Loading...
HomeMy WebLinkAboutNCC232958_Site Plan or Location Map (3)_20231004 0- co ui GENERAL NOTES: o A. TOPOGRAPHIC BOUNDARY SURVEY,INCLUDING PROPERTY LINES,LEGAL DESCRIPTION,EXISTING UTILITIES,SITE TOPOGRAPHY WITH SPOT ELEVATIONS,OUTSTANDING PHYSICAL FEATURES AND EXISTING STRUCTURE LOCATIONS WAS PROVIDED BY THE FOLLOWING COMPANY,AS A CONTRACTOR TO THE SELLER/OWNER: r E COASTALCAROLINA SURVEYORS,PLLC PO BOXX2768,WINTERVILLE,NC 28590 (252)702-1427 B. ALL PHASES OF SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED THE OWNER/DEVELOPER SITE WORK SPECIFICATIONS. N Jil C. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF EXISTING STRUCTURES,RELATED UTILITIES,PAVING,UNDERGROUND STORAGE Z 0 TANKS AND ANY OTHER EXISTING IMPROVEMENTS AS NOTED.SEE SITE WORK SPECIFICATIONS. N D. CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS.RUBBISH AND OTHER MATERIALS RESULTING FROM PREVIOUS AND CURRENT DEMOLITION OPERATIONS DISPOSAL WILL BE IN ACCORDANCE WITH ALL LOCAL,STATE AND/OR FEDERAL REGULATIONS GOVERNING SUCH z OPERATIONS. E. THE GENERAL CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR AND SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. F. WARRANTY/DISCLAMFR' THE DESIGNS REPRESENTED IN THESE PLANS ARE IN ACCORDANCE WITH ESTABLISHED PRACTICES OF CIVIL ENGINEERING FOR THE DESIGN FUNCTIONS AND USES INTENDED BY THE OWNER AT THIS TIME.HOWEVER,NEITHER THE ENGINEER NOR ITS PERSONNEL CAN OR DO WARRANT THESE DESIGNS OR PLANS AS CONSTRUCTED EXCEPT IN THE SPECIFIC CASES WHERE THE ENGINEER INSPECTS AND CONTROLS THE PHYSICAL CONSTRUCTION ON A CONTEMPORARY BASIS AT THE SITE. S G. SAFETY NOTICE TO CONTRACTOR; IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES,THE CONTRACTOR SHALL BE z SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE,INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK.THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE UNITED TO NORMAL WORKING HOURS.ANY N CONSTRUCTION INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTORS SAFETY MEASURES,IN,ON OR NEAR THE CONSTRUCTION SITE. N 1. E GENERAL DEMOLITION NOTES: L ''2 A. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF THE EXISTING STRUCTURES,RELATED UTILITIES,PAVING,UNDERGROUND STORAGE 0 <N<i`�M Q TANKS AND ANY OTHER EXISTING IMPROVEMENTS AS NOTES. w m B. CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS,RUBBISH AND OTHER MATERIALS RESULTING FROM PREVIOUS AND CURRENT = 0 z n U DEMOLITION OPERATIONS.DISPOSAL WILL BE IN ACCORDANCE WITH ALL LOCAL,STATE AND/OR FEDERAL REGULATIONS GOVERNING SUCH cn OPERATIONS. ^ <o i<z > o C. THE GENERALTR CONTRACTOR SHALL TAKE ALL .THE ONTR NECESSARY AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING /^ I THE CONSTRUCTION PHASES OF THIS PROJECT.THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. \ z o 0 w o D. ENGINEERS NOTICE TO CONTRACTOR T..........y THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS w 5 IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES,AND WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE FIELD.THE 3 INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY g w AT LEAST 48-HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES.IT SHALL BE THE RESPONSIBIUTY OF Y THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. O N r GENERAL SIONN ANOTESRE TO THE ACE OF CURB UNLESS OTHERWISE NOTED. ®N z B. UNLESS OTHERWISE SHOWN,CALLED OUT OR SPECIFIED HERON OR WITHIN THE SPECIFICATIONS: ALL CURB AND GUTTER SHALL BE v INSTALLED PER NCDOT STANDARD. C. ALL PAVING AND EARTHWORK OPERATIONS SHALL CONFORM TO THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT PREPARED BY ECS ,,`,,,,,,,,,,,,,,i SOUTHEAST,LLP,DATED JANUARY 11,2019. .cFi CA HO , = GENERAL GRADING NOTES: ,e N'... Essid..