0.25)]/1.450 Post.Dev Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 2 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 3 Post.Dev-Bypass Hydrograph type = Rational Peak discharge = 0.188 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 56 cuft Drainage area = 0.120 ac Runoff coeff. = 0.35* Intensity = 4.480 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.120 x 0.35)]/0.120 Post.Dev-Bypass Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 3 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 4 Bioretention Hydrograph type = Reservoir Peak discharge = 0.061 cfs Storm frequency = 1 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 1,246 cuft Inflow hyd. No. = 2 - Post.Dev Max. Elevation = 280.91 ft Reservoir name = BIORETENTION CELL Max. Storage = 1,248 cuft Storage Indication method used. Outflow includes exfiltration. Bioretention Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 4 Hyd No. 2 ® Total storage used = 1,248 cult Pond Report 8 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc.v2023 Wednesday,08/30/2023 Pond No. 1 - BIORETENTION CELL Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=280.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 280.50 2,850 0 0 0.50 281.00 3,170 1,505 1,505 1.50 282.00 4,000 3,585 5,090 2.00 282.50 4,500 2,125 7,215 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise(in) = 15.00 Inactive Inactive Inactive Crest Len(ft) = 8.00 8.00 0.00 0.00 Span(in) = 15.00 4.00 0.00 0.00 Crest El.(ft) = 281.50 281.75 0.00 0.00 No.Barrels = 1 1 1 1 WeirCoeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 276.85 281.50 0.00 0.00 Weir Type = 1 Broad --- --- Length(ft) = 35.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 1.00 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 1.000(by Contour) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 2.00 282.50 1.80 282.30 1.60 282.10 1.40 281.90 1.20 281.70 1.00 281.50 0.80 281.30 0.60 281.10 0.40 280.90 0.20 280.70 0.00 280.50 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 Total Q Discharge(cfs) 9 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 5 PostDev West(POA#2) Hydrograph type = Combine Peak discharge = 0.219 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,303 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.120 ac PostDev_West (POA#2) Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 5 Hyd No. 3 Hyd No. 4 2-yr Storm Runoff 10 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 2.872 1 5 862 ------ ------ ------ PreDev 2 Rational 5.422 1 5 1,627 ------ ------ ------ Post.Dev 3 Rational 0.242 1 5 72 ------ ------ ------ Post.Dev-Bypass 4 Reservoir 0.074 1 10 1,606 2 281.03 1,603 Bioretention 5 Combine 0.281 1 5 1,679 3, 4 ------ ------ Post Dev_West(POA#2) Stormwater BenHaven_v4.gpw Return Period: 2 Year Wednesday, 08/30/2023 11 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 1 PreDev Hydrograph type = Rational Peak discharge = 2.872 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 862 cuft Drainage area = 1.560 ac Runoff coeff. = 0.32* Intensity = 5.753 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.520 x 0.30)+(0.040 x 0.95)]/1.560 PreDev Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 2 Post.Dev Hydrograph type = Rational Peak discharge = 5.422 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,627 cuft Drainage area = 1.450 ac Runoff coeff. = 0.65* Intensity = 5.753 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.770 x 0.95)+(0.420 x 0.35)+(0.260 x 0.25)]/1.450 Post.Dev Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 3 Post.Dev-Bypass Hydrograph type = Rational Peak discharge = 0.242 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 72 cuft Drainage area = 0.120 ac Runoff coeff. = 0.35* Intensity = 5.753 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.120 