HomeMy WebLinkAboutSW5120201_Inspection Reports_20181211!* '4
Compliance Inspection Report
Permit: SW5100901 Effective:10/18110 Expiration:
Project: The Oaks at Hunter Hill - Phase II
Owner: . Mullen & Company Inc
County: Nash Adress: 5495 Hunter Hill Rd
Region: Raleigh
Contact Person: Charles Mullen
Directions to Project:
City/StatelZip: Rocky Mount NC 27804
Title: Owner Phone: 252-443-0300
Type of Project: State Stormwater - Low Density
Drain Areas: 001 - (Stony Creek (Buddies Millpond)) (03-03-02) ( C:NSW)
On -Site Representative(s):
Related Permits:
Inspection Date: 12/04/2018 Entry Time: 12:45PM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: 0 Compliant ❑ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Exit Time: 01:35PM
Phone:
Inspection Type: Compliance Evaluation
page: 'I
Permit: SW510CS01 Owner- Project: Mullen & Company Inc
Inspection Date: 12/0412018 Inspection Type Compliance Evaluation
Inspection Summary:
The ditches are well vegetated
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: OK
Built upon Area
Is the site BUA constructed as per the permit and approval plans?
Is the drainage area as per the permit and approved plans?
Is the BUA (as permitted) graded such that the runoff drains to the system?
Comment: OK
SWReasures
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment: OK
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Are the SW BMP inspection and maintenance records complete and available for review or provided to
DWQ upon request?
Comment: OK
Other Permit Conditions
Is the site compliant with other conditions of the permit?
Comment: OK
Other WQ Issues
1s the site compliant with other water quality issues as noted during the inspection?
Comment: OK
Reason for Visit: Routine
Yes No NA NE
❑ ❑ ❑
Yes No NA NE
■ ❑❑❑
❑ ❑ ❑
■ ❑❑❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑❑❑
Yes No NA NE
■ ❑❑❑
■ ❑❑❑
Yes No NA NE
■ ❑❑❑
Yes No NA NE
■❑❑❑
page: 2
Compliance Inspection Report
Permit: SW5120802 Effective:11109/12 Expiration: 11/09/20
Project: Infrastructure Technology Services
Owner: Infrastructure Technology Services
County: Franklin Adress: 360 Wolfpack Land
Region: Raleigh
City/State/Zip: Youngsville NC 27596
Contact Person: Danny L Howell Title: Phone: 919-851-4426
Directions to Project:
east from intersection US Hwy 11NC Hwy 96 & left on AG Dr - Left on Wolfpack Lane - parcel on north side
Type of Project: State Stormwater - HD - Detent"son Pond
Drain Areas: 001 - (Brandy Creek) (03-03-01) ( B;NSW)
On -Site Representative(s):
Related Permits:
Inspection Date: 12/11/2018 Entry Time: 10:25AM Exit Time: 11:05AM
Primary Inspector: ThaddeusVtl Valentine
Secondary Inspector(s):
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: State Stormwater
Facility Status: M Compliant ❑ Not Compliant
Question Areas:
M State Stormwater
(See attachment summary)
page: 1
Permit: SW5120802 Owner- Project: Infrastructure Technology Services
Inspection Date: 12/1112018 inspection Type Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The cell is well vegetated and looks good
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: OK
Built Upon Area
Is the site BUA constructed as per the permit and approval plans?
Is the drainage area as per the permit and approved plans?
Is the BUA (as permitted) graded such that the runoff drains to the system?
Comment: Looks Good
SW Measures
Are the SW measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment: Looks Good
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Are the SW BMP inspection and maintenance records complete and available for review or provided to
DWQ upon request?
Comment: Appear to be maintained and in order
Other Permit Conditions
Is the site compliant with other conditions of the permit?
Comment: yes
Other WO Issues
Is the site compliant with other water quality issues as noted during the inspection?
Comment: yes
Yes No NA NE
■❑❑❑
■ ❑❑❑
E ❑ ❑ ❑
❑ ❑ ❑
Yes No NA NE
■ ❑❑❑
❑ ❑ ❑
❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑❑❑
Yes No NA NE
■ ❑❑❑
■ ❑❑❑
Yes No NA NE
❑ ❑ ❑
Yes No NA NE
❑ ❑ ❑
page: 2
Compliance Inspection Report
Permit: SW5120201 Effective:02113/12 Expiration: 02/12/20
Project: Dollar General Spring Hope
Owner: Glandon Forest Equity LLC
County: Nash Adress: Nash St
Region: Raleigh
City/State/Zip: Spring Hope NC 27882
Contact Person: George T Barnes Title:
Directions to Project:
intersection of E Nash St & Louisburg Rd
Type of Project: State Stormwater- HD - Bioretention
Drain Areas: 001 - (Sapony Creek) (03-03-02 } ( C,NSW)
On -Site Representative(s):
Related Permits:
Inspection Date: M2412018 Entry Time: 11:50AM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ® Compliant ❑ Not Compliant
Question Areas:
M State Stormwater
(See attachment summary)
Phone: 919-459-2600
Exit Time: 12:30PM
Phone:
Inspection Type: Compliance Evaluation
page: 1
Permit: SW5120201 Owner- Project: Glandon Forest Equity LLC
Inspection Date: 1012412018 Inspection Type Compliance Evaluation Reason for Visit:
Routine
Inspection Summary:
The project and the stormwater measures have been installed and mainatined in accordance with the permit
File Review
Yes
No NA NE
is the permit active?
®
❑ ❑ ❑
Signed copy of the Engineer's certification is in the file?
❑
®❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the fiie?
❑
®❑ ❑
Copy of the recorded deed restrictions is in the file?
❑
®❑ ❑
Comment: Project was complete and stormwater measures have been installed
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑
Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑
Comment: Compliant
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? ® ❑ ❑ ❑
Are the inlets located per the approved plans? ® ❑ ❑ ❑
Are the outlet structures located per the approved plans? ® ❑ ❑ ❑
Comment: Compliant
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑
DWQ upon request?
Comment: compliant
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? ® ❑ ❑ ❑
Comment: Compliant
Other WO Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? M ❑ ❑ ❑
Comment: No problems
page. 2