Loading...
HomeMy WebLinkAboutNCC233008_Site Plan or Location Map_20231009 IIIIIIIIIII I I I I I I I I I 111111111 I I I I I I I I I I I TENTHS 0 INCHES 1 2 3 4 5 0 7 8 9 10 EIGHTHS 0 AN 10 20 30 40 50 60 70 80 90 100 ?I'll:0mig Celanese STORM WATER NORTH OUTFALL REPAIR SHELBY, NC G ,.,1 { 1,1. •a allinri DRAWING INDEX �` - - _ - ,.,.. . ` _. 4.. �. ,- •s )-•• ;- p i a r 1 4. DRAWING NUMBER DESCRIPTION P • • Y 4•'y�. n l _ N 1 i III . Y: per_ re a 252950-C-DOT COVER SHEET ti� Y •1_x '`'., S - d! 41 252950-C-002 NOTES,ABBREVIATIONS,AND LEGEND - • 't • ZN' 252950-C-005 EXISTING CONDITIONS AND DEMOLITION PLAN I P''. , 1F, _ r- j � • e t •0 t T 252950-C-DID INITIAL SITE,GRADING,AND DRAINAGE PLAN F� t ,,[[''���4II • 252950-C-011 FINISHED SITE,GRADING,AND DRAINAGE PLAN Shelby I v I P} - ,��.^- • -'`/,'' _ i14 .' •`• ' .1Iii-lI F 252950-C-020 INITIAL EROSION AND SEDIMENTATION CONTROL PLAN U Gastonia �wc M1T .A'e�r,; ' 7 SITE LOCATION K� g L BOWEEN RIVER .3 252950-C-021 FINAL EROSION AND SEDIMENTATION CONTROL PLAN fl rI <•: "• �'•� I �'a ountain s, �i,� 252950-C-110 SITE AND GRADING DETAILS SHEET 1 �j- ? r,r (^II► , J.. _ Charlotte . 252950-C-111 SITE AND GRADING DETAILS SHEET 2 - _ 4. •< _ 1.. >r - � 2 252950-C-112 SITE AND GRADING DETAILS SHEET 3 L4 252950-C-120 EROSION AND SEDIMENTATION CONTROL DETAILS SHEET 1 - - AS , \ 252950-C-121 EROSION AND SEDIMENTATION CONTROL DETAILS SHEET 2 • • }"!^: ' 252950-C-122 EROSION AND SEDIMENTATION CONTROL DETAILS SHEET 3 ---• _•. '-- _ _ 9:17 ..a. i•t - - F I':. 0 252950-C-123 EROSION AND SEDIMENTATION CONTROL DETAILS SHEET -•-•- •"_ `- - ... W -T , _ 1� 252950-C-124 EROSION AND SEDIMENTATION CONTROL DETAILS SHEET 5 —Nr" '4 ' ' 2 w '. E acN;stur Matt © f�, ryE • 'f 55 _�c .k, 4"4` E P ne,�ille }-, aaffn.' - , _ e -4tA Fort Mill • ` >e., ,:r I .,,r 4 jYork r , BEILVITI' IIIMMIFIll . iiimriiii,‘, ...--- mi,. •--:',- PROJECT ENTRANCE COORDINATES: 2 VICINITY 0.26 MAP LAT:N :81°31'0.00 LOCUS MAP APPROX I"=0.26 MILES LONG:81°31'50.00"W I APPROX I"=1650' D 1 PROJECT ADJOINING PROPERTY STABILIZATION TIME FRAMES III 2 KEY#: OWNERSHIP ID: SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTIONS 1 1108020 — OWNER: CELANESE PERIMETER DIKES,SWALES,DITCHES,SLOPES 7 DAYS NONE 2 10644001 RAY POWELL PROJECT 3 1306587 2525 BLACKSBURG ROAD HIGH QUALITY WATER(HOW)ZONES 7 DAYS NONE AREAS 3 4 1213758 GOVER,NC 28073 5 1340402 (419)343-0657 •IF SLOPES ARE 10'OR LESS IN LENGTH AND ARE NOT 6 1307094 ray.powell@celanese.com SLOPES STEEPER THAN 3:1 7 DAYS 4 STEEPER THAN 2:1,14 DAYS IS ALLOWED 7 3471001 GROVER INVESTMENTS I LLC CIVIL ENGINEER: WOOD. •7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH AND WITH 8 1240544 MR.BRENT HANLEY,P.E. SLOPES 3:1 TO 4:1 14 DAYS • SLOPES STEEPER THAN 4:1 PARCEL ID:4512 30 PATEWOOD DRIVE,SUITE 200 OWNER ID:1343343 9 1210101 C GREENVILLE,SC 29615 SLOPES FLATTER THAN 4:1 4 DAYS NONE 10 j* 1204151 (864)458-3600 — brent.hanley@woodplc.com TEMPORARY STOCKPILES 14 DAYS NONE 6 12 1192258 — 13 1115444 GEOTECHNICAL: WOOD ENVIRONMENT&INFRASTRUCTURE SOLUTIONS,INC. 