x 0.35)]/0.120 Post.Dev-Bypass Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 3 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 4 Bioretention Hydrograph type = Reservoir Peak discharge = 0.074 cfs Storm frequency = 2 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 1,606 cuft Inflow hyd. No. = 2 - Post.Dev Max. Elevation = 281.03 ft Reservoir name = BIORETENTION CELL Max. Storage = 1,603 cuft Storage Indication method used. Outflow includes exfiltration. Bioretention Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 — Hyd No. 2 Total storage used = 1,603 cult 15 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 5 PostDev West(POA#2) Hydrograph type = Combine Peak discharge = 0.281 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,679 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.120 ac PostDev_West (POA#2) Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 5 Hyd No. 3 Hyd No. 4 10-yr Storm Runoff 16 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 3.602 1 5 1,081 ------ ------ ------ PreDev 2 Rational 6.801 1 5 2,040 ------ ------ ------ Post.Dev 3 Rational 0.303 1 5 91 ------ ------ ------ Post.Dev-Bypass 4 Reservoir 0.076 1 10 2,020 2 281.14 2,014 Bioretention 5 Combine 0.353 1 5 2,111 3, 4 ------ ------ Post Dev_West(POA#2) Stormwater BenHaven_v4.gpw Return Period: 10 Year Wednesday, 08/30/2023 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 1 PreDev Hydrograph type = Rational Peak discharge = 3.602 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,081 cuft Drainage area = 1.560 ac Runoff coeff. = 0.32* Intensity = 7.216 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.520 x 0.30)+(0.040 x 0.95)]/1.560 PreDev Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 2 Post.Dev Hydrograph type = Rational Peak discharge = 6.801 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,040 cuft Drainage area = 1.450 ac Runoff coeff. = 0.65* Intensity = 7.216 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.770 x 0.95)+(0.420 x 0.35)+(0.260 x 0.25)]/1.450 Post.Dev Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 2 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 3 Post.Dev-Bypass Hydrograph type = Rational Peak discharge = 0.303 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 91 cuft Drainage area = 0.120 ac Runoff coeff. = 0.35* Intensity = 7.216 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.120 x 0.35)]/0.120 Post.Dev-Bypass Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 21 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 3 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 4 Bioretention Hydrograph type = Reservoir Peak discharge = 0.076 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,020 cuft Inflow hyd. No. = 2 - Post.Dev Max. Elevation = 281.14 ft Reservoir name = BIORETENTION CELL Max. Storage = 2,014 cuft Storage Indication method used. Outflow includes exfiltration. Bioretention Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 4 Hyd No. 2 ® Total storage used = 2,014 cult 21 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 5 PostDev West(POA#2) Hydrograph type = Combine Peak discharge = 0.353 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,111 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.120 ac PostDev_West (POA#2) Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 5 Hyd No. 3 Hyd No. 4 100-yr Storm Runoff 22 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 4.852 1 5 1,456 ------ ------ ------ PreDev 2 Rational 9.161 1 5 2,748 ------ ------ ------ Post.Dev 3 Rational 0.408 1 5 122 ------ ------ ------ Post.Dev-Bypass 4 Reservoir 0.080 1 10 2,728 2 281.34 2,718 Bioretention 5 Combine 0.475 1 5 2,850 3, 4 ------ ------ PostDev_West(POA#2) Stormwater BenHaven_v4.gpw Return Period: 