Loading...
HomeMy WebLinkAboutNCC232759_Site Plan or Location Map_20231004 - 8� \ Ab RA'LR,AD ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY yS`'y5 CONSTRUCTION SCHEDULE NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 5�5'v - I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control erd � ® E&S d a Certificate of Covers COC be obtained before an land disturbing -\ -- ae \ COMPLETED AS AN EXCEL SPREADSHEET. ( C)permit m Coverage( )must y g activities n R/1�.,7 AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED S' cur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a ±1°.a 7�/-Y EROSION AND I rmits box,and accessible dining inspection. �_ Neil, SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 2. TI . tarveways,was an patos. 4 �gin lose grading of lot areas/ . nal gra s g,m Iching and stabilizing of lot.In most cases this will involve the ivstallatov of sod on Ne lot. \ 1/ e silt force will remain in place until the lot is sodded or grassing is stabilized and rakes hold. (I\ ' \qe� � � 10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures end complete es me following morose self-inspection r sane me DeM R w<naa= SODDING 2:Ap G ��• https:I/files.ne.gov/ncdeq/Emery%20Miveral%e20and%20Land%"20Resources/SlomrwatuMPDE3%e20 \ \ _► -1,-.:;:- General%20P .DEMLR-CBW M 't gF R A gus 82019.pdr.T Twelve months of complete \ SITE1 .( fey )available f p all recommended gybe \ I kept ap b (G5113A 54.1()IPA NCAC 04B.0131 NCGo1P III Sections A dB) �� Tunnml SR-oaoAp :".,,,,\_ 1�. u. s Ir p I a a" I beperformed 1 ery.eamVAC.MO ON O made d days d within 24h f every _ ll ben event of h 1 h.Ay neededTerceira Shall be \ \ M�A���� axms Axm Ta MM xaPscas.4w o3 ■■ ode immd ly to maintain measures as J -g dAII ESC h'llb J"p -r din the eCtiO a 'I h pl rs g b h ect Eed h n J o f gSAY 3 12. Inspecto df 1 Pt I t Wh th P) PI h p h II DEMLR to 316Alp pwve close outN 5&SC PI Afl DEMLR'f raw h p f b p 3 p nrepprt, II cONSTRUC O. /"V �eOTxoMA tneperm car shall visit daq vc.govMCO01'to bmrt av electron N icc of tcrminenon(c NOT).A SI0011111 LIMITS \ _� \�� 61 / INikai " annual general permit fee will be charged until the e-NNOT has been filled out. \ rMnATCHED...I-I.. sp y 4� ,b A RALFO _\ § Pia �� _ o \' Y *frilktW otHlanill \ \ \ Leona ► / 5 \ I DLL"wG uul ' wA RTDAc�er , MDw.....1°�Ds all. 9...:..)W o _ ive Lot Flan wmxTxsarehro^Tic.O AS SOON ASE oo L mnwea it o y vp.�v \ 18 \ --- _ / ) NT APPEARANCE OF GOOD SOD x'o 1 a' g 401 VICINITY MAP ° ; Gt Plan MITSTION I ill "� Ii I^'1III/ N.T.S. \\ 19 II L33 36 / nG„ / l'll V{II Vh aII w x<w DATE: II PAGE: \ \ \ 20 i 4 � / _ f~ a MIN. FENCE \ `-_ ,s. �NLIMITSTIO�I 43 CO LIMITSTION Ns 3 I 40 / + .- 11111111 11111111111111111. . \ \ 21an i 37 own I J \ \ J .� -- --- -- I �ry / DATE: PAGE: TOP of S Q 2 MD T6EA ILT \ BEwASNEDaTGNE 22 audio Lane STEELFsecs10ST �° �� q q p N WIRE FENCE HARDWARE CLOTH FRONT VIEW \ / '~ 1 J 4 a nLTERDF.6 FENCE \au / �23 /4g 50f / / R No R Q ou �xous I I �G House S IAV RDWARE L a 1. J � MEI ` LII � - pY ,� JNOinches. ES: - / / KIOSK ROADWAY -Ro •AV - -Roy Av 1.Hardware cloth and gravel should overlay the silt fence at least 12 \ r 24 I t ♦ \ AREA , Alp LEnGE nF cAee Notes: a'nLTER FAeR1c rR / L^ CURB INLET f O 1.If Tree Protection oleeshould be installed alongthe buffer zone wetland 2.Stone outlets should be placed on low elevation areas of silt fence cq 308 - fencing P and based on field conditions. \/ --- \ --/----- � // boundary and/or around protected trees,providing a radius of at least 1.25 feet for each `\\ MAINTENANCE qa C _- \ LEGErvo inch of bunktliamatar. euav waRE reNCE 00 eURv s•oFUPPEa EDGEOF 1.Per NCG 01 nspect outlet at lest onceaweek and alter eachlinch or 2, \ 2. -- --- 55 / 2.Install Silt Fence on the low elevaton sides of each lot Install Silt Fence outlets shown on NARDwpnE CLOTN FILTER FABRIC IN TRENCH Keep mesh event Complete any adequate flow. immediately. O� Ni. tPlan /�ly4e Bls_T ,�2, Flow DIRECTION E= schematic/diagram agram antl Feld adjusted,if necessary,for placement at low points.if lots are 4.Remove sediment sediment noi stone outlet is covered. inches. CZ �CONS / YiT nal• 56\/ / / / / SILT FENCE ___ contiguous and have different land owners or builders,each lot should have individual Silt 2.Freshen stone when Brea p y accumulation required repairs6 inMes. \ LO \ / Fences. 