14 5267001 MR.CRAIG TREMBLAY,P.E. ALL REQUIRED PERMITTING FOR LAND DISTURBANCE OF THIS SITE SHALL BE IN PLACE PRIOR TO THE START OF ANY CONSTRUCTION 7 2801 YORKMONT ROAD,SUITE 100 ACTIVITIES.PERMITTING AS REQUIRED BY AHJ FOR LAND DISTURBANCE SHALL BE IN HAND PRIOR TO THE START OF CONSTRUCTION.ALL 448 CHARLOTTE,NORTH CAROLINA 28208 PERMIT CONDITIONS SHALL BE ADHERED TO,AND ANY PERMIT CONDITIONS RESULTING IN A MODIFICATION TO AND/OR CONFLICT WITH THELII4 (704)357-8600 CONSTRUCTION DOCUMENTS SHALL BE RESOLVED WITH THE ENGINEER PRIOR TO START OF CONSTRUCTION. 9 IIIwww.woodplc.com re SURVEYOR: ESP ASSOCIATES,INC. 3BRIAN 475LA ELAHERTLVD. PHASED EROSION SCHEDULE 10 3475 K.FLA E BLVD. FORT MILL,SC 29708 (704)583-0949 1 1 www.espassociates.com SUE: ESP ASSOCIATES,INC. WEEK# 1 2 3 4 5 8 9 10 11 12 13 62 63 64 65 66 67 12 NORTH CAROLINA S47S K.FLAHERTY,MONTBLVD. P.S. INITIAL PHASE , ' ' ' • • ' ' / • , ' ' I F LMKEMON2 B08D. 13 �� . FORT)MILL,49 29708 I B (704)583-0949 FINAL PHASE 14 www.espassociates.com CONSTRUCTIONSRFENCE, TOAD STABILIZATIOIN:N. IMANENT VEGETATION. ��� ECLEON SILT FENCE, RIPRAP SLOPE PROTECTION, UCRON ROM SNS.INLET RON,FIBER ROLLS, PERMANENT VCONCRETE. CLEARING GRUBBING, DAMS,TEMPORARY SEEDING,SURFACE TEMPORARY SLOPE DRAINS,INLET PROTECTION,AND AGGREGATE,CONCRETE, TOPSOIL ROUGHENING,EROSION CONTROL OUTFALL PROTECTION AND ASPHALT PAVING STRIPPING/STOCKPIUHG, BLANKET GIS PROPERTY LIMITS I/ ��y,{ DUST CONTROL APPROX i"=7' Know what's below. 24-HOUR EROSION AND SEDIMENTATION CONTROL CONTACT: Call beforeyou dig. MONTEITH (803)554-3418 mitch.monteith@celanese.com TOTAL PROJECT AREA DISTURBANCE: ±4.98 ACRES WORK SAFELY COPYRIGHT 0 2022 UNLESS OTHERWISE AGREED IN AWRITTEN CONTRACTEETTEEN WOOD AND ITS CLIENT,THIS APPROVED FOR CONSTRUCTION DOCUMENT:(0 CONTAINS INFORMATION.DATA AND DESIGN THAT IS CONFIDENTIAL AND MAY NOT THCOPIEoSS PURPOSE URPDISC SE FORWHAND ICHIT BE USED MENDED. ANY THE Y OF,OR RHECCmEXTHIS FOR WOO J• iOCUMENTB ANYTHIEFORWHIIS IT WAS INARTY'S SOLE RISK OF,OR RELIANCE ON,THIS RP CLF CLF Q AMANYTHIRDPARTYISATTHATPPRtt'SSOLEHISH. i. e I a n e s e A — — STAMP/SEAL CLIENT PROJECT MGR DEPARTMENT MGR PROJECT MGR �p``��tCAq�ii,� PROJECT PHASE - 1979 LAKESIDE PARKWAY,SUITE 400,TUCKER,GA30084(770)688.2500 an �•'�.$$IQ CONSTRUCTION y DOING BUSINESS AS AMEC NORTH CAROLINA INC.-NC FIRM LICENSE:FL48G Y• S. PROJECT NO. BY DDMMMYY SUBJECT AREA I Ih 2 18AUG23 IFC,REVISED DRAWING INDEX AND LOCUS MAP ELE BTH BTH JCS E DB4724 } 252950 DES LJW 22JUL22 CIVIL ti Q•J CLIENT DWG NO. 2 1 02JUN23 IFC,REVISED TO ADD PROPERTY LINE MAP0 22SEP22 ISSUED FOR CAC BTH BTH CLF �i B"'• 'OR4E�.l��� DRN WW 22JUL22 PLAN A 12AUG22 ISSUED FOR APPROVAL CONSTRUCTION UW SJS BTH CLF REF NUMBER TITLE '''i,�ti�b•�,:•` SCALE AS NOTED CHK SJS 12SEP22 COVER SHEET DRAWING NO. REV S U REV DDMMMYY REVISION/ISSUE DESCRIPTION DRN I CHK APP APP APP APP REV DDMMMYY REVISION/ISSUE DESCRIPTION DRN CHK APP APP APP APP l REFERENCES APP CLF 22SEP22 252950-C-001 I 2 s 8 I 7 I 6 I 5 I 4 I 3 I 2 I SAVED:16-Au9-25457 PM PLOTTED:.--USER EDMUNDS,EVAN