100 Year Wednesday, 08/30/2023 23 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 1 PreDev Hydrograph type = Rational Peak discharge = 4.852 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,456 cuft Drainage area = 1.560 ac Runoff coeff. = 0.32* Intensity = 9.720 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.520 x 0.30)+(0.040 x 0.95)]/1.560 PreDev Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 1 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 2 Post.Dev Hydrograph type = Rational Peak discharge = 9.161 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,748 cuft Drainage area = 1.450 ac Runoff coeff. = 0.65* Intensity = 9.720 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.770 x 0.95)+(0.420 x 0.35)+(0.260 x 0.25)]/1.450 Post.Dev Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 2 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 3 Post.Dev-Bypass Hydrograph type = Rational Peak discharge = 0.408 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 122 cuft Drainage area = 0.120 ac Runoff coeff. = 0.35* Intensity = 9.720 in/hr Tc by User = 5.00 min OF Curve = mid NC IDF.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.120 x 0.35)]/0.120 Post.Dev-Bypass Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 NIL 0.25 0.20 0.20 0.15 z X0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 — Hyd No. 3 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 4 Bioretention Hydrograph type = Reservoir Peak discharge = 0.080 cfs Storm frequency = 100 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,728 cuft Inflow hyd. No. = 2 - Post.Dev Max. Elevation = 281.34 ft Reservoir name = BIORETENTION CELL Max. Storage = 2,718 cuft Storage Indication method used. Outflow includes exfiltration. Bioretention Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 Time (min) Hyd No. 4 - Hyd No. 2 ® Total storage used = 2,718 cult 27 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc.v2023 Wednesday,08/30/2023 Hyd. No. 5 PostDev West(POA#2) Hydrograph type = Combine Peak discharge = 0.475 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,850 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.120 ac PostDev_West (POA#2) Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 5 Hyd No. 3 Hyd No. 4 Annex C: Drainage Swale Design Benhaven Emergency Services 13 Channel Design Sheet Swale ID#1 Solve depth of flow for given discharge, shape and slope of channel C 0.73 A 0.48 Input 7.22 Discharge, Q 2.51 Input Discharge 2.51 cfs Bed slope 0.0263 Shape Trapezoidal Bottom width 1 ft Side slope 3 H to 1V Mannings Coeff. 0.025 Depth of flow (assumed) 0.347 Ft Calculation Flow area 0.71 SF wetted perimeter 3.20 Ft hydraulic radius 0.22 Ft velocity 3.54 ft/s Calculated Discharge 2.51 CFS Depth of Flow (calculated) 0.35 Ft (see separate channel lining calculation using North American Green Erosion Control Materials Design Software ECMDS Version 7.0) Benhaven Emergency Services 13 Channel Design Sheet Swale ID#2 Solve depth of flow for given discharge, shape and slope of channel C 0.61 A 0.97 Input 7.22 Discharge, Q 4.30 Input Discharge 4.30 cfs Bed slope 0.06 Shape Trapezoidal Bottom width 1 ft Side slope 3 H to 1V Mannings Coeff. 0.025 Depth of flow (assumed) 0.369 Ft Calculation Flow area 0.78 SF wetted perimeter 3.33 Ft hydraulic radius 0.23 Ft velocity 5.53 ft/s Calculated Discharge 4.30 CFS Depth of Flow (calculated) 0.37 Ft (see separate channel lining calculation using North American Green Erosion Control Materials Design Software ECMDS Version 7.0) NORTH North American Green AMER�CAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>BENHAVEN E.S. 13 Swale ID#1 Name BENHAVEN E.S. 13 Swale ID#1 Discharge 2.51 Channel Slope 0.0263 Channel Bottom Width 1 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class