3 Kee h free of debris to A SILT FENCE OUTLET SECTION VIEW IMITS ON I 4 3.Install required Slit Fence within 10 feet of property line to ensure there Is no conflict with 5.Replace stone as needed to facilitate de-waterinp. LIMITS Lot P n / CONSTRucnoN ENTRANCE septic system.It Is the responsibility of the builder to ensure the Installation Of Sediment ANC-Envir entMl.peg I CURB INLET control measuresdces not impact the septic system and repair area(s). SILT FENCE OUTLET / 26 / 5�� / /1 \ 5.coop,n�lfal;aueewasts.lf�sslettictobelnsalledperlot. \ C NSTRUCTION for managing building material waste shall be at PP LIMBS / y inlets or drainage ditches unless h can be shown that \ 27 / i i 45 / / / \e / / separation cannot be achieved,these areas must be / contained behind Silt Fence. / 6,Inlets downstream of disturbances should be protected;streets should be swept when DATE: PAGE: sediment from the construction activity is present. Silt sock/wmtue Silt sock/wa \ 7 ( / \ -- -� / / ..\NC-Environmen lot.peg ].Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are aowc� Miwowni9III� Row mI 1. IX 1111111F44 .r{Lyy / provided on atltlaional sheets.Erosion and sediment control details are not drawn to stele. vM 2.Ilnhn._ n.0Il ago.erosive veto,es may he substiMed I 1 p / / OI+' EccErTivE D^TE h+�s2/2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER n I II::II. pest_ 28 j/Q� / 12 m'n'I 2 2' 2 M ' ' 3to...red length such that logs do not instal, / __.-- Stakes Stakes - k/Wattleand a minimum())aof10 parallel I \ / \ / Lot Plan / DATE: PAGE: SECTION SECTION eetbeyond the. of I\ \ \ / /_�an - - f� SOCItfwemeldmouslPat areas should beland a be tru�rree.s of a stlgnryetlpslanem 1 \ \ / \ \/ 'Zo fro goinga endreen offssilt I \ yA 29 CONSTRUCTION) �j / / °, enter.. wwatuelst. \ / LIMITS iil l)l 4. Oak or ober durable hardwood stakes with a 2 GROUND STABILIZATION \ •' Trench in the silt socktwamles paces m a 4 inch SITE AREA STABILIZATION I / / \ Oda /��y�y�:�� EXCEPTIONS / Q' o 1/2 Mulch or o g grouse a Mn 6 I DESCRIPTION TIME FRAME g \ .. / 0., �.� 4^`"°'wra uSTRENCNED NSTArr0T ON ,o,„,. ) PERIMETER DIKES, 7 DAYS NONEle.when ' Pc runoffSWALES,DITCHES / \ \ \SoWtretde to hold It in \ Q/'• 810204.4.4.40404020, '°'+ ISOMETRIC Vlace MAINTENANCE:IEW &SLOPES 1 pen" N after HIGH QUALITY 7 DAYS NONE I Remove ( \ x 1 1 Z 1'1 1 T • COMPOST SOCK MML FLOW WESreater WATER ZONES I / \ • _ .. ••1 1 1 I I I I I 1 1 ..ntrenreed6o<ka retaTo 7.4 m:r 2rN roc",)r:.m"tor)WO. .'7 :. ache n N ea (HOW) \ \ /Mulch or Compost .,,,,../.. 6 Mn i i =i� . ° D SLOPES STEEPER 7 DAYS IF SLOPES ARE �, e. . sheen Way coat sock/ r^^�^mr�x1 cr�Trm)(roarm) rFoom hr s THAN 3:1 10'OR LESS IN III' I \ / -y'y"� .7'tterE, „ ) < m) 4. LENGTH AND ARE \ �'i"" f.