Loading...
HomeMy WebLinkAboutSW6130201_Demolition Plan_20130222coREE SURVEY OEMOL/T/ON NOTES ? occ /I ' W W O r ■ g! ( .' - I , \ 1. TABLE INDICATES TREES 6" IN DIAMETER OR GREATER W Z � 0 Z = W W / ■ `s ^/ +.:; 4 I I 2. SHADING IN TABLE INDICATES A TREE TO BE REMOVED. 1• CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES = OO Q W W z ^ m W • e� IL N, all cuqrn a/ TO BE INSTALLED PRIOR TO DEMOLITION / / — / `✓/ \ WORK. SEE SHEET C6.1 FOR PHASE 1 EROSION CONTROL MEASURES. WL& AA TMTaM" Pobts DSBWW r 58M 12'DNPINE um 7MAppe 5004 15•DIAP■ff Gm 15'DIAPNE 5405 PDIA POE 5807 2YDNPINE .,........,�.....� It v u1— - - v NONU.B-S-C-R-I.B.E.R..S•-NE-E-D.T.O_ B_E_C.O.N_T_AC_E.D.DR.ECTLY... TA m Q Q 0 Z � CC UJ 2. CONTRACTOR TO REMOVE ALL EXISTING PAVEMENT, CURB & GUTTER, SIDEWALK, O T% I.-Q LL Q Z LL SIGNAGE, & ANY OTHER EXISTING STRUCTURES NOTED ON PLANS. THE CONTRACTOR Z O Q Q O Q Z Z Oa TO HAUL OFF & DISPOSE OF ALL DEBRIS AT AN APPROVED, LEGAL OFFSITE LOCATION. Q } Z Z W Z O Q = 3. THE CONTRACTOR 18 TO PROTECT ALL ADJACENT CURBS, WALKS, BUILDING WALLS, 2. 2 - U fr W C3 0 UTILITY POLES, CONTRACTOR SHALL BE RESPONSIBLE FOR REPLIGHTING, & OTHER AIR AND/OFROM R PAYMENT OF ANY fn a GE. THE GENERAL a Lu W Z 0 O 0 Z DAMAGED ITEMS TO REMAIN. ALSO, ALL DAMAGE MADE TO EXISTING UTILITIES BY THE = O Z Q O J W O im GENERAL CONTRACTOR SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL F- 73 m 0 CONTRACTOR TO REPAIR OR REPLACE THE DAMAGED UTILITIES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COST ASSOCIATED WITH THE REMOVAL OR RELOCATION OF UTILITY POLES OR SITE LIGHTING POLES WITHIN THE 0- W � x O G. LIMITS OF CONSTRUCTION. w In I --a 5. ALL PAVEMENT & CONCRETE TO REMAIN TO HAVE SAW CUT PERIMETER EDGES FOR O ¢ H co n CLEAN EDGES DURING PATCHING & REINSTALLATION OF NEW PAVEMENT. PROTECT - pe' > 0 N co ALL PAVEMENT & PAVEMENT THE CONCRETE WILL BE REPAIRED BY CONTRACTOR AT 140 COST TO THE OWNER. 0 Z S. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES & Q m 0 FW-. I� ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING F- O a coNSTRucnoN. O 7. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE N.C. DEPT. OF TRANSPORTATION AND/OR HOKE COUNTY m SPECIFICATIONS, WHICHEVER IS MORE STRINGENT. m LLB M 0 0 8. ALL DEMOLITION TO ADHERE TO ALL LOCAL & STATE STANDARDS. LU f j. �`r/ / i ,�"d5� OEMOL/T/ON LEGENO 9.. ALL PLUMBING INSTALLATION & ABANDONMENT TO MEET ALL LOCAL & STATE PLUMBING Q / ///% �\ \ \ \\ \ \ \\\h�\ \ / ' �v CODES. -i 10. CAP OR ABANDON ALL EXISTING UTILITY LINES PER LOCAL & STATE PLUMBING & EXISTING INFRASTRUCTURE TO BE REMOVED ELECTRICALCODES. p / / / / / G j / \ \ \ a®' • \\ \ �� \ \ 11. THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS WHICH ARE TO REMAIN FROM DAMAGE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AND/OR PAYMENT EXISTING POWER LINES TO BE RELOCATED/REMOVED FOR ANY DAMAGED ITEMS WHICH WERE INTENDED TO REMAIN. ALSO, ALL DAMAGE \► i \ \ MADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THE SOLE V ,- / � W \ \ ` \ \ \ \ \ �`' \ gl1\ RRESSPPONSIBILITY OF THE CONTRACTOR WHO DAMAGED THE WORK TO REPAIR OR Z W cm 00 i /i <\ \ \ \ \• EXISTING MISC. UTILITIES TO BE REMOVED � Z / � \ l/ � \ \ p \ \ \4t\ \ \ .c9- - 12. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH THE EROSION � TO BE RELOCATED. \ ' , �L- \ \ \\ \ \on '�`.e \ \ PgpP6>�e CONTROL PLAN. z W W La COORDINATE WITH PROGRESS ENERGY CO. \ //jj y \ \ \ l \y� \ \ ��� I& THERE MAY BE OTHER UNDERGROUND UTILITIES NOT FOUND. TAKE NECESSARY to Q W V W Z al to )( PRECAUTIONS DURING EXCAVATION. NOTIFY ARCHITECT OR ENGINEER OF ANYTHING LL ZZa t FOUND THAT 16 NOT ON PLANS. r O Z J O r- '\. EXISTING TREE TO BE REMOVED 10 m — a m - / i cP° \ \ \ \ \ 14. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES, USING FLAG MEN, ETC.; A8 Z (n z LL c 'R EXISTING WELL \ \ `'f'y �\ \ 'd NECESSARY, TO INSURE THE PUBLICS SAFETY. > TO BE PLUGGED AND ABANDONED PER \ \ `` N 15. SHORING WILL BE IN ACCORDANCE TO OSHA TRENCHING STANDARDS PART 1926 STATE AND LOCAL STANDARDS. \ \ \ \ �\ —LDc— - PROPOSED LIMITS OF CONSTRUCTION SUBPART P. OR AS AMENDED. •p € u. CONTACT: \ \\ \ \\\\ Or NCDENR AQUIFER PROTECTION SECTION / TO STAY IN PLACE UNTIL NEW CULVERT IS FAYETTEVILLE REGIONAL OFFICE ��C J �. �, INSTALLED. SEE SHEET C5.1 FOR STORM � � \ / \ \ • / 1 ( \ \ \ \ 225 GREEN STREET, SUITE 714 \ a°� � 1 � — — v DRAINAGE PLAN.� FAYETTEVILLE, NC 28301-5043 \ \ \\ \ \ \ \ ��. �j (910) 433-3300 ///�� ✓ j /_ o 9 \\ \ \ \ \ C TO BE REMOVED FROM SITE. \ \ I \ \ \ TOBEDEMOLISHED&REMOVED. x/ \\ \ \� \\ \ \PRkWED ON41TE WASTEWATER AR AFTER DEMO WORK IS COMPLETE IN THIS AREA INSTALL SAFETY ORANGE CONSTRUCTION FENCING AS SHOWN. / \ \ \ \ LIMIT USE OF HEAVY EQUIPMENT IN THIS AREA TO PREVENT A \ \ 7 ° \ \ \ \ COMPACTION OF EXISTING SOILS \ 75 — — \�`\� tom/ / / \\ C\ / \ \\\+1,258 MAIM \\ \\ COORDINATE CLOSELY WITH UTILITY COMPANIES TO AVOID DISRUPTION OF SERVICE. CONTACTS LISTED ON COVER SHEET NOTE: COORDINATE DEMOLITION WITH EROSION CONTROL INSPECTOR NOTE: CONTRACTOR RESPONSIBLE FOR OBTAINING DEMOLITION PERMIT(S) 49 1 ! \ / / / Ij / / j / 1 / + \ x \ TO BE DEMOLISHED & REMOVED. \\x0 7 i N,� l ! \ \\ \\\ I \ 745 16. ALL DEMOUTION HAUL OFF TO BE DISPOSED OF IN AN APPROPRIATE MANNER TO AN APPROVED LEGAL LANDFILL & PER ALL LOCAL & STATE CODES. LLC IMPORTANT NOTES • DEMOLITION OF EXISTING UTILITIES SHALL BE COORDINATED WITH Seel ..... GRADING & INSTALLATION OF RELOCATED UTILITIES. q_N,.! CARO-''. • CONTRACTOR TO COORDINATE WITH LOCAL UTILITY COMPANIES FOR �• pe'.rpFESS% 'W �.zp p'��y•�•. DEMOLITION & RELOCATION OF UTILITIES AS SHOWN IN THESE Ty}7 9 PLANS. jQ SEAL rS 5 S 12557 • CONTRACTOR TO INSTALL ALL EROSION CONTROL MEASURES PRIOR TO BEGINNING RELOCATION AND DEMOLITION. •• !T •:'2�1 �•.�••� uo 4 •40 NOTES TO CONTRACTOR �� • CONTRACTOR TO USE EXTREME CAUTION AROUND EXISTING FACILITIES. • ALL DRIVEWAYS DRIVE AISLES PARKING SPACES FIRE LANES & �/ J TRAFFIC PATTERNS MUST BE MAINTAINED. THEY WILL BE HEAVILY 0 USED THROUGHOUT CONSTRUCTION. U. • NO PARKING AVAILABLE FOR CONSTRUCTION WORKER'S VEHICLES , Q IN ADJACENT PARKING LOTS. ALL PERSONAL VEHICLES MUST BE z PARKED ON SITE. ALL CONSTRUCTION VEHICLES MUST REMAIN 0 J WITHIN CONSTRUCTION AREA. (' O • MULTIPLE UNDERGROUND AND ABOVE -GROUND UTILITIES ARE I Q Z PRESENT THROUGHOUT THE SITE, CONTRACTOR TO CONTACT ALL = V O UTILITIES PRIOR TO BEGINNING CONSTRUCTION. AN ON -SITE V = MEETING WITH EACH INDIVIDUAL UTILITY COMPANY IS HIGHLY j I- _ z ENCOURAGED. CONTRACTOR TO USE EXTREME CAUTION TO AVOID T DISRUPTION OF SERVICE FROM ADJACENT BUSINESSES AND i = Z J Q RESIDENCES. ( , C.)O �I • CONTRACTOR TO ENSURE RUN-OFF IS NOT TO ENTER ADJACENT /vim W H 2 (L PROPERTIES, STREETS, DRIVE AISLES, PARKING LOTS OR Y Z DRIVEWAYS. SHOULD RUN-OFF OCCUR, THE CONTRACTOR MUST W it 5 Q O W CLEAN THE AFFECTED AREA IMMEDIATELY. - d U �Zw Y ^Q^ _ r d cl) 12-D /6/ 302 3 '2i3 CTB Engineer UB Drawn By 1 /30/13 Date Revisions ORAWIN& /NPORMAT/ON TRUE NORTH I .� I W 811 Before roue►0 GRAPHIC SCALE PLAN NORTH 487-038 c3 Sheet 3 of 14