�4. Nv 5 ./�,it._:.. o A. PRIOR TO INSTALLATION OF STORM OR SANITARY SEWER,THE CONTRACTOR SHALL EXCAVATE,VERIFY,AND CALCULATE ALL CROSSINGS _ 0 0/20 • m 7. AND INFORM THE OWNER AND THE ENGINEER OF ANY CONFLICTS PRIOR TO CONSTRUCTION.THE ENGINEER WILL BE HELD HARMLESS IN THE 95 03/2022 y� EVENT THE ENGINEER IS NOT NOTIFIED OF DESIGN CONFLICTS 0 ys�M�� �,� in E •�. B. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH AND MINIMUM 4"OF TOPSOIL APPLIED.IF ADEQUATE ,��°�YN a a`o TOPSOIL IS NOT AVAILABLE ON SITE,THE CONTRACTOR SHALL PROVIDE TOPSOIL,APPROVED BY THE OWNER,AS NEEDED.THE AREA SHALL M. ,,,,,,, a THEN BE SEEDED,FERTILIZED,MULCHED,WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS(SEE ��•cr��i��ti' E LANDSCAPE PLAN FOR PROPER APPLICATION RATE).ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE cai " PROJECT SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. N 3M M i U R U N N 0 -, -, N z C. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS W 0 O 1 IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES,AND WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE FIELD.THE 0<O O W Cl INFORMATION IS NOT TO BE REUED ON AS BEING EXACT OR COMPLETE.THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY [r N H\ 00 AT LEAST 48-HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. a ro o<0 4 o m r Q N D. UNLESS OTHERWISE SHOWN,CALLED OUT OR SPECIFIED HERON OR WITHIN THE SPECIFICATIONS: ALL STORM DRAIN PIPE BEDDING SHALL BE _ W 3 °a INSTALLED PER NCDOT STANDARDS. Y' E, I E. ALL STORM DRAIN PIPES ARE MEASURED FROM CENTER OF STRUCTURES AND ENDS OF A FLARED END SECTIONS. N N N`a F. CROSS SLOPE SHALL NOT EXCEED 2%WITHIN ADA PARKING SPACE AREA AND ACROSS SIDEWALKS. ['Et' n ` GENERAL UTILITY NOTES: n a A. ALL PRIVATE WATER LINES SHALL BE TYPE 1C'COPPER WITH 24"MIN.COVER.ALL WATER MAIN LINES SHALL BE PVC C900 WITH 3'MIN.COVER. V) o B. ALL SANITARY SEWER UNES SHALL BE SDR-26 PVC WITH 24"MIN.COVER. UJ C. CONTRACTOR SHALL COORDINATE ANY DISRUPTIONS TO EXISTING UTILITY SERVICES WITH ADJACENT PROPERTY OWNERS,THE CITY OF O 'a o WASHINGTON,AND NCDOT. o V D. ALL ELECTRIC,TELEPHONE AND GAS EXTENSIONS INCLUDING SERVICE LINES SHALL BE CONSTRUCTED TO THE APPROPRIATE UTILITY COMPANY Z �I a SPECIFICATIONS.ALL UTILITY DISCONNECTIONS SHALL BE COORDINATED WITH THE DESIGNATED UTILITY COMPANIES. <U" J E. CONSTRUCTION SHALL NOT START ON ANY PUBUC UTILITY SYSTEM UNTIL WRITTEN APPROVAL HAS BEEN RECEIVED BY THE ENGINEER FROM ul Q THE APPROPRIATE GOVERNING AUTHORITY AND CONTRACTOR HAS BEEN NOTIFIED BY THE ENGINEER. ��// j LF. PRIOR TO THE CONSTRUCTION OF OR CONNECTION TO ANY STORM DRAIN,SANITARY SEWER,WATER MAIN OR ANY OF THE DAY UTILITIES.THE LL a CONTRACTOR SHALL EXCAVATE,VERIFY AND CALCULATE ALL POINTS OF CONNECTION AND ALL UTILITY CROSSING AND INFORM KIMLEY-HORN UJ AND THE OWNER/DEVELOPER OF ANY CONFLICT OR REQUIRED DEVIATIONS FROM THE PLAN.NOTIFICATION SHALL BE MADE A MINIMUM OF 48-HOURS PRIOR TO CONSTRUCTION.KIMLEY-HORN AND ITS CLIENTS SHALL BE HELD HARMLESS IN THE EVENT THAT THE CONTRACTOR FAILS E c TO MAKE SUCH NOTIFICATION. W�1 o; 0 0 E Z 0 Z s a LC) 0 O D- LO o s U a.PIt m W H ct O 0 Et 0 p Q H U) Li L.L E K J Q 7,7 W N o Q 0- O J Q z O O H m E SHEET NUMBER a- CA002