`D�a"T�`,req�a`ni� g]jn (miffgtjTt gm/ft gmift s. _ rin�apan NOT STEEPER s(s Tin n (:t (a m been -area- e THAN 2:1, 14 SO IIinv..) I//m) I/mien) I/mien) 1/mien) measure . geranemb NM.a. DAYS ARE construction: Maintenance: SILTSOCK/WATTLEFORPERIMETERANDINLETPROTECTION ALLOWEDj/ aearmeemraneandexlareamallyegetaumn,rmmce,andmhermbjeamname PerrvcG-o,Inape aueaatpnpeaweekanaatereaphlmphgrL_- SLOPES 3:1 OR 14 DAYS 7 DAYS FOR O materialandpropeaygradet. greater mmfal¢makeany regmretlrepairs immetliatety. FLATTER SLOPES GREATER2.PIace[he gravel to the specihe gretleand dimensionsshown on the plans,end 2.Maintainthe gravel padin acontliti0nmprevent mutlorsetlimentooth it. from leaving the construction site.This may require periodic THAN 50 N � \ I \ 3.Provide drelnege to tarty water to a sediment trap or other sukable outlet. toptlressing with 2 inch stone. LENGTH 1 1 \ 4.Use geotea1ile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or ALL OTHER AREAS 14 DAYS NONE(EXCEPT • �n 6 ( subject to seepage or high water table. tracked onto publicncedways. WITH SLOPES FOR PERIMETERS N II" DATE:, ° n Ma.E.aa,t1.gtl,arel<kntl,retwlr.�nre wr =Fm< Filter Fabric en„Ace FLATTER THAN a;1 AND HOW ZONES) ��T^SS �A CONSTRUCTION ENTRANCE/EXIT I4 nett, a FanmeMr= eaekrlo troy 1 Steel Post tnorougMyacl p pe I ' 1 f PAGE1of2 Plastic or ST General Erosion Control Notes TOTAL DISTURBED ACREAGE: 1.68 ACRES ,6 4• �1a core tes s • •min 1.Only the areas shown shall be disturbed. c� I 24. z. All disturbed areas shall be grassed and LOT EROSION CONTROL PLAN f Wa w mulched i anent coverpis3elslablished:maintained - \/ LOTS 5, 6, 10, 21, 25, 28, 33 & 46 X;(\� �amg�ete'nro are Construction: harder Flter Fabn< / I -� GATES FARM Construct re�hnreast� hsymhet filter CROSS - Enearewatt heigMaf�e.ealm.mfen<ea�anmt.x Higmrfineea _ coral impound °i.Tramacconnti ousrollc`utothelaneih'Offath`na'Mertoaewal nte.Whenjointsare / �- FOR S.necesse wire ary.securely frt to asten filter of hremesFbtenNaeurel `Uea .side.,the or..Rgin, Maintenance: MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FURR CONSTRUCTION afte of the Nnce post.wire a plastic:lp eesrshould nave a minim reinforcement,O oe ( ile wensN.fabric on °p oPe 1. Ho,°rame�errainfee.M m elately. sear s.Posre a maximum...0.Part.Support....be amen ,teasdecompose, ...COIF mom.ground aam Me. of 24General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per weak minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be 6.Ewe strength flter...with 6 foot post spacing aces not require a wire mesh support fence.Securely AND DEVELOPMENT, INC. ferrabn=air y posts wre plastic p ties should have a minimum m poundtmaiM Remove r6.n relmanaereacre provide adequate o�ginm relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. ea M1en m nd,..colas am a�nrnaa see aloe me proposed bee of pen and ere to evaa Drwermining the tens agog Gravel Construction Entrance-The gravel pad should remain in a condition to prevent in dor sediment from leaving the construction site.This may require periodic toptlressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all 7.undone eq"m°eeeepr�. p g P p p objectionable materials spilled,washed,or tracked onto public roadways. RAEFORD TOWNSHIP HOKE COUNTY Remove to ng grad land Stab can sediment ors cOnr con g Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure roe filter fabric and compact.Tn u9< os mofine baakfiiva orange area hoe been properly stabill:m. that the removed sediment does not wash back against thefence,Adequate storage volume should be provided for behind the fence at tall times,Take care to not undermine the fence during cleanout operations. SCALE:�" ADO' JULY 2023 Icon nalana<h finer fawlcroexce5ngC8.Place 12 inc.Of fade along the og end Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE <nerelmautfena peMom�an and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. log o 5o i W 200 400 ..\NC-Envir omen tel.fpeg Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be SILT FENCE repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE ltF-0106 LUST SAVED:]/19/2023 7:15 AM LAST PLOTTED:]/19/2023 7:43 AM PLOTTED BY.Dennis Gilbert FILENAME:G:\STAFF\DENNIS\BENNIS WORK PILES\PROJECTS\EC NEW PROJECT\GATES FARM EC\GATES FARM EC-LOTS S.6.10.21.25.26,33,460W0