E<2 in Vegetation Type None Vegetation Density None Soil Type Silt Loam(SM) C125 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Sple Depth Shear Stress Shear Stress Factor Pattatern C125 Straight 2.51 cfs 3.53 ft/s 0.35 ft 0.025 2.3 Ibs/ft2 0.57 Ibs/ft2 4.04 STABLE D Unvegetated Underlying Straight 2.51 cfs 3.53 ft/s 0.35 ft 0.025 1.68 Ibs/ft2 0.36 Ibs/ft2 4.63 STABLE D Substrate NORTH North American Green AMER�CAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>BENHAVEN E.S. 13 Swale#2 Name BENHAVEN E.S. 13 Swale#2 Discharge 4.3 Channel Slope 0.06 Channel Bottom Width 1 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Silt Loam(SM) C125 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Sple Depth Shear Stress Shear Stress Factor Pattatern C125 Straight 4.3 cfs 5.52 ft/s 0.37 ft 0.025 2.3 Ibs/ft2 1.38 Ibs/ft2 1.66 STABLE D Unvegetated Underlying Straight 4.3 cfs 5.52 ft/s 0.37 ft 0.025 1.68 Ibs/ft2 0.87 Ibs/ft2 1.93 STABLE D Substrate BENHAVEN EMERGENCY SERVICES 13 STORM DRAINAGE CALCULATIONS n=0.012(RCP) n=0.010(HDPE) STORM FREQUENCY-10 YR Al-AREA INLET MH-MANHOLE RCP-REINFORCED CONCRETE PIPE DI-DROP INLET FES-FLARED END SECTION HDPE-HIGH DENSITY POLYETHELENE SMOOTH CORE,DOUBLE WALLED PIPE Cl-CURB INLET 1B-JUNCTION BOX INCREMENTAL GRATE STRUCTURE DESIGN FLOW-10YR STORM SEWER DESIGN STORM PIPE INVERTS HEADWATER COMMENTS INLET AREA ELEV. FROM TO TYPE C. AREA AVG. AREA I Q LENGTH DIA. SLOPE DEPTH OF VELOCITY CAPACITY INV.IN INV.OUT (FT) REQ'D AVAIL. - .C' (CFS) (ft.) (in.) I%) FLOW(ft) (F/S) FULL(CFS) 5 - DI 0.81 0.48 - - - - - - - - - - - - 289.50 1.45 1.50 15"NYLOPLAST CATCH BASIN W/LIGHT-DUTY GRATE INLINE WITH PROPOSED ROOF DRAIN.CONNECT ROOF LEADER W/'WYE'CONNECTOR 5 4 HDPE - - 0.81 0.48 7.22 2.79 152.00 12 0.99 0.56 6.15 4.61 1 287.50 286.00 - - - 6"ROOF DRAIN LEADER AT 1%SLOPE 4 MH 290.50 2.45 4.17 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4 3 HDPE - - 0.81 0.48 7.22 2.79 57.00 12 3.04 0.40 9.35 8.09 285.83 284.10 - - - - 2 - RISER 0.58 0.97 - - - - - - - - - - - - 281.00 1.92 4.15 - 2 1 RCP 0.66 1.45 7.22 0.50 35.00 15 2.43 0.18 4.52 10.94 276.85 276.00 Q=0.5 CFS IS 10-YR SCM DISCHARGE BASED ON HYDRAFLOW MODEL 1 FES ROOF DRAIN(SEE PLAN FOR SIZES,LOCATIONS AND SLOPE) NOTE: 6"HDPE ROOF DRAIN-APPROX.250 LF 8"HDPE ROOF DRAIN-APPROX 240 LF HDPE PIPE SHALL ADHERE TO THE SPECIFICATIONS OF ASTM D2321 AND BE CERTIFIED BY AN ENGINEER ACCORDING TO HARNETT COUNTY STANDARDS Annex D : Bioretention Cell Design Benhaven Emergency Services Bioretention Design Sheet Design Volume (DV) Calculation Using Simple Method Drainage area, A 62984 SF Impervious area 34022 SF R = 0.06 + 0.9 * I� '10,hCIe Rv = Runoff coefficient(unitless) 1A = Impervious fraction (unitless) IA 54 % R 0.54 DV = 3630 # Rc * Rv ` A Where: DV = Design volume (cu ft) RD = Design storm depth (in) A - Drainage area (ac) A 1.45 Ac Rp 1 Inch DV 2834 CF Also called Water Quality Volume (WQV) Bioretention Design Ponding depth, H 12.0 inch (12" max) Depth of filter media, df 2.5 ft (min. depth with IWS) filtration rate (min. assumed), IR 1.0 in/hr Required Provided Surface Area (S.A.), DV/H 2834 2850 SF Underdrain Design Infiltration to underdrain,Qf(S.A.x/R) 237.5 ft3/hr [(ie. 2850 SF * 1 in* 1/12 (in/ft)] =0.066 cfs De. 237.5 ft^3/hr * 1/3600 (hr/sec)] Underdrain design flow, Q 0.66 cfs [Q= 10 X infiltration] Roughness factor, n 0.011 Slope of underdrain pipe, S 0.005 ft/ft Diameter of underdrain, D 6.81 inch D= I S* Number of Pipes Kequired in the Underdrain JJ If D is less than #of 4"pipes If D is less than #of 6" pipes 5.13 2 7.84 2 5.95 3 9M 3 6_66 4 10,13 4 7_22 5 7.75 6 8_2D Provide (5) rows of 4" SCH 40 perforated (4 rows of 3/8" perforations@6" O.C.) PVC pipe @ 0.5%slope DESIGN OF - - - OUTLET PROTECTION New York DOT Dissipator Method For Use in Defined Channels (Source: "Bank and cliaiuiel lining procedures',New York Depanmew of Transportation_Division of Design and Constnuction_ 1971.) Guide to Color Key: jUserinputData I Calculated Value lReference Data Designed By: N Nyaupane Date: 8/30/2023 Checked By: B. Pittman Date: 8/30/2023 Company: Bobbitt Construction Inc. Project Name: Benhanve Emergency Services 13 Project No.: 22-0011 Site Location (City/Town) Broadway Culvert Id. 101 Estimation of Stone Size and Dimensions For Culvert Aprons Step 1) Compute flow velocity V.at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter_ For pipe arch, arch and box culverts, and paved channel outlets, Do=A.where A.=cross-sectional area of flow at outlet. For multiple culverts,use Do= 1.25 x Do of single culvert_ Velocity(ft/s) 4.52 Opening type Pipe Culvert Single or multiple openings? Single Outlet pipe diameter, Do (ft) 1.25 NOTE 1: If opening type is anything other than"Pipe Culvert", Do=Ao (Cross-sectional area of flow at outlet). NOTE 2: If multiple openings, Do=1.25 x Do of single culvert. Step 3) For apron grades of 10%or steeper,use recomniendation� For next higher zone. (Zones 1 through 6)_ Zone 1 Figure 8.06c Will apron have >/=10% grade? No NOTE: For apron slopes equal to or greater than 10%, use next higher Zone in Figure 8.06d to determine apron length. Apron length (ft) 5 Figure 8.06d Determination of Stone Sizes For Dumped Stone Channel Linings and Revetments Stone size required(as per NCDOT Riprap Stone Class) Class A(Min. 2", Midrange 4", &Max 6") Calculations provides minimal appron size, for better protection provide a 6'X8'X18" NCDOT Class B rip rap Figure 8.06c: Zone Determiniation for Apron Material 25 1 1 1 I I I I 1 1 • 1 • { I 1 1 1 . 6 1 1 I I I I t 1 1 I V I 20 1 1 1 S I 1 # 1111 1 1 1 1 1 • I • I l • 1 1 1 I _ I I I I 1 1 1I 1 1 1 1 1 1 1 11 1 1 1 • 1 1 1 1 1 1 1 1 • 1 1 I f 1 I I I I I I 1 loll 1 I I I 1 11 1 I I I I 1 1 11 1 1 1 1 1 1 �l•� 15CL 1 1 LIL- ON I • 1 1 1 _ 7 __ _ 1 1 1 1 1 1 1 ' 1 1 1 � 1 ' 1 1 1 ; t • f . I I � 1 I _ � I 1 1 1 1 1 1 � 1 I I I , 1 1 I ••7 1 : 1 1 1 1 I 1 1 1 1 1 1 1 I Lrr 1 1 I 1 I 1 1 11 I I I U 1 1 1 1 1 1 1 J 1 Q / 1 k l 1 1 1 = LU 1 • I 1 1 1 1 1 I 1 1 • 1 1 1 1 1 1 I 1 1 1 1 I I I I Y I 1 1 • I I 1 ! 1 1 1 I I 1 1 1 1 1 I I 1 1 d l • 1 1 1 1 1 1 1 1 1 I 1 1 1 1 I I i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 1 , 1 1 1 1 1 1 1 • 1 1 1 1 1 1 1 1 1 1 I I 1 • 1 1 1 1 1 11 1 1 , 1 1 � 1 1 1 1 1 1 1 1 1 1 1 . 1 ' • 1 � 1 1 1 1 I • I 1 1 1 1 1 � 1 1 1 1 1 • 1 1 1 V I • 1 I 1 1 1 1 1 1 ' ! 1 l i 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 • 1 . 1 1 1 1 1 1 / l 1 1 1 1 1 1 1 1 ! 1 1 1 I 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I l f 1 O 1 1 1 1 1 1 1 1 1 1 / V 1 1 1 1 1 I 1 1 1 • 1 I I 1 k a' or it.r Or I ( I 0 5' 10, 15, 20' 257 DIAMETER (Ft,) Figure 8.06c Figure 8.06d: Length of Apron LENGTH OF APRON Z TO PROTECT TO PREVENT SCOUR p APRON MATERIAL CULVERT HOLE USE L2ALWAYS N L2 L1 1 STONE FILLING(FINE) CL.A 3 X D, 4 x D. 2 STONE FILLING(LIGHT) CL.B 3 X Da 6 x De 3 STONE FILLING(MEDIUM) CL. 1 4 X Do 8 x Do 4 STONE FILLING(HEAVY) CL. 1 4 X Do 8 x Do 5 STONE FILLING(HEAVY) CL. 2 5 X Do 10 x D. 6 STONE FILLING(HEAVY) CL 2 6 X Do 10 x D. 7 SPECIAL STUDY REQUIRED(ENERGY DISSIPATORS,STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d .Lidth=3 times pipe dia.(Ed-) NOTE: For apron slopes equal to or greater than 10%, use next higher Zone to determine Apron Length. Annex E : SCM Operation & Maintenance Manual OPERATIONS & MAINTENANCE MANUAL Project. BENHEVEN EMERGENCY SERVICES 13 STORMWATER CONTROL STRUCTURE BIO-RETENTION AREA Broadway , NC Owners: Address: Phone Number: Prepared by: Date: Project: BENHEVEN EMERGENCY SERVICES 13 Date Constructed: Location: Contractor: (List below) Landscape Contractor Grading Contractor OPERATIONS AND MAINTENANCE MANUAL BENHEVEN EMERGENCY SERVICES 13 ORMWATER BIO-RETENTION AREA This manual establishes procedures for maintenance and operation of the [project name] Bio-retention area (s) in accordance with the Harnett County guidelines as set forth in the LDO Section 4.4.6 MAINTENANCE OF BIO-RETENTION AREAS Vegetation—The drainage areas have a ground cover of warm season grasses or fescue, which if properly maintained will prevent erosion of the embankment and provide an easy surface for inspection. The grass will be most difficult to obtain in the area subject to water level fluctuation. Re-Seeding—Periodic re-seeding may be required to establish grass on areas where seed did not take or have been destroyed. Before seeding, a one time fertilizer Rev 1/2011 1 application (12-12-12) should be applied at a minimum rate of 12 to 15 pounds per 1 ,000 SF. The seed should be evenly sown at a rate of three pounds per 1 ,000 SF. The seed should be covered with soil to the depth of approximately Y4". Immediately following the planting, the area should be mulched with straw and tacked. Trees and Shrubs—Trees, shrubs and other landscape vegetation should be permitted only as shown on the approved planting plan. The vegetation should be kept healthy and vibrant. If a tree or shrub dies it should be removed and replaced with another tree or shrub from the same species (attach plant list). Mowing—Grass mowing, brush cutting and removal of weed vegetation will be necessary for the proper maintenance of the areas. All area slopes and vegetation should be mowed when the grass exceeds 8" in height. Acceptable methods include the use of weed whips or power brush cutters and mowers. Erosion—Erosion occurs when the water concentrates causing failure of the vegetation or when vegetation dies and sets up the environment for rill erosion and eventually gullies from the stormwater runoff. The areas should be inspected. Proper care of vegetative areas that develop erosion is required to prevent more serious damage to the site. Rills and gullies should be filled with suitable soil compacted and then seeded. Methods described earlier on vegetation should be used to properly establish the grass surface. Where eroded areas are detected, the cause of the erosion should be addressed to prevent a continued maintenance problem. Frequently, problems result from the concentration of runoff to one point of the bio-retention area instead of a uniform distribution of runoff usually on slopes and at the inflow points. This can be corrected by reshaping, to more evenly distribute the runoff to areas not experiencing erosion problems. Rodent Control—Generally in this urban environment, rodents are not a problem. Rodents such as groundhogs, muskrats and moles are attracted to moist, wet areas and can be quite dangerous to structural integrity and proper performance of the earthwork and drainage. Groundhogs and muskrats thrive on burrowing into the manmade earthwork, which become pathways for seepage. In the event that burrows are detected within the bio-retention area, the rodents should be dealt with by removal. Trash and Debris--Trash acts as a barrier to stormwater infiltration and attracts unwanted pests. The bio-retention area should be kept clear of debris such as loose bottles, cans, food containers and other forms of rubbish. The area should be cleared of debris as needed. MAINTENANCE OF SPILLWAYS AND CONTROL STRUCTURE Inspection of Conduits--Conduits should be inspected thoroughly once a year. Conduits should be visually inspected at the joints. Pipes should be inspected for proper alignment (sagging), elongation and displacement at joints, cracks, leaks, surface wear, loss of protective coating, corrosion and blocking. Problems with conduits most often occur at joints and special attention should be given to them during inspection. Joints should be checked for gaps caused by elongation or settlement and loss of joint filler material. Open joints can permit erosion of the earthwork and possibly the piping of soil Rev 1/2011 2 material through the joints. A depression in the soil surface over the pipe may be signs that soil is being removed from around the pipe. The underdrains should be inspected to ensure that they are functional and allowing the bioretention area to drain. OPERATION Record Keeping--Operation of bio-retention area should include recording of the following: Annual Inspection Reports--A collection of written inspection reports should be kept on record. Inspection by a qualified professional is required annually. Copies should be provided to the Harnett County Stormwater Management Section of the Engineering Department on the approved form. Observations--All observations should be recorded. Maintenance--Written records of maintenance and/or repairs should be recorded. Other Operational Procedures--The owner should maintain a complete and up-to-date set of plans (as-built drawings) and all changes made to the bio-retention area over time should be recorded on the as-builts. Do not pile snow on top of bioretention area. Sedimentation and Dredging--Sedimentation from on-site and off-site soils will eventually result in the clogging of drainage conduits and will have to be removed. The frequency of this sediment removal can be reduced by ensuring that the site areas around the building be stabilized with a vegetative ground cover such that it restrains erosion. Do not drive heavy equipment into the bioretention area. Remove and replace vegetation, sediment, mulch, etc. by hand or have equipment that can reach from edge of bioretention area. Example Maintenance Schedule for Bio-retention Areas Description Method Frequency Time of year SOIL Inspect and repair erosion Visual Monthly All year ORGANIC LAYER Remulch any void area By hand As needed As needed Remove previous mulch By hand Once every Spring layer before applying new 2-3 years layer (optional) Any additional mulch added By hand As needed As needed PLANTS Removal and replacement See planting Twice a year As directed by of all dead and diseased specifications landscaper vegetation considered beyond treatment Treat all diseased trees Mechanical N/A Varies, dependent and shrubs or by hand on insect or disease Rev 1/2011 3 infestation Removal of cattails and By hand or As needed As needed other invasive species through hand application of herbicide Watering of plant material By hand Daily Immediately after shall take place at the end completion of project of each day for fourteen consecutive days and after planting is completed Remove support stakes and By hand As needed As needed wires within 6 months of establishment Detail of Planting Guide for each Bio-Retention Basin BIO-RETENTION INSPECTION CHECKLIST Date: Rev 1/2011 4 Time: BENHEVEN EMERGENCY SERVICES 13 _ Broadway NC Check/Circle Condition Observations Actin — [Action — Action -- Noted Re air Monitor Investig ative U/S Sloe Type: Vegetation/Riprap Rodent burrows Crest Type: Ruts/erosion Cracks/settlement Poor alignment D/S Sloe Type: Vegetation/erosion Rodent burrows Sloughs/slides/cracks Seepage/wetness Pool Type: Ground cover Sedimentation Abutment Type: Vegetation/erosion Slough/slides/cracks Seepage/wetness General Comments, Sketches & Field Measurements Rev 1/2011 5 PERODIC INSPECTION, OPERATION & MAINTENANCE RECORDS BENHEVEN EMERGENCY SERVICES 13 Broadway , NC Date Time Rain Weather General Observations Recorded By Conditions or Comments Date Maintenance Performed Comments Recorded By Date Equipment Operated Comments Recorded By Rev